Volumn 8, Issue 1, 2002, Pages 109-136

A constraint-based method for project scheduling with time windows

Author keywords

Constraint based scheduling; Procedence constraint posting; Project scheduling

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; ITERATIVE METHODS; MATHEMATICAL MODELS; OPERATIONS RESEARCH; PROBLEM SOLVING; PROJECT MANAGEMENT;

EID: 0036182335     PISSN: 13811231     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1013617802515     Document Type: Article
Times cited : (168)

References (31)
  • 8
    • 4244007817 scopus 로고    scopus 로고
    • Scheduling multi-capacitated resources under complex temporal constraints
    • Technical Report CMU-RI-TR-98-17, Robotics Institute, Carnegie Mellon University
    • (1998)
    • Cesta, A.1    Oddi, A.2    Smith, S.F.3
  • 15
    • 0038981599 scopus 로고    scopus 로고
    • A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalized precedence relations
    • Technical Report, University of Bonn, Faculty of Economics
    • (1998)
    • Dorndorf, U.1    Pesch, E.2    Phan Huy, T.3
  • 16
    • 0008426131 scopus 로고    scopus 로고
    • Resource constrained project scheduling problems with time windows - Structural questions and priority-rule methods
    • Technical Report WIOR-492, Universität Karlsruhe (Revised November 1998)
    • (1998)
    • Franck, B.1    Neumann, K.2
  • 21
    • 0038188877 scopus 로고    scopus 로고
    • Resource constrained project scheduling with time windows: A branching scheme based on dynamic release dates
    • Technical Report 596/1998, Fachbereich Mathematick, Technische Universität Berlin
    • (1998)
    • Möhring, R.1    Stork, F.2    Uetz, M.3
  • 28
    • 0003842449 scopus 로고
    • Look-ahead techniques for micro-opportunistic job-shop scheduling
    • Ph.D. Thesis, School of Computer Science, Carnegie Mellon University
    • (1991)
    • Sadeh, N.1
  • 29
    • 0003516461 scopus 로고    scopus 로고
    • Generation of resource constrained project scheduling problems with minimal and maximal time lags
    • Technical Report WIOR-489, Universität Karlsruhe
    • (1996)
    • Schwindt, C.1
  • 30
    • 0003516463 scopus 로고    scopus 로고
    • A branch and bound algorithm for the resource-constrained project duration problem subject to temporal constraints
    • Technical Report WIOR-544, Universität Karlsruhe
    • (1998)
    • Schwindt, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.