Alvarez-Valdés, R., Martín, G., Tamarit, J.M., 2006. New heuristic algorithms for project scheduling with resource availability costs. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 44-49.
-
Alvarez-Valdés, R., Martín, G., Tamarit, J.M., 2006. New heuristic algorithms for project scheduling with resource availability costs. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 44-49.
-
-
-
-
3
-
-
53449098950
-
-
Alvarez-Valdés, R., Crespo, E., Tamarit, J.M., Villa, F., 2005. A Scatter Search Algorithm for Project Scheduling under Partially Renewable Resources. Technical Report University of Valencia 54.
-
Alvarez-Valdés, R., Crespo, E., Tamarit, J.M., Villa, F., 2005. A Scatter Search Algorithm for Project Scheduling under Partially Renewable Resources. Technical Report University of Valencia 54.
-
-
-
-
4
-
-
53449101903
-
-
Bartels, J.H., 2008. Anwendungen von Methoden der ressourcenbeschränkten Projektplanung mit multiplen Ausführungsmodi in der betriebswirtschaftlichen Praxis. PhD Thesis.
-
Bartels, J.H., 2008. Anwendungen von Methoden der ressourcenbeschränkten Projektplanung mit multiplen Ausführungsmodi in der betriebswirtschaftlichen Praxis. PhD Thesis.
-
-
-
-
5
-
-
0039147551
-
Rightsizing and management of prototype vehicle testing at Ford Motor Company
-
Chelst K., Sidelko J., Przebienda A., Lockledge J., and Mihailidis D. Rightsizing and management of prototype vehicle testing at Ford Motor Company. Interfaces 31 1 (2001) 91-107
-
(2001)
Interfaces
, vol.31
, Issue.1
, pp. 91-107
-
-
Chelst, K.1
Sidelko, J.2
Przebienda, A.3
Lockledge, J.4
Mihailidis, D.5
-
9
-
-
0442269144
-
Resource-constrained project scheduling: A heuristic for the multi-mode case
-
Heilmann R. Resource-constrained project scheduling: A heuristic for the multi-mode case. OR Spectrum 23 (2001) 335-357
-
(2001)
OR Spectrum
, vol.23
, pp. 335-357
-
-
Heilmann, R.1
-
13
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revised: Theory and computation
-
Kolisch R. Serial and parallel resource-constrained project scheduling methods revised: Theory and computation. European Journal of Operational Research 90 (1996) 320-333
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
14
-
-
0002030298
-
Benchmark Instances for Project Scheduling Problems
-
Wȩglarz J. (Ed), Kluwer, Boston
-
Kolisch R., Schwindt C., and Sprecher A. Benchmark Instances for Project Scheduling Problems. In: Wȩglarz J. (Ed). Project Scheduling: Recent Models, Algorithms and Applications (1999), Kluwer, Boston 197-212
-
(1999)
Project Scheduling: Recent Models, Algorithms and Applications
, pp. 197-212
-
-
Kolisch, R.1
Schwindt, C.2
Sprecher, A.3
-
16
-
-
0001681374
-
Methods for resource-constrained project scheduling with regular and nonregular objective functions and schedule-dependent time windows
-
Wȩglarz J. (Ed), Kluwer, Boston
-
Neumann K., and Zimmermann J. Methods for resource-constrained project scheduling with regular and nonregular objective functions and schedule-dependent time windows. In: Wȩglarz J. (Ed). Project Scheduling: Recent Models, Algorithms and Applications (1999), Kluwer, Boston 261-287
-
(1999)
Project Scheduling: Recent Models, Algorithms and Applications
, pp. 261-287
-
-
Neumann, K.1
Zimmermann, J.2
-
17
-
-
0034559447
-
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
-
Neumann K., and Zimmermann J. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research 127 (2000) 425-443
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 425-443
-
-
Neumann, K.1
Zimmermann, J.2
-
18
-
-
17444428192
-
Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
-
Neumann K., Schwindt C., and Zimmermann J. Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications. Central European Journal of Operations Research 10 (2002) 113-148
-
(2002)
Central European Journal of Operations Research
, vol.10
, pp. 113-148
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
21
-
-
0014574409
-
Multi-project scheduling with limited resources: A zero-one programming approach
-
Pritsker A.A.B., Watters L.J., and Wolfe P.M. Multi-project scheduling with limited resources: A zero-one programming approach. Management Science 16 (1969) 93-108
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
24
-
-
53449087021
-
-
Stake, R.B., 2001. A framework for evaluation commonality. In: Riitahuhta, A., Pulkinnen, A. (Eds.), Design for Configuration - A Debate based on the 5th WDK Workshop on Product Structuring. Springer, Berlin, pp. 169-184.
-
Stake, R.B., 2001. A framework for evaluation commonality. In: Riitahuhta, A., Pulkinnen, A. (Eds.), Design for Configuration - A Debate based on the 5th WDK Workshop on Product Structuring. Springer, Berlin, pp. 169-184.
-
-
-
-
25
-
-
53449085625
-
-
Schwindt, C., 1998. Generation of Resource-Constrained Project Scheduling Problems Subject to Temporal Constraints. Report WIOR 543 University of Karlsruhe.
-
Schwindt, C., 1998. Generation of Resource-Constrained Project Scheduling Problems Subject to Temporal Constraints. Report WIOR 543 University of Karlsruhe.
-
-
-
-
27
-
-
53449093002
-
-
Valls, V., Ballestín, F., Barrios, A., 2006. An evolutionary algorithm for the resource-constrained project scheduling problem subject to temporal constraints. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 370-376.
-
Valls, V., Ballestín, F., Barrios, A., 2006. An evolutionary algorithm for the resource-constrained project scheduling problem subject to temporal constraints. In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznań, pp. 370-376.
-
-
-
-
29
-
-
53449091168
-
-
Springer, Berlin
-
Zimmermann J., Stark C., and Rieck J. Projektplanung - Modelle, Methoden, Management (2006), Springer, Berlin
-
(2006)
Projektplanung - Modelle, Methoden, Management
-
-
Zimmermann, J.1
Stark, C.2
Rieck, J.3
|