Formal development of line-of-balance technique
-
Al Sarraj, Z. M. (1990). " Formal development of line-of-balance technique. " J. Constr. Eng. Manage., 116 (4), 689-704.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 689-704
-
-
Al Sarraj, Z.M.1
-
2
-
-
8644266554
-
Scheduling programs with repetitive projects using composite learning curve approximations
-
Amor, J. P. (2002). " Scheduling programs with repetitive projects using composite learning curve approximations. " Proj. Manage. J., 33 (2), 16-29.
-
(2002)
Proj. Manage. J.
, vol.33
, Issue.2
, pp. 16-29
-
-
Amor, J.P.1
-
3
-
-
0040651491
-
Improving CPM's accuracy using learning curves
-
Amor, J. P., and Teplitz, C. J. (1993). " Improving CPM's accuracy using learning curves. " Proj. Manage. J., 24 (4), 15-19.
-
(1993)
Proj. Manage. J.
, vol.24
, Issue.4
, pp. 15-19
-
-
Amor, J.P.1
Teplitz, C.J.2
-
4
-
-
2142812265
-
An efficient approximation procedure for project composite learning curves
-
Amor, J. P., and Teplitz, C. J. (1998). " An efficient approximation procedure for project composite learning curves. " Proj. Manage. J., 29 (3), 28-42.
-
(1998)
Proj. Manage. J.
, vol.29
, Issue.3
, pp. 28-42
-
-
Amor, J.P.1
Teplitz, C.J.2
-
5
-
-
0019030430
-
Simulation of repetitive-unit construction
-
Ashley, D. B. (1980). " Simulation of repetitive-unit construction. " J. Constr. Div., Am. Soc. Civ. Eng., 106 (2), 185-194.
-
(1980)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.106
, Issue.2
, pp. 185-194
-
-
Ashley, D.B.1
-
6
-
-
8644228338
-
Incorporating learning curve effects into critical resource diagramming
-
Badiru, A. B. (1995). " Incorporating learning curve effects into critical resource diagramming. " Proj. Manage. J., 2 (2), 38-45.
-
(1995)
Proj. Manage. J.
, vol.2
, Issue.2
, pp. 38-45
-
-
Badiru, A.B.1
-
7
-
-
0004146280
-
-
McGraw-Hill, New York
-
Barrie, D. S., and Paulson, B. C., Jr. (1978). Professional construction management, McGraw-Hill, New York, 232-233.
-
(1978)
Professional Construction Management
, pp. 232-233
-
-
Barrie, D.S.1
Paulson Jr., B.C.2
-
8
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
Bartusch, M., Möhring, R. H., and Radermacher, F. J. (1988). " Scheduling project networks with resource constraints and time windows. " Ann. Operat. Res., 16, 201-240.
-
(1988)
Ann. Operat. Res.
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, F.J.3
-
9
-
-
0019064535
-
Construction planning - Beyond the critical path
-
Birrell, G. E. (1980). " Construction planning - Beyond the critical path. " J. Constr. Div., Am. Soc. Civ. Eng., 106 (3), 389-407.
-
(1980)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.E.1
-
10
-
-
0004278233
-
-
McGraw-Hill, New York
-
Callahan, M. T., Quackenbush, D. G., and Rowings, J. E. (1992). Construction project scheduling, McGraw-Hill, New York.
-
(1992)
Construction Project Scheduling
-
-
Callahan, M.T.1
Quackenbush, D.G.2
Rowings, J.E.3
-
11
-
-
0000981977
-
Planning construction of repetitive building units
-
Carr, R. I., and Meyer, W. L. (1974). " Planning construction of repetitive building units. " J. Constr. Div., Am. Soc. Civ. Eng., 100 (3), 403-412.
-
(1974)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.100
, Issue.3
, pp. 403-412
-
-
Carr, R.I.1
Meyer, W.L.2
-
12
-
-
0022917749
-
Application of linear scheduling
-
Chrzanowski, E. N., and Johnston, D. W. (1986). " Application of linear scheduling. " J. Constr. Eng. Manage., 112 (4), 476-491.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski, E.N.1
Johnston, D.W.2
-
14
-
-
3543055794
-
A random network generator for activity-on-the-node networks
-
Demeulemeester, E., Vanhoucke, M., and Herroelen, W. (2003). " A random network generator for activity-on-the-node networks. " J. Scheduling, 6, 13-34.
-
(2003)
J. Scheduling
, vol.6
, pp. 13-34
-
-
Demeulemeester, E.1
Vanhoucke, M.2
Herroelen, W.3
-
15
-
-
0031624059
-
An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
-
De Reyck, B., and Herroelen, W. (1998). " An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations. " Comput. Oper. Res., 25, 1-17.
-
(1998)
Comput. Oper. Res.
, vol.25
, pp. 1-17
-
-
De Reyck, B.1
Herroelen, W.2
-
16
-
-
0019193555
-
Construction management in West Germany
-
Dressler, J. (1980). " Construction management in West Germany. " J. Constr. Div., Am. Soc. Civ. Eng., 106 (4), 477-487.
-
(1980)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.106
, Issue.4
, pp. 477-487
-
-
Dressler, J.1
-
17
-
-
0035335276
-
Object-oriented model for repetitive construction scheduling
-
El-Rayes, K. (2001). " Object-oriented model for repetitive construction scheduling. " J. Constr. Eng. Manage., 127 (3), 199-205.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 199-205
-
-
El-Rayes, K.1
-
18
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
El-Rayes, K., and Moselhi, O. (1998). " Resource-driven scheduling of repetitive activities. " Constr. Manage. Econom., 16, 433-446.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
19
-
-
0031153881
-
Optimization of float use in risk analysis-based network scheduling
-
Gong, D. (1997). " Optimization of float use in risk analysis-based network scheduling. " Int. J. Proj. Manage., 15 (3), 187-192.
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.3
, pp. 187-192
-
-
Gong, D.1
-
20
-
-
3743100358
-
How to get visual impact on planning diagrams
-
Gorman, J. E. (1972). " How to get visual impact on planning diagrams. " Roads Streets, 115 (8), 74-75.
-
(1972)
Roads Streets
, vol.115
, Issue.8
, pp. 74-75
-
-
Gorman, J.E.1
-
21
-
-
33645510901
-
-
Nomura Research Institute, Tokyo, Japan
-
Goto, E., Joko, T., Fujisawa, K., Katoh, N., and Furusaka, S. (2000). " Maximizing net present value for generalized resource constrained project scheduling problem. " Nomura Research Institute, Tokyo, Japan.
-
(2000)
Maximizing Net Present Value for Generalized Resource Constrained Project Scheduling Problem
-
-
Goto, E.1
Joko, T.2
Fujisawa, K.3
Katoh, N.4
Furusaka, S.5
-
22
-
-
0001666378
-
The payment scheduling problem
-
Grinold, R. C. (1972). " The payment scheduling problem. " Naval Res. Logistics Quart., 19, 123-136.
-
(1972)
Naval Res. Logistics Quart.
, vol.19
, pp. 123-136
-
-
Grinold, R.C.1
-
23
-
-
0035391905
-
Linear scheduling model: Float characteristics
-
Harmelink, D. J. (2001). " Linear scheduling model: Float characteristics. " J. Constr. Eng. Manage., 127 (4), 255-260.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 255-260
-
-
Harmelink, D.J.1
-
24
-
-
0017539377
-
Road construction - Simulation game for site managers
-
Harris, F. C., and Evans, J. B. (1977). " Road construction - Simulation game for site managers. " J. Constr. Div., Am. Soc. Civ. Eng., 103 (3), 405-414.
-
(1977)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.103
, Issue.3
, pp. 405-414
-
-
Harris, F.C.1
Evans, J.B.2
-
25
-
-
0000674566
-
Scheduling projects with repeating activities
-
Harris, R. B., and Ioannou, P. G. (1998). " Scheduling projects with repeating activities. " J. Constr. Eng. Manage., 124 (4), 269-278.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
26
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Hegazy, T., and Wassef, N. (2001). " Cost optimization in projects with repetitive nonserial activities. " J. Constr. Eng. Manage., 127 (3), 183-191.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
27
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D. W. (1981). " Linear scheduling method for highway construction. " J. Constr. Div., Am. Soc. Civ. Eng., 107 (2), 241-261.
-
(1981)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.107
, Issue.2
, pp. 241-261
-
-
Johnston, D.W.1
-
28
-
-
0035454358
-
Optimal schedule planning for multiple, repetitive construction process
-
Kang, L. S., Park, I. C., and Lee, B. H. (2001). " Optimal schedule planning for multiple, repetitive construction process. " J. Constr. Eng. Manage., 127 (5), 382-390.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.5
, pp. 382-390
-
-
Kang, L.S.1
Park, I.C.2
Lee, B.H.3
-
29
-
-
0001636411
-
An experimental and comparative evaluation of production line balancing techniques
-
Mastor, A. A. (1970). " An experimental and comparative evaluation of production line balancing techniques. " Manage. Sci., 16, 728-746.
-
(1970)
Manage. Sci.
, vol.16
, pp. 728-746
-
-
Mastor, A.A.1
-
30
-
-
0000466018
-
Resource leveling of linear schedules using integer linear programming
-
Mattila, K. G., and Abraham, D. M. (1998). " Resource leveling of linear schedules using integer linear programming. " J. Constr. Eng. Manage., 124 (3), 232-244.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.3
, pp. 232-244
-
-
Mattila, K.G.1
Abraham, D.M.2
-
31
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Moselhi, O., and El-Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization. " J. Constr. Eng. Manage., 119 (4), 681-697.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
32
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
O'Brien, J. J. (1975). " VPM scheduling for high-rise buildings. " J. Constr. Div., Am. Soc. Civ. Eng., 101 (4), 895-905.
-
(1975)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.101
, Issue.4
, pp. 895-905
-
-
O'Brien, J.J.1
-
33
-
-
0022076783
-
Network scheduling variations for repetitive work
-
O'Brien, J. J., Kreitzberg, F. C., and Mikes, W. F. (1985). " Network scheduling variations for repetitive work. " J. Constr. Eng. Manage., 111 (2), 105-116.
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.2
, pp. 105-116
-
-
O'Brien, J.J.1
Kreitzberg, F.C.2
Mikes, W.F.3
-
34
-
-
2142649813
-
Network analysis and construction planning
-
Peer, S. (1974). " Network analysis and construction planning. " J. Constr. Div., Am. Soc. Civ. Eng., 100 (3), 203-210.
-
(1974)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.100
, Issue.3
, pp. 203-210
-
-
Peer, S.1
-
35
-
-
0025447970
-
RPM: Repetitive project modeling
-
Reda, R. M. (1990). " RPM: Repetitive project modeling. " J. Constr. Eng. Manage., 116 (2), 316-330.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.M.1
-
36
-
-
33645519100
-
A multi-project scheduling procedure for transportation projects
-
Iowa Dept. of Transportation, Ames, Iowa
-
Rowings, J. E., and Harmelink, D. J. (1993). " A multi-project scheduling procedure for transportation projects. " Final Rep. Part 1, Iowa Dept. of Transportation, Ames, Iowa.
-
(1993)
Final Rep. Part 1
-
-
Rowings, J.E.1
Harmelink, D.J.2
-
37
-
-
33645532112
-
A multi-project scheduling procedure for transportation projects
-
Iowa Dept. of Transportation, Ames, Iowa
-
Rowings, J. E., and Harmelink, D. J. (1994). " A multi-project scheduling procedure for transportation projects. " Final Rep. Part 2, Iowa Dept. of Transportation, Ames, Iowa.
-
(1994)
Final Rep. Part 2
-
-
Rowings, J.E.1
Harmelink, D.J.2
-
38
-
-
0023984188
-
Extensions to linear scheduling optimization
-
Russell, A. D., and Caselton, W. F. (1988). " Extensions to linear scheduling optimization. " J. Constr. Eng. Manage., 114 (1), 36-52.
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.1
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
39
-
-
0027607475
-
New generation of planning structures
-
Russell, A. D., and Wong, W. C. M. (1993). " New generation of planning structures. " J. Constr. Eng. Manage., 119 (2), 196-214.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
40
-
-
0019030431
-
Construction planning for linear projects
-
Selinger, S. (1980). " Construction planning for linear projects. " J. Constr. Div., Am. Soc. Civ. Eng., 106 (2), 195-205.
-
(1980)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.106
, Issue.2
, pp. 195-205
-
-
Selinger, S.1
-
41
-
-
4043127335
-
Third generation PERT/LOB
-
Shoderbek, P. P., and Digman, L. A. (1967). " Third generation PERT/LOB. " Harvard Bus. Rev., 45 (5), 100-110.
-
(1967)
Harvard Bus. Rev.
, vol.45
, Issue.5
, pp. 100-110
-
-
Shoderbek, P.P.1
Digman, L.A.2
-
42
-
-
0013370739
-
Scheduling of programs with repetitive projects
-
Shtub, A. (1991). " Scheduling of programs with repetitive projects. " Proj. Manage. J., 22 (4), 49-53.
-
(1991)
Proj. Manage. J.
, vol.22
, Issue.4
, pp. 49-53
-
-
Shtub, A.1
-
43
-
-
0030571697
-
Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
-
Shtub, A., LeBlanc, L. J., and Cai, Z. (1996). " Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. " Eur. J. Oper. Res., 88, 124-138.
-
(1996)
Eur. J. Oper. Res.
, vol.88
, pp. 124-138
-
-
Shtub, A.1
Leblanc, L.J.2
Cai, Z.3
-
44
-
-
0020178299
-
Time space scheduling method
-
Stradal, O., and Cacha, J. (1982). " Time space scheduling method. " J. Constr. Div., Am. Soc. Civ. Eng., 108 (3), 445-457.
-
(1982)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.108
, Issue.3
, pp. 445-457
-
-
Stradal, O.1
Cacha, J.2
-
45
-
-
0028495816
-
CPL/LOB: New methodology to integrate CPM and line of balance
-
Suhail, S. A., and Neale, R. H. (1994). " CPL/LOB: New methodology to integrate CPM and line of balance. " J. Constr. Eng. Manage., 120 (3), 667-684.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.3
, pp. 667-684
-
-
Suhail, S.A.1
Neale, R.H.2
-
46
-
-
0028750185
-
HVLS: Horizontal and vertical logic scheduling for multistorey projects
-
Thabet, W. Y., and Beliveau, Y. J. (1994). " HVLS: horizontal and vertical logic scheduling for multistorey projects. " J. Constr. Eng. Manage., 120 (4), 875-892.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 875-892
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
47
-
-
33645526696
-
The application of project scheduling techniques in a real-life environment
-
Vanhoucke, M., and Demeulemeester, E. (2003). " The application of project scheduling techniques in a real-life environment. " Proj. Manage. J., 34 (1), 30-42.
-
(2003)
Proj. Manage. J.
, vol.34
, Issue.1
, pp. 30-42
-
-
Vanhoucke, M.1
Demeulemeester, E.2
-
48
-
-
33645514309
-
-
Vanhoucke, M., Demeulemeester, E., and Herroelen, W. (2000). " A validation of procedures for maximizing the net present value of a project. " Working Paper 0030, Dept. Toegepaste Economische Wetenschappen, K.U. Leuven, Belgium.
-
(2000)
A Validation of Procedures for Maximizing the Net Present Value of A Project
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
49
-
-
0035435965
-
On maximizing the net present value of a project under renewable resource constraints
-
Vanhoucke, M., Demeulemeester, E., and Herroelen, W. (2001). " On maximizing the net present value of a project under renewable resource constraints. " Manage. Sci., 47, 1113-1121.
-
(2001)
Manage. Sci.
, vol.47
, pp. 1113-1121
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
50
-
-
33645508775
-
Work continuity in a real-life schedule: The Westerscheldetunnel
-
Ghent Univ., Ghent, Belgium
-
Vanhoucke, M., and Van Osselaer, K. (2004). " Work continuity in a real-life schedule: The Westerscheldetunnel. " Working Paper, Ghent Univ., Ghent, Belgium 〈 http://www.westerscheldetunnel.nl 〉.
-
(2004)
Working Paper
-
-
Vanhoucke, M.1
Van Osselaer, K.2
-
51
-
-
4043100270
-
Disturbance scheduling technique for managing renovation work
-
Whiteman, W. E., and Irwig, H. G. (1988). " Disturbance scheduling technique for managing renovation work. " J. Constr. Eng. Manage., 114 (2), 191-213.
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.2
, pp. 191-213
-
-
Whiteman, W.E.1
Irwig, H.G.2
-
52
-
-
0035454491
-
Comparison of linear scheduling method (LSM) and critical path method (CPM)
-
Yamin, R. A., and Harmelink, D. J. (2001). " Comparison of linear scheduling method (LSM) and critical path method (CPM). " J. Constr. Eng. Manage., 127 (5), 374-381.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.5
, pp. 374-381
-
-
Yamin, R.A.1
Harmelink, D.J.2
|