Project scheduling with time-varying resource constraints

Author keywords

[No Author keywords available]

Indexed keywords

CONCURRENT ENGINEERING; CONSTRAINT THEORY; HEURISTIC METHODS; PROBLEM SOLVING;

EID: 0034634797     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540050176094     Document Type: Article
Times cited : (73)

References (31)
  • 1
    • 0003131416 scopus 로고    scopus 로고
    • Tabu-search algorithms for the resource-constrained project scheduling problem
    • edited by S. VOSS, S. Martello, I. Osman and C. Roucairol (Boston: Kluwer)
    • Baar, T., Brucker P. and Knust, S., 1998, Tabu-search algorithms for the resource-constrained project scheduling problem. Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization, edited by S. VOSS, S. Martello, I. Osman and C. Roucairol (Boston: Kluwer), pp. 1-18.
    • (1998) Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization , pp. 1-18
    • Baar, T.1    Brucker, P.2    Knust, S.3
  • 3
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • Boctor, F.F., 1996, Resource-constrained project scheduling by simulated annealing. International Journal of Production Research, 34, 2335-2351.
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 5
    • 0011725015 scopus 로고
    • An algorithm for finding optimal or near optimal solutions to the production scheduling problem
    • January February
    • Brooks, G.H. and White, C.R., 1965, An algorithm for finding optimal or near optimal solutions to the production scheduling problem. Journal of Industrial Engineering, January February, 34-40.
    • (1965) Journal of Industrial Engineering , pp. 34-40
    • Brooks, G.H.1    White, C.R.2
  • 8
    • 0030574803 scopus 로고    scopus 로고
    • Modeling setup times, process batches and transfer batches using activity network logic
    • Demeulemeester, E.L. and Herroelen, W.S., 1996, Modeling setup times, process batches and transfer batches using activity network logic. European Journal of Operational Research, 89, 355-365; 1997, A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Operations Research, 45, 201-212.
    • (1996) European Journal of Operational Research , vol.89 , pp. 355-365
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 9
    • 0031097802 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the generalized resource-constrained project scheduling problem
    • Demeulemeester, E.L. and Herroelen, W.S., 1996, Modeling setup times, process batches and transfer batches using activity network logic. European Journal of Operational Research, 89, 355-365; 1997, A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Operations Research, 45, 201-212.
    • (1997) Operations Research , vol.45 , pp. 201-212
  • 12
    • 11644286761 scopus 로고    scopus 로고
    • Scheduling medical research experiments - An application of project scheduling methods
    • University of Kiel
    • Hartmann, S., 1997, Scheduling medical research experiments-An application of project scheduling methods. Manuskripte aus den Instituten für Betriebswirtsehaftslehre, 452, University of Kiel.
    • (1997) Manuskripte aus den Instituten für Betriebswirtsehaftslehre , vol.452
    • Hartmann, S.1
  • 13
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic alogrithm for resource-constrained project scheduling
    • Hartmann, S., 1998, A competitive genetic alogrithm for resource-constrained project scheduling. Naval Research Logistics, 45, 733-750.
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 15
    • 0002866635 scopus 로고
    • The critical-path method: Resources planning and scheduling
    • edited by J.F. Muth and G.L. Thompson (Englewood Cliffs: Prentice Hall)
    • Kelley, J.E., 1963, The critical-path method: resources planning and scheduling. Industrial Scheduling, edited by J.F. Muth and G.L. Thompson (Englewood Cliffs: Prentice Hall), pp. 347-365.
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.E.1
  • 16
    • 0034544454 scopus 로고    scopus 로고
    • Bidirectional planning-improving priority rule based heuristics for scheduling resource-constrained projects
    • Klein, R., 2000a, Bidirectional planning-improving priority rule based heuristics for scheduling resource-constrained projects. To appear in: European Journal of Operational Research, 127; 2000b, Scheduling of Resource-Constrained Projects (Boston: Kluwer).
    • (2000) European Journal of Operational Research , pp. 127
    • Klein, R.1
  • 17
    • 0034544454 scopus 로고    scopus 로고
    • Boston: Kluwer
    • Klein, R., 2000a, Bidirectional planning-improving priority rule based heuristics for scheduling resource-constrained projects. To appear in: European Journal of Operational Research, 127; 2000b, Scheduling of Resource-Constrained Projects (Boston: Kluwer).
    • (2000) Scheduling of Resource-Constrained Projects
  • 18
    • 0011779933 scopus 로고    scopus 로고
    • Progress: Optimally solving the generalized resource-constrained project scheduling problem
    • Klein, R. and Scholl, A., 1998, Progress: Optimally solving the generalized resource-constrained project scheduling problem. Mathematical Methods of Operations Research, to be published; 1999, Scattered branch and bound An adaptive search strategy applied to resource-constrained project scheduling. Central European Journal of Operations Research, 7, 177-201.
    • (1998) Mathematical Methods of Operations Research
    • Klein, R.1    Scholl, A.2
  • 19
    • 0011725236 scopus 로고    scopus 로고
    • Scattered branch and bound An adaptive search strategy applied to resource-constrained project scheduling
    • Klein, R. and Scholl, A., 1998, Progress: Optimally solving the generalized resource-constrained project scheduling problem. Mathematical Methods of Operations Research, to be published; 1999, Scattered branch and bound An adaptive search strategy applied to resource-constrained project scheduling. Central European Journal of Operations Research, 7, 177-201.
    • (1999) Central European Journal of Operations Research , vol.7 , pp. 177-201
  • 20
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch, R., 1996a, Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14, 179-192; 1996b, Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. European Journal of Operational Research, 90, 320-333.
    • (1996) Journal of Operations Management , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 21
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch, R., 1996a, Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14, 179-192; 1996b, Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. European Journal of Operational Research, 90, 320-333.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
  • 22
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • edited by J. Weglarz (Boston: Kluwer)
    • Kolisch, R. and Hartmann, S., 1999, Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. Handbook on Recent Advances in Project Scheduling, edited by J. Weglarz (Boston: Kluwer), pp. 147-178.
    • (1999) Handbook on Recent Advances in Project Scheduling , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 23
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A. and Drexl, A., 1995, Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41, 1693-1703.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 25
    • 33845274958 scopus 로고
    • Strength and adaptability of problem-space based neighbourhoods for resource-constrained scheduling
    • Leon, V.J. and Balakrishnan, R., 1995, Strength and adaptability of problem-space based neighbourhoods for resource-constrained scheduling. OR Spektrum, 17, 173-182.
    • (1995) OR Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Balakrishnan, R.2
  • 27
    • 0000497721 scopus 로고    scopus 로고
    • Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
    • Neumann, K. and Schwindt, Ch., 1997, Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. OR Spektrum, 19, 205-217.
    • (1997) OR Spektrum , vol.19 , pp. 205-217
    • Neumann, K.1    Schwindt, Ch.2
  • 28
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J.H., 1984, A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science, 30, 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 29
    • 0030105481 scopus 로고    scopus 로고
    • A multiple-tree search procedure for the resource-constrained project scheduling problem
    • Simpson, W.P. and Patterson, J.H., 1996, A multiple-tree search procedure for the resource-constrained project scheduling problem. European Journal of Operational Research, 89, 525-542.
    • (1996) European Journal of Operational Research , vol.89 , pp. 525-542
    • Simpson, W.P.1    Patterson, J.H.2
  • 30
    • 0029636114 scopus 로고
    • Semi-active, active and nondelay schedules for the resource-constrained project scheduling problem
    • Sprecher, A., Kolisch, R. and Drexl, A., 1995, Semi-active, active and nondelay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research, 80, 94-102.
    • (1995) European Journal of Operational Research , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.