1
-
-
0030269388
-
Constructing good solutions for a school time-tabling problem
-
[1] R. Alvarez-Valdes, G. Martin, and J.M. Tamarit, Constructing good solutions for a school time-tabling problem, J Oper Res Soc 47 (1996), 1203-1215.
-
(1996)
J Oper Res Soc
, vol.47
, pp. 1203-1215
-
-
Alvarez-Valdes, R.1
Martin, G.2
Tamarit, J.M.3
-
2
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
[2] M. Bartusch, R.H. Möhring, and F.J. Radermacher, Scheduling project networks with resource constraints and time windows, Ann Oper Res 16 (1988), 201-240.
-
(1988)
Ann Oper Res
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, F.J.3
-
3
-
-
0003316011
-
Scheduling under resource constraints - Deterministic models
-
Baltzer, Basel
-
[3] J. Blazewicz, W. Cellary, R. Slowinski, and J. Weglarz, Scheduling under resource constraints-Deterministic models, Baltzer, Basel, 1986 (Ann Oper Res 7).
-
(1986)
Ann Oper Res
, vol.7
-
-
Blazewicz, J.1
Cellary, W.2
Slowinski, R.3
Weglarz, J.4
-
4
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
[4] J. Blazewicz, J.K. Lenstra, and A.H.G. Rinnooy Kan, Scheduling subject to resource constraints: Classification and complexity, Discr Appl Math 5 (1983), 11-24.
-
(1983)
Discr Appl Math
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
6
-
-
18144452822
-
Project scheduling under partially renewable resource constraints
-
[6] J. Böttcher, A. Drexl, R. Kolisch, and F. Salewski, Project scheduling under partially renewable resource constraints, Mgmt Sci 45 (1999), 543-559.
-
(1999)
Mgmt Sci
, vol.45
, pp. 543-559
-
-
Böttcher, J.1
Drexl, A.2
Kolisch, R.3
Salewski, F.4
-
7
-
-
0007290145
-
Kapazitätsplanung in Netzwerken-Ein Überblick über neuere Modelle und Verfahren
-
in German
-
[7] W. Domschke and A. Drexl, Kapazitätsplanung in Netzwerken-Ein Überblick über neuere Modelle und Verfahren, Oper Res Spektr 13 (1991), 63-76 (in German).
-
(1991)
Oper Res Spektr
, vol.13
, pp. 63-76
-
-
Domschke, W.1
Drexl, A.2
-
8
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
[8] A. Drexl and J. Grünewald, Nonpreemptive multi-mode resource-constrained project scheduling, IIE Trans 25/5 (1993), 74-81.
-
(1993)
IIE Trans
, vol.25
, Issue.5
, pp. 74-81
-
-
Drexl, A.1
Grünewald, J.2
-
9
-
-
0007223240
-
Zur Bedeutung der Modellbildung für die Entwicklung wissensbasierter Systeme
-
[9] A. Drexl, E. Pesch, and F. Salewski, Zur Bedeutung der Modellbildung für die Entwicklung wissensbasierter Systeme, Zeit Betriebswirtschaft 65 (1995), 1135-1153.
-
(1995)
Zeit Betriebswirtschaft
, vol.65
, pp. 1135-1153
-
-
Drexl, A.1
Pesch, E.2
Salewski, F.3
-
10
-
-
0001627504
-
Complexity results for multiprocessor scheduling under resource constraints
-
[10] M.R. Garey and D.S. Johnson, Complexity results for multiprocessor scheduling under resource constraints, SIAM J Comput 4 (1975), 397-411.
-
(1975)
SIAM J Comput
, vol.4
, pp. 397-411
-
-
Garey, M.R.1
Johnson, D.S.2
-
11
-
-
0032210324
-
The course scheduling problem at Lufthansa Technical Training
-
[11] K. Haase, J. Latteier, and A. Schirmer, The course scheduling problem at Lufthansa Technical Training, Eur J Oper Res 110 (1998), 441-456.
-
(1998)
Eur J Oper Res
, vol.110
, pp. 441-456
-
-
Haase, K.1
Latteier, J.2
Schirmer, A.3
-
12
-
-
0038928811
-
Course planning at Lufthansa Technical Training - Constructing more profitable schedules
-
[12] K. Haase, J. Latteier, and A. Schirmer, Course planning at Lufthansa Technical Training - Constructing more profitable schedules, Interfaces 29(5) (1999), 95-109.
-
(1999)
Interfaces
, vol.29
, Issue.5
, pp. 95-109
-
-
Haase, K.1
Latteier, J.2
Schirmer, A.3
-
14
-
-
0030212866
-
Solving the resource constrained project scheduling problem with optimization subroutine library
-
[14] O. Icmeli Tukel and W.O. Rom, Solving the resource constrained project scheduling problem with optimization subroutine library, Comput Oper Res 23 (1995), 801-817.
-
(1995)
Comput Oper Res
, vol.23
, pp. 801-817
-
-
Icmeli Tukel, O.1
Rom, W.O.2
-
15
-
-
0031639845
-
Analysis of the characteristics of projects in diverse industries
-
[15] O. Icmeli Tukel and W.O. Rom, Analysis of the characteristics of projects in diverse industries, J Oper Mgmt 16 (1998), 43-61.
-
(1998)
J Oper Mgmt
, vol.16
, pp. 43-61
-
-
Icmeli Tukel, O.1
Rom, W.O.2
-
16
-
-
0029638551
-
An intelligent interactive project management support system
-
[16] F.J. Jungen and W. Kowalczik, An intelligent interactive project management support system, Eur J Oper Res 84 (1995), 60-81.
-
(1995)
Eur J Oper Res
, vol.84
, pp. 60-81
-
-
Jungen, F.J.1
Kowalczik, W.2
-
17
-
-
0001620447
-
Critical path planning and scheduling: Mathematical basis
-
[17] J.E. Kelley, Critical path planning and scheduling: Mathematical basis, Oper Res 9 (1961), 296-320.
-
(1961)
Oper Res
, vol.9
, pp. 296-320
-
-
Kelley, J.E.1
-
20
-
-
0007226447
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel
-
[20] A. Schirmer, A guide to complexity theory in operations research, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 381, 1995, www.bwl.uni-kiel.de/bwlinstitute/Prod/mab/schirmer/ pdf/wp381.pdf.
-
(1995)
A Guide to Complexity Theory in Operations Research
, vol.381
-
-
Schirmer, A.1
-
21
-
-
0003662483
-
-
Kovac, Hamburg
-
[21] A. Schirmer, Project scheduling with scarce resources -Models, methods, and applications, Kovac, Hamburg, 1999.
-
(1999)
Project Scheduling with Scarce Resources -Models, Methods, and Applications
-
-
Schirmer, A.1
-
22
-
-
0019586862
-
Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
-
[22] R. Slowinski, Multiobjective network scheduling with efficient use of renewable and nonrenewable resources, Eur J Oper Res 7 (1981), 265-273.
-
(1981)
Eur J Oper Res
, vol.7
, pp. 265-273
-
-
Slowinski, R.1
-
23
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
-
[23] F.B. Talbot and J.H. Patterson, An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems, Mgmt Sci 24 (1978), 1163-1174.
-
(1978)
Mgmt Sci
, vol.24
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
25
-
-
0007155875
-
Calendarization of time planning in MPM networks
-
[25] J. Zhan, Calendarization of time planning in MPM networks, ZOR - Methods Models Oper Res 36 (1992), 423-438.
-
(1992)
ZOR - Methods Models Oper Res
, vol.36
, pp. 423-438
-
-
Zhan, J.1
|