메뉴 건너뛰기




Volumn 183, Issue 2, 2006, Pages 1057-1070

A genetic algorithm for resource investment problem with discounted cash flows

Author keywords

Genetic algorithms; Net present value; Project scheduling; Resource investment

Indexed keywords

FUNCTIONS; OPTIMIZATION; PROBLEM SOLVING;

EID: 33845784358     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2006.05.118     Document Type: Article
Times cited : (47)

References (36)
  • 1
    • 0036027411 scopus 로고    scopus 로고
    • A review of the contribution of operation research to project management
    • Tavares L.V. A review of the contribution of operation research to project management. European Journal of Operational Research 136 (2002) 1-18
    • (2002) European Journal of Operational Research , vol.136 , pp. 1-18
    • Tavares, L.V.1
  • 3
    • 0021161421 scopus 로고
    • Minimizing costs of resource requirements in project networks subject to a fix completion time
    • Mohring R.H. Minimizing costs of resource requirements in project networks subject to a fix completion time. Operational Research 32 (1984) 89-120
    • (1984) Operational Research , vol.32 , pp. 89-120
    • Mohring, R.H.1
  • 4
    • 0000463458 scopus 로고
    • Minimizing resource availability costs in time limited project networks
    • Demeulemeester E.L. Minimizing resource availability costs in time limited project networks. Management Science 41 (1995) 1590-1598
    • (1995) Management Science , vol.41 , pp. 1590-1598
    • Demeulemeester, E.L.1
  • 5
    • 85008862604 scopus 로고    scopus 로고
    • Optimal resource determination for project scheduling
    • Akpan E.O.P. Optimal resource determination for project scheduling. Production Planning and Control 8 (1997) 462-468
    • (1997) Production Planning and Control , vol.8 , pp. 462-468
    • Akpan, E.O.P.1
  • 6
    • 0035280765 scopus 로고    scopus 로고
    • Optimization guided lower and upper bounds for the resource investment problem
    • Drexl A., and Kimms A. Optimization guided lower and upper bounds for the resource investment problem. Journal of the Operational Research Society 52 (2001) 340-351
    • (2001) Journal of the Operational Research Society , vol.52 , pp. 340-351
    • Drexl, A.1    Kimms, A.2
  • 7
    • 33845788755 scopus 로고    scopus 로고
    • S. Shadrokh, F. Kianfar, A genetic algorithm for resource investment problem, Ph.D. thesis, Sharif University of Technology, Iran, 2004.
  • 8
    • 33845730379 scopus 로고    scopus 로고
    • J. Zimmermann, H. Engelhardt, Lower bounds and exact algorithms for resource leveling problems, Technical Report 517, University of Karlsruhe, Germany, 1998.
  • 9
    • 33845735126 scopus 로고    scopus 로고
    • H. Nübel, A branch and bound procedure for the resource investment problem subject to temporal constraints, Technical Report 574, University of Karlsruhe, Germany, 1999.
  • 10
    • 0442327390 scopus 로고    scopus 로고
    • The resource renting problem subject to temporal constraints
    • Nübel H. The resource renting problem subject to temporal constraints. OR Spektrum 23 (2001) 574-586
    • (2001) OR Spektrum , vol.23 , pp. 574-586
    • Nübel, H.1
  • 11
    • 0017478425 scopus 로고
    • Scheduling a project to maximize its present value; zero-one programming approach
    • Doersch R.H., and Patterson J.H. Scheduling a project to maximize its present value; zero-one programming approach. Management Science 23 (1977) 882-889
    • (1977) Management Science , vol.23 , pp. 882-889
    • Doersch, R.H.1    Patterson, J.H.2
  • 12
    • 0000637036 scopus 로고
    • Cash flows in networks
    • Russell A.H. Cash flows in networks. Management Science 16 (1970) 357-373
    • (1970) Management Science , vol.16 , pp. 357-373
    • Russell, A.H.1
  • 14
    • 0008242145 scopus 로고
    • The net present value criterion; its impact on project scheduling
    • Bey R.B., Doersch R.H., and Patterson J.H. The net present value criterion; its impact on project scheduling. Project Management Quarterly 12 (1981) 223-233
    • (1981) Project Management Quarterly , vol.12 , pp. 223-233
    • Bey, R.B.1    Doersch, R.H.2    Patterson, J.H.3
  • 15
    • 0022794872 scopus 로고
    • A comparison of heuristics for scheduling projects with cash flows and resource restrictions
    • Russell R.A. A comparison of heuristics for scheduling projects with cash flows and resource restrictions. Management Science 32 (1986) 291-300
    • (1986) Management Science , vol.32 , pp. 291-300
    • Russell, R.A.1
  • 16
    • 38249035744 scopus 로고
    • Maximizing the net present value of a project subject to materials and capital constraints
    • Smith-Daniels D.E., and Smith-Daniels V.L. Maximizing the net present value of a project subject to materials and capital constraints. Journal of Operations Management 7 (1987) 33-45
    • (1987) Journal of Operations Management , vol.7 , pp. 33-45
    • Smith-Daniels, D.E.1    Smith-Daniels, V.L.2
  • 17
    • 0030262162 scopus 로고    scopus 로고
    • A branch and bound procedure the resource-constrained project scheduling problem with discounted cash flows
    • Icmeli O., and Erenguc S.S. A branch and bound procedure the resource-constrained project scheduling problem with discounted cash flows. Management Science 42 (1996) 1395-1408
    • (1996) Management Science , vol.42 , pp. 1395-1408
    • Icmeli, O.1    Erenguc, S.S.2
  • 19
    • 33845741622 scopus 로고    scopus 로고
    • E. Demeulemeester, W. Herroelen, P. Van Dommelen, An optimal recursive search procedure for the deterministic unconstrained Max-npv project scheduling problem, Research Report 9603, Department of Applied Economics, K.U. Leuven, 1996.
  • 20
    • 33845727087 scopus 로고    scopus 로고
    • C. Sepil, B. Kazaz, Project scheduling with discounted cash flows and progress payments, Working Paper, Middle East Technical University, 1995.
  • 21
    • 33845804314 scopus 로고    scopus 로고
    • D.E. Smith-Daniels, Summary measures for predicting the net present value of a project, Working Paper, College of St. Thomas, Minnesota, 1986.
  • 22
    • 33845733182 scopus 로고    scopus 로고
    • S.M. Baroum, An exact solution procedure for maximizing the net present value of resource-constrained projects, Ph.D. thesis, Indiana University, 1992.
  • 23
    • 0027235016 scopus 로고
    • Scheduling a project to maximize its net present value; an integer programming approach
    • Yang K.K., Talbot F.B., and Patterson J.H. Scheduling a project to maximize its net present value; an integer programming approach. European Journal of Operational Research 64 (1992) 188-198
    • (1992) European Journal of Operational Research , vol.64 , pp. 188-198
    • Yang, K.K.1    Talbot, F.B.2    Patterson, J.H.3
  • 24
    • 84985756242 scopus 로고
    • Using a late start resource constrained project schedule to improve net present value
    • Smith-Daniels D.E., and Aquilano N.J. Using a late start resource constrained project schedule to improve net present value. Decision Sciences 18 (1987) 617-630
    • (1987) Decision Sciences , vol.18 , pp. 617-630
    • Smith-Daniels, D.E.1    Aquilano, N.J.2
  • 25
    • 0030231623 scopus 로고    scopus 로고
    • The development of cash flow weight procedures for maximizing the net present value of a project
    • Baroum S.M., and Patterson J.H. The development of cash flow weight procedures for maximizing the net present value of a project. Journal of Operation Management 14 (1996) 209-227
    • (1996) Journal of Operation Management , vol.14 , pp. 209-227
    • Baroum, S.M.1    Patterson, J.H.2
  • 26
    • 33845783799 scopus 로고    scopus 로고
    • R. Padman, J.H. Patterson, A comparative evaluation of cash flow weight heuristics for maximizing the net present value of a project, Working Paper, King Abdul Aziz University, 1993.
  • 27
    • 33845763409 scopus 로고    scopus 로고
    • R. Padman, D.E. Smith-Daniels, V.L. Smith-Daniels, Heuristic scheduling of resource-constrained project scheduling problem with discounted cash flows: an optimization-guided approach, Working Paper, Arnegie-Ellon University, 1990.
  • 28
    • 3543056985 scopus 로고
    • A heuristic scheduling algorithm for improving the duration and net present value of a project
    • Ulusoy G., and Ozdamar L. A heuristic scheduling algorithm for improving the duration and net present value of a project. International Journal of Operations and Production Management 15 (1995) 89-98
    • (1995) International Journal of Operations and Production Management , vol.15 , pp. 89-98
    • Ulusoy, G.1    Ozdamar, L.2
  • 29
    • 33845734149 scopus 로고    scopus 로고
    • R. Padman, D.E. Smith-Daniels, Maximizing the net present value of capital constrained projects: an optimization guided approach, Working Paper, Carnegie Mellon University, 1993.
  • 30
    • 0031271266 scopus 로고    scopus 로고
    • Performance of the heuristic procedures for constrained projects with progress payments
    • Sepil C., and Ortac N. Performance of the heuristic procedures for constrained projects with progress payments. Journal of the Operational Research Society 48 (1997) 1123-1130
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 1123-1130
    • Sepil, C.1    Ortac, N.2
  • 31
    • 33845796595 scopus 로고    scopus 로고
    • S.S. Erenguc, S. Tufekei, C.J. Zappe, The solution of the time/cost trade-off problem with discounted cash flows using generalized benders decomposition, Research Report, University of Florida, 1991.
  • 32
    • 0042788727 scopus 로고    scopus 로고
    • Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
    • Ulusoy G., and Sivrikaya F. Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows. Annals of Operations Research 102 (2001) 237-261
    • (2001) Annals of Operations Research , vol.102 , pp. 237-261
    • Ulusoy, G.1    Sivrikaya, F.2
  • 34
    • 0030232836 scopus 로고    scopus 로고
    • Using discounted cash flow heuristics to improve project net present value
    • Pinder J.P., and Marucheck A.S. Using discounted cash flow heuristics to improve project net present value. Journal of Operation Management 14 (1996) 229-240
    • (1996) Journal of Operation Management , vol.14 , pp. 229-240
    • Pinder, J.P.1    Marucheck, A.S.2
  • 35
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolish R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 (1995) 1693-1703
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolish, R.1    Sprecher, A.2    Drexl, A.3
  • 36
    • 33845755376 scopus 로고    scopus 로고
    • Available from: .