메뉴 건너뛰기




Volumn 3616 LNCS, Issue , 2005, Pages 229-243

Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills

Author keywords

[No Author keywords available]

Indexed keywords

OPTIMIZATION; PERSONNEL; SCHEDULING;

EID: 33645986632     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/11593577_14     Document Type: Conference Paper
Times cited : (94)

References (25)
  • 1
    • 0030269388 scopus 로고    scopus 로고
    • Constructing good solutions for a school timetabling problem
    • Alvarez-Valdes, R., Martin, G., Tamarit, J. M.: Constructing Good Solutions for a School Timetabling Problem. J. Oper. Res. Soc. 47 (1996) 1203-1215
    • (1996) J. Oper. Res. Soc. , vol.47 , pp. 1203-1215
    • Alvarez-Valdes, R.1    Martin, G.2    Tamarit, J.M.3
  • 2
    • 0029369394 scopus 로고
    • Optimization and heuristic models to integrate project task and man-power scheduling
    • Bailey, J.: Optimization and Heuristic Models to Integrate Project Task and Man-power scheduling. Comput. Indust. Eng. 29 (1995) 473-476
    • (1995) Comput. Indust. Eng. , vol.29 , pp. 473-476
    • Bailey, J.1
  • 3
    • 0033479482 scopus 로고    scopus 로고
    • Satisfiability tests and time bound adjustments for cumulative scheduling problems
    • Baptiste, P., Le Pape, C., Nuijten, W.: Satisfiability Tests and Time Bound Adjustments for Cumulative Scheduling Problems. Ann. Oper. Res. 92 (1999) 305-333
    • (1999) Ann. Oper. Res. , vol.92 , pp. 305-333
    • Baptiste, P.1    Le Pape, C.2    Nuijten, W.3
  • 4
    • 15344348592 scopus 로고    scopus 로고
    • Tight LP bounds for resource constrained project scheduling
    • Baptiste, P., Demassey, S.: Tight LP Bounds for Resource Constrained Project Scheduling. OR Spectrum 26 (2004) 251-262
    • (2004) OR Spectrum , vol.26 , pp. 251-262
    • Baptiste, P.1    Demassey, S.2
  • 5
    • 33645985859 scopus 로고    scopus 로고
    • An exact method for solving the multi-skill project scheduling problem
    • Tilburg
    • Bellenguez, O., Néron, E.: An Exact Method for Solving the Multi-skill Project Scheduling Problem. Operations Research Conference, Tilburg (2004) 97-98
    • (2004) Operations Research Conference , pp. 97-98
    • Bellenguez, O.1    Néron, E.2
  • 7
    • 0038183863 scopus 로고    scopus 로고
    • Lower bounds for resource-constrained project scheduling problems
    • Brucker, P., Knust, S.: Lower Bounds for Resource-Constrained Project Scheduling Problems. Eur. J. Oper. Res. 149 (2003) 302-313
    • (2003) Eur. J. Oper. Res. , vol.149 , pp. 302-313
    • Brucker, P.1    Knust, S.2
  • 9
    • 0032094795 scopus 로고    scopus 로고
    • Multi-resource shop scheduling with resource flexibility
    • Dauzére-Pérès, S., Roux, J., Lasserre, J. B.: Multi-resource Shop Scheduling with Resource Flexibility. Eur. J. Oper. Res. 107 (1998) 289-305
    • (1998) Eur. J. Oper. Res. , vol.107 , pp. 289-305
    • Dauzére-Pérès, S.1    Roux, J.2    Lasserre, J.B.3
  • 10
    • 17444369123 scopus 로고    scopus 로고
    • Constraint-propagation-based cutting planes: An application to the resource-constrained project-scheduling problem
    • In press
    • Demassey, S., Artigues, C., Michelon, P.: Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project-Scheduling Problem. INFORMS J. Comput. (2003) In press
    • (2003) INFORMS J. Comput.
    • Demassey, S.1    Artigues, C.2    Michelon, P.3
  • 11
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester, E., Herroelen, W.: New Benchmark Results for the Resource-Constrained Project Scheduling Problem. Manage. Sci. 43 (1997) 1485-1492
    • (1997) Manage. Sci. , vol.43 , pp. 1485-1492
    • Demeulemeester, E.1    Herroelen, W.2
  • 12
    • 0033311742 scopus 로고    scopus 로고
    • The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • De Reyck, B., Herroelen, W.: The Multi-mode Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Eur. J. Oper. Res. 119 (1999) 538-556
    • (1999) Eur. J. Oper. Res. , vol.119 , pp. 538-556
    • De Reyck, B.1    Herroelen, W.2
  • 13
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • Hartmann, S., Drexl, A.: Project Scheduling with Multiple Modes: A Comparison of Exact Algorithms. Networks 32 (1998) 283-297
    • (1998) Networks , vol.32 , pp. 283-297
    • Hartmann, S.1    Drexl, A.2
  • 14
    • 0032210324 scopus 로고    scopus 로고
    • The course scheduling problem at the Lufthansa technical training
    • Haase, K., Latteier, J., Schirmer, A.: The Course Scheduling Problem at the Lufthansa Technical Training. Eur. J. Oper. Res. 110 (1998) 441-456
    • (1998) Eur. J. Oper. Res. , vol.110 , pp. 441-456
    • Haase, K.1    Latteier, J.2    Schirmer, A.3
  • 15
    • 13544263209 scopus 로고    scopus 로고
    • A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
    • Hanne, T., Nickel, S.: A Multiobjective Evolutionary Algorithm for Scheduling and Inspection Planning in Software Development Projects. Eur. J. Oper. Res. 167 (2005) 663-678
    • (2005) Eur. J. Oper. Res. , vol.167 , pp. 663-678
    • Hanne, T.1    Nickel, S.2
  • 16
    • 0035612931 scopus 로고    scopus 로고
    • Simulated annealing for multi-mode resource-constrained project scheduling problem
    • Josefowska, J., Mika, M., Rozycki, R., Waligora, G., Weglarz, J.: Simulated Annealing for Multi-mode Resource-Constrained Project Scheduling Problem. Ann. Oper. Res. 102 (2001) 137-155
    • (2001) Ann. Oper. Res. , vol.102 , pp. 137-155
    • Josefowska, J.1    Mika, M.2    Rozycki, R.3    Waligora, G.4    Weglarz, J.5
  • 17
    • 0034634797 scopus 로고    scopus 로고
    • Project scheduling with time-varying resource constraints
    • Klein, R.: Project Scheduling with Time-Varying Resource Constraints. Int. J. Prod. Res. 38 (2000) 3937-3952
    • (2000) Int. J. Prod. Res. , vol.38 , pp. 3937-3952
    • Klein, R.1
  • 18
    • 0031276875 scopus 로고    scopus 로고
    • Local search for non-preemptive multi-mode resource-constrained project scheduling problem
    • Kolisch, R., Drexl, A.: Local Search for Non-preemptive Multi-mode Resource-Constrained Project Scheduling Problem. IIE Trans. 29 (1997) 987-999
    • (1997) IIE Trans. , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 19
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling problem library
    • Kolisch, R., Sprecher, A.: PSPLIB - A Project Scheduling Problem Library. Eur. J. Oper. Res. 96 (1997) 205-216
    • (1997) Eur. J. Oper. Res. , vol.96 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 21
    • 0038188851 scopus 로고
    • Ordonnancement de tâches sous contraintes: Une approche énergétique
    • Lopez, P., Erschler, J., Esquirol, P.: Ordonnancement de Tâches sous Contraintes: Une Approche Énergétique. RAIRO-APII 26 (1992) 453-481
    • (1992) RAIRO-APII , vol.26 , pp. 453-481
    • Lopez, P.1    Erschler, J.2    Esquirol, P.3
  • 22
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
    • Mingozzi, A., Maniezzo, V., Riciardelli, S., Bianco, L.: An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation. Manage. Sci. 44 (1998) 714-729
    • (1998) Manage. Sci. , vol.44 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Riciardelli, S.3    Bianco, L.4
  • 23
    • 33645980691 scopus 로고    scopus 로고
    • A genetic algorithm approach to a general category project scheduling problem
    • forthcoming
    • Özdamar L.: A Genetic Algorithm Approach to a General Category Project Scheduling Problem. IEEE Trans. on Systems, Man, and Cybernetics, forthcoming
    • IEEE Trans. on Systems, Man, and Cybernetics
    • Özdamar, L.1
  • 24
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource constrained project scheduling problem by a simple, general and powerful sequencing algorithm
    • Sprecher, A., Drexl, A.: Multi-mode Resource Constrained Project Scheduling Problem by a Simple, General and Powerful Sequencing Algorithm. Eur. J. Oper. Res. 107 (1998) 431-450
    • (1998) Eur. J. Oper. Res. , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 25
    • 0141621043 scopus 로고    scopus 로고
    • Personnel assignment problem with hierarchical ordering constraints
    • Toroslu, I.: Personnel Assignment Problem with Hierarchical Ordering Constraints. Comput. Indust. Eng. (2003) 493-510
    • (2003) Comput. Indust. Eng. , pp. 493-510
    • Toroslu, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.