-
2
-
-
12244257693
-
Activity nets: a guided tour through some recent developments
-
Elmaghraby S.E. Activity nets: a guided tour through some recent developments. European Journal of Operational Research 64 (1995) 199-215
-
(1995)
European Journal of Operational Research
, vol.64
, pp. 199-215
-
-
Elmaghraby, S.E.1
-
3
-
-
0029393209
-
A survey on the resource-constrained project scheduling problem
-
Özdamar L., and Ulusoy G. A survey on the resource-constrained project scheduling problem. IIE Transactions 27 (1995) 574-586
-
(1995)
IIE Transactions
, vol.27
, pp. 574-586
-
-
Özdamar, L.1
Ulusoy, G.2
-
5
-
-
0032736579
-
Resource-constrained project scheduling: notation, classification, models and methods
-
Brucker P., Drexl A., Möhring R., Neumann K., and Pesch E. Resource-constrained project scheduling: notation, classification, models and methods. European Journal of Operational Research 112 (1999) 3-41
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
7
-
-
25944434000
-
Project scheduling under discrete and continuous resources
-
We{ogonek}glarz J. (Ed), Kluwer Academic Publishers, Dordrecht
-
Józefowska J., Mika M., Różycki R., Waligóra G., and We{ogonek}glarz J. Project scheduling under discrete and continuous resources. In: We{ogonek}glarz J. (Ed). Project scheduling-recent models, algorithms and applications (1999), Kluwer Academic Publishers, Dordrecht 289-308
-
(1999)
Project scheduling-recent models, algorithms and applications
, pp. 289-308
-
-
Józefowska, J.1
Mika, M.2
Rózycki, R.3
Waligóra, G.4
Weglarz, J.5
-
8
-
-
0019049127
-
Multiprocessor scheduling with memory allocation-a deterministic approach
-
We{ogonek}glarz J. Multiprocessor scheduling with memory allocation-a deterministic approach. IEEE Transactions on Computers C-29 (1980) 703-709
-
(1980)
IEEE Transactions on Computers
, vol.C-29
, pp. 703-709
-
-
Weglarz, J.1
-
9
-
-
0037521894
-
Scheduling and resource allocation problems in some flow type manufacturing processes
-
Fandel G., and Zapfel G. (Eds), Springer, Berlin
-
Janiak A. Scheduling and resource allocation problems in some flow type manufacturing processes. In: Fandel G., and Zapfel G. (Eds). Modern production concepts (1991), Springer, Berlin 404-415
-
(1991)
Modern production concepts
, pp. 404-415
-
-
Janiak, A.1
-
10
-
-
36348961234
-
Discrete-continuous project scheduling
-
Banaszak Z., and Józefowska J. (Eds), WNT, Warszawa
-
Józefowska J. Discrete-continuous project scheduling. In: Banaszak Z., and Józefowska J. (Eds). Project driven manufacturing (2003), WNT, Warszawa 7-22
-
(2003)
Project driven manufacturing
, pp. 7-22
-
-
Józefowska, J.1
-
11
-
-
0026203180
-
Single machine scheduling problem with a common deadline and resource dependent release dates
-
Janiak A. Single machine scheduling problem with a common deadline and resource dependent release dates. European Journal of Operational Research 55 (1991) 317-325
-
(1991)
European Journal of Operational Research
, vol.55
, pp. 317-325
-
-
Janiak, A.1
-
12
-
-
36348993033
-
Raspriedielenije riesursow kak zadacza optimalnogo bystrodiejstwia
-
Burkov V.N. Raspriedielenije riesursow kak zadacza optimalnogo bystrodiejstwia. Avtomat. i Tielemieh. 27 7 (1966)
-
(1966)
Avtomat. i Tielemieh.
, vol.27
, Issue.7
-
-
Burkov, V.N.1
-
13
-
-
0019612987
-
Project scheduling with continuously-divisible, doubly constrained resources
-
We{ogonek}glarz J. Project scheduling with continuously-divisible, doubly constrained resources. Management Science 27 (1981) 1040-1052
-
(1981)
Management Science
, vol.27
, pp. 1040-1052
-
-
Weglarz, J.1
-
14
-
-
0042832882
-
Modelling and control of dynamic resource allocation project scheduling systems
-
Tzafestas S.G. (Ed), North-Holland, Amsterdam
-
We{ogonek}glarz J. Modelling and control of dynamic resource allocation project scheduling systems. In: Tzafestas S.G. (Ed). Optimization and control of dynamic operational research models (1982), North-Holland, Amsterdam 105-140
-
(1982)
Optimization and control of dynamic operational research models
, pp. 105-140
-
-
Weglarz, J.1
-
18
-
-
0034561525
-
An equitable approach to the payment scheduling problem in project management
-
Ulusoy G., and Cebelli S. An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research 127 (2000) 262-278
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 262-278
-
-
Ulusoy, G.1
Cebelli, S.2
-
19
-
-
0041611531
-
On payment schedules in contractor client negotiations in projects: an overview of the problem and research issues
-
We{ogonek}glarz J. (Ed), Kluwer Academic Publishers, Dordrecht
-
Dayanand N., and Padman R. On payment schedules in contractor client negotiations in projects: an overview of the problem and research issues. In: We{ogonek}glarz J. (Ed). Project scheduling-recent models, algorithms and applications (1999), Kluwer Academic Publishers, Dordrecht 477-508
-
(1999)
Project scheduling-recent models, algorithms and applications
, pp. 477-508
-
-
Dayanand, N.1
Padman, R.2
-
20
-
-
12244289668
-
Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
-
Mika M., Waligóra G., and We{ogonek}glarz J. Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research 164 3 (2005) 639-668
-
(2005)
European Journal of Operational Research
, vol.164
, Issue.3
, pp. 639-668
-
-
Mika, M.1
Waligóra, G.2
Weglarz, J.3
-
21
-
-
36348952541
-
-
Kolisch R. Project scheduling under resource constraints-efficient heuristics for several problem classes. Physica, Heidelberg; 1995.
-
-
-
-
22
-
-
0004215426
-
-
Kluwer Academic Publishers, Norwell
-
Glover F., and Laguna M. Tabu Search (1997), Kluwer Academic Publishers, Norwell
-
(1997)
Tabu Search
-
-
Glover, F.1
Laguna, M.2
-
23
-
-
0001997908
-
Tabu search applied to the quadratic assignment problem
-
Skorin-Kapov J. Tabu search applied to the quadratic assignment problem. ORSA Journal of Computing 2 (1990) 33-45
-
(1990)
ORSA Journal of Computing
, vol.2
, pp. 33-45
-
-
Skorin-Kapov, J.1
-
24
-
-
36348965875
-
-
Lawrence C, Zhou JL, Tits AL. Users guide for CFSQP Version 2.3. Available by email: 〈andre@eng.umd.edu〉; 1995.
-
-
-
-
25
-
-
19044362523
-
A heuristic approach to allocating the continuous resource in discrete-continuous scheduling problems to minimize the makespan
-
Józefowska J., Mika M., Różycki R., Waligóra G., and We{ogonek}glarz J. A heuristic approach to allocating the continuous resource in discrete-continuous scheduling problems to minimize the makespan. Journal of Scheduling 5 (2002) 487-499
-
(2002)
Journal of Scheduling
, vol.5
, pp. 487-499
-
-
Józefowska, J.1
Mika, M.2
Rózycki, R.3
Waligóra, G.4
Weglarz, J.5
-
26
-
-
36348959571
-
Heuristic procedures for allocating the continuous resource in discrete-continuous scheduling problems
-
Józefowska J., and Waligóra G. Heuristic procedures for allocating the continuous resource in discrete-continuous scheduling problems. Foundations of Computing and Decision Sciences 29 4 (2004) 315-328
-
(2004)
Foundations of Computing and Decision Sciences
, vol.29
, Issue.4
, pp. 315-328
-
-
Józefowska, J.1
Waligóra, G.2
|