-
1
-
-
33748299537
-
Bi-objective resource-constrained project scheduling with robustness and makespan criteria
-
Abbasi B., Shadrokh S., and Arkat J. Bi-objective resource-constrained project scheduling with robustness and makespan criteria. Applied Mathematics and Computation 180 1 (2006) 146-152
-
(2006)
Applied Mathematics and Computation
, vol.180
, Issue.1
, pp. 146-152
-
-
Abbasi, B.1
Shadrokh, S.2
Arkat, J.3
-
2
-
-
0035742360
-
Project scheduling under time dependent costs - A branch and bound algorithm
-
Achuthan N., and Hardjawidjaja A. Project scheduling under time dependent costs - A branch and bound algorithm. Annals of Operations Research 108 1-4 (2001) 55-74
-
(2001)
Annals of Operations Research
, vol.108
, Issue.1-4
, pp. 55-74
-
-
Achuthan, N.1
Hardjawidjaja, A.2
-
4
-
-
13444270579
-
Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
-
Akkan C., Drexl A., and Kimms A. Network decomposition-based benchmark results for the discrete time-cost tradeoff problem. European Journal of Operational Research 165 (2005) 339-358
-
(2005)
European Journal of Operational Research
, vol.165
, pp. 339-358
-
-
Akkan, C.1
Drexl, A.2
Kimms, A.3
-
6
-
-
0038209741
-
Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
-
Alcaraz J., Maroto C., and Ruiz R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society 54 (2003) 614-626
-
(2003)
Journal of the Operational Research Society
, vol.54
, pp. 614-626
-
-
Alcaraz, J.1
Maroto, C.2
Ruiz, R.3
-
7
-
-
32544433600
-
A scatter search algorithm for project scheduling under partially renewable resources
-
Alvarez-Valdes R., Crespo E., Tamarit J.M., and Villa F. A scatter search algorithm for project scheduling under partially renewable resources. Journal of Heuristics 12 1-2 (2006) 95-113
-
(2006)
Journal of Heuristics
, vol.12
, Issue.1-2
, pp. 95-113
-
-
Alvarez-Valdes, R.1
Crespo, E.2
Tamarit, J.M.3
Villa, F.4
-
8
-
-
40849118104
-
GRASP and path relinking for project scheduling under partially renewable resources
-
Alvarez-Valdes R., Crespo E., Tamarit J.M., and Villa F. GRASP and path relinking for project scheduling under partially renewable resources. European Journal of Operational Research 189 3 (2008) 1153-1170
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1153-1170
-
-
Alvarez-Valdes, R.1
Crespo, E.2
Tamarit, J.M.3
Villa, F.4
-
9
-
-
38049013796
-
A genetic algorithm for the resource renting problem with minimum and maximum time lags
-
Ballestín F. A genetic algorithm for the resource renting problem with minimum and maximum time lags. Lecture Notes in Computer Science 4446 (2007) 25-35
-
(2007)
Lecture Notes in Computer Science
, vol.4446
, pp. 25-35
-
-
Ballestín, F.1
-
10
-
-
77953872977
-
-
F. Ballestín, V. Valls, S. Quintanilla, Due dates and RCPSP, in: Józefowska, J. Wȩglarz [95], pp. 131-163.
-
F. Ballestín, V. Valls, S. Quintanilla, Due dates and RCPSP, in: Józefowska, J. Wȩglarz [95], pp. 131-163.
-
-
-
-
13
-
-
0033479482
-
Satisfiability tests and time-bound adjustments for cumulative scheduling problems
-
Baptiste P., Pape C.L., and Nuijten W. Satisfiability tests and time-bound adjustments for cumulative scheduling problems. Annals of Operations Research 92 (1999) 305333
-
(1999)
Annals of Operations Research
, vol.92
, pp. 305333
-
-
Baptiste, P.1
Pape, C.L.2
Nuijten, W.3
-
17
-
-
0029309888
-
Resource-constrained scheduling of hierarchically structured design activity networks
-
Belhe U., and Kusiak A. Resource-constrained scheduling of hierarchically structured design activity networks. IEEE Transactions on Engineering Management 52 (1995) 150-158
-
(1995)
IEEE Transactions on Engineering Management
, vol.52
, pp. 150-158
-
-
Belhe, U.1
Kusiak, A.2
-
18
-
-
33645986632
-
Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills
-
Bellenguez O., and Néron E. Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills. Lecture Notes in Computer Science 3616 (2005) 229-243
-
(2005)
Lecture Notes in Computer Science
, vol.3616
, pp. 229-243
-
-
Bellenguez, O.1
Néron, E.2
-
20
-
-
77953870407
-
Solving a preemptive project scheduling problem with coloring techniques
-
L. Bianco, M. Caramia, P. DellÓlmo, Solving a preemptive project scheduling problem with coloring techniques, in Wȩglarz [193], pp. 135-146.
-
Wȩglarz
, vol.193
, pp. 135-146
-
-
Bianco, L.1
Caramia, M.2
DellÓlmo, P.3
-
22
-
-
51849167828
-
-
Springer, Berlin, Germany
-
Blazewicz J., Ecker K., Pesch E., Schmidt G., and Weglarz J. Handbook on Scheduling (2007), Springer, Berlin, Germany
-
(2007)
Handbook on Scheduling
-
-
Blazewicz, J.1
Ecker, K.2
Pesch, E.3
Schmidt, G.4
Weglarz, J.5
-
23
-
-
47849113328
-
A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem
-
Bomsdorf F., and Derigs U. A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem. OR Spectrum 30 4 (2008) 751-772
-
(2008)
OR Spectrum
, vol.30
, Issue.4
, pp. 751-772
-
-
Bomsdorf, F.1
Derigs, U.2
-
24
-
-
18144452822
-
Project scheduling under partially renewable resource constraints
-
Böttcher J., Drexl A., Kolisch R., and Salewski F. Project scheduling under partially renewable resource constraints. Management Science 45 (1999) 543-559
-
(1999)
Management Science
, vol.45
, pp. 543-559
-
-
Böttcher, J.1
Drexl, A.2
Kolisch, R.3
Salewski, F.4
-
25
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
-
Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 2 (2003) 268-281
-
(2003)
European Journal of Operational Research
, vol.149
, Issue.2
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
26
-
-
0141682348
-
Two approaches to the problem of sharing delay costs in joint projects
-
Brânzei R., Ferrari G., Fragnelli V., and Tijs S. Two approaches to the problem of sharing delay costs in joint projects. Annals of Operations Research 109 1-4 (2002) 359-374
-
(2002)
Annals of Operations Research
, vol.109
, Issue.1-4
, pp. 359-374
-
-
Brânzei, R.1
Ferrari, G.2
Fragnelli, V.3
Tijs, S.4
-
27
-
-
77953871708
-
-
T.R. Browning, A.A. Yassine, Resource-constrained Multi-project Scheduling: Priority Rule Performance Revisited, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2006.
-
T.R. Browning, A.A. Yassine, Resource-constrained Multi-project Scheduling: Priority Rule Performance Revisited, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2006.
-
-
-
-
28
-
-
77953872469
-
-
T.R. Browning, A.A. Yassine, A Random Generator of Resource-constrained Multi-project Scheduling Problems, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2007.
-
T.R. Browning, A.A. Yassine, A Random Generator of Resource-constrained Multi-project Scheduling Problems, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2007.
-
-
-
-
29
-
-
84867925682
-
Scheduling and constraint propagation
-
Brucker P. Scheduling and constraint propagation. Discrete Applied Mathematics 123 1-3 (2002) 227-256
-
(2002)
Discrete Applied Mathematics
, vol.123
, Issue.1-3
, pp. 227-256
-
-
Brucker, P.1
-
30
-
-
0038527516
-
Resource-constrained project scheduling and timetabling
-
Brucker P., and Knust S. Resource-constrained project scheduling and timetabling. Lecture Notes in Computer Science 2079 (2001) 277-293
-
(2001)
Lecture Notes in Computer Science
, vol.2079
, pp. 277-293
-
-
Brucker, P.1
Knust, S.2
-
31
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker P., Drexl A., Möhring R., Neumann K., and Pesch E. Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research 112 (1999) 3-41
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
32
-
-
33749155193
-
Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
-
Buddhakulsomsiria J., and Kim D.S. Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research 175 (2006) 279-295
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 279-295
-
-
Buddhakulsomsiria, J.1
Kim, D.S.2
-
33
-
-
33750989916
-
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
-
Buddhakulsomsiria J., and Kim D.S. Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research 178 (2007) 374-390
-
(2007)
European Journal of Operational Research
, vol.178
, pp. 374-390
-
-
Buddhakulsomsiria, J.1
Kim, D.S.2
-
34
-
-
0036273802
-
Planning and re-planning in project and production scheduling
-
Calhoun K.M., Deckro R.F., Moore J.T., Chrissis J.W., and Hove J.C.V. Planning and re-planning in project and production scheduling. Omega - The international Journal of Management Science 30 3 (2002) 155-170
-
(2002)
Omega - The international Journal of Management Science
, vol.30
, Issue.3
, pp. 155-170
-
-
Calhoun, K.M.1
Deckro, R.F.2
Moore, J.T.3
Chrissis, J.W.4
Hove, J.C.V.5
-
35
-
-
0345821708
-
Scheduling projects with labor constraints
-
Cavalcante C.C.B., de Souza C.C., Savelsbergh M.W.P., Wang Y., and Wolsey L.A. Scheduling projects with labor constraints. Discrete Applied Mathematics 112 1-3 (2001) 27-52
-
(2001)
Discrete Applied Mathematics
, vol.112
, Issue.1-3
, pp. 27-52
-
-
Cavalcante, C.C.B.1
de Souza, C.C.2
Savelsbergh, M.W.P.3
Wang, Y.4
Wolsey, L.A.5
-
36
-
-
0036182335
-
A constraint-based method for project scheduling with time windows
-
Cesta A., Oddi A., and Smith S.F. A constraint-based method for project scheduling with time windows. Journal of Heuristics 8 1 (2002) 109-136
-
(2002)
Journal of Heuristics
, vol.8
, Issue.1
, pp. 109-136
-
-
Cesta, A.1
Oddi, A.2
Smith, S.F.3
-
38
-
-
52049102073
-
Project selection, scheduling and resource allocation with time dependent returns
-
Chen J., and Askin R.G. Project selection, scheduling and resource allocation with time dependent returns. European Journal of Operational Research 193 1 (2009) 23-34
-
(2009)
European Journal of Operational Research
, vol.193
, Issue.1
, pp. 23-34
-
-
Chen, J.1
Askin, R.G.2
-
39
-
-
0028766752
-
A 0-1 goal programming model for scheduling multiple maintenance projects at a copper mine
-
Chen V.Y.X. A 0-1 goal programming model for scheduling multiple maintenance projects at a copper mine. European Journal of Operational Research 76 1 (1994) 176-191
-
(1994)
European Journal of Operational Research
, vol.76
, Issue.1
, pp. 176-191
-
-
Chen, V.Y.X.1
-
40
-
-
0036142437
-
An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows
-
Chiu H.N., and Tsai D.M. An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics 20 (2002) 5566
-
(2002)
Construction Management and Economics
, vol.20
, pp. 5566
-
-
Chiu, H.N.1
Tsai, D.M.2
-
41
-
-
44649128530
-
A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
-
Chtourou H., and Haouari M. A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling. Computers and Industrial Engineering 55 1 (2008) 183-194
-
(2008)
Computers and Industrial Engineering
, vol.55
, Issue.1
, pp. 183-194
-
-
Chtourou, H.1
Haouari, M.2
-
42
-
-
33846864716
-
A market-based multi-agent system model for decentralized multi-project scheduling
-
Confessore G., Giordani S., and Rismondo S. A market-based multi-agent system model for decentralized multi-project scheduling. Annals of Operations Research 150 1 (2007) 115-135
-
(2007)
Annals of Operations Research
, vol.150
, Issue.1
, pp. 115-135
-
-
Confessore, G.1
Giordani, S.2
Rismondo, S.3
-
43
-
-
34248214093
-
Linear programming based algorithms for preemptive and non-preemptive RCPSP
-
Damay J., Quilliot A., and Sanlaville E. Linear programming based algorithms for preemptive and non-preemptive RCPSP. European Journal of Operational Research 182 3 (2007) 1012-1022
-
(2007)
European Journal of Operational Research
, vol.182
, Issue.3
, pp. 1012-1022
-
-
Damay, J.1
Quilliot, A.2
Sanlaville, E.3
-
44
-
-
0026938843
-
Resource constrained project scheduling with multiple objectives: A decision support approach
-
Davis K.R., Stam A., and Grzybowski R.A. Resource constrained project scheduling with multiple objectives: A decision support approach. Computers and Operations Research 19 7 (1992) 657-669
-
(1992)
Computers and Operations Research
, vol.19
, Issue.7
, pp. 657-669
-
-
Davis, K.R.1
Stam, A.2
Grzybowski, R.A.3
-
45
-
-
0035708796
-
Project contracts and payment schedules: The client's problem
-
Dayanand N., and Padman R. Project contracts and payment schedules: The client's problem. Management Science 47 (2001) 1654-1667
-
(2001)
Management Science
, vol.47
, pp. 1654-1667
-
-
Dayanand, N.1
Padman, R.2
-
47
-
-
0033311742
-
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
-
de Reyck B., and Herroelen W.S. The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research 119 2 (1999) 538-556
-
(1999)
European Journal of Operational Research
, vol.119
, Issue.2
, pp. 538-556
-
-
de Reyck, B.1
Herroelen, W.S.2
-
48
-
-
36048993713
-
The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects
-
Debels D., and Vanhoucke M. The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects. Computers and Industrial Engineering 54 (2008) 140-154
-
(2008)
Computers and Industrial Engineering
, vol.54
, pp. 140-154
-
-
Debels, D.1
Vanhoucke, M.2
-
49
-
-
0001036327
-
Nonlinear time/cost tradeoff models in project management
-
Deckro R.F., Hebert J.E., Verdini W.A., Grimsrud P.H., and Venkateshwar S. Nonlinear time/cost tradeoff models in project management. Computers and Industrial Engineering 28 2 (1995) 219-229
-
(1995)
Computers and Industrial Engineering
, vol.28
, Issue.2
, pp. 219-229
-
-
Deckro, R.F.1
Hebert, J.E.2
Verdini, W.A.3
Grimsrud, P.H.4
Venkateshwar, S.5
-
50
-
-
0030574803
-
Modelling setup times, process batches and transfer batches using activity network logic
-
Demeulemeester E.L., and Herroelen W.S. Modelling setup times, process batches and transfer batches using activity network logic. European Journal of Operational Research 89 (1996) 355-365
-
(1996)
European Journal of Operational Research
, vol.89
, pp. 355-365
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
51
-
-
0030122629
-
An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
-
Demeulemeester E.L., and Herroelen W.S. An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem. European Journal of Operational Research 90 2 (1996) 334-348
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 334-348
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
52
-
-
0032205606
-
New computational results on the discrete time/cost trade-off problem in project networks
-
Demeulemeester E.L., de Reyck B., Foubert B., Herroelen W.S., and Vanhoucke M. New computational results on the discrete time/cost trade-off problem in project networks. Journal of the Operational Research Society 49 (1998) 614-626
-
(1998)
Journal of the Operational Research Society
, vol.49
, pp. 614-626
-
-
Demeulemeester, E.L.1
de Reyck, B.2
Foubert, B.3
Herroelen, W.S.4
Vanhoucke, M.5
-
53
-
-
0034311599
-
The discrete time/resource trade-off problem in project networks - A branch-and-bound approach
-
Demeulemeester E.L., de Reyck B., and Herroelen W.S. The discrete time/resource trade-off problem in project networks - A branch-and-bound approach. IIE Transactions 32 (2000) 1059-1069
-
(2000)
IIE Transactions
, vol.32
, pp. 1059-1069
-
-
Demeulemeester, E.L.1
de Reyck, B.2
Herroelen, W.S.3
-
55
-
-
0035501860
-
Integrated project scheduling and material planning with variable activity duration and rewards
-
Dodin B., and Elimam A.A. Integrated project scheduling and material planning with variable activity duration and rewards. IIE Transactions 33 (2001) 1005-1018
-
(2001)
IIE Transactions
, vol.33
, pp. 1005-1018
-
-
Dodin, B.1
Elimam, A.A.2
-
56
-
-
0017478425
-
Scheduling a project to maximize its present value: A zero-one programming approach
-
Doersch R.H., and Patterson J.H. Scheduling a project to maximize its present value: A zero-one programming approach. Management Science 23 (1977) 882-889
-
(1977)
Management Science
, vol.23
, pp. 882-889
-
-
Doersch, R.H.1
Patterson, J.H.2
-
57
-
-
0012649023
-
A survey of interval capacity consistency tests for time- and resource constrained scheduling
-
U. Dorndorf, T. Phan Huy, E. Pesch, A survey of interval capacity consistency tests for time- and resource constrained scheduling, in: Wȩglarz [193], pp. 213-238.
-
Wȩglarz
, vol.193
, pp. 213-238
-
-
Dorndorf, U.1
Phan Huy, T.2
Pesch, E.3
-
58
-
-
0034296143
-
A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalized precedence constraints
-
Dorndorf U., Pesch E., and Phan Huy T. A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalized precedence constraints. Management Science 46 (2000) 1365-1384
-
(2000)
Management Science
, vol.46
, pp. 1365-1384
-
-
Dorndorf, U.1
Pesch, E.2
Phan Huy, T.3
-
59
-
-
0034271995
-
Constraint propagation techniques for the disjunctive scheduling problem
-
Dorndorf U., Pesch E., and Phan Huy T. Constraint propagation techniques for the disjunctive scheduling problem. Artificial Intelligence 122 (2000) 189-240
-
(2000)
Artificial Intelligence
, vol.122
, pp. 189-240
-
-
Dorndorf, U.1
Pesch, E.2
Phan Huy, T.3
-
60
-
-
40649102433
-
Nature-inspired metaheuristics for multiobjective activity crashing
-
Dörner K.F., Gutjahr W.J., Hartl R.F., Strauss C., and Stummer C. Nature-inspired metaheuristics for multiobjective activity crashing. Omega 36 (2008) 1019-1037
-
(2008)
Omega
, vol.36
, pp. 1019-1037
-
-
Dörner, K.F.1
Gutjahr, W.J.2
Hartl, R.F.3
Strauss, C.4
Stummer, C.5
-
61
-
-
0035280765
-
Optimization guided lower and upper bounds for the resource investment problem
-
Drexl A., and Kimms A. Optimization guided lower and upper bounds for the resource investment problem. Journal of the Operational Research Society 52 (2001) 340-351
-
(2001)
Journal of the Operational Research Society
, vol.52
, pp. 340-351
-
-
Drexl, A.1
Kimms, A.2
-
62
-
-
0031246797
-
Distribution requirements and compactness constraints in school timetabling
-
Drexl A., and Salewski F. Distribution requirements and compactness constraints in school timetabling. European Journal of Operational Research 102 (1997) 193-214
-
(1997)
European Journal of Operational Research
, vol.102
, pp. 193-214
-
-
Drexl, A.1
Salewski, F.2
-
63
-
-
67349120926
-
New modelling concepts and their impact on resource-constrained project scheduling
-
A. Drexl, J. Juretzka, F. Salewski, A. Schirmer, New modelling concepts and their impact on resource-constrained project scheduling, in: Wȩglarz [193], pp. 413-432.
-
Wȩglarz
, vol.193
, pp. 413-432
-
-
Drexl, A.1
Juretzka, J.2
Salewski, F.3
Schirmer, A.4
-
64
-
-
0033722085
-
Progen/πx - An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
-
Drexl A., Nissen R., Patterson J.H., and Salewski F. Progen/πx - An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions. European Journal of Operational Research 125 1 (2000) 59-72
-
(2000)
European Journal of Operational Research
, vol.125
, Issue.1
, pp. 59-72
-
-
Drexl, A.1
Nissen, R.2
Patterson, J.H.3
Salewski, F.4
-
65
-
-
38749139204
-
A project scheduling problem with labour constraints and time-dependent activities requirements
-
Drezet L.-E., and Billaut J.-C. A project scheduling problem with labour constraints and time-dependent activities requirements. European Journal of Operational Research 112 1 (2008) 217-225
-
(2008)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 217-225
-
-
Drezet, L.-E.1
Billaut, J.-C.2
-
67
-
-
0001273577
-
An algebra for the analysis of generalized networks
-
Elmaghraby S.E. An algebra for the analysis of generalized networks. Management Science 10 (1964) 419-514
-
(1964)
Management Science
, vol.10
, pp. 419-514
-
-
Elmaghraby, S.E.1
-
68
-
-
0035281212
-
The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
-
Erenguc S.S., Ahn T., and Conway D.G. The resource constrained project scheduling problem with multiple crashable modes: An exact solution method. Naval Research Logistics 48 (2001) 107-127
-
(2001)
Naval Research Logistics
, vol.48
, pp. 107-127
-
-
Erenguc, S.S.1
Ahn, T.2
Conway, D.G.3
-
69
-
-
0030784381
-
Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows
-
Etgar R., Shtub A., and LeBlanc L.J. Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows. European Journal of Operational Research 96 1 (1997) 90-96
-
(1997)
European Journal of Operational Research
, vol.96
, Issue.1
, pp. 90-96
-
-
Etgar, R.1
Shtub, A.2
LeBlanc, L.J.3
-
70
-
-
77953872652
-
Structural questions and priority rule methods
-
Resource-constrained project scheduling with time windows:, Technical Report WIOR-492, Universität Karlsruhe, Germany
-
B. Franck and K. Neumann, Resource-constrained project scheduling with time windows: Structural questions and priority rule methods. Technical Report WIOR-492, Universität Karlsruhe, Germany, 1997.
-
(1997)
-
-
Franck, B.1
Neumann, K.2
-
71
-
-
33744913189
-
Different resource-constrained project scheduling models with minimal and maximal time-lags
-
Technical Report WIOR-450, Universität Karlsruhe, Germany
-
B. Franck and C. Schwindt. Different resource-constrained project scheduling models with minimal and maximal time-lags. Technical Report WIOR-450, Universität Karlsruhe, Germany, 1995.
-
(1995)
-
-
Franck, B.1
Schwindt, C.2
-
72
-
-
0012712572
-
A capacity-oriented hierarchical approach to single-item and small-batch production using project scheduling methods
-
Franck B., Neumann K., and Schwindt C. A capacity-oriented hierarchical approach to single-item and small-batch production using project scheduling methods. OR Spektrum 19 (1997) 77-85
-
(1997)
OR Spektrum
, vol.19
, pp. 77-85
-
-
Franck, B.1
Neumann, K.2
Schwindt, C.3
-
78
-
-
23044518893
-
Packing problems and project scheduling models: An integrating perspective
-
Hartmann S. Packing problems and project scheduling models: An integrating perspective. Journal of the Operational Research Society 51 (2000) 1083-1092
-
(2000)
Journal of the Operational Research Society
, vol.51
, pp. 1083-1092
-
-
Hartmann, S.1
-
79
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
Hartmann S. Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research 102 (2001) 111-135
-
(2001)
Annals of Operations Research
, vol.102
, pp. 111-135
-
-
Hartmann, S.1
-
80
-
-
0347077154
-
-
Springer, Berlin, Germany
-
Hartmann S. Project scheduling under limited resources: Models, methods, and applications, Number 478 in Lecture Notes in Economics and Mathematical Systems (1999), Springer, Berlin, Germany
-
(1999)
Project scheduling under limited resources: Models, methods, and applications, Number 478 in Lecture Notes in Economics and Mathematical Systems
-
-
Hartmann, S.1
-
81
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
-
Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 (2000) 394-407
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
82
-
-
0442269144
-
Resource-constrained project scheduling: A heuristic for the multi-mode case
-
Heilmann R. Resource-constrained project scheduling: A heuristic for the multi-mode case. OR Spektrum 23 (2001) 335-357
-
(2001)
OR Spektrum
, vol.23
, pp. 335-357
-
-
Heilmann, R.1
-
83
-
-
0037448273
-
A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
-
Heilmann R. A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags. European Journal of Operational Research 144 (2003) 348-365
-
(2003)
European Journal of Operational Research
, vol.144
, pp. 348-365
-
-
Heilmann, R.1
-
84
-
-
77952651437
-
Scheduling and staffing multiple projects with a multi-skilled workforce
-
Forthcoming
-
C. Heimerl and R. Kolisch, Scheduling and staffing multiple projects with a multi-skilled workforce, OR Spektrum, 2009. Forthcoming.
-
(2009)
OR Spektrum
-
-
Heimerl, C.1
Kolisch, R.2
-
86
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
Herroelen W.S., and Leus R. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165 2 (2005) 289-306
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.S.1
Leus, R.2
-
89
-
-
77953872113
-
A multi-agent system for the decentralized resource-constrained multi-project scheduling problem
-
Homberger J. A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. International Transactions in Operational Research 14 (2007) 565589
-
(2007)
International Transactions in Operational Research
, vol.14
, pp. 565589
-
-
Homberger, J.1
-
90
-
-
0030262162
-
A branch and bound procedure for the resource constrained project scheduling problem with discounted cash-flows
-
Icmeli O., and Erenguc S.S. A branch and bound procedure for the resource constrained project scheduling problem with discounted cash-flows. Management Science 42 (1996) 1395-1408
-
(1996)
Management Science
, vol.42
, pp. 1395-1408
-
-
Icmeli, O.1
Erenguc, S.S.2
-
91
-
-
0030233586
-
The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows
-
Icmeli O., and Erenguc S.S. The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows. Journal of Operations Management 14 3 (1996) 255-275
-
(1996)
Journal of Operations Management
, vol.14
, Issue.3
, pp. 255-275
-
-
Icmeli, O.1
Erenguc, S.S.2
-
92
-
-
0030212866
-
Solving the resource constrained project scheduling problem with optimization subroutine library
-
Icmeli O., and Rom W.O. Solving the resource constrained project scheduling problem with optimization subroutine library. Computers and Operations Research 23 8 (1996) 801-817
-
(1996)
Computers and Operations Research
, vol.23
, Issue.8
, pp. 801-817
-
-
Icmeli, O.1
Rom, W.O.2
-
94
-
-
36749094527
-
A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
-
Jarboui B., Damak N., Siarry P., and Rebai A. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation 195 (2008) 299-308
-
(2008)
Applied Mathematics and Computation
, vol.195
, pp. 299-308
-
-
Jarboui, B.1
Damak, N.2
Siarry, P.3
Rebai, A.4
-
95
-
-
52049101753
-
-
Józefowska J., and Wȩglarz J. (Eds), Springer, Berlin, Germany
-
In: Józefowska J., and Wȩglarz J. (Eds). Perspectives in Modern Project Scheduling (2006), Springer, Berlin, Germany
-
(2006)
Perspectives in Modern Project Scheduling
-
-
-
96
-
-
18044401370
-
Solving the discrete-continuous project scheduling problem via its discretization
-
Józefowska J., Mika M., Rózycki R., and und Jan Wȩglarz G.W. Solving the discrete-continuous project scheduling problem via its discretization. Mathematical Methods of Operations Research 52 3 (2000) 489-499
-
(2000)
Mathematical Methods of Operations Research
, vol.52
, Issue.3
, pp. 489-499
-
-
Józefowska, J.1
Mika, M.2
Rózycki, R.3
und Jan Wȩglarz, G.W.4
-
97
-
-
0035612931
-
Simulated annealing for multi-mode resource-constrained project scheduling
-
Józefowska J., Mika M., Rozycki R., Waligora G., and Wȩglarz J. Simulated annealing for multi-mode resource-constrained project scheduling. Annals of Operations Research 102 (2001) 137-155
-
(2001)
Annals of Operations Research
, vol.102
, pp. 137-155
-
-
Józefowska, J.1
Mika, M.2
Rozycki, R.3
Waligora, G.4
Wȩglarz, J.5
-
98
-
-
0035637003
-
Maximizing the net present value of a project under resource constraints using a lagrangian relaxation based heuristic with tight upper bounds
-
Kimms A. Maximizing the net present value of a project under resource constraints using a lagrangian relaxation based heuristic with tight upper bounds. Annals of Operations Research 102 1-4 (2001) 221-236
-
(2001)
Annals of Operations Research
, vol.102
, Issue.1-4
, pp. 221-236
-
-
Kimms, A.1
-
99
-
-
21644447132
-
A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
-
Kis T. A branch-and-cut algorithm for scheduling of projects with variable-intensity activities. Mathematical Programming A 103 (2005) 515-539
-
(2005)
Mathematical Programming A
, vol.103
, pp. 515-539
-
-
Kis, T.1
-
100
-
-
77953872683
-
RCPS with Variable intensity activities and feeding precedence constraints
-
T. Kis, RCPS with Variable intensity activities and feeding precedence constraints, in: Wȩglarz [95], pp. 105-129.
-
Wȩglarz
, vol.95
, pp. 105-129
-
-
Kis, T.1
-
101
-
-
0034634797
-
Computing lower bounds by destructive improvement - An application to resource-constrained project scheduling
-
Klein R. Computing lower bounds by destructive improvement - An application to resource-constrained project scheduling. International Journal of Production Research 38 (2000) 3937-3952
-
(2000)
International Journal of Production Research
, vol.38
, pp. 3937-3952
-
-
Klein, R.1
-
102
-
-
0034634797
-
Project scheduling with time-varying resource constraints
-
Klein R. Project scheduling with time-varying resource constraints. International Journal of Production Research 38 (2000) 3937-3952
-
(2000)
International Journal of Production Research
, vol.38
, pp. 3937-3952
-
-
Klein, R.1
-
103
-
-
0011725236
-
Scattered branch and bound - An adaptive search strategy applied to resource-constrained project scheduling
-
Klein R., and Scholl A. Scattered branch and bound - An adaptive search strategy applied to resource-constrained project scheduling. Central European Journal of Operations Research 7 (2000) 177-201
-
(2000)
Central European Journal of Operations Research
, vol.7
, pp. 177-201
-
-
Klein, R.1
Scholl, A.2
-
104
-
-
0345893880
-
PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
-
Klein R., and Scholl A. PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem. Mathematical Methods of Operations Research 52 3 (2000) 467-488
-
(2000)
Mathematical Methods of Operations Research
, vol.52
, Issue.3
, pp. 467-488
-
-
Klein, R.1
Scholl, A.2
-
105
-
-
34047102496
-
A note on the paper by M.A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling
-
Kobylanski P., and Kuchta D. A note on the paper by M.A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling. International Journal of Production Economics 107 (2007) 496-501
-
(2007)
International Journal of Production Economics
, vol.107
, pp. 496-501
-
-
Kobylanski, P.1
Kuchta, D.2
-
106
-
-
0033908629
-
Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies
-
Kolisch R. Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies. International Journal of Production Economics 64 1-3 (2000) 127-141
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.1-3
, pp. 127-141
-
-
Kolisch, R.1
-
107
-
-
0031276875
-
Local search for nonpreemptive multi-mode resource-constrained project scheduling
-
Kolisch R., and Drexl A. Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 29 (1997) 987-999
-
(1997)
IIE Transactions
, vol.29
, pp. 987-999
-
-
Kolisch, R.1
Drexl, A.2
-
108
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174 (2006) 23-37
-
(2006)
European Journal of Operational Research
, vol.174
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
109
-
-
0002030301
-
Classification and computational analysis
-
Heuristic algorithms for solving the resource-constrained project scheduling problem
-
R. Kolisch, S. Hartmann, Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis, in: Wȩglarz [193], pp. 147-178.
-
Wȩglarz
, vol.193
, pp. 147-178
-
-
Kolisch, R.1
Hartmann, S.2
-
110
-
-
84955259221
-
Selection and scheduling of pharmaceutical research projects
-
Jozefowska J., and Weglarz J. (Eds), Springer, Berlin, Germany
-
Kolisch R., and Meyer K. Selection and scheduling of pharmaceutical research projects. In: Jozefowska J., and Weglarz J. (Eds). Perspectives in Modern Project Scheduling (2006), Springer, Berlin, Germany 321-344
-
(2006)
Perspectives in Modern Project Scheduling
, pp. 321-344
-
-
Kolisch, R.1
Meyer, K.2
-
111
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 29 (2001) 249-272
-
(2001)
Omega
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
113
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 (1995) 1693-1703
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
114
-
-
0002030298
-
Benchmark instances for project scheduling problems
-
R. Kolisch, A. Sprecher, C. Schwindt, Benchmark instances for project scheduling problems, in: Wȩglarz [193], pp. 197-212.
-
Wȩglarz
, vol.193
, pp. 197-212
-
-
Kolisch, R.1
Sprecher, A.2
Schwindt, C.3
-
117
-
-
33751552022
-
Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties
-
Kurtulus I.S. Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties. Journal of Operations Management 5 (1985) 291-307
-
(1985)
Journal of Operations Management
, vol.5
, pp. 291-307
-
-
Kurtulus, I.S.1
-
118
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
Kurtulus I.S., and Davis E.W. Multi-project scheduling: Categorization of heuristic rules performance. Management Science 28 (1982) 161-172
-
(1982)
Management Science
, vol.28
, pp. 161-172
-
-
Kurtulus, I.S.1
Davis, E.W.2
-
119
-
-
33746254848
-
Handling airport ground processes based on resource-constrained project scheduling
-
Kuster J., and Jannach D. Handling airport ground processes based on resource-constrained project scheduling. Lecture Notes in Computer Science 4031 (2006) 166-176
-
(2006)
Lecture Notes in Computer Science
, vol.4031
, pp. 166-176
-
-
Kuster, J.1
Jannach, D.2
-
120
-
-
0027306874
-
Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
-
Lawrence S.R., and Morton T.E. Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics. European Journal of Operational Research 64 2 (1993) 168-187
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 168-187
-
-
Lawrence, S.R.1
Morton, T.E.2
-
121
-
-
49349085445
-
Modeling the supply chain configuration problem with resource constraints
-
Li H., and Womer K. Modeling the supply chain configuration problem with resource constraints. International Journal of Project Management 26 6 (2008) 646-654
-
(2008)
International Journal of Project Management
, vol.26
, Issue.6
, pp. 646-654
-
-
Li, H.1
Womer, K.2
-
123
-
-
0034559445
-
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
-
Lova A., Maroto C., and Tormos P. A multicriteria heuristic method to improve resource allocation in multiproject scheduling. European Journal of Operational Research 127 2 (2000) 408-424
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 408-424
-
-
Lova, A.1
Maroto, C.2
Tormos, P.3
-
124
-
-
0033357402
-
The project scheduling problem with irregular starting time costs
-
Maniezzo V., and Mingozzi A. The project scheduling problem with irregular starting time costs. Operations Research Letters 25 4 (1999) 175-182
-
(1999)
Operations Research Letters
, vol.25
, Issue.4
, pp. 175-182
-
-
Maniezzo, V.1
Mingozzi, A.2
-
125
-
-
12244289668
-
Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
-
Mika M., Waligóra G., and Wȩglvarz J. Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research 164 3 (2005) 639-668
-
(2005)
European Journal of Operational Research
, vol.164
, Issue.3
, pp. 639-668
-
-
Mika, M.1
Waligóra, G.2
Wȩglvarz, J.3
-
126
-
-
77953870508
-
Modelling setup times in project scheduling
-
M. Mika, G. Waligóra, J. Wȩglarz, Modelling setup times in project scheduling, in: Józefowska, Wȩglarz [95], pp. 131-165.
-
Józefowska, Wȩglarz
, vol.95
, pp. 131-165
-
-
Mika, M.1
Waligóra, G.2
Wȩglarz, J.3
-
127
-
-
36849084169
-
Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
-
Mika M., Waligóra G., and Weglarz J. Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times. European Journal of Operational Research 187 3 (2008) 1238-1250
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1238-1250
-
-
Mika, M.1
Waligóra, G.2
Weglarz, J.3
-
128
-
-
0035329641
-
On project scheduling with irregular starting time costs
-
Möhring R.H., Schulz A.S., Stork F., and Uetz M. On project scheduling with irregular starting time costs. Operations Research Letters 28 4 (2001) 149-154
-
(2001)
Operations Research Letters
, vol.28
, Issue.4
, pp. 149-154
-
-
Möhring, R.H.1
Schulz, A.S.2
Stork, F.3
Uetz, M.4
-
129
-
-
0037871958
-
Solving project scheduling problems by minimum cut computations
-
Möhring R.H., Schulz A.S., Stork F., and Uetz M. Solving project scheduling problems by minimum cut computations. Management Science 49 (2003) 330-350
-
(2003)
Management Science
, vol.49
, pp. 330-350
-
-
Möhring, R.H.1
Schulz, A.S.2
Stork, F.3
Uetz, M.4
-
130
-
-
0346713432
-
Knowledge-based multiobjective project scheduling problems
-
J. Nabrzynski, J. Wȩglarz, Knowledge-based multiobjective project scheduling problems, in: Wȩglarz [193], pp. 383-411.
-
Wȩglarz
, vol.193
, pp. 383-411
-
-
Nabrzynski, J.1
Wȩglarz, J.2
-
131
-
-
33845784358
-
A genetic algorithm for resource investment problem with discounted cash flows
-
Najafi A.A., and Niaki S.T.A. A genetic algorithm for resource investment problem with discounted cash flows. Applied Mathematics and Computation 183 2 (2006) 1057-1070
-
(2006)
Applied Mathematics and Computation
, vol.183
, Issue.2
, pp. 1057-1070
-
-
Najafi, A.A.1
Niaki, S.T.A.2
-
132
-
-
0032749973
-
The multiple resource constrained project scheduling problem: A breadth-first approach
-
Nazareth T., Verma S., Bhattacharya S., and Bagchi A. The multiple resource constrained project scheduling problem: A breadth-first approach. European Journal of Operational Research 112 2 (1999) 347-366
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.2
, pp. 347-366
-
-
Nazareth, T.1
Verma, S.2
Bhattacharya, S.3
Bagchi, A.4
-
133
-
-
0003808866
-
-
Springer, Berlin, Germany
-
Neumann K. Stochastic project networks: Temporal analysis, scheduling and cost minimization, Number 344 in Lecture Notes in Economics and Mathematical Systems (1990), Springer, Berlin, Germany
-
(1990)
Stochastic project networks: Temporal analysis, scheduling and cost minimization, Number 344 in Lecture Notes in Economics and Mathematical Systems
-
-
Neumann, K.1
-
135
-
-
0012408586
-
Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints
-
Neumann K., and Zimmermann J. Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. Central European Journal of Operations Research 10 (2002) 357-380
-
(2002)
Central European Journal of Operations Research
, vol.10
, pp. 357-380
-
-
Neumann, K.1
Zimmermann, J.2
-
136
-
-
77953870809
-
Methods for resource-constrained project scheduling problem with regular and nonregular objective functions and schedule-dependent time windows
-
K. Neumann, J. Zimmermann, Methods for resource-constrained project scheduling problem with regular and nonregular objective functions and schedule-dependent time windows, in: Wȩglarz [193], pp. 261-288.
-
Wȩglarz
, vol.193
, pp. 261-288
-
-
Neumann, K.1
Zimmermann, J.2
-
137
-
-
0034559447
-
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
-
Neumann K., and Zimmermann J. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research 127 2 (2000) 425-443
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 425-443
-
-
Neumann, K.1
Zimmermann, J.2
-
138
-
-
17444428192
-
Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
-
Neumann K., Schwindt C., and Zimmermann J. Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications. Central European Journal of Operations Research 10 (2002) 113-148
-
(2002)
Central European Journal of Operations Research
, vol.10
, pp. 113-148
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
139
-
-
13444269157
-
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
-
Neumann K., Schwindt C., and Trautmann N. Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. European Journal of Operational Research 165 (2005) 495-509
-
(2005)
European Journal of Operational Research
, vol.165
, pp. 495-509
-
-
Neumann, K.1
Schwindt, C.2
Trautmann, N.3
-
140
-
-
77953870160
-
Resource-constrained project scheduling with time windows: Recent developments and new applications
-
K. Neumann, C. Schwindt, J. Zimmermann, Resource-constrained project scheduling with time windows: Recent developments and new applications, in: Józefowska, Wȩglarz [95], pp. 375-407.
-
Józefowska, Wȩglarz
, vol.95
, pp. 375-407
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
141
-
-
84888782064
-
Formulation and tabu search algorithm for the resource constrained project scheduling problem
-
Ribeiro C.C., and Hansen P. (Eds), Kluwer Academic Publishers.
-
Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro C.C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2002), Kluwer Academic Publishers. 557-588
-
(2002)
Essays and Surveys in Metaheuristics
, pp. 557-588
-
-
Nonobe, K.1
Ibaraki, T.2
-
142
-
-
77953869930
-
A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost functions
-
K. Nonobe, T. Ibaraki, A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost functions, in: Józefowska, Wȩglarz [95], pp. 225-248.
-
Józefowska, Wȩglarz
, vol.95
, pp. 225-248
-
-
Nonobe, K.1
Ibaraki, T.2
-
143
-
-
0442327390
-
The resource renting problem subject to temporal constraints
-
Nübel H. The resource renting problem subject to temporal constraints. OR Spektrum 23 (2001) 359-381
-
(2001)
OR Spektrum
, vol.23
, pp. 359-381
-
-
Nübel, H.1
-
144
-
-
0030830501
-
Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs
-
Nudtasomboon N., and Randhawa S.U. Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs. Computers and Industrial Engineering 32 1 (1997) 227-242
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.1
, pp. 227-242
-
-
Nudtasomboon, N.1
Randhawa, S.U.2
-
146
-
-
0029393209
-
A survey on the resource-constrained project scheduling problem
-
Özdamar L., and Ulusoy G. A survey on the resource-constrained project scheduling problem. IIE Transactions 27 (1995) 574-586
-
(1995)
IIE Transactions
, vol.27
, pp. 574-586
-
-
Özdamar, L.1
Ulusoy, G.2
-
148
-
-
33646387470
-
Knowledge integration using problem spaces: A study in resource-constrained project scheduling
-
Padman R., and Zhu D. Knowledge integration using problem spaces: A study in resource-constrained project scheduling. Journal of Scheduling 9 2 (2006) 133-152
-
(2006)
Journal of Scheduling
, vol.9
, Issue.2
, pp. 133-152
-
-
Padman, R.1
Zhu, D.2
-
149
-
-
78549252856
-
Lower bounds in different problem classes of project schedules with resource constraints
-
E. Pesch, Lower bounds in different problem classes of project schedules with resource constraints, in: Wȩglarz [193], pp. 53-76.
-
Wȩglarz
, vol.193
, pp. 53-76
-
-
Pesch, E.1
-
150
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
Pritsker A.A.B., Watters L.J., and Wolfe P.M. Multiproject scheduling with limited resources: A zero-one programming approach. Management Science 16 (1969) 93-107
-
(1969)
Management Science
, vol.16
, pp. 93-107
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
151
-
-
34548127710
-
Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
-
Ranjbar M., and Kianfar F. Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms. Applied Mathematics and Computation 191 (2007) 451-456
-
(2007)
Applied Mathematics and Computation
, vol.191
, pp. 451-456
-
-
Ranjbar, M.1
Kianfar, F.2
-
152
-
-
38649127603
-
Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
-
Ranjbar M., Kianfar F., and Shadrokh S. Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm. Applied Mathematics and Computation 196 (2008) 879-888
-
(2008)
Applied Mathematics and Computation
, vol.196
, pp. 879-888
-
-
Ranjbar, M.1
Kianfar, F.2
Shadrokh, S.3
-
153
-
-
52049097838
-
A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
-
Ranjbar M., de Reyck B., and Kianfar F. A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling. European Journal of Operational Research 193 (2009) 35-48
-
(2009)
European Journal of Operational Research
, vol.193
, pp. 35-48
-
-
Ranjbar, M.1
de Reyck, B.2
Kianfar, F.3
-
154
-
-
0036062756
-
MRP in a job shop environment using a resource constrained project scheduling model
-
Rom W.O., Tukel O.I., and Muscatello J.R. MRP in a job shop environment using a resource constrained project scheduling model. Omega 30 4 (2002) 275-286
-
(2002)
Omega
, vol.30
, Issue.4
, pp. 275-286
-
-
Rom, W.O.1
Tukel, O.I.2
Muscatello, J.R.3
-
155
-
-
7444264088
-
Activity consolidation to improve responsiveness
-
Rummel J.L., Walter Z., Dewan R., and Seidmann A. Activity consolidation to improve responsiveness. European Journal of Operational Research 161 3 (2005) 683-703
-
(2005)
European Journal of Operational Research
, vol.161
, Issue.3
, pp. 683-703
-
-
Rummel, J.L.1
Walter, Z.2
Dewan, R.3
Seidmann, A.4
-
156
-
-
42149186441
-
A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
-
Sabzehparvar M., and Seyed-Hosseini S.M. A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags. Journal of Supercomputing 44 3 (2008) 257-273
-
(2008)
Journal of Supercomputing
, vol.44
, Issue.3
, pp. 257-273
-
-
Sabzehparvar, M.1
Seyed-Hosseini, S.M.2
-
157
-
-
0034288713
-
Probe backtrack search for minimal perturbation in dynamic scheduling
-
Sakkout H., and Wallace M. Probe backtrack search for minimal perturbation in dynamic scheduling. Constraints 5 4 (2000) 359-388
-
(2000)
Constraints
, vol.5
, Issue.4
, pp. 359-388
-
-
Sakkout, H.1
Wallace, M.2
-
158
-
-
0031250372
-
Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
-
Salewski F., Schirmer A., and Drexl A. Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application. European Journal of Operational Research 102 (1997) 88-110
-
(1997)
European Journal of Operational Research
, vol.102
, pp. 88-110
-
-
Salewski, F.1
Schirmer, A.2
Drexl, A.3
-
159
-
-
0035219341
-
Allocation of partially renewable resources - Concepts, capabilities, and applications
-
Schirmer A., and Drexl A. Allocation of partially renewable resources - Concepts, capabilities, and applications. Networks 37 (2001) 21-34
-
(2001)
Networks
, vol.37
, pp. 21-34
-
-
Schirmer, A.1
Drexl, A.2
-
160
-
-
0042176683
-
Environment-oriented project scheduling for the dismantling of buildings
-
Schultmann F., and Rentz O. Environment-oriented project scheduling for the dismantling of buildings. OR Spectrum 23 1 (2001) 51-78
-
(2001)
OR Spectrum
, vol.23
, Issue.1
, pp. 51-78
-
-
Schultmann, F.1
Rentz, O.2
-
161
-
-
0011006529
-
Generation of resource-constrained project scheduling problems subject to temporal constraints
-
Technical Report WIOR-543, Universität Karlsruhe, Germany
-
C. Schwindt, Generation of resource-constrained project scheduling problems subject to temporal constraints, Technical Report WIOR-543, Universität Karlsruhe, Germany, 1998.
-
(1998)
-
-
Schwindt, C.1
-
162
-
-
0001775820
-
Batch scheduling in process industries: An application of resource-constrained project scheduling
-
Schwindt C., and Trautmann N. Batch scheduling in process industries: An application of resource-constrained project scheduling. OR Spectrum 22 4 (2000) 501-524
-
(2000)
OR Spectrum
, vol.22
, Issue.4
, pp. 501-524
-
-
Schwindt, C.1
Trautmann, N.2
-
163
-
-
33847297058
-
A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
-
Shadrokh S., and Kianfar F. A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty. European Journal of Operational Research 181 1 (2007) 86-101
-
(2007)
European Journal of Operational Research
, vol.181
, Issue.1
, pp. 86-101
-
-
Shadrokh, S.1
Kianfar, F.2
-
164
-
-
0030571697
-
Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
-
Shtub A., LeBlanc L.J., and Cai Z. Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. European Journal of Operational Research 88 (1996) 124-138
-
(1996)
European Journal of Operational Research
, vol.88
, pp. 124-138
-
-
Shtub, A.1
LeBlanc, L.J.2
Cai, Z.3
-
165
-
-
0019586862
-
Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
-
Słowiński R. Multiobjective network scheduling with efficient use of renewable and nonrenewable resources. European Journal of Operational Research 7 (1981) 265-273
-
(1981)
European Journal of Operational Research
, vol.7
, pp. 265-273
-
-
Słowiński, R.1
-
169
-
-
29344475492
-
Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrating perspective
-
Stadtler H. Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrating perspective. International Journal of Production Research 43 (2005) 5253-5270
-
(2005)
International Journal of Production Research
, vol.43
, pp. 5253-5270
-
-
Stadtler, H.1
-
170
-
-
12244281005
-
A project activity scheduling problem with net present value measure
-
Sung C.S., and Lim S.K. A project activity scheduling problem with net present value measure. International Journal of Production Economics 37 2-3 (1994) 177-187
-
(1994)
International Journal of Production Economics
, vol.37
, Issue.2-3
, pp. 177-187
-
-
Sung, C.S.1
Lim, S.K.2
-
171
-
-
34250621376
-
A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
-
Tareghian H.R., and Taheri S.H. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. Applied Mathematics and Computation 190 2 (2007) 1136-1145
-
(2007)
Applied Mathematics and Computation
, vol.190
, Issue.2
, pp. 1136-1145
-
-
Tareghian, H.R.1
Taheri, S.H.2
-
172
-
-
0036027411
-
A review of the contribution of operational research to project management
-
Tavares L.V. A review of the contribution of operational research to project management. European Journal of Operational Research 136 1 (2002) 1-18
-
(2002)
European Journal of Operational Research
, vol.136
, Issue.1
, pp. 1-18
-
-
Tavares, L.V.1
-
173
-
-
53649107339
-
Scheduling projects with heterogeneous resources to meet time and quality objectives
-
Tiwari V., Patterson J.H., and Mabert V.A. Scheduling projects with heterogeneous resources to meet time and quality objectives. European Journal of Operational Research 193 3 (2009) 780-790
-
(2009)
European Journal of Operational Research
, vol.193
, Issue.3
, pp. 780-790
-
-
Tiwari, V.1
Patterson, J.H.2
Mabert, V.A.3
-
174
-
-
0035283872
-
Analysis of supplier buyer relationships using resource constrained project scheduling strategies
-
Tukel O.I., and Wasti S.N. Analysis of supplier buyer relationships using resource constrained project scheduling strategies. European Journal of Operational Research 129 2 (2001) 271-276
-
(2001)
European Journal of Operational Research
, vol.129
, Issue.2
, pp. 271-276
-
-
Tukel, O.I.1
Wasti, S.N.2
-
175
-
-
0034561525
-
An equitable approach to the payment scheduling problem in project management
-
Ulusoy G., and Cebelli S. An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research 127 2 (2000) 262-278
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 262-278
-
-
Ulusoy, G.1
Cebelli, S.2
-
176
-
-
0042788727
-
Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
-
Ulusoy G., Sivrikaya-Şerifoǧlu F., and Şahin S. Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows. Annals of Operations Research 102 1-4 (2001) 237-261
-
(2001)
Annals of Operations Research
, vol.102
, Issue.1-4
, pp. 237-261
-
-
Ulusoy, G.1
Sivrikaya-Şerifoǧlu, F.2
Şahin, S.3
-
178
-
-
41449117771
-
Setup times and fast tracking in resource-constrained project scheduling
-
Vanhoucke M. Setup times and fast tracking in resource-constrained project scheduling. Computers and Industrial Engineering 54 4 (2008) 1062-1070
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.4
, pp. 1062-1070
-
-
Vanhoucke, M.1
-
179
-
-
33745888696
-
Scheduling an R&D project with quality-dependent time slots
-
Vanhoucke M. Scheduling an R&D project with quality-dependent time slots. Lecture Notes in Computer Science 3982 (2006) 621-630
-
(2006)
Lecture Notes in Computer Science
, vol.3982
, pp. 621-630
-
-
Vanhoucke, M.1
-
181
-
-
0035435965
-
On maximizing the net present value of a project under renewable resource constraints
-
Vanhoucke M., Demeulemeester E.L., and Herroelen W.S. On maximizing the net present value of a project under renewable resource constraints. Management Science 47 (2001) 1113-1121
-
(2001)
Management Science
, vol.47
, pp. 1113-1121
-
-
Vanhoucke, M.1
Demeulemeester, E.L.2
Herroelen, W.S.3
-
182
-
-
0035617606
-
An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
-
Vanhoucke M., Demeulemeester E.L., and Herroelen W.S. An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem. Annals of Operations Research 102 (2001) 179-196
-
(2001)
Annals of Operations Research
, vol.102
, pp. 179-196
-
-
Vanhoucke, M.1
Demeulemeester, E.L.2
Herroelen, W.S.3
-
186
-
-
36048990558
-
An evaluation of the adequacy of project network generators with systematically sampled networks
-
Vanhoucke M., Coelho J., Debels D., Maenhout B., and Tavares L.V. An evaluation of the adequacy of project network generators with systematically sampled networks. European Journal of Operational Research 187 (2008) 511-524
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 511-524
-
-
Vanhoucke, M.1
Coelho, J.2
Debels, D.3
Maenhout, B.4
Tavares, L.V.5
-
187
-
-
34548564553
-
Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry
-
Varma V.A., Uzsoy R., Pekny J., and Blau G. Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry. Journal of Heuristics 13 5 (2007) 403-433
-
(2007)
Journal of Heuristics
, vol.13
, Issue.5
, pp. 403-433
-
-
Varma, V.A.1
Uzsoy, R.2
Pekny, J.3
Blau, G.4
-
188
-
-
0343496853
-
Using metaheuristics in multiobjective resource constrained project scheduling
-
Viana A., and de Sousa J.P. Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research 120 2 (2000) 359-374
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 359-374
-
-
Viana, A.1
de Sousa, J.P.2
-
189
-
-
37849188714
-
Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
-
Voß S., and Witt A. Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application. International Journal of Production Economics 105 2 (2007) 445-458
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 445-458
-
-
Voß, S.1
Witt, A.2
-
190
-
-
36348965285
-
Discrete-continuous project scheduling with discounted cash flows - A tabu search approach
-
Waligóra G. Discrete-continuous project scheduling with discounted cash flows - A tabu search approach. Computers and Operations Research 35 7 (2008) 2141-2153
-
(2008)
Computers and Operations Research
, vol.35
, Issue.7
, pp. 2141-2153
-
-
Waligóra, G.1
-
191
-
-
0018923627
-
On certain models of resource allocation problems
-
Wȩglarz J. On certain models of resource allocation problems. Kybernetics 9 (1981) 61-66
-
(1981)
Kybernetics
, vol.9
, pp. 61-66
-
-
Wȩglarz, J.1
-
192
-
-
0019612987
-
Project scheduling with continuously divisible, doubly-con-strained resources
-
Wȩglarz J. Project scheduling with continuously divisible, doubly-con-strained resources. Management Science 27 (1981) 1040-1057
-
(1981)
Management Science
, vol.27
, pp. 1040-1057
-
-
Wȩglarz, J.1
-
195
-
-
33845504706
-
Robust optimization models for project scheduling with resource availability cost
-
Yamashita D.S., Armentano V.A., and Laguna M. Robust optimization models for project scheduling with resource availability cost. Journal of Scheduling 10 1 (2007) 67-76
-
(2007)
Journal of Scheduling
, vol.10
, Issue.1
, pp. 67-76
-
-
Yamashita, D.S.1
Armentano, V.A.2
Laguna, M.3
-
196
-
-
0033897639
-
Finding the critical path in an activity network with time-switch constraints
-
Yang H.H., and Chen Y.L. Finding the critical path in an activity network with time-switch constraints. European Journal of Operational Research 120 (2000) 603-613
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 603-613
-
-
Yang, H.H.1
Chen, Y.L.2
-
198
-
-
33748521972
-
A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
-
Zhu G., Bard J.F., and Yu G. A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem. INFORMS Journal on Computing 18 (2006) 377-390
-
(2006)
INFORMS Journal on Computing
, vol.18
, pp. 377-390
-
-
Zhu, G.1
Bard, J.F.2
Yu, G.3
|