메뉴 건너뛰기




Volumn 193, Issue 3, 2009, Pages 805-819

Scheduling tests in automotive R&D projects

Author keywords

Experimental vehicles; Multiple execution modes; Project scheduling; Renewable and cumulative resources

Indexed keywords

SCHEDULING; VEHICLES;

EID: 53449098566     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2007.11.010     Document Type: Article
Times cited : (37)

References (29)
  • 2
    • 53449094675 scopus 로고    scopus 로고
    • Alvarez-Valdés, R., Martín, G., Tamarit, J.M., 2006. New heuristic algorithms for project scheduling with resource availability costs. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 44-49.
    • Alvarez-Valdés, R., Martín, G., Tamarit, J.M., 2006. New heuristic algorithms for project scheduling with resource availability costs. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 44-49.
  • 3
    • 53449098950 scopus 로고    scopus 로고
    • Alvarez-Valdés, R., Crespo, E., Tamarit, J.M., Villa, F., 2005. A Scatter Search Algorithm for Project Scheduling under Partially Renewable Resources. Technical Report University of Valencia 54.
    • Alvarez-Valdés, R., Crespo, E., Tamarit, J.M., Villa, F., 2005. A Scatter Search Algorithm for Project Scheduling under Partially Renewable Resources. Technical Report University of Valencia 54.
  • 4
    • 53449101903 scopus 로고    scopus 로고
    • Bartels, J.H., 2008. Anwendungen von Methoden der ressourcenbeschränkten Projektplanung mit multiplen Ausführungsmodi in der betriebswirtschaftlichen Praxis. PhD Thesis.
    • Bartels, J.H., 2008. Anwendungen von Methoden der ressourcenbeschränkten Projektplanung mit multiplen Ausführungsmodi in der betriebswirtschaftlichen Praxis. PhD Thesis.
  • 5
    • 0039147551 scopus 로고    scopus 로고
    • Rightsizing and management of prototype vehicle testing at Ford Motor Company
    • Chelst K., Sidelko J., Przebienda A., Lockledge J., and Mihailidis D. Rightsizing and management of prototype vehicle testing at Ford Motor Company. Interfaces 31 1 (2001) 91-107
    • (2001) Interfaces , vol.31 , Issue.1 , pp. 91-107
    • Chelst, K.1    Sidelko, J.2    Przebienda, A.3    Lockledge, J.4    Mihailidis, D.5
  • 9
    • 0442269144 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A heuristic for the multi-mode case
    • Heilmann R. Resource-constrained project scheduling: A heuristic for the multi-mode case. OR Spectrum 23 (2001) 335-357
    • (2001) OR Spectrum , vol.23 , pp. 335-357
    • Heilmann, R.1
  • 13
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revised: Theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revised: Theory and computation. European Journal of Operational Research 90 (1996) 320-333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 16
    • 0001681374 scopus 로고    scopus 로고
    • Methods for resource-constrained project scheduling with regular and nonregular objective functions and schedule-dependent time windows
    • Wȩglarz J. (Ed), Kluwer, Boston
    • Neumann K., and Zimmermann J. Methods for resource-constrained project scheduling with regular and nonregular objective functions and schedule-dependent time windows. In: Wȩglarz J. (Ed). Project Scheduling: Recent Models, Algorithms and Applications (1999), Kluwer, Boston 261-287
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications , pp. 261-287
    • Neumann, K.1    Zimmermann, J.2
  • 17
    • 0034559447 scopus 로고    scopus 로고
    • Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
    • Neumann K., and Zimmermann J. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research 127 (2000) 425-443
    • (2000) European Journal of Operational Research , vol.127 , pp. 425-443
    • Neumann, K.1    Zimmermann, J.2
  • 18
    • 17444428192 scopus 로고    scopus 로고
    • Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
    • Neumann K., Schwindt C., and Zimmermann J. Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications. Central European Journal of Operations Research 10 (2002) 113-148
    • (2002) Central European Journal of Operations Research , vol.10 , pp. 113-148
    • Neumann, K.1    Schwindt, C.2    Zimmermann, J.3
  • 21
    • 0014574409 scopus 로고
    • Multi-project scheduling with limited resources: A zero-one programming approach
    • Pritsker A.A.B., Watters L.J., and Wolfe P.M. Multi-project scheduling with limited resources: A zero-one programming approach. Management Science 16 (1969) 93-108
    • (1969) Management Science , vol.16 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 24
    • 53449087021 scopus 로고    scopus 로고
    • Stake, R.B., 2001. A framework for evaluation commonality. In: Riitahuhta, A., Pulkinnen, A. (Eds.), Design for Configuration - A Debate based on the 5th WDK Workshop on Product Structuring. Springer, Berlin, pp. 169-184.
    • Stake, R.B., 2001. A framework for evaluation commonality. In: Riitahuhta, A., Pulkinnen, A. (Eds.), Design for Configuration - A Debate based on the 5th WDK Workshop on Product Structuring. Springer, Berlin, pp. 169-184.
  • 25
    • 53449085625 scopus 로고    scopus 로고
    • Schwindt, C., 1998. Generation of Resource-Constrained Project Scheduling Problems Subject to Temporal Constraints. Report WIOR 543 University of Karlsruhe.
    • Schwindt, C., 1998. Generation of Resource-Constrained Project Scheduling Problems Subject to Temporal Constraints. Report WIOR 543 University of Karlsruhe.
  • 27
    • 53449093002 scopus 로고    scopus 로고
    • Valls, V., Ballestín, F., Barrios, A., 2006. An evolutionary algorithm for the resource-constrained project scheduling problem subject to temporal constraints. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 370-376.
    • Valls, V., Ballestín, F., Barrios, A., 2006. An evolutionary algorithm for the resource-constrained project scheduling problem subject to temporal constraints. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 370-376.
  • 28


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.