메뉴 건너뛰기




Volumn 15, Issue , 2002, Pages 557-588

Formulation and Tabu search algorithm for the resource constrained project scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84888782064     PISSN: 1387666X     EISSN: None     Source Type: Book Series    
DOI: 10.1007/978-1-4615-1507-4     Document Type: Article
Times cited : (133)

References (22)
  • 1
    • 0003131416 scopus 로고    scopus 로고
    • Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem
    • S. Voss, S. Martello, 1. Osman, and C. Roucairol, editors, Kluwer
    • T. Baar, P. Brucker, and S. Knust. Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem. In: Meta-heuristics: Advances and Trends in Local Search Paradigms for Optimization, S. Voss, S. Martello, 1. Osman, and C. Roucairol, editors, Kluwer, pages 1-18, 1998.
    • (1998) Meta-heuristics: Advances and Trends In Local Search Paradigms For Optimization , pp. 1-18
    • Baar, T.1    Brucker, P.2    Knust, S.3
  • 2
    • 84989743918 scopus 로고
    • A New Heuristic Solution Method in ResourceConstrained Project Scheduling
    • C.E. Bell and J. Han. A New Heuristic Solution Method in ResourceConstrained Project Scheduling. Naval Research Logistics, 38:315-331, 1991.
    • (1991) Naval Research Logistics , vol.38 , pp. 315-331
    • Bell, C.E.1    Han, J.2
  • 5
    • 0031188915 scopus 로고    scopus 로고
    • A Simulated Annealing Algorithm for Resource Constrained Project Scheduling Problems
    • J-H. Cho and Y-D. Kim. A Simulated Annealing Algorithm for Resource Constrained Project Scheduling Problems. Journal of the Operational Research Society, 48:736-744, 1997.
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 736-744
    • Cho, J.-H.1    Kim, Y.-D.2
  • 7
    • 0032188522 scopus 로고    scopus 로고
    • A Competitive Genetic Algorithm for Resource-Constrained Project Scheduling
    • S. Hartmann. A Competitive Genetic Algorithm for Resource-Constrained Project Scheduling. Naval Research Logistics, 45:733-750, 1998.
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 10
    • 0030121479 scopus 로고    scopus 로고
    • Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation
    • R. Kolisch. Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation. European Journal of Operational Research, 90:320-333, 1996.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 15
    • 0031192667 scopus 로고    scopus 로고
    • A Genetic Algorithm for Multi-Mode Resource Constrained Project Scheduling Problem
    • M. Mori and C.C. Tseng. A Genetic Algorithm for Multi-Mode Resource Constrained Project Scheduling Problem. European Journal of Operational Research, 100:134-141,1997.
    • (1997) European Journal of Operational Research , vol.100 , pp. 134-141
    • Mori, M.1    Tseng, C.C.2
  • 17
    • 0032045813 scopus 로고    scopus 로고
    • A Tabu Search Approach to the Constraint Satisfaction Problem as a General Problem Solver
    • K. Nonobe and T. Ibaraki. A Tabu Search Approach to the Constraint Satisfaction Problem as a General Problem Solver. European Journal of Operational Research, 106:599-623, 1998.
    • (1998) European Journal of Operational Research , vol.106 , pp. 599-623
    • Nonobe, K.1    Ibaraki, T.2
  • 18
    • 0021460636 scopus 로고
    • A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
    • J.H. Patterson. A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem. Management Science, 30:854-867, 1984.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 19
    • 84989730007 scopus 로고
    • Local Search Techniques for Generalized Resource Constrained Project Scheduling Problem
    • S.E. Sampson and E.N. Weiss. Local Search Techniques for Generalized Resource Constrained Project Scheduling Problem. Naval Research Logistics, 40:665-675, 1993.
    • (1993) Naval Research Logistics , vol.40 , pp. 665-675
    • Sampson, S.E.1    Weiss, E.N.2
  • 20
    • 0029636114 scopus 로고
    • Semi-Active Active, Non-Delay Schedules for the Resource-Constrained Project Scheduling Problem
    • A. Sprecher, R. Kolisch, and A. Drexl. Semi-Active, Active, Non-Delay Schedules for the Resource-Constrained Project Scheduling Problem. European Journal of Operational Research, 80:94-102, 1995.
    • (1995) European Journal of Operational Research , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3
  • 21
    • 0032117729 scopus 로고    scopus 로고
    • A Tabu Search Approach for the Resource Constrained Project Scheduling Problem
    • P.R. Thomas and S. Salhi. A Tabu Search Approach for the Resource Constrained Project Scheduling Problem. Journal of Heuristics, 4:123-139, 1998.
    • (1998) Journal of Heuristics , vol.4 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.