Volumn 32, Issue 2, 2010, Pages 369-394

Managing and modelling general resource transfers in (multi-)project scheduling

Author keywords

Combinatorial optimization; Mathematical model; Project scheduling; Resource flow; Setup; Transfer cost; Transfer times

Indexed keywords


EID: 77349084842     PISSN: 01716468     EISSN: 14366304     Source Type: Journal    
DOI: 10.1007/s00291-008-0144-5     Document Type: Article
Times cited : (64)

References (27)
  • 1
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi A, Gupta JN, Aldowaisan T (1999) A review of scheduling research involving setup considerations. Omega 27(2): 219-239.
    • (1999) Omega , vol.27 , Issue.2 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.2    Aldowaisan, T.3
  • 2
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource-constrained project scheduling
    • Artigue C, Michelon P, Reusser S (2003) Insertion techniques for static and dynamic resource-constrained project scheduling. Eur J Oper Res 149(2): 249-267.
    • (2003) Eur J Oper Res , vol.149 , Issue.2 , pp. 249-267
    • Artigue, C.1    Michelon, P.2    Reusser, S.3
  • 3
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models, and methods
    • Brucker P, Drexl A, Möhring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Oper Res 112(1): 3-41.
    • (1999) Eur J Oper Res , vol.112 , Issue.1 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Möhring, R.3    Neumann, K.4    Pesch, E.5
  • 5
    • 0031076814 scopus 로고    scopus 로고
    • Audit scheduling with overlapping activities and sequence-dependent setup costs
    • Dodin B, Elimam AA (1997) Audit scheduling with overlapping activities and sequence-dependent setup costs. Eur J Oper Res 97(1): 22-33.
    • (1997) Eur J Oper Res , vol.97 , Issue.1 , pp. 22-33
    • Dodin, B.1    Elimam, A.A.2
  • 6
    • 0023824517 scopus 로고
    • Evaluating project scheduling and due date assignment procedures: An experimental analysis
    • Dumond J, Mabert VA (1988) Evaluating project scheduling and due date assignment procedures: an experimental analysis. Manage Sci 34(1): 101-118.
    • (1988) Manage Sci , vol.34 , Issue.1 , pp. 101-118
    • Dumond, J.1    Mabert, V.A.2
  • 7
    • 0011717163 scopus 로고
    • Towards the development of a complete multi-project scheduling system
    • Fendley LG (1968) Towards the development of a complete multi-project scheduling system. J Ind Eng 19(10): 505-515.
    • (1968) J Ind Eng , vol.19 , Issue.10 , pp. 505-515
    • Fendley, L.G.1
  • 8
    • 36448995797 scopus 로고    scopus 로고
    • Modeling industrial lot sizing problems: A review
    • Jans R, Degraeve Z (2008) Modeling industrial lot sizing problems: a review. Int J Prod Res 46(6): 1619-1643.
    • (2008) Int J Prod Res , vol.46 , Issue.6 , pp. 1619-1643
    • Jans, R.1    Degraeve, Z.2
  • 10
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource-constrained project scheduling problems. Manage Sci 41(10): 1693-1704.
    • (1995) Manage Sci , vol.41 , Issue.10 , pp. 1693-1704
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 11
    • 77349121090 scopus 로고    scopus 로고
    • A heuristic solution framework for the resource constrained multi-project scheduling problem with sequence-dependent transfer times
    • (to appear)
    • Krüger D, Scholl A (2007) A heuristic solution framework for the resource constrained multi-project scheduling problem with sequence-dependent transfer times. Eur J Oper Res (to appear).
    • (2007) Eur J Oper Res
    • Krüger, D.1    Scholl, A.2
  • 12
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus I, Davis EW (1982) Multi-project scheduling: categorization of heuristic rules performance. Manage Sci 28(2): 161-172.
    • (1982) Manage Sci , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 13
    • 0022025928 scopus 로고
    • Multi-project scheduling: Analysis of project performance
    • Kurtulus IS, Narula SC (1985) Multi-project scheduling: analysis of project performance. IIE Trans 17(1): 58-66.
    • (1985) IIE Trans , vol.17 , Issue.1 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 14
    • 0027306874 scopus 로고
    • Resource constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
    • Lawrence SR, Morton TE (1993) Resource constrained multi-project scheduling with tardy costs: comparing myopic, bottleneck, and resource pricing heuristics. Eur J Oper Res 64(2): 168-187.
    • (1993) Eur J Oper Res , vol.64 , Issue.2 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 15
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
    • Lova A, Tormos P (2001) Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Ann Oper Res 102(1-4): 263-286.
    • (2001) Ann Oper Res , vol.102 , Issue.1-4 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 16
    • 0034559445 scopus 로고    scopus 로고
    • A multicriteria heuristic method to improve resource allocation in multiproject scheduling
    • Lova A, Maroto C, Tormos P (2000) A multicriteria heuristic method to improve resource allocation in multiproject scheduling. Eur J Oper Res 127(2): 408-424.
    • (2000) Eur J Oper Res , vol.127 , Issue.2 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 17
    • 17444432165 scopus 로고    scopus 로고
    • Scheduling the factory pick-up of new cars
    • Mellentien C, Schwindt C, Trautmann N (2004) Scheduling the factory pick-up of new cars. OR Spectrum 26(4): 579-601.
    • (2004) OR Spectrum , vol.26 , Issue.4 , pp. 579-601
    • Mellentien, C.1    Schwindt, C.2    Trautmann, N.3
  • 18
    • 84955278998 scopus 로고    scopus 로고
    • Modelling setup times in project scheduling
    • J. Jósefowska and J. Weglarz (Eds.), New York: Springer
    • Mika M, Waligóra G, Weglarz J (2006) Modelling setup times in project scheduling. In: Jósefowska J, Weglarz J(eds) Perspectives in modern project scheduling. Springer, New York, pp 131-163.
    • (2006) Perspectives in Modern Project Scheduling , pp. 131-163
    • Mika, M.1    Waligóra, G.2    Weglarz, J.3
  • 21
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson JH (1984) A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Manage Sci 30(7): 854-867.
    • (1984) Manage Sci , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 22
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker LJ, Watters AAB, Wolfe PM (1969) Multiproject scheduling with limited resources: a zero-one programming approach. Manage Sci 16(1): 93-108.
    • (1969) Manage Sci , vol.16 , Issue.1 , pp. 93-108
    • Pritsker, L.J.1    Watters, A.A.B.2    Wolfe, P.M.3
  • 23
    • 0001775820 scopus 로고    scopus 로고
    • Batch scheduling in process industries: An application of resource-constrained project scheduling
    • Schwindt C, Trautmann N (2000) Batch scheduling in process industries: an application of resource-constrained project scheduling. OR Spektrum 22(4): 501-524.
    • (2000) OR Spektrum , vol.22 , Issue.4 , pp. 501-524
    • Schwindt, C.1    Trautmann, N.2
  • 24
    • 9644266019 scopus 로고    scopus 로고
    • Scheduling the production of rolling ingots: Industrial context, model, and solution method
    • Schwindt C, Trautmann N (2003) Scheduling the production of rolling ingots: industrial context, model, and solution method. Int Trans Oper Res 10(6): 547-563.
    • (2003) Int Trans Oper Res , vol.10 , Issue.6 , pp. 547-563
    • Schwindt, C.1    Trautmann, N.2
  • 25
    • 41449117771 scopus 로고    scopus 로고
    • Setup times and fast tracking in resource-constrained project scheduling
    • Vanhoucke M (2008) Setup times and fast tracking in resource-constrained project scheduling. Comput Ind Eng 54(4): 1062-1070.
    • (2008) Comput Ind Eng , vol.54 , Issue.4 , pp. 1062-1070
    • Vanhoucke, M.1
  • 26
    • 0027612534 scopus 로고
    • A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment
    • Yang KK, Sum CC (1993) A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment. J Oper Manage 11(2): 207-218.
    • (1993) J Oper Manage , vol.11 , Issue.2 , pp. 207-218
    • Yang, K.K.1    Sum, C.C.2
  • 27
    • 0031277169 scopus 로고    scopus 로고
    • An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
    • Yang KK, Sum CC (1997) An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment. Eur J Oper Res 103(1): 139-154.
    • (1997) Eur J Oper Res , vol.103 , Issue.1 , pp. 139-154
    • Yang, K.K.1    Sum, C.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.