Volumn 207, Issue 1, 2010, Pages 1-14

A survey of variants and extensions of the resource-constrained project scheduling problem

Author keywords

Modeling; Networks; Project scheduling; Resource constraints; Temporal constraints

Indexed keywords

BASIC MODELS; HEURISTIC SCHEDULING; MAKESPAN; MINIMAL AND MAXIMAL TIME LAGS; MODELING NETWORKS; MULTIPLE MODES; MULTIPLE PROJECTS; NET PRESENT VALUE; PRECEDENCE RELATIONS; PROJECT SCHEDULING; RESOURCE CONSTRAINT; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; STANDARD PROBLEMS; TEMPORAL CONSTRAINTS;

EID: 77953872383     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2009.11.005     Document Type: Review
Times cited : (765)

References (198)
  • 1
    • 33748299537 scopus 로고    scopus 로고
    • Bi-objective resource-constrained project scheduling with robustness and makespan criteria
    • Abbasi B., Shadrokh S., and Arkat J. Bi-objective resource-constrained project scheduling with robustness and makespan criteria. Applied Mathematics and Computation 180 1 (2006) 146-152
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 146-152
    • Abbasi, B.1    Shadrokh, S.2    Arkat, J.3
  • 2
    • 0035742360 scopus 로고    scopus 로고
    • Project scheduling under time dependent costs - A branch and bound algorithm
    • Achuthan N., and Hardjawidjaja A. Project scheduling under time dependent costs - A branch and bound algorithm. Annals of Operations Research 108 1-4 (2001) 55-74
    • (2001) Annals of Operations Research , vol.108 , Issue.1-4 , pp. 55-74
    • Achuthan, N.1    Hardjawidjaja, A.2
  • 4
    • 13444270579 scopus 로고    scopus 로고
    • Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
    • Akkan C., Drexl A., and Kimms A. Network decomposition-based benchmark results for the discrete time-cost tradeoff problem. European Journal of Operational Research 165 (2005) 339-358
    • (2005) European Journal of Operational Research , vol.165 , pp. 339-358
    • Akkan, C.1    Drexl, A.2    Kimms, A.3
  • 5
    • 13444254192 scopus 로고    scopus 로고
    • A bi-objective model for robust resource-constrained project scheduling
    • Al-Fawzan M., and Haouari M. A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics 96 (2005) 175-187
    • (2005) International Journal of Production Economics , vol.96 , pp. 175-187
    • Al-Fawzan, M.1    Haouari, M.2
  • 6
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • Alcaraz J., Maroto C., and Ruiz R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society 54 (2003) 614-626
    • (2003) Journal of the Operational Research Society , vol.54 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 7
    • 32544433600 scopus 로고    scopus 로고
    • A scatter search algorithm for project scheduling under partially renewable resources
    • Alvarez-Valdes R., Crespo E., Tamarit J.M., and Villa F. A scatter search algorithm for project scheduling under partially renewable resources. Journal of Heuristics 12 1-2 (2006) 95-113
    • (2006) Journal of Heuristics , vol.12 , Issue.1-2 , pp. 95-113
    • Alvarez-Valdes, R.1    Crespo, E.2    Tamarit, J.M.3    Villa, F.4
  • 9
    • 38049013796 scopus 로고    scopus 로고
    • A genetic algorithm for the resource renting problem with minimum and maximum time lags
    • Ballestín F. A genetic algorithm for the resource renting problem with minimum and maximum time lags. Lecture Notes in Computer Science 4446 (2007) 25-35
    • (2007) Lecture Notes in Computer Science , vol.4446 , pp. 25-35
    • Ballestín, F.1
  • 10
    • 77953872977 scopus 로고    scopus 로고
    • F. Ballestín, V. Valls, S. Quintanilla, Due dates and RCPSP, in: Józefowska, J. Wȩglarz [95], pp. 131-163.
    • F. Ballestín, V. Valls, S. Quintanilla, Due dates and RCPSP, in: Józefowska, J. Wȩglarz [95], pp. 131-163.
  • 13
    • 0033479482 scopus 로고    scopus 로고
    • Satisfiability tests and time-bound adjustments for cumulative scheduling problems
    • Baptiste P., Pape C.L., and Nuijten W. Satisfiability tests and time-bound adjustments for cumulative scheduling problems. Annals of Operations Research 92 (1999) 305333
    • (1999) Annals of Operations Research , vol.92 , pp. 305333
    • Baptiste, P.1    Pape, C.L.2    Nuijten, W.3
  • 17
    • 0029309888 scopus 로고
    • Resource-constrained scheduling of hierarchically structured design activity networks
    • Belhe U., and Kusiak A. Resource-constrained scheduling of hierarchically structured design activity networks. IEEE Transactions on Engineering Management 52 (1995) 150-158
    • (1995) IEEE Transactions on Engineering Management , vol.52 , pp. 150-158
    • Belhe, U.1    Kusiak, A.2
  • 18
    • 33645986632 scopus 로고    scopus 로고
    • Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills
    • Bellenguez O., and Néron E. Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills. Lecture Notes in Computer Science 3616 (2005) 229-243
    • (2005) Lecture Notes in Computer Science , vol.3616 , pp. 229-243
    • Bellenguez, O.1    Néron, E.2
  • 20
    • 77953870407 scopus 로고    scopus 로고
    • Solving a preemptive project scheduling problem with coloring techniques
    • L. Bianco, M. Caramia, P. DellÓlmo, Solving a preemptive project scheduling problem with coloring techniques, in Wȩglarz [193], pp. 135-146.
    • Wȩglarz , vol.193 , pp. 135-146
    • Bianco, L.1    Caramia, M.2    DellÓlmo, P.3
  • 23
    • 47849113328 scopus 로고    scopus 로고
    • A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem
    • Bomsdorf F., and Derigs U. A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem. OR Spectrum 30 4 (2008) 751-772
    • (2008) OR Spectrum , vol.30 , Issue.4 , pp. 751-772
    • Bomsdorf, F.1    Derigs, U.2
  • 24
    • 18144452822 scopus 로고    scopus 로고
    • Project scheduling under partially renewable resource constraints
    • Böttcher J., Drexl A., Kolisch R., and Salewski F. Project scheduling under partially renewable resource constraints. Management Science 45 (1999) 543-559
    • (1999) Management Science , vol.45 , pp. 543-559
    • Böttcher, J.1    Drexl, A.2    Kolisch, R.3    Salewski, F.4
  • 25
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 2 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 26
    • 0141682348 scopus 로고    scopus 로고
    • Two approaches to the problem of sharing delay costs in joint projects
    • Brânzei R., Ferrari G., Fragnelli V., and Tijs S. Two approaches to the problem of sharing delay costs in joint projects. Annals of Operations Research 109 1-4 (2002) 359-374
    • (2002) Annals of Operations Research , vol.109 , Issue.1-4 , pp. 359-374
    • Brânzei, R.1    Ferrari, G.2    Fragnelli, V.3    Tijs, S.4
  • 27
    • 77953871708 scopus 로고    scopus 로고
    • T.R. Browning, A.A. Yassine, Resource-constrained Multi-project Scheduling: Priority Rule Performance Revisited, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2006.
    • T.R. Browning, A.A. Yassine, Resource-constrained Multi-project Scheduling: Priority Rule Performance Revisited, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2006.
  • 28
    • 77953872469 scopus 로고    scopus 로고
    • T.R. Browning, A.A. Yassine, A Random Generator of Resource-constrained Multi-project Scheduling Problems, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2007.
    • T.R. Browning, A.A. Yassine, A Random Generator of Resource-constrained Multi-project Scheduling Problems, Technical Report, Texas Christian University, M.J. Neeley School of Business, 2007.
  • 29
    • 84867925682 scopus 로고    scopus 로고
    • Scheduling and constraint propagation
    • Brucker P. Scheduling and constraint propagation. Discrete Applied Mathematics 123 1-3 (2002) 227-256
    • (2002) Discrete Applied Mathematics , vol.123 , Issue.1-3 , pp. 227-256
    • Brucker, P.1
  • 30
    • 0038527516 scopus 로고    scopus 로고
    • Resource-constrained project scheduling and timetabling
    • Brucker P., and Knust S. Resource-constrained project scheduling and timetabling. Lecture Notes in Computer Science 2079 (2001) 277-293
    • (2001) Lecture Notes in Computer Science , vol.2079 , pp. 277-293
    • Brucker, P.1    Knust, S.2
  • 32
    • 33749155193 scopus 로고    scopus 로고
    • Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
    • Buddhakulsomsiria J., and Kim D.S. Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research 175 (2006) 279-295
    • (2006) European Journal of Operational Research , vol.175 , pp. 279-295
    • Buddhakulsomsiria, J.1    Kim, D.S.2
  • 33
    • 33750989916 scopus 로고    scopus 로고
    • Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
    • Buddhakulsomsiria J., and Kim D.S. Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research 178 (2007) 374-390
    • (2007) European Journal of Operational Research , vol.178 , pp. 374-390
    • Buddhakulsomsiria, J.1    Kim, D.S.2
  • 36
    • 0036182335 scopus 로고    scopus 로고
    • A constraint-based method for project scheduling with time windows
    • Cesta A., Oddi A., and Smith S.F. A constraint-based method for project scheduling with time windows. Journal of Heuristics 8 1 (2002) 109-136
    • (2002) Journal of Heuristics , vol.8 , Issue.1 , pp. 109-136
    • Cesta, A.1    Oddi, A.2    Smith, S.F.3
  • 38
    • 52049102073 scopus 로고    scopus 로고
    • Project selection, scheduling and resource allocation with time dependent returns
    • Chen J., and Askin R.G. Project selection, scheduling and resource allocation with time dependent returns. European Journal of Operational Research 193 1 (2009) 23-34
    • (2009) European Journal of Operational Research , vol.193 , Issue.1 , pp. 23-34
    • Chen, J.1    Askin, R.G.2
  • 39
    • 0028766752 scopus 로고
    • A 0-1 goal programming model for scheduling multiple maintenance projects at a copper mine
    • Chen V.Y.X. A 0-1 goal programming model for scheduling multiple maintenance projects at a copper mine. European Journal of Operational Research 76 1 (1994) 176-191
    • (1994) European Journal of Operational Research , vol.76 , Issue.1 , pp. 176-191
    • Chen, V.Y.X.1
  • 40
    • 0036142437 scopus 로고    scopus 로고
    • An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows
    • Chiu H.N., and Tsai D.M. An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics 20 (2002) 5566
    • (2002) Construction Management and Economics , vol.20 , pp. 5566
    • Chiu, H.N.1    Tsai, D.M.2
  • 41
    • 44649128530 scopus 로고    scopus 로고
    • A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
    • Chtourou H., and Haouari M. A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling. Computers and Industrial Engineering 55 1 (2008) 183-194
    • (2008) Computers and Industrial Engineering , vol.55 , Issue.1 , pp. 183-194
    • Chtourou, H.1    Haouari, M.2
  • 42
    • 33846864716 scopus 로고    scopus 로고
    • A market-based multi-agent system model for decentralized multi-project scheduling
    • Confessore G., Giordani S., and Rismondo S. A market-based multi-agent system model for decentralized multi-project scheduling. Annals of Operations Research 150 1 (2007) 115-135
    • (2007) Annals of Operations Research , vol.150 , Issue.1 , pp. 115-135
    • Confessore, G.1    Giordani, S.2    Rismondo, S.3
  • 43
    • 34248214093 scopus 로고    scopus 로고
    • Linear programming based algorithms for preemptive and non-preemptive RCPSP
    • Damay J., Quilliot A., and Sanlaville E. Linear programming based algorithms for preemptive and non-preemptive RCPSP. European Journal of Operational Research 182 3 (2007) 1012-1022
    • (2007) European Journal of Operational Research , vol.182 , Issue.3 , pp. 1012-1022
    • Damay, J.1    Quilliot, A.2    Sanlaville, E.3
  • 44
    • 0026938843 scopus 로고
    • Resource constrained project scheduling with multiple objectives: A decision support approach
    • Davis K.R., Stam A., and Grzybowski R.A. Resource constrained project scheduling with multiple objectives: A decision support approach. Computers and Operations Research 19 7 (1992) 657-669
    • (1992) Computers and Operations Research , vol.19 , Issue.7 , pp. 657-669
    • Davis, K.R.1    Stam, A.2    Grzybowski, R.A.3
  • 45
    • 0035708796 scopus 로고    scopus 로고
    • Project contracts and payment schedules: The client's problem
    • Dayanand N., and Padman R. Project contracts and payment schedules: The client's problem. Management Science 47 (2001) 1654-1667
    • (2001) Management Science , vol.47 , pp. 1654-1667
    • Dayanand, N.1    Padman, R.2
  • 47
    • 0033311742 scopus 로고    scopus 로고
    • The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • de Reyck B., and Herroelen W.S. The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research 119 2 (1999) 538-556
    • (1999) European Journal of Operational Research , vol.119 , Issue.2 , pp. 538-556
    • de Reyck, B.1    Herroelen, W.S.2
  • 48
    • 36048993713 scopus 로고    scopus 로고
    • The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects
    • Debels D., and Vanhoucke M. The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects. Computers and Industrial Engineering 54 (2008) 140-154
    • (2008) Computers and Industrial Engineering , vol.54 , pp. 140-154
    • Debels, D.1    Vanhoucke, M.2
  • 50
    • 0030574803 scopus 로고    scopus 로고
    • Modelling setup times, process batches and transfer batches using activity network logic
    • Demeulemeester E.L., and Herroelen W.S. Modelling setup times, process batches and transfer batches using activity network logic. European Journal of Operational Research 89 (1996) 355-365
    • (1996) European Journal of Operational Research , vol.89 , pp. 355-365
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 51
    • 0030122629 scopus 로고    scopus 로고
    • An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
    • Demeulemeester E.L., and Herroelen W.S. An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem. European Journal of Operational Research 90 2 (1996) 334-348
    • (1996) European Journal of Operational Research , vol.90 , Issue.2 , pp. 334-348
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 53
    • 0034311599 scopus 로고    scopus 로고
    • The discrete time/resource trade-off problem in project networks - A branch-and-bound approach
    • Demeulemeester E.L., de Reyck B., and Herroelen W.S. The discrete time/resource trade-off problem in project networks - A branch-and-bound approach. IIE Transactions 32 (2000) 1059-1069
    • (2000) IIE Transactions , vol.32 , pp. 1059-1069
    • Demeulemeester, E.L.1    de Reyck, B.2    Herroelen, W.S.3
  • 55
    • 0035501860 scopus 로고    scopus 로고
    • Integrated project scheduling and material planning with variable activity duration and rewards
    • Dodin B., and Elimam A.A. Integrated project scheduling and material planning with variable activity duration and rewards. IIE Transactions 33 (2001) 1005-1018
    • (2001) IIE Transactions , vol.33 , pp. 1005-1018
    • Dodin, B.1    Elimam, A.A.2
  • 56
    • 0017478425 scopus 로고
    • Scheduling a project to maximize its present value: A zero-one programming approach
    • Doersch R.H., and Patterson J.H. Scheduling a project to maximize its present value: A zero-one programming approach. Management Science 23 (1977) 882-889
    • (1977) Management Science , vol.23 , pp. 882-889
    • Doersch, R.H.1    Patterson, J.H.2
  • 57
    • 0012649023 scopus 로고    scopus 로고
    • A survey of interval capacity consistency tests for time- and resource constrained scheduling
    • U. Dorndorf, T. Phan Huy, E. Pesch, A survey of interval capacity consistency tests for time- and resource constrained scheduling, in: Wȩglarz [193], pp. 213-238.
    • Wȩglarz , vol.193 , pp. 213-238
    • Dorndorf, U.1    Phan Huy, T.2    Pesch, E.3
  • 58
    • 0034296143 scopus 로고    scopus 로고
    • A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalized precedence constraints
    • Dorndorf U., Pesch E., and Phan Huy T. A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalized precedence constraints. Management Science 46 (2000) 1365-1384
    • (2000) Management Science , vol.46 , pp. 1365-1384
    • Dorndorf, U.1    Pesch, E.2    Phan Huy, T.3
  • 59
    • 0034271995 scopus 로고    scopus 로고
    • Constraint propagation techniques for the disjunctive scheduling problem
    • Dorndorf U., Pesch E., and Phan Huy T. Constraint propagation techniques for the disjunctive scheduling problem. Artificial Intelligence 122 (2000) 189-240
    • (2000) Artificial Intelligence , vol.122 , pp. 189-240
    • Dorndorf, U.1    Pesch, E.2    Phan Huy, T.3
  • 60
    • 40649102433 scopus 로고    scopus 로고
    • Nature-inspired metaheuristics for multiobjective activity crashing
    • Dörner K.F., Gutjahr W.J., Hartl R.F., Strauss C., and Stummer C. Nature-inspired metaheuristics for multiobjective activity crashing. Omega 36 (2008) 1019-1037
    • (2008) Omega , vol.36 , pp. 1019-1037
    • Dörner, K.F.1    Gutjahr, W.J.2    Hartl, R.F.3    Strauss, C.4    Stummer, C.5
  • 61
    • 0035280765 scopus 로고    scopus 로고
    • Optimization guided lower and upper bounds for the resource investment problem
    • Drexl A., and Kimms A. Optimization guided lower and upper bounds for the resource investment problem. Journal of the Operational Research Society 52 (2001) 340-351
    • (2001) Journal of the Operational Research Society , vol.52 , pp. 340-351
    • Drexl, A.1    Kimms, A.2
  • 62
    • 0031246797 scopus 로고    scopus 로고
    • Distribution requirements and compactness constraints in school timetabling
    • Drexl A., and Salewski F. Distribution requirements and compactness constraints in school timetabling. European Journal of Operational Research 102 (1997) 193-214
    • (1997) European Journal of Operational Research , vol.102 , pp. 193-214
    • Drexl, A.1    Salewski, F.2
  • 63
    • 67349120926 scopus 로고    scopus 로고
    • New modelling concepts and their impact on resource-constrained project scheduling
    • A. Drexl, J. Juretzka, F. Salewski, A. Schirmer, New modelling concepts and their impact on resource-constrained project scheduling, in: Wȩglarz [193], pp. 413-432.
    • Wȩglarz , vol.193 , pp. 413-432
    • Drexl, A.1    Juretzka, J.2    Salewski, F.3    Schirmer, A.4
  • 64
    • 0033722085 scopus 로고    scopus 로고
    • Progen/πx - An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
    • Drexl A., Nissen R., Patterson J.H., and Salewski F. Progen/πx - An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions. European Journal of Operational Research 125 1 (2000) 59-72
    • (2000) European Journal of Operational Research , vol.125 , Issue.1 , pp. 59-72
    • Drexl, A.1    Nissen, R.2    Patterson, J.H.3    Salewski, F.4
  • 65
    • 38749139204 scopus 로고    scopus 로고
    • A project scheduling problem with labour constraints and time-dependent activities requirements
    • Drezet L.-E., and Billaut J.-C. A project scheduling problem with labour constraints and time-dependent activities requirements. European Journal of Operational Research 112 1 (2008) 217-225
    • (2008) European Journal of Operational Research , vol.112 , Issue.1 , pp. 217-225
    • Drezet, L.-E.1    Billaut, J.-C.2
  • 67
    • 0001273577 scopus 로고
    • An algebra for the analysis of generalized networks
    • Elmaghraby S.E. An algebra for the analysis of generalized networks. Management Science 10 (1964) 419-514
    • (1964) Management Science , vol.10 , pp. 419-514
    • Elmaghraby, S.E.1
  • 68
    • 0035281212 scopus 로고    scopus 로고
    • The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
    • Erenguc S.S., Ahn T., and Conway D.G. The resource constrained project scheduling problem with multiple crashable modes: An exact solution method. Naval Research Logistics 48 (2001) 107-127
    • (2001) Naval Research Logistics , vol.48 , pp. 107-127
    • Erenguc, S.S.1    Ahn, T.2    Conway, D.G.3
  • 69
    • 0030784381 scopus 로고    scopus 로고
    • Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows
    • Etgar R., Shtub A., and LeBlanc L.J. Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows. European Journal of Operational Research 96 1 (1997) 90-96
    • (1997) European Journal of Operational Research , vol.96 , Issue.1 , pp. 90-96
    • Etgar, R.1    Shtub, A.2    LeBlanc, L.J.3
  • 70
    • 77953872652 scopus 로고    scopus 로고
    • Structural questions and priority rule methods
    • Resource-constrained project scheduling with time windows:, Technical Report WIOR-492, Universität Karlsruhe, Germany
    • B. Franck and K. Neumann, Resource-constrained project scheduling with time windows: Structural questions and priority rule methods. Technical Report WIOR-492, Universität Karlsruhe, Germany, 1997.
    • (1997)
    • Franck, B.1    Neumann, K.2
  • 71
    • 33744913189 scopus 로고
    • Different resource-constrained project scheduling models with minimal and maximal time-lags
    • Technical Report WIOR-450, Universität Karlsruhe, Germany
    • B. Franck and C. Schwindt. Different resource-constrained project scheduling models with minimal and maximal time-lags. Technical Report WIOR-450, Universität Karlsruhe, Germany, 1995.
    • (1995)
    • Franck, B.1    Schwindt, C.2
  • 72
    • 0012712572 scopus 로고    scopus 로고
    • A capacity-oriented hierarchical approach to single-item and small-batch production using project scheduling methods
    • Franck B., Neumann K., and Schwindt C. A capacity-oriented hierarchical approach to single-item and small-batch production using project scheduling methods. OR Spektrum 19 (1997) 77-85
    • (1997) OR Spektrum , vol.19 , pp. 77-85
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 73
    • 0442311836 scopus 로고    scopus 로고
    • Project scheduling with calendars
    • Franck B., Neumann K., and Schwindt C. Project scheduling with calendars. OR Spektrum 23 (2001) 325-334
    • (2001) OR Spektrum , vol.23 , pp. 325-334
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 74
  • 78
    • 23044518893 scopus 로고    scopus 로고
    • Packing problems and project scheduling models: An integrating perspective
    • Hartmann S. Packing problems and project scheduling models: An integrating perspective. Journal of the Operational Research Society 51 (2000) 1083-1092
    • (2000) Journal of the Operational Research Society , vol.51 , pp. 1083-1092
    • Hartmann, S.1
  • 79
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • Hartmann S. Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research 102 (2001) 111-135
    • (2001) Annals of Operations Research , vol.102 , pp. 111-135
    • Hartmann, S.1
  • 81
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 (2000) 394-407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 82
    • 0442269144 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A heuristic for the multi-mode case
    • Heilmann R. Resource-constrained project scheduling: A heuristic for the multi-mode case. OR Spektrum 23 (2001) 335-357
    • (2001) OR Spektrum , vol.23 , pp. 335-357
    • Heilmann, R.1
  • 83
    • 0037448273 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
    • Heilmann R. A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags. European Journal of Operational Research 144 (2003) 348-365
    • (2003) European Journal of Operational Research , vol.144 , pp. 348-365
    • Heilmann, R.1
  • 84
    • 77952651437 scopus 로고    scopus 로고
    • Scheduling and staffing multiple projects with a multi-skilled workforce
    • Forthcoming
    • C. Heimerl and R. Kolisch, Scheduling and staffing multiple projects with a multi-skilled workforce, OR Spektrum, 2009. Forthcoming.
    • (2009) OR Spektrum
    • Heimerl, C.1    Kolisch, R.2
  • 86
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen W.S., and Leus R. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165 2 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.S.1    Leus, R.2
  • 89
    • 77953872113 scopus 로고    scopus 로고
    • A multi-agent system for the decentralized resource-constrained multi-project scheduling problem
    • Homberger J. A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. International Transactions in Operational Research 14 (2007) 565589
    • (2007) International Transactions in Operational Research , vol.14 , pp. 565589
    • Homberger, J.1
  • 90
    • 0030262162 scopus 로고    scopus 로고
    • A branch and bound procedure for the resource constrained project scheduling problem with discounted cash-flows
    • Icmeli O., and Erenguc S.S. A branch and bound procedure for the resource constrained project scheduling problem with discounted cash-flows. Management Science 42 (1996) 1395-1408
    • (1996) Management Science , vol.42 , pp. 1395-1408
    • Icmeli, O.1    Erenguc, S.S.2
  • 91
    • 0030233586 scopus 로고    scopus 로고
    • The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows
    • Icmeli O., and Erenguc S.S. The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows. Journal of Operations Management 14 3 (1996) 255-275
    • (1996) Journal of Operations Management , vol.14 , Issue.3 , pp. 255-275
    • Icmeli, O.1    Erenguc, S.S.2
  • 92
    • 0030212866 scopus 로고    scopus 로고
    • Solving the resource constrained project scheduling problem with optimization subroutine library
    • Icmeli O., and Rom W.O. Solving the resource constrained project scheduling problem with optimization subroutine library. Computers and Operations Research 23 8 (1996) 801-817
    • (1996) Computers and Operations Research , vol.23 , Issue.8 , pp. 801-817
    • Icmeli, O.1    Rom, W.O.2
  • 94
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • Jarboui B., Damak N., Siarry P., and Rebai A. A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation 195 (2008) 299-308
    • (2008) Applied Mathematics and Computation , vol.195 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 95
    • 52049101753 scopus 로고    scopus 로고
    • Józefowska J., and Wȩglarz J. (Eds), Springer, Berlin, Germany
    • In: Józefowska J., and Wȩglarz J. (Eds). Perspectives in Modern Project Scheduling (2006), Springer, Berlin, Germany
    • (2006) Perspectives in Modern Project Scheduling
  • 98
    • 0035637003 scopus 로고    scopus 로고
    • Maximizing the net present value of a project under resource constraints using a lagrangian relaxation based heuristic with tight upper bounds
    • Kimms A. Maximizing the net present value of a project under resource constraints using a lagrangian relaxation based heuristic with tight upper bounds. Annals of Operations Research 102 1-4 (2001) 221-236
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 221-236
    • Kimms, A.1
  • 99
    • 21644447132 scopus 로고    scopus 로고
    • A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
    • Kis T. A branch-and-cut algorithm for scheduling of projects with variable-intensity activities. Mathematical Programming A 103 (2005) 515-539
    • (2005) Mathematical Programming A , vol.103 , pp. 515-539
    • Kis, T.1
  • 100
    • 77953872683 scopus 로고    scopus 로고
    • RCPS with Variable intensity activities and feeding precedence constraints
    • T. Kis, RCPS with Variable intensity activities and feeding precedence constraints, in: Wȩglarz [95], pp. 105-129.
    • Wȩglarz , vol.95 , pp. 105-129
    • Kis, T.1
  • 101
    • 0034634797 scopus 로고    scopus 로고
    • Computing lower bounds by destructive improvement - An application to resource-constrained project scheduling
    • Klein R. Computing lower bounds by destructive improvement - An application to resource-constrained project scheduling. International Journal of Production Research 38 (2000) 3937-3952
    • (2000) International Journal of Production Research , vol.38 , pp. 3937-3952
    • Klein, R.1
  • 102
    • 0034634797 scopus 로고    scopus 로고
    • Project scheduling with time-varying resource constraints
    • Klein R. Project scheduling with time-varying resource constraints. International Journal of Production Research 38 (2000) 3937-3952
    • (2000) International Journal of Production Research , vol.38 , pp. 3937-3952
    • Klein, R.1
  • 103
    • 0011725236 scopus 로고    scopus 로고
    • Scattered branch and bound - An adaptive search strategy applied to resource-constrained project scheduling
    • Klein R., and Scholl A. Scattered branch and bound - An adaptive search strategy applied to resource-constrained project scheduling. Central European Journal of Operations Research 7 (2000) 177-201
    • (2000) Central European Journal of Operations Research , vol.7 , pp. 177-201
    • Klein, R.1    Scholl, A.2
  • 104
    • 0345893880 scopus 로고    scopus 로고
    • PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
    • Klein R., and Scholl A. PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem. Mathematical Methods of Operations Research 52 3 (2000) 467-488
    • (2000) Mathematical Methods of Operations Research , vol.52 , Issue.3 , pp. 467-488
    • Klein, R.1    Scholl, A.2
  • 105
    • 34047102496 scopus 로고    scopus 로고
    • A note on the paper by M.A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling
    • Kobylanski P., and Kuchta D. A note on the paper by M.A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling. International Journal of Production Economics 107 (2007) 496-501
    • (2007) International Journal of Production Economics , vol.107 , pp. 496-501
    • Kobylanski, P.1    Kuchta, D.2
  • 106
    • 0033908629 scopus 로고    scopus 로고
    • Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies
    • Kolisch R. Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies. International Journal of Production Economics 64 1-3 (2000) 127-141
    • (2000) International Journal of Production Economics , vol.64 , Issue.1-3 , pp. 127-141
    • Kolisch, R.1
  • 107
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • Kolisch R., and Drexl A. Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 29 (1997) 987-999
    • (1997) IIE Transactions , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 108
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174 (2006) 23-37
    • (2006) European Journal of Operational Research , vol.174 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 109
    • 0002030301 scopus 로고    scopus 로고
    • Classification and computational analysis
    • Heuristic algorithms for solving the resource-constrained project scheduling problem
    • R. Kolisch, S. Hartmann, Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis, in: Wȩglarz [193], pp. 147-178.
    • Wȩglarz , vol.193 , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 110
    • 84955259221 scopus 로고    scopus 로고
    • Selection and scheduling of pharmaceutical research projects
    • Jozefowska J., and Weglarz J. (Eds), Springer, Berlin, Germany
    • Kolisch R., and Meyer K. Selection and scheduling of pharmaceutical research projects. In: Jozefowska J., and Weglarz J. (Eds). Perspectives in Modern Project Scheduling (2006), Springer, Berlin, Germany 321-344
    • (2006) Perspectives in Modern Project Scheduling , pp. 321-344
    • Kolisch, R.1    Meyer, K.2
  • 111
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 29 (2001) 249-272
    • (2001) Omega , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 113
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 (1995) 1693-1703
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 114
    • 0002030298 scopus 로고    scopus 로고
    • Benchmark instances for project scheduling problems
    • R. Kolisch, A. Sprecher, C. Schwindt, Benchmark instances for project scheduling problems, in: Wȩglarz [193], pp. 197-212.
    • Wȩglarz , vol.193 , pp. 197-212
    • Kolisch, R.1    Sprecher, A.2    Schwindt, C.3
  • 117
    • 33751552022 scopus 로고
    • Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties
    • Kurtulus I.S. Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties. Journal of Operations Management 5 (1985) 291-307
    • (1985) Journal of Operations Management , vol.5 , pp. 291-307
    • Kurtulus, I.S.1
  • 118
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus I.S., and Davis E.W. Multi-project scheduling: Categorization of heuristic rules performance. Management Science 28 (1982) 161-172
    • (1982) Management Science , vol.28 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 119
    • 33746254848 scopus 로고    scopus 로고
    • Handling airport ground processes based on resource-constrained project scheduling
    • Kuster J., and Jannach D. Handling airport ground processes based on resource-constrained project scheduling. Lecture Notes in Computer Science 4031 (2006) 166-176
    • (2006) Lecture Notes in Computer Science , vol.4031 , pp. 166-176
    • Kuster, J.1    Jannach, D.2
  • 120
    • 0027306874 scopus 로고
    • Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
    • Lawrence S.R., and Morton T.E. Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics. European Journal of Operational Research 64 2 (1993) 168-187
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 121
    • 49349085445 scopus 로고    scopus 로고
    • Modeling the supply chain configuration problem with resource constraints
    • Li H., and Womer K. Modeling the supply chain configuration problem with resource constraints. International Journal of Project Management 26 6 (2008) 646-654
    • (2008) International Journal of Project Management , vol.26 , Issue.6 , pp. 646-654
    • Li, H.1    Womer, K.2
  • 122
    • 33744511185 scopus 로고    scopus 로고
    • A multi-mode resource-constrained scheduling problem in the context of port operations
    • Lorenzoni L.L., Ahonen H., and de Alvarenga A.G. A multi-mode resource-constrained scheduling problem in the context of port operations. Computers and Industrial Engineering 50 (2006) 55-65
    • (2006) Computers and Industrial Engineering , vol.50 , pp. 55-65
    • Lorenzoni, L.L.1    Ahonen, H.2    de Alvarenga, A.G.3
  • 123
    • 0034559445 scopus 로고    scopus 로고
    • A multicriteria heuristic method to improve resource allocation in multiproject scheduling
    • Lova A., Maroto C., and Tormos P. A multicriteria heuristic method to improve resource allocation in multiproject scheduling. European Journal of Operational Research 127 2 (2000) 408-424
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 124
    • 0033357402 scopus 로고    scopus 로고
    • The project scheduling problem with irregular starting time costs
    • Maniezzo V., and Mingozzi A. The project scheduling problem with irregular starting time costs. Operations Research Letters 25 4 (1999) 175-182
    • (1999) Operations Research Letters , vol.25 , Issue.4 , pp. 175-182
    • Maniezzo, V.1    Mingozzi, A.2
  • 125
    • 12244289668 scopus 로고    scopus 로고
    • Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
    • Mika M., Waligóra G., and Wȩglvarz J. Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research 164 3 (2005) 639-668
    • (2005) European Journal of Operational Research , vol.164 , Issue.3 , pp. 639-668
    • Mika, M.1    Waligóra, G.2    Wȩglvarz, J.3
  • 127
    • 36849084169 scopus 로고    scopus 로고
    • Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
    • Mika M., Waligóra G., and Weglarz J. Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times. European Journal of Operational Research 187 3 (2008) 1238-1250
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1238-1250
    • Mika, M.1    Waligóra, G.2    Weglarz, J.3
  • 129
    • 0037871958 scopus 로고    scopus 로고
    • Solving project scheduling problems by minimum cut computations
    • Möhring R.H., Schulz A.S., Stork F., and Uetz M. Solving project scheduling problems by minimum cut computations. Management Science 49 (2003) 330-350
    • (2003) Management Science , vol.49 , pp. 330-350
    • Möhring, R.H.1    Schulz, A.S.2    Stork, F.3    Uetz, M.4
  • 130
    • 0346713432 scopus 로고    scopus 로고
    • Knowledge-based multiobjective project scheduling problems
    • J. Nabrzynski, J. Wȩglarz, Knowledge-based multiobjective project scheduling problems, in: Wȩglarz [193], pp. 383-411.
    • Wȩglarz , vol.193 , pp. 383-411
    • Nabrzynski, J.1    Wȩglarz, J.2
  • 131
    • 33845784358 scopus 로고    scopus 로고
    • A genetic algorithm for resource investment problem with discounted cash flows
    • Najafi A.A., and Niaki S.T.A. A genetic algorithm for resource investment problem with discounted cash flows. Applied Mathematics and Computation 183 2 (2006) 1057-1070
    • (2006) Applied Mathematics and Computation , vol.183 , Issue.2 , pp. 1057-1070
    • Najafi, A.A.1    Niaki, S.T.A.2
  • 132
  • 135
    • 0012408586 scopus 로고    scopus 로고
    • Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints
    • Neumann K., and Zimmermann J. Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. Central European Journal of Operations Research 10 (2002) 357-380
    • (2002) Central European Journal of Operations Research , vol.10 , pp. 357-380
    • Neumann, K.1    Zimmermann, J.2
  • 136
    • 77953870809 scopus 로고    scopus 로고
    • Methods for resource-constrained project scheduling problem with regular and nonregular objective functions and schedule-dependent time windows
    • K. Neumann, J. Zimmermann, Methods for resource-constrained project scheduling problem with regular and nonregular objective functions and schedule-dependent time windows, in: Wȩglarz [193], pp. 261-288.
    • Wȩglarz , vol.193 , pp. 261-288
    • Neumann, K.1    Zimmermann, J.2
  • 137
    • 0034559447 scopus 로고    scopus 로고
    • Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
    • Neumann K., and Zimmermann J. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research 127 2 (2000) 425-443
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 425-443
    • Neumann, K.1    Zimmermann, J.2
  • 138
    • 17444428192 scopus 로고    scopus 로고
    • Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
    • Neumann K., Schwindt C., and Zimmermann J. Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications. Central European Journal of Operations Research 10 (2002) 113-148
    • (2002) Central European Journal of Operations Research , vol.10 , pp. 113-148
    • Neumann, K.1    Schwindt, C.2    Zimmermann, J.3
  • 139
    • 13444269157 scopus 로고    scopus 로고
    • Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
    • Neumann K., Schwindt C., and Trautmann N. Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. European Journal of Operational Research 165 (2005) 495-509
    • (2005) European Journal of Operational Research , vol.165 , pp. 495-509
    • Neumann, K.1    Schwindt, C.2    Trautmann, N.3
  • 140
    • 77953870160 scopus 로고    scopus 로고
    • Resource-constrained project scheduling with time windows: Recent developments and new applications
    • K. Neumann, C. Schwindt, J. Zimmermann, Resource-constrained project scheduling with time windows: Recent developments and new applications, in: Józefowska, Wȩglarz [95], pp. 375-407.
    • Józefowska, Wȩglarz , vol.95 , pp. 375-407
    • Neumann, K.1    Schwindt, C.2    Zimmermann, J.3
  • 141
    • 84888782064 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem
    • Ribeiro C.C., and Hansen P. (Eds), Kluwer Academic Publishers.
    • Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro C.C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2002), Kluwer Academic Publishers. 557-588
    • (2002) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 142
    • 77953869930 scopus 로고    scopus 로고
    • A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost functions
    • K. Nonobe, T. Ibaraki, A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost functions, in: Józefowska, Wȩglarz [95], pp. 225-248.
    • Józefowska, Wȩglarz , vol.95 , pp. 225-248
    • Nonobe, K.1    Ibaraki, T.2
  • 143
    • 0442327390 scopus 로고    scopus 로고
    • The resource renting problem subject to temporal constraints
    • Nübel H. The resource renting problem subject to temporal constraints. OR Spektrum 23 (2001) 359-381
    • (2001) OR Spektrum , vol.23 , pp. 359-381
    • Nübel, H.1
  • 144
    • 0030830501 scopus 로고    scopus 로고
    • Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs
    • Nudtasomboon N., and Randhawa S.U. Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs. Computers and Industrial Engineering 32 1 (1997) 227-242
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.1 , pp. 227-242
    • Nudtasomboon, N.1    Randhawa, S.U.2
  • 146
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Özdamar L., and Ulusoy G. A survey on the resource-constrained project scheduling problem. IIE Transactions 27 (1995) 574-586
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 148
    • 33646387470 scopus 로고    scopus 로고
    • Knowledge integration using problem spaces: A study in resource-constrained project scheduling
    • Padman R., and Zhu D. Knowledge integration using problem spaces: A study in resource-constrained project scheduling. Journal of Scheduling 9 2 (2006) 133-152
    • (2006) Journal of Scheduling , vol.9 , Issue.2 , pp. 133-152
    • Padman, R.1    Zhu, D.2
  • 149
    • 78549252856 scopus 로고    scopus 로고
    • Lower bounds in different problem classes of project schedules with resource constraints
    • E. Pesch, Lower bounds in different problem classes of project schedules with resource constraints, in: Wȩglarz [193], pp. 53-76.
    • Wȩglarz , vol.193 , pp. 53-76
    • Pesch, E.1
  • 150
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker A.A.B., Watters L.J., and Wolfe P.M. Multiproject scheduling with limited resources: A zero-one programming approach. Management Science 16 (1969) 93-107
    • (1969) Management Science , vol.16 , pp. 93-107
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 151
    • 34548127710 scopus 로고    scopus 로고
    • Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
    • Ranjbar M., and Kianfar F. Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms. Applied Mathematics and Computation 191 (2007) 451-456
    • (2007) Applied Mathematics and Computation , vol.191 , pp. 451-456
    • Ranjbar, M.1    Kianfar, F.2
  • 152
    • 38649127603 scopus 로고    scopus 로고
    • Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
    • Ranjbar M., Kianfar F., and Shadrokh S. Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm. Applied Mathematics and Computation 196 (2008) 879-888
    • (2008) Applied Mathematics and Computation , vol.196 , pp. 879-888
    • Ranjbar, M.1    Kianfar, F.2    Shadrokh, S.3
  • 153
    • 52049097838 scopus 로고    scopus 로고
    • A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
    • Ranjbar M., de Reyck B., and Kianfar F. A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling. European Journal of Operational Research 193 (2009) 35-48
    • (2009) European Journal of Operational Research , vol.193 , pp. 35-48
    • Ranjbar, M.1    de Reyck, B.2    Kianfar, F.3
  • 154
    • 0036062756 scopus 로고    scopus 로고
    • MRP in a job shop environment using a resource constrained project scheduling model
    • Rom W.O., Tukel O.I., and Muscatello J.R. MRP in a job shop environment using a resource constrained project scheduling model. Omega 30 4 (2002) 275-286
    • (2002) Omega , vol.30 , Issue.4 , pp. 275-286
    • Rom, W.O.1    Tukel, O.I.2    Muscatello, J.R.3
  • 156
    • 42149186441 scopus 로고    scopus 로고
    • A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    • Sabzehparvar M., and Seyed-Hosseini S.M. A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags. Journal of Supercomputing 44 3 (2008) 257-273
    • (2008) Journal of Supercomputing , vol.44 , Issue.3 , pp. 257-273
    • Sabzehparvar, M.1    Seyed-Hosseini, S.M.2
  • 157
    • 0034288713 scopus 로고    scopus 로고
    • Probe backtrack search for minimal perturbation in dynamic scheduling
    • Sakkout H., and Wallace M. Probe backtrack search for minimal perturbation in dynamic scheduling. Constraints 5 4 (2000) 359-388
    • (2000) Constraints , vol.5 , Issue.4 , pp. 359-388
    • Sakkout, H.1    Wallace, M.2
  • 158
    • 0031250372 scopus 로고    scopus 로고
    • Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
    • Salewski F., Schirmer A., and Drexl A. Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application. European Journal of Operational Research 102 (1997) 88-110
    • (1997) European Journal of Operational Research , vol.102 , pp. 88-110
    • Salewski, F.1    Schirmer, A.2    Drexl, A.3
  • 159
    • 0035219341 scopus 로고    scopus 로고
    • Allocation of partially renewable resources - Concepts, capabilities, and applications
    • Schirmer A., and Drexl A. Allocation of partially renewable resources - Concepts, capabilities, and applications. Networks 37 (2001) 21-34
    • (2001) Networks , vol.37 , pp. 21-34
    • Schirmer, A.1    Drexl, A.2
  • 160
    • 0042176683 scopus 로고    scopus 로고
    • Environment-oriented project scheduling for the dismantling of buildings
    • Schultmann F., and Rentz O. Environment-oriented project scheduling for the dismantling of buildings. OR Spectrum 23 1 (2001) 51-78
    • (2001) OR Spectrum , vol.23 , Issue.1 , pp. 51-78
    • Schultmann, F.1    Rentz, O.2
  • 161
    • 0011006529 scopus 로고    scopus 로고
    • Generation of resource-constrained project scheduling problems subject to temporal constraints
    • Technical Report WIOR-543, Universität Karlsruhe, Germany
    • C. Schwindt, Generation of resource-constrained project scheduling problems subject to temporal constraints, Technical Report WIOR-543, Universität Karlsruhe, Germany, 1998.
    • (1998)
    • Schwindt, C.1
  • 162
    • 0001775820 scopus 로고    scopus 로고
    • Batch scheduling in process industries: An application of resource-constrained project scheduling
    • Schwindt C., and Trautmann N. Batch scheduling in process industries: An application of resource-constrained project scheduling. OR Spectrum 22 4 (2000) 501-524
    • (2000) OR Spectrum , vol.22 , Issue.4 , pp. 501-524
    • Schwindt, C.1    Trautmann, N.2
  • 163
    • 33847297058 scopus 로고    scopus 로고
    • A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
    • Shadrokh S., and Kianfar F. A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty. European Journal of Operational Research 181 1 (2007) 86-101
    • (2007) European Journal of Operational Research , vol.181 , Issue.1 , pp. 86-101
    • Shadrokh, S.1    Kianfar, F.2
  • 164
    • 0030571697 scopus 로고    scopus 로고
    • Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
    • Shtub A., LeBlanc L.J., and Cai Z. Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. European Journal of Operational Research 88 (1996) 124-138
    • (1996) European Journal of Operational Research , vol.88 , pp. 124-138
    • Shtub, A.1    LeBlanc, L.J.2    Cai, Z.3
  • 165
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
    • Słowiński R. Multiobjective network scheduling with efficient use of renewable and nonrenewable resources. European Journal of Operational Research 7 (1981) 265-273
    • (1981) European Journal of Operational Research , vol.7 , pp. 265-273
    • Słowiński, R.1
  • 169
    • 29344475492 scopus 로고    scopus 로고
    • Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrating perspective
    • Stadtler H. Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrating perspective. International Journal of Production Research 43 (2005) 5253-5270
    • (2005) International Journal of Production Research , vol.43 , pp. 5253-5270
    • Stadtler, H.1
  • 170
    • 12244281005 scopus 로고
    • A project activity scheduling problem with net present value measure
    • Sung C.S., and Lim S.K. A project activity scheduling problem with net present value measure. International Journal of Production Economics 37 2-3 (1994) 177-187
    • (1994) International Journal of Production Economics , vol.37 , Issue.2-3 , pp. 177-187
    • Sung, C.S.1    Lim, S.K.2
  • 171
    • 34250621376 scopus 로고    scopus 로고
    • A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
    • Tareghian H.R., and Taheri S.H. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. Applied Mathematics and Computation 190 2 (2007) 1136-1145
    • (2007) Applied Mathematics and Computation , vol.190 , Issue.2 , pp. 1136-1145
    • Tareghian, H.R.1    Taheri, S.H.2
  • 172
    • 0036027411 scopus 로고    scopus 로고
    • A review of the contribution of operational research to project management
    • Tavares L.V. A review of the contribution of operational research to project management. European Journal of Operational Research 136 1 (2002) 1-18
    • (2002) European Journal of Operational Research , vol.136 , Issue.1 , pp. 1-18
    • Tavares, L.V.1
  • 173
    • 53649107339 scopus 로고    scopus 로고
    • Scheduling projects with heterogeneous resources to meet time and quality objectives
    • Tiwari V., Patterson J.H., and Mabert V.A. Scheduling projects with heterogeneous resources to meet time and quality objectives. European Journal of Operational Research 193 3 (2009) 780-790
    • (2009) European Journal of Operational Research , vol.193 , Issue.3 , pp. 780-790
    • Tiwari, V.1    Patterson, J.H.2    Mabert, V.A.3
  • 174
    • 0035283872 scopus 로고    scopus 로고
    • Analysis of supplier buyer relationships using resource constrained project scheduling strategies
    • Tukel O.I., and Wasti S.N. Analysis of supplier buyer relationships using resource constrained project scheduling strategies. European Journal of Operational Research 129 2 (2001) 271-276
    • (2001) European Journal of Operational Research , vol.129 , Issue.2 , pp. 271-276
    • Tukel, O.I.1    Wasti, S.N.2
  • 175
    • 0034561525 scopus 로고    scopus 로고
    • An equitable approach to the payment scheduling problem in project management
    • Ulusoy G., and Cebelli S. An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research 127 2 (2000) 262-278
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 262-278
    • Ulusoy, G.1    Cebelli, S.2
  • 176
    • 0042788727 scopus 로고    scopus 로고
    • Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
    • Ulusoy G., Sivrikaya-Şerifoǧlu F., and Şahin S. Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows. Annals of Operations Research 102 1-4 (2001) 237-261
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 237-261
    • Ulusoy, G.1    Sivrikaya-Şerifoǧlu, F.2    Şahin, S.3
  • 177
    • 34249890486 scopus 로고    scopus 로고
    • A classification of predictive-reactive project scheduling procedures
    • Van de Vonder S., Demeulemeester E.L., and Herroelen W.S. A classification of predictive-reactive project scheduling procedures. Journal of Scheduling 10 3 (2007) 195-207
    • (2007) Journal of Scheduling , vol.10 , Issue.3 , pp. 195-207
    • Van de Vonder, S.1    Demeulemeester, E.L.2    Herroelen, W.S.3
  • 178
    • 41449117771 scopus 로고    scopus 로고
    • Setup times and fast tracking in resource-constrained project scheduling
    • Vanhoucke M. Setup times and fast tracking in resource-constrained project scheduling. Computers and Industrial Engineering 54 4 (2008) 1062-1070
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 1062-1070
    • Vanhoucke, M.1
  • 179
    • 33745888696 scopus 로고    scopus 로고
    • Scheduling an R&D project with quality-dependent time slots
    • Vanhoucke M. Scheduling an R&D project with quality-dependent time slots. Lecture Notes in Computer Science 3982 (2006) 621-630
    • (2006) Lecture Notes in Computer Science , vol.3982 , pp. 621-630
    • Vanhoucke, M.1
  • 181
    • 0035435965 scopus 로고    scopus 로고
    • On maximizing the net present value of a project under renewable resource constraints
    • Vanhoucke M., Demeulemeester E.L., and Herroelen W.S. On maximizing the net present value of a project under renewable resource constraints. Management Science 47 (2001) 1113-1121
    • (2001) Management Science , vol.47 , pp. 1113-1121
    • Vanhoucke, M.1    Demeulemeester, E.L.2    Herroelen, W.S.3
  • 182
    • 0035617606 scopus 로고    scopus 로고
    • An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
    • Vanhoucke M., Demeulemeester E.L., and Herroelen W.S. An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem. Annals of Operations Research 102 (2001) 179-196
    • (2001) Annals of Operations Research , vol.102 , pp. 179-196
    • Vanhoucke, M.1    Demeulemeester, E.L.2    Herroelen, W.S.3
  • 187
    • 34548564553 scopus 로고    scopus 로고
    • Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry
    • Varma V.A., Uzsoy R., Pekny J., and Blau G. Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry. Journal of Heuristics 13 5 (2007) 403-433
    • (2007) Journal of Heuristics , vol.13 , Issue.5 , pp. 403-433
    • Varma, V.A.1    Uzsoy, R.2    Pekny, J.3    Blau, G.4
  • 188
    • 0343496853 scopus 로고    scopus 로고
    • Using metaheuristics in multiobjective resource constrained project scheduling
    • Viana A., and de Sousa J.P. Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research 120 2 (2000) 359-374
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 359-374
    • Viana, A.1    de Sousa, J.P.2
  • 189
    • 37849188714 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
    • Voß S., and Witt A. Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application. International Journal of Production Economics 105 2 (2007) 445-458
    • (2007) International Journal of Production Economics , vol.105 , Issue.2 , pp. 445-458
    • Voß, S.1    Witt, A.2
  • 190
    • 36348965285 scopus 로고    scopus 로고
    • Discrete-continuous project scheduling with discounted cash flows - A tabu search approach
    • Waligóra G. Discrete-continuous project scheduling with discounted cash flows - A tabu search approach. Computers and Operations Research 35 7 (2008) 2141-2153
    • (2008) Computers and Operations Research , vol.35 , Issue.7 , pp. 2141-2153
    • Waligóra, G.1
  • 191
    • 0018923627 scopus 로고
    • On certain models of resource allocation problems
    • Wȩglarz J. On certain models of resource allocation problems. Kybernetics 9 (1981) 61-66
    • (1981) Kybernetics , vol.9 , pp. 61-66
    • Wȩglarz, J.1
  • 192
    • 0019612987 scopus 로고
    • Project scheduling with continuously divisible, doubly-con-strained resources
    • Wȩglarz J. Project scheduling with continuously divisible, doubly-con-strained resources. Management Science 27 (1981) 1040-1057
    • (1981) Management Science , vol.27 , pp. 1040-1057
    • Wȩglarz, J.1
  • 195
    • 33845504706 scopus 로고    scopus 로고
    • Robust optimization models for project scheduling with resource availability cost
    • Yamashita D.S., Armentano V.A., and Laguna M. Robust optimization models for project scheduling with resource availability cost. Journal of Scheduling 10 1 (2007) 67-76
    • (2007) Journal of Scheduling , vol.10 , Issue.1 , pp. 67-76
    • Yamashita, D.S.1    Armentano, V.A.2    Laguna, M.3
  • 196
    • 0033897639 scopus 로고    scopus 로고
    • Finding the critical path in an activity network with time-switch constraints
    • Yang H.H., and Chen Y.L. Finding the critical path in an activity network with time-switch constraints. European Journal of Operational Research 120 (2000) 603-613
    • (2000) European Journal of Operational Research , vol.120 , pp. 603-613
    • Yang, H.H.1    Chen, Y.L.2
  • 197
    • 15844407876 scopus 로고    scopus 로고
    • Disruption management for resource-constrained project scheduling
    • Zhu G., Bard J.F., and Yu G. Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society 56 (2005) 365-381
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 365-381
    • Zhu, G.1    Bard, J.F.2    Yu, G.3
  • 198
    • 33748521972 scopus 로고    scopus 로고
    • A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
    • Zhu G., Bard J.F., and Yu G. A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem. INFORMS Journal on Computing 18 (2006) 377-390
    • (2006) INFORMS Journal on Computing , vol.18 , pp. 377-390
    • Zhu, G.1    Bard, J.F.2    Yu, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.