Volumn 25, Issue 4, 1998, Pages 279-302

Resource-constrained project scheduling: A survey of recent developments

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL METHODS; CONSTRAINT THEORY; CRITICAL PATH ANALYSIS; DECISION THEORY; PERT; RESOURCE ALLOCATION;

EID: 0032042933     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(97)00055-5     Document Type: Article
Times cited : (447)

References (118)
  • 15
    • 0030212185 scopus 로고    scopus 로고
    • Scheduling research in multiple resource constrained job shops: A review and critique
    • Gargeya, V. B. and Deane, R. H., Scheduling research in multiple resource constrained job shops: A review and critique. International Journal of Production Research, 1996, 34, 2077-2097.
    • (1996) International Journal of Production Research , vol.34 , pp. 2077-2097
    • Gargeya, V.B.1    Deane, R.H.2
  • 16
  • 17
    • 0038709760 scopus 로고
    • The schedule-sequencing problem
    • Bowman, E. H., The schedule-sequencing problem. Operations Research, 1959, 7, 621-624.
    • (1959) Operations Research , vol.7 , pp. 621-624
    • Bowman, E.H.1
  • 19
    • 0001303226 scopus 로고
    • Some properties of schedules for large projects with limited resources
    • Wiest, J. D., Some properties of schedules for large projects with limited resources. Operations Research, 1964, 12, 395-418.
    • (1964) Operations Research , vol.12 , pp. 395-418
    • Wiest, J.D.1
  • 20
    • 0043050468 scopus 로고
    • Project resource balancing by assembly line balancing techniques
    • Moodie, C. L. and Mandeville, D. E., Project resource balancing by assembly line balancing techniques. Journal of Industrial Engineering, 1966, 17, 377-383.
    • (1966) Journal of Industrial Engineering , vol.17 , pp. 377-383
    • Moodie, C.L.1    Mandeville, D.E.2
  • 22
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A. B., Watters, L. J. and Wolfe, P. M., Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 1969, 16, 93-108.
    • (1969) Management Science , vol.16 , pp. 93-108
    • Pritsker, A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 23
    • 0016028677 scopus 로고
    • A horizon-varying zero-one approach to project scheduling
    • Patterson, J. H. and Huber, W. D., A horizon-varying zero-one approach to project scheduling. Management Science, 1974, 20, 990-998.
    • (1974) Management Science , vol.20 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 24
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one programming approach
    • Patterson, J. H. and Roth, G., Scheduling a project under multiple resource constraints: A zero-one programming approach. AIIE Transactions, 1976, 8, 449-456.
    • (1976) AIIE Transactions , vol.8 , pp. 449-456
    • Patterson, J.H.1    Roth, G.2
  • 26
    • 0030212866 scopus 로고    scopus 로고
    • Solving the resource-constrained project scheduling problem with optimization subroutine library
    • Icmeli, O. and Rom, W. O., Solving the resource-constrained project scheduling problem with optimization subroutine library. Computers and Operations Research, 1996, 23, 801-817.
    • (1996) Computers and Operations Research , vol.23 , pp. 801-817
    • Icmeli, O.1    Rom, W.O.2
  • 28
    • 0042403537 scopus 로고
    • Optimisation of resource allocation in project planning
    • Petroviç, R., Optimisation of resource allocation in project planning. Operations Research, 1968, 16, 559-586.
    • (1968) Operations Research , vol.16 , pp. 559-586
    • Petroviç, R.1
  • 30
    • 0040347834 scopus 로고
    • Project scheduling with resource constraints
    • ed E. M. L. Beale. The English University Press, London
    • Balas, E., Project Scheduling with Resource Constraints. In Applications of Mathematical Programming, ed E. M. L. Beale. The English University Press, London, 1971, pp. 187-200.
    • (1971) Applications of Mathematical Programming , pp. 187-200
    • Balas, E.1
  • 31
    • 0000478729 scopus 로고
    • Solving resource-constrained network problems by implicit enumeration - Nonpreemptive case
    • Schrage, L., Solving resource-constrained network problems by implicit enumeration - Nonpreemptive case. Operations Research, 1970, 10, 263-278.
    • (1970) Operations Research , vol.10 , pp. 263-278
    • Schrage, L.1
  • 32
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • Davis, E. W. and Heidorn, G. E., An algorithm for optimal project scheduling under multiple resource constraints. Management Science, 1971, 27, B803-B816.
    • (1971) Management Science , vol.27
    • Davis, E.W.1    Heidorn, G.E.2
  • 33
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch-and-bound
    • Stinson, J. P., Davis, E. W. and Khumawala, B. M., Multiple resource-constrained scheduling using branch-and-bound. AIIE Transactions, 1978, 10, 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 34
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • Talbot, B. and Patterson, J. H., An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems. Management Science, 1978, 24, 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, B.1    Patterson, J.H.2
  • 37
  • 38
    • 0025385096 scopus 로고
    • Solving resource-constrained project scheduling problems by A* search
    • Bell, C. A. and Park, K., Solving resource-constrained project scheduling problems by A* search. Naval Research Logistics, 1990, 37, 61-84.
    • (1990) Naval Research Logistics , vol.37 , pp. 61-84
    • Bell, C.A.1    Park, K.2
  • 39
    • 0038527478 scopus 로고
    • Une méthode arborescente pour les problèmes cumulatifs
    • Carlier, J. and Latapie, B., Une méthode arborescente pour les problèmes cumulatifs. R.A.I.R.O., 1991, 25, 311-340.
    • (1991) R.A.I.R.O. , vol.25 , pp. 311-340
    • Carlier, J.1    Latapie, B.2
  • 40
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 1992, 38, 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 41
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., New benchmark results for the resource-constrained project scheduling problem. Management Science, 1997, 43, 1485-1492.
    • (1997) Management Science , vol.43 , pp. 1485-1492
    • Demeulemeester, E.1    Herroelen, W.2
  • 43
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation
    • to appear
    • Mingozzi, A., Maniezzo, V., Ricciardelli, S. and Bianco, L., An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation. Management Science, 1998, to appear.
    • (1998) Management Science
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 44
    • 0032096810 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource-constrained project scheduling problem
    • to appear
    • Brucker, P., Schoo, A. and Thiele, O., A branch-and-bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 1998, to appear.
    • (1998) European Journal of Operational Research
    • Brucker, P.1    Schoo, A.2    Thiele, O.3
  • 45
    • 0042904338 scopus 로고
    • Resource allocation in project network models - A survey
    • Davis, E. W., Resource allocation in project network models - A survey. Journal of Industrial Engineering, 1966, 17, 177-188.
    • (1966) Journal of Industrial Engineering , vol.17 , pp. 177-188
    • Davis, E.W.1
  • 46
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints: Historical review and categorization of procedures
    • Davis, E. W., Project scheduling under resource constraints: Historical review and categorization of procedures. AIlE Transactions, 1973, 5, 297-313.
    • (1973) AIlE Transactions , vol.5 , pp. 297-313
    • Davis, E.W.1
  • 47
    • 0015404241 scopus 로고
    • Resource-constrained project scheduling - The state of the art
    • Herroelen, W., Resource-constrained project scheduling - The state of the art. Operational Research Quarterly, 1972, 23, 261-275.
    • (1972) Operational Research Quarterly , vol.23 , pp. 261-275
    • Herroelen, W.1
  • 48
    • 0021460636 scopus 로고
    • A comparison of exact procedures for solving the multiple constrained resource project scheduling problem
    • Patterson, J. H., A comparison of exact procedures for solving the multiple constrained resource project scheduling problem. Management Science, 1984, 30, 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 50
    • 0029635345 scopus 로고
    • Activity nets: A guided tour through some recent developments
    • Elmaghraby, S. E., Activity nets: A guided tour through some recent developments. European Journal of Operational Research, 1995, 82, 383-408.
    • (1995) European Journal of Operational Research , vol.82 , pp. 383-408
    • Elmaghraby, S.E.1
  • 51
    • 0041962998 scopus 로고
    • Recent advances in branch-and-bound procedures for resource-constrained project scheduling problems
    • eds Ph. Chrétienne, E. G. Coffmann Jr., J. K. Lenstra and Z. Liu. John Wiley and Sons
    • Herroelen, W. and Demeulemeester, E., Recent advances in branch-and-bound procedures for resource-constrained project scheduling problems. In Scheduling Theory and Its Applications, eds Ph. Chrétienne, E. G. Coffmann Jr., J. K. Lenstra and Z. Liu. John Wiley and Sons, 1995, pp. 259-276.
    • (1995) Scheduling Theory and Its Applications , pp. 259-276
    • Herroelen, W.1    Demeulemeester, E.2
  • 52
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Özdamar, L. and Ulusoy, G., A Survey on the resource-constrained project scheduling problem. IIE Transactions, 1995, 27, 574-586.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 53
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A. and Drexl, A., Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 1995, 41, 1693-1703.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 55
    • 0032096811 scopus 로고    scopus 로고
    • Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm
    • to appear
    • Sprecher, A. and Drexl, A., Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm. European Journal of Operational Research, 1998, to appear.
    • (1998) European Journal of Operational Research
    • Sprecher, A.1    Drexl, A.2
  • 57
    • 0030573494 scopus 로고    scopus 로고
    • On the use of the complexity index as a measure of complexity in activity networks
    • De Reyck, B. and Herroelen, W., On the use of the complexity index as a measure of complexity in activity networks, European Journal of Operational Research, 1996, 91, 347-366.
    • (1996) European Journal of Operational Research , vol.91 , pp. 347-366
    • De Reyck, B.1    Herroelen, W.2
  • 59
    • 0016520377 scopus 로고
    • Project network summary measures and constrained resource scheduling
    • Davis, E. W., Project network summary measures and constrained resource scheduling. IIE Transactions, 1975, 7, 132-142.
    • (1975) IIE Transactions , vol.7 , pp. 132-142
    • Davis, E.W.1
  • 60
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource trade-offs: The nonpreemptive case
    • Talbot, F. B., Resource-constrained project scheduling with time-resource trade-offs: The nonpreemptive case. Management Science, 1982, 28, 1197-1210.
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 61
    • 0022025928 scopus 로고
    • Multi-project scheduling: Analysis of project performance
    • Kurtulus, I. S. and Narula, S. C., Multi-project scheduling: Analysis of project performance. IIE Transactions, 1985, 17, 58-66.
    • (1985) IIE Transactions , vol.17 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 62
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling: A review and empirical analysis
    • ed R. Slowinski and J. Weglarz. Elsevier, Amsterdam
    • Alvarez-Valdes, R. and Tamarit, J. M. Heuristic algorithms for resource-constrained project scheduling: A review and empirical analysis. In Advances in Project Scheduling, ed R. Slowinski and J. Weglarz. Elsevier, Amsterdam, 1989.
    • (1989) Advances in Project Scheduling
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 66
    • 0042904337 scopus 로고    scopus 로고
    • Assembly line balancing by resource-constrained project scheduling techniques - A critical appraisal
    • De Reyck, B. and Herroelen, W., Assembly line balancing by resource-constrained project scheduling techniques - A critical appraisal. Foundations of Computing and Decision Sciences, 1997, 99, 143-167.
    • (1997) Foundations of Computing and Decision Sciences , vol.99 , pp. 143-167
    • De Reyck, B.1    Herroelen, W.2
  • 67
    • 0001636411 scopus 로고
    • An experimental and comparative evaluation of production line balancing techniques
    • Mastor, A. A., An experimental and comparative evaluation of production line balancing techniques. Management Science, 1970, 16, 728-746.
    • (1970) Management Science , vol.16 , pp. 728-746
    • Mastor, A.A.1
  • 68
    • 0020103084 scopus 로고
    • On dynamic programming methods for assembly line balancing
    • Kao, E. P. C. and Queyranne, M., On dynamic programming methods for assembly line balancing. Operations Research, 1992, 30, 375-390.
    • (1992) Operations Research , vol.30 , pp. 375-390
    • Kao, E.P.C.1    Queyranne, M.2
  • 69
    • 0015727839 scopus 로고
    • MALB - A heuristic technique for balancing large single-model assembly lines
    • Dar-El, E. M., MALB - A heuristic technique for balancing large single-model assembly lines, AIIE Transactions, 1973, 5, 343-356.
    • (1973) AIIE Transactions , vol.5 , pp. 343-356
    • Dar-El, E.M.1
  • 70
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource-constrained projects: An experimental comparison
    • Cooper, D. F., Heuristics for scheduling resource-constrained projects: An experimental comparison. Management Science, 1976, 22, 1186-1194.
    • (1976) Management Science , vol.22 , pp. 1186-1194
    • Cooper, D.F.1
  • 71
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic performance
    • Patterson, J. H., Project scheduling: The effects of problem structure on heuristic performance. Naval Research Logistics, 1976, 23, 95-123.
    • (1976) Naval Research Logistics , vol.23 , pp. 95-123
    • Patterson, J.H.1
  • 73
    • 0019047699 scopus 로고
    • Two approaches to problems of resource allocation among project activities - A comparative study
    • Slowinski, R., Two approaches to problems of resource allocation among project activities - A comparative study. Journal of the Operational Research Society, 1980, 31, 711-723.
    • (1980) Journal of the Operational Research Society , vol.31 , pp. 711-723
    • Slowinski, R.1
  • 74
    • 0019612987 scopus 로고
    • Project scheduling with continuously-divisible doubly-constrained resources
    • Weglarz, J., Project scheduling with continuously-divisible doubly-constrained resources. Management Science, 1981, 27, 1040-1053.
    • (1981) Management Science , vol.27 , pp. 1040-1053
    • Weglarz, J.1
  • 77
    • 0030122629 scopus 로고    scopus 로고
    • An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem. European Journal of Operational Research, 1996, 90, 334-348.
    • (1996) European Journal of Operational Research , vol.90 , pp. 334-348
    • Demeulemeester, E.1    Herroelen, W.2
  • 78
    • 0030105481 scopus 로고    scopus 로고
    • A multiple-tree search procedure for the resource-constrained project scheduling problem
    • Simpson III, W. P. and Patterson, J. H., A multiple-tree search procedure for the resource-constrained project scheduling problem. European Journal of Operational Research, 1996, 89, 525-542.
    • (1996) European Journal of Operational Research , vol.89 , pp. 525-542
    • Simpson W.P. III1    Patterson, J.H.2
  • 80
    • 0028766751 scopus 로고
    • Heuristics for scheduling resource-constrained projects in MPM networks
    • Zahn, J., Heuristics for scheduling resource-constrained projects in MPM networks. European Journal of Operational Research, 1994, 76, 192-205.
    • (1994) European Journal of Operational Research , vol.76 , pp. 192-205
    • Zahn, J.1
  • 82
    • 0042403535 scopus 로고
    • Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The minimum project duration and resource levelling problem
    • Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe
    • Brinkmann, K. and Neumann, K., Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The minimum project duration and resource levelling problem, Technical Report WIOR-443, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe, 1994.
    • (1994) Technical Report WIOR-443
    • Brinkmann, K.1    Neumann, K.2
  • 83
    • 0000647152 scopus 로고
    • Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints
    • Neumann, K. and Zahn, J., Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints. Journal of Intelligent Manufacturing, 1995, 6, 145-154.
    • (1995) Journal of Intelligent Manufacturing , vol.6 , pp. 145-154
    • Neumann, K.1    Zahn, J.2
  • 84
    • 0040165701 scopus 로고
    • Projects with minimal and maximal time lags: Construction of activity-on-node networks and applications
    • Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe
    • Neumann, K. and Schwindt, C., Projects with minimal and maximal time lags: Construction of activity-on-node networks and applications, Technical Report WIOR-447, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe, 1995.
    • (1995) Technical Report WIOR-447
    • Neumann, K.1    Schwindt, C.2
  • 85
    • 0003516461 scopus 로고    scopus 로고
    • Generation of resource-constrained project scheduling problems with minimal and maximal time lags
    • Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe
    • Schwindt, C., Generation of resource-constrained project scheduling problems with minimal and maximal time lags, Technical Report WIOR-489, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe, 1996.
    • (1996) Technical Report WIOR-489
    • Schwindt, C.1
  • 86
    • 0004477822 scopus 로고    scopus 로고
    • Priority-rule methods for the resource-constrained project scheduling problem with minimal and maximal time lags - An empirical analysis
    • April 11-13, Poznan
    • Franck, B. and Neumann, K., Priority-rule methods for the resource-constrained project scheduling problem with minimal and maximal time lags - An empirical analysis. Proceedings of the Fifth International Workshop on Project Management and Scheduling, April 11-13, Poznan, 1996, pp. 88-91.
    • (1996) Proceedings of the Fifth International Workshop on Project Management and Scheduling , pp. 88-91
    • Franck, B.1    Neumann, K.2
  • 87
    • 0004457172 scopus 로고    scopus 로고
    • A new branch-and-bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags
    • April 11-13, Poznan
    • Schwindt, C. and Neumann, K., A new branch-and-bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags. Proceedings of the Fifth International Workshop on Project Management and Scheduling, April 11-13, Poznan, pp. 212-215, 1996.
    • (1996) Proceedings of the Fifth International Workshop on Project Management and Scheduling , pp. 212-215
    • Schwindt, C.1    Neumann, K.2
  • 88
    • 0013363622 scopus 로고
    • One-machine generalized precedence constrained scheduling problems
    • Wikum, E. D., Donna, C. L. and Nemhauser, G. L., One-machine generalized precedence constrained scheduling problems. Operations Research Letters, 1994, 16, 87-99.
    • (1994) Operations Research Letters , vol.16 , pp. 87-99
    • Wikum, E.D.1    Donna, C.L.2    Nemhauser, G.L.3
  • 89
    • 0001215033 scopus 로고
    • The analysis of activity networks under generalized precedence relations
    • Elmaghraby, S. E. and Kamburowski, J., The analysis of activity networks under generalized precedence relations. Management Science, 1992, 38, 1245-1263.
    • (1992) Management Science , vol.38 , pp. 1245-1263
    • Elmaghraby, S.E.1    Kamburowski, J.2
  • 90
    • 0031097802 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the generalized resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Operations Research, 1997, 45, 201-212.
    • (1997) Operations Research , vol.45 , pp. 201-212
    • Demeulemeester, E.1    Herroelen, W.2
  • 91
    • 85033882566 scopus 로고    scopus 로고
    • Private communication
    • Möhring, R. H., Private communication, 1996.
    • (1996)
    • Möhring, R.H.1
  • 92
    • 0041902144 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence constraints
    • to appear
    • De Reyck, B. and Herroelen, W., A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence constraints. European Journal of Operational Research, 1997, to appear.
    • (1997) European Journal of Operational Research
    • De Reyck, B.1    Herroelen, W.2
  • 93
  • 94
    • 0000637036 scopus 로고
    • Cash flows in networks
    • Russell, A. H., Cash flows in networks, Management Science, 1970, 16, 357-373.
    • (1970) Management Science , vol.16 , pp. 357-373
    • Russell, A.H.1
  • 96
    • 0025701916 scopus 로고
    • The scheduling of activities to maximize the net present value of projects
    • Elmaghraby, S. E. and Herroelen, W., The scheduling of activities to maximize the net present value of projects, European Journal of Operational Research, 1990, 49, 35-49.
    • (1990) European Journal of Operational Research , vol.49 , pp. 35-49
    • Elmaghraby, S.E.1    Herroelen, W.2
  • 97
    • 0027553638 scopus 로고
    • Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects
    • Herroelen, W. and Gallens, E., Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects. European Journal of Operational Research, 1993, 65, 274-277.
    • (1993) European Journal of Operational Research , vol.65 , pp. 274-277
    • Herroelen, W.1    Gallens, E.2
  • 101
    • 0030262162 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the resource-constrained project scheduling problem with discounted cash flows
    • Icmeli, O. and Erenguç, S., A branch-and-bound procedure for the resource-constrained project scheduling problem with discounted cash flows. Management Science, 1996, 42, 1395-1408.
    • (1996) Management Science , vol.42 , pp. 1395-1408
    • Icmeli, O.1    Erenguç, S.2
  • 102
    • 0027235016 scopus 로고
    • Scheduling a project to maximize its net present value: An integer programming approach
    • Yang, K. K., Talbot, F. B. and Patterson, J. H., Scheduling a project to maximize its net present value: An integer programming approach. European Journal of Operational Research, 1992, 64, 188-198.
    • (1992) European Journal of Operational Research , vol.64 , pp. 188-198
    • Yang, K.K.1    Talbot, F.B.2    Patterson, J.H.3
  • 103
    • 0031624059 scopus 로고    scopus 로고
    • An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
    • De Reyck, B. and Herroelen, W., An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations. Computers and Operations Research, 1998, 25, 1-17.
    • (1998) Computers and Operations Research , vol.25 , pp. 1-17
    • De Reyck, B.1    Herroelen, W.2
  • 108
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • Sprecher, A., Hartmann, S. and Drexl, A., An exact algorithm for project scheduling with multiple modes. OR Spektrum, 1997, 19, 195-203.
    • (1997) OR Spektrum , vol.19 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 110
    • 21344485821 scopus 로고
    • Resource-constrained project scheduling: Exact methods for the multi-mode case
    • Springer-Verlag, Berlin
    • Sprecher, A., Resource-constrained project scheduling: Exact methods for the multi-mode case. In Lecture Notes in Economics and Mathematical Systems, Vol. 409, Springer-Verlag, Berlin, 1994.
    • (1994) Lecture Notes in Economics and Mathematical Systems , vol.409
    • Sprecher, A.1
  • 111
    • 0030263765 scopus 로고    scopus 로고
    • A note on "hierarchical models for multi-project planning and scheduling"
    • Hartmann, S. and Sprecher, A., A note on "Hierarchical models for multi-project planning and scheduling". European Journal of Operational Research, 1996, 94, 377-383.
    • (1996) European Journal of Operational Research , vol.94 , pp. 377-383
    • Hartmann, S.1    Sprecher, A.2
  • 112
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problems
    • ed R. Slowinski and J. Weglarz. Elsevier, Amsterdam
    • Patterson, J. H., Slowinski, R., Talbot, F. B. and Weglarz, J., An algorithm for a general class of precedence and resource constrained scheduling problems. In Advances in Project Scheduling, ed R. Slowinski and J. Weglarz. Elsevier, Amsterdam, 1989.
    • (1989) Advances in Project Scheduling
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 113
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
    • Patterson, J. H., Slowinski, R., Talbot, F. B. and Weglarz, J., Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems. European Journal of Operational Research, 1990, 49, 68-79.
    • (1990) European Journal of Operational Research , vol.49 , pp. 68-79
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 115
    • 0042403492 scopus 로고    scopus 로고
    • Local search methods for project scheduling under partially renewable resource constraints
    • May 4-7
    • Drexl, A., Local search methods for project scheduling under partially renewable resource constraints. INFORMS San Diego Meeting, May 4-7, 1997.
    • (1997) INFORMS San Diego Meeting
    • Drexl, A.1
  • 116
    • 0041401128 scopus 로고    scopus 로고
    • Partially renewable resources - A generalization of resource-constrained project scheduling
    • Vancouver, B.C., July 8-12
    • Schirmer, A. and Drexl, A., Partially renewable resources - A generalization of resource-constrained project scheduling. IFORS 14th Triennal Conference, Vancouver, B.C., July 8-12, 1996.
    • (1996) IFORS 14th Triennal Conference
    • Schirmer, A.1    Drexl, A.2
  • 118
    • 0041902124 scopus 로고    scopus 로고
    • Tabu search algorithms for project scheduling under resource and mode identity constraints
    • Vancouver, B.C., July 8-12
    • Salewski, F., Tabu search algorithms for project scheduling under resource and mode identity constraints. IFORS 14th Triennal Conference, Vancouver, B.C., July 8-12, 1996.
    • (1996) IFORS 14th Triennal Conference
    • Salewski, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.