Volumn 10, Issue 3, 2007, Pages 195-207

A classification of predictive-reactive project scheduling procedures

Author keywords

Proactive reactive project scheduling; Stability; Time uncertainty; Timely project completion

Indexed keywords

PROACTIVE-REACTIVE PROJECT SCHEDULING; PROJECT COMPLETION; TIME UNCERTAINTY; TIMELY PROJECT COMPLETION;

EID: 34249890486     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-007-0011-2     Document Type: Article
Times cited : (120)

References (35)
  • 1
    • 0034561509 scopus 로고    scopus 로고
    • A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
    • Artigues, C., & Roubellat, F. (2000). A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. European Journal of Operational Research, 127, 294-316.
    • (2000) European Journal of Operational Research , vol.127 , pp. 294-316
    • Artigues, C.1    Roubellat, F.2
  • 2
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., Lawley, M., McKay, K., Mohan, S., & Uzsoy, R. (2005). Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research, 161 (1), 86-110.
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 3
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints-classification and complexity
    • Blazewicz, J., Lenstra, J., & Kan, A.R. (1983). Scheduling subject to resource constraints-classification and complexity. Discrete Applied Mathematics, 5, 11-24.
    • (1983) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.2    Kan, A.R.3
  • 5
    • 13544260210 scopus 로고    scopus 로고
    • A survey of techniques for scheduling with uncertainty
    • Unpublished manuscript
    • Davenport, A., & Beck, J. (2002). A survey of techniques for scheduling with uncertainty. Unpublished manuscript.
    • (2002)
    • Davenport, A.1    Beck, J.2
  • 6
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis, E., & Patterson, J. (1975). A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Science, 21, 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.1    Patterson, J.2
  • 7
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E., & Herroelen, W. (1992). A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38, 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 8
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester, E., & Herroelen, W. (1997). New benchmark results for the resource-constrained project scheduling problem. Management Science, 43, 1485-1492.
    • (1997) Management Science , vol.43 , pp. 1485-1492
    • Demeulemeester, E.1    Herroelen, W.2
  • 10
    • 3543055794 scopus 로고    scopus 로고
    • RanGen: A random network generator for activity-on-the-node networks
    • Demeulemeester, E., Vanhoucke, M., & Herroelen, W. (2003). RanGen: A random network generator for activity-on-the-node networks. Journal of Scheduling, 6, 17-38.
    • (2003) Journal of Scheduling , vol.6 , pp. 17-38
    • Demeulemeester, E.1    Vanhoucke, M.2    Herroelen, W.3
  • 11
    • 0003926816 scopus 로고    scopus 로고
    • North River: Great Barrington
    • Goldratt, E. (1997). Critical chain. North River: Great Barrington.
    • (1997) Critical chain
    • Goldratt, E.1
  • 12
    • 84987049329 scopus 로고
    • Computational complexity of PERT problems
    • Hagstrom, J. (1988). Computational complexity of PERT problems. Computers and Operations Research, 18, 139-147.
    • (1988) Computers and Operations Research , vol.18 , pp. 139-147
    • Hagstrom, J.1
  • 14
    • 34249900522 scopus 로고    scopus 로고
    • Herroelen, W., De Reyck, B., & Demeulemeester, E. (2000). On the paper Resource-constrained project scheduling: notation, classification, models and methods by Brucker et al., European Journal of Operational Research, 128(3), 221-230.
    • Herroelen, W., De Reyck, B., & Demeulemeester, E. (2000). On the paper "Resource-constrained project scheduling: notation, classification, models and methods" by Brucker et al., European Journal of Operational Research, 128(3), 221-230.
  • 15
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty - Survey and research potentials
    • Herroelen, W., & Leus, R. (2005). Project scheduling under uncertainty - Survey and research potentials. European Journal of Operational Research, 165, 289-306.
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 17
    • 0020632498 scopus 로고
    • Algorithmic approaches to preselective strategies for stochastic scheduling problems
    • Igelmund, G., & Radermacher, F. (1983a). Algorithmic approaches to preselective strategies for stochastic scheduling problems. Networks, 13, 29-48.
    • (1983) Networks , vol.13 , pp. 29-48
    • Igelmund, G.1    Radermacher, F.2
  • 18
    • 0020497533 scopus 로고
    • Preselective strategies for the optimization of stochastic project networks under resource constraints
    • Igelmund, G., & Radermacher, F. (1983b). Preselective strategies for the optimization of stochastic project networks under resource constraints. Networks, 13, 1-28.
    • (1983) Networks , vol.13 , pp. 1-28
    • Igelmund, G.1    Radermacher, F.2
  • 19
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch, R. (1996). Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14, 179-192.
    • (1996) Journal of Operations Management , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 20
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • J. Weglarz Ed, Dordrecht: Kluwer Academic
    • Kolisch, R., & Hartmann, S. (1999). Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. In: J. Weglarz (Ed.), Project scheduling: Recent models, algorithms and applications, Dordrecht: Kluwer Academic.
    • (1999) Project scheduling: Recent models, algorithms and applications
    • Kolisch, R.1    Hartmann, S.2
  • 21
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch, R., & Padman, R. (1999). An integrated survey of deterministic project scheduling. Omega, 49, 249-272.
    • (1999) Omega , vol.49 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 22
    • 9944228880 scopus 로고    scopus 로고
    • PhD thesis, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium
    • Leus, R. (2003). The generation of stable project plans. PhD thesis, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium.
    • (2003) The generation of stable project plans
    • Leus, R.1
  • 23
    • 9644275655 scopus 로고    scopus 로고
    • The complexity of machine scheduling for stability with a single disrupted job
    • Leus, R., & Herroelen, W. (2005). The complexity of machine scheduling for stability with a single disrupted job. Operations Research Letters, 33, 151-156.
    • (2005) Operations Research Letters , vol.33 , pp. 151-156
    • Leus, R.1    Herroelen, W.2
  • 24
    • 0001636411 scopus 로고
    • An experimental and comparative evaluation of production line balancing techniques
    • Mastor, A. (1970). An experimental and comparative evaluation of production line balancing techniques. Management Science, 16, 728-746.
    • (1970) Management Science , vol.16 , pp. 728-746
    • Mastor, A.1
  • 25
  • 29
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic scheduling
    • Patterson, J. (1976). Project scheduling: the effects of problem structure on heuristic scheduling. Naval Research Logistics, 23, 95-123.
    • (1976) Naval Research Logistics , vol.23 , pp. 95-123
    • Patterson, J.1
  • 30
    • 1542526705 scopus 로고    scopus 로고
    • PhD thesis, School of Mathematics and Natural Sciences, Technical University of Berlin
    • Stork, F. (2001). Stochastic resource-constrained project scheduling. PhD thesis, School of Mathematics and Natural Sciences, Technical University of Berlin.
    • (2001) Stochastic resource-constrained project scheduling
    • Stork, F.1
  • 33
    • 0035617606 scopus 로고    scopus 로고
    • An exact procedure for the resource-constrained weighted earlinesstardiness project scheduling problem
    • Vanhoucke, M., Demeulemeester, E., & Herroelen, W. (2001). An exact procedure for the resource-constrained weighted earlinesstardiness project scheduling problem. Annals of Operations Research, 102, 179-196.
    • (2001) Annals of Operations Research , vol.102 , pp. 179-196
    • Vanhoucke, M.1    Demeulemeester, E.2    Herroelen, W.3
  • 34
    • 12244267730 scopus 로고    scopus 로고
    • Constraint-based schedule repair for product development projects with time-limited constraints
    • Wang, J. (2005). Constraint-based schedule repair for product development projects with time-limited constraints. International Journal of Production Economics, 95, 399-414.
    • (2005) International Journal of Production Economics , vol.95 , pp. 399-414
    • Wang, J.1
  • 35
    • 15844407876 scopus 로고    scopus 로고
    • Disruption management for resource-constrained project scheduling
    • Zhu, G., Bard, J., & Yu, G. (2005). Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society, 56, 365-381.
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 365-381
    • Zhu, G.1    Bard, J.2    Yu, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.