A review of the contribution of operation research to project management
-
Tavares L.V. A review of the contribution of operation research to project management. European Journal of Operational Research 136 (2002) 1-18
-
(2002)
European Journal of Operational Research
, vol.136
, pp. 1-18
-
-
Tavares, L.V.1
-
2
-
-
0032736579
-
Resource-constrained project scheduling: notation, classification, models and methods
-
Brucker P., Drexl A., Mohring R., Neumann K., and Pesch E. Resource-constrained project scheduling: notation, classification, models and methods. European Journal of Operational Research 112 (1999) 3-41
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Mohring, R.3
Neumann, K.4
Pesch, E.5
-
3
-
-
0021161421
-
Minimizing costs of resource requirements in project networks subject to a fix completion time
-
Mohring R.H. Minimizing costs of resource requirements in project networks subject to a fix completion time. Operational Research 32 (1984) 89-120
-
(1984)
Operational Research
, vol.32
, pp. 89-120
-
-
Mohring, R.H.1
-
4
-
-
0000463458
-
Minimizing resource availability costs in time limited project networks
-
Demeulemeester E.L. Minimizing resource availability costs in time limited project networks. Management Science 41 (1995) 1590-1598
-
(1995)
Management Science
, vol.41
, pp. 1590-1598
-
-
Demeulemeester, E.L.1
-
5
-
-
85008862604
-
Optimal resource determination for project scheduling
-
Akpan E.O.P. Optimal resource determination for project scheduling. Production Planning and Control 8 (1997) 462-468
-
(1997)
Production Planning and Control
, vol.8
, pp. 462-468
-
-
Akpan, E.O.P.1
-
6
-
-
0035280765
-
Optimization guided lower and upper bounds for the resource investment problem
-
Drexl A., and Kimms A. Optimization guided lower and upper bounds for the resource investment problem. Journal of the Operational Research Society 52 (2001) 340-351
-
(2001)
Journal of the Operational Research Society
, vol.52
, pp. 340-351
-
-
Drexl, A.1
Kimms, A.2
-
7
-
-
33845788755
-
-
S. Shadrokh, F. Kianfar, A genetic algorithm for resource investment problem, Ph.D. thesis, Sharif University of Technology, Iran, 2004.
-
-
-
-
8
-
-
33845730379
-
-
J. Zimmermann, H. Engelhardt, Lower bounds and exact algorithms for resource leveling problems, Technical Report 517, University of Karlsruhe, Germany, 1998.
-
-
-
-
9
-
-
33845735126
-
-
H. Nübel, A branch and bound procedure for the resource investment problem subject to temporal constraints, Technical Report 574, University of Karlsruhe, Germany, 1999.
-
-
-
-
10
-
-
0442327390
-
The resource renting problem subject to temporal constraints
-
Nübel H. The resource renting problem subject to temporal constraints. OR Spektrum 23 (2001) 574-586
-
(2001)
OR Spektrum
, vol.23
, pp. 574-586
-
-
Nübel, H.1
-
11
-
-
0017478425
-
Scheduling a project to maximize its present value; zero-one programming approach
-
Doersch R.H., and Patterson J.H. Scheduling a project to maximize its present value; zero-one programming approach. Management Science 23 (1977) 882-889
-
(1977)
Management Science
, vol.23
, pp. 882-889
-
-
Doersch, R.H.1
Patterson, J.H.2
-
12
-
-
0000637036
-
Cash flows in networks
-
Russell A.H. Cash flows in networks. Management Science 16 (1970) 357-373
-
(1970)
Management Science
, vol.16
, pp. 357-373
-
-
Russell, A.H.1
-
15
-
-
0022794872
-
A comparison of heuristics for scheduling projects with cash flows and resource restrictions
-
Russell R.A. A comparison of heuristics for scheduling projects with cash flows and resource restrictions. Management Science 32 (1986) 291-300
-
(1986)
Management Science
, vol.32
, pp. 291-300
-
-
Russell, R.A.1
-
16
-
-
38249035744
-
Maximizing the net present value of a project subject to materials and capital constraints
-
Smith-Daniels D.E., and Smith-Daniels V.L. Maximizing the net present value of a project subject to materials and capital constraints. Journal of Operations Management 7 (1987) 33-45
-
(1987)
Journal of Operations Management
, vol.7
, pp. 33-45
-
-
Smith-Daniels, D.E.1
Smith-Daniels, V.L.2
-
17
-
-
0030262162
-
A branch and bound procedure the resource-constrained project scheduling problem with discounted cash flows
-
Icmeli O., and Erenguc S.S. A branch and bound procedure the resource-constrained project scheduling problem with discounted cash flows. Management Science 42 (1996) 1395-1408
-
(1996)
Management Science
, vol.42
, pp. 1395-1408
-
-
Icmeli, O.1
Erenguc, S.S.2
-
19
-
-
33845741622
-
-
E. Demeulemeester, W. Herroelen, P. Van Dommelen, An optimal recursive search procedure for the deterministic unconstrained Max-npv project scheduling problem, Research Report 9603, Department of Applied Economics, K.U. Leuven, 1996.
-
-
-
-
20
-
-
33845727087
-
-
C. Sepil, B. Kazaz, Project scheduling with discounted cash flows and progress payments, Working Paper, Middle East Technical University, 1995.
-
-
-
-
21
-
-
33845804314
-
-
D.E. Smith-Daniels, Summary measures for predicting the net present value of a project, Working Paper, College of St. Thomas, Minnesota, 1986.
-
-
-
-
22
-
-
33845733182
-
-
S.M. Baroum, An exact solution procedure for maximizing the net present value of resource-constrained projects, Ph.D. thesis, Indiana University, 1992.
-
-
-
-
23
-
-
0027235016
-
Scheduling a project to maximize its net present value; an integer programming approach
-
Yang K.K., Talbot F.B., and Patterson J.H. Scheduling a project to maximize its net present value; an integer programming approach. European Journal of Operational Research 64 (1992) 188-198
-
(1992)
European Journal of Operational Research
, vol.64
, pp. 188-198
-
-
Yang, K.K.1
Talbot, F.B.2
Patterson, J.H.3
-
24
-
-
84985756242
-
Using a late start resource constrained project schedule to improve net present value
-
Smith-Daniels D.E., and Aquilano N.J. Using a late start resource constrained project schedule to improve net present value. Decision Sciences 18 (1987) 617-630
-
(1987)
Decision Sciences
, vol.18
, pp. 617-630
-
-
Smith-Daniels, D.E.1
Aquilano, N.J.2
-
25
-
-
0030231623
-
The development of cash flow weight procedures for maximizing the net present value of a project
-
Baroum S.M., and Patterson J.H. The development of cash flow weight procedures for maximizing the net present value of a project. Journal of Operation Management 14 (1996) 209-227
-
(1996)
Journal of Operation Management
, vol.14
, pp. 209-227
-
-
Baroum, S.M.1
Patterson, J.H.2
-
26
-
-
33845783799
-
-
R. Padman, J.H. Patterson, A comparative evaluation of cash flow weight heuristics for maximizing the net present value of a project, Working Paper, King Abdul Aziz University, 1993.
-
-
-
-
27
-
-
33845763409
-
-
R. Padman, D.E. Smith-Daniels, V.L. Smith-Daniels, Heuristic scheduling of resource-constrained project scheduling problem with discounted cash flows: an optimization-guided approach, Working Paper, Arnegie-Ellon University, 1990.
-
-
-
-
28
-
-
3543056985
-
A heuristic scheduling algorithm for improving the duration and net present value of a project
-
Ulusoy G., and Ozdamar L. A heuristic scheduling algorithm for improving the duration and net present value of a project. International Journal of Operations and Production Management 15 (1995) 89-98
-
(1995)
International Journal of Operations and Production Management
, vol.15
, pp. 89-98
-
-
Ulusoy, G.1
Ozdamar, L.2
-
29
-
-
33845734149
-
-
R. Padman, D.E. Smith-Daniels, Maximizing the net present value of capital constrained projects: an optimization guided approach, Working Paper, Carnegie Mellon University, 1993.
-
-
-
-
30
-
-
0031271266
-
Performance of the heuristic procedures for constrained projects with progress payments
-
Sepil C., and Ortac N. Performance of the heuristic procedures for constrained projects with progress payments. Journal of the Operational Research Society 48 (1997) 1123-1130
-
(1997)
Journal of the Operational Research Society
, vol.48
, pp. 1123-1130
-
-
Sepil, C.1
Ortac, N.2
-
31
-
-
33845796595
-
-
S.S. Erenguc, S. Tufekei, C.J. Zappe, The solution of the time/cost trade-off problem with discounted cash flows using generalized benders decomposition, Research Report, University of Florida, 1991.
-
-
-
-
32
-
-
0042788727
-
Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
-
Ulusoy G., and Sivrikaya F. Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows. Annals of Operations Research 102 (2001) 237-261
-
(2001)
Annals of Operations Research
, vol.102
, pp. 237-261
-
-
Ulusoy, G.1
Sivrikaya, F.2
-
34
-
-
0030232836
-
Using discounted cash flow heuristics to improve project net present value
-
Pinder J.P., and Marucheck A.S. Using discounted cash flow heuristics to improve project net present value. Journal of Operation Management 14 (1996) 229-240
-
(1996)
Journal of Operation Management
, vol.14
, pp. 229-240
-
-
Pinder, J.P.1
Marucheck, A.S.2
-
35
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolish R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 (1995) 1693-1703
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolish, R.1
Sprecher, A.2
Drexl, A.3
-
36
-
-
33845755376
-
-