-
1
-
-
0037193646
-
Mixed-integer programming models for the scheduling and operational optimization of multiproduct continuous plants
-
Alle A., Pinto J.M. Mixed-integer programming models for the scheduling and operational optimization of multiproduct continuous plants. Industrial and Engineering Chemistry Research. 41:2002;2689-2704
-
(2002)
Industrial and Engineering Chemistry Research
, vol.41
, pp. 2689-2704
-
-
Alle, A.1
Pinto, J.M.2
-
2
-
-
0031351620
-
Issues in the use, design and evolution of process scheduling and planning systems
-
Applequist G., Samikoglu O., Pekny J., Reklaitis G. Issues in the use, design and evolution of process scheduling and planning systems. ISA Transactions. 36:1997;81-121
-
(1997)
ISA Transactions
, vol.36
, pp. 81-121
-
-
Applequist, G.1
Samikoglu, O.2
Pekny, J.3
Reklaitis, G.4
-
4
-
-
0004048738
-
-
Berlin: Springer
-
BlŁażewicz J., Ecker K.H., Pesch E., Schmidt G., Wȩglarz J. Scheduling Computer and Manufacturing Processes. 2001;Springer, Berlin
-
(2001)
Scheduling Computer and Manufacturing Processes
-
-
BlŁazewicz, J.1
Ecker, K.H.2
Pesch, E.3
Schmidt, G.4
Wȩglarz, J.5
-
7
-
-
0032210246
-
A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
-
De Reyck B., Herroelen W.S. A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research. 111:1998;152-174
-
(1998)
European Journal of Operational Research
, vol.111
, pp. 152-174
-
-
De Reyck, B.1
Herroelen, W.S.2
-
8
-
-
0012649023
-
A survey of interval capacity consistency tests for time- and resource-constrained scheduling
-
J. Wȩglarz. Boston: Kluwer
-
Dorndorf U., Phan Huy T., Pesch E. A survey of interval capacity consistency tests for time- and resource-constrained scheduling. Wȩglarz J. Project Scheduling: Recent Models, Algorithms, and Applications. 1999;213-238 Kluwer, Boston
-
(1999)
Project Scheduling: Recent Models, Algorithms, and Applications
, pp. 213-238
-
-
Dorndorf, U.1
Phan Huy, T.2
Pesch, E.3
-
9
-
-
0038188877
-
Resource-constrained project scheduling with time windows: A branching scheme based on dynamic release dates
-
Technical University of Berlin
-
Fest, A., Möhring, R.H., Stork, F., Uetz, M., 1999. Resource-constrained project scheduling with time windows: A branching scheme based on dynamic release dates. Technical Report 596, Technical University of Berlin
-
(1999)
Technical Report
, vol.596
-
-
Fest, A.1
Möhring, R.H.2
Stork, F.3
Uetz, M.4
-
10
-
-
0034661328
-
Intermediate storage tank operation strategies in the production scheduling of multi-product batch processes
-
Ha J.-K., Chang H.-K., Lee E.S., Lee I.-B., Lee B.-S., Yi G. Intermediate storage tank operation strategies in the production scheduling of multi-product batch processes. Computers and Chemical Engineering. 24:2000;1633-1640
-
(2000)
Computers and Chemical Engineering
, vol.24
, pp. 1633-1640
-
-
Ha, J.-K.1
Chang, H.-K.2
Lee, E.S.3
Lee, I.-B.4
Lee, B.-S.5
Yi, G.6
-
11
-
-
0032216046
-
Effective continuous-time formulation for short-term scheduling: 2. Continuous and semicontinuous processes
-
Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling: 2. Continuous and semicontinuous processes. Industrial and Engineering Chemistry Research. 37:1998;4360-4374
-
(1998)
Industrial and Engineering Chemistry Research
, vol.37
, pp. 4360-4374
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
13
-
-
0037302545
-
Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
-
Laborie P. Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results. Artificial Intelligence. 143:2003;151-188
-
(2003)
Artificial Intelligence
, vol.143
, pp. 151-188
-
-
Laborie, P.1
-
14
-
-
0041375052
-
Job shop scheduling with group-dependent setups, finite buffers, and long time horizon
-
Luh P.B., Gou L., Zhang Y., Nagahora T., Tsuji M., Yoneda K., Hasegawa T., Kyoya Y., Kano T. Job shop scheduling with group-dependent setups, finite buffers, and long time horizon. Annals of Operations Research. 76:1998;233-260
-
(1998)
Annals of Operations Research
, vol.76
, pp. 233-260
-
-
Luh, P.B.1
Gou, L.2
Zhang, Y.3
Nagahora, T.4
Tsuji, M.5
Yoneda, K.6
Hasegawa, T.7
Kyoya, Y.8
Kano, T.9
-
15
-
-
0037093434
-
An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities
-
Méndez C.A., Cerdá J. An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities. Computers and Chemical Engineering. 26:2002;687-695
-
(2002)
Computers and Chemical Engineering
, vol.26
, pp. 687-695
-
-
Méndez, C.A.1
Cerdá, J.2
-
16
-
-
0032997426
-
Continuous time representation approach to batch and continuous process scheduling: I. MINLP formulation
-
Mockus L., Reklaitis G.V. Continuous time representation approach to batch and continuous process scheduling: I. MINLP formulation. Industrial and Engineering Research. 38:1999;197-203
-
(1999)
Industrial and Engineering Research
, vol.38
, pp. 197-203
-
-
Mockus, L.1
Reklaitis, G.V.2
-
18
-
-
0442267558
-
Short-term planning of batch plants in process industries
-
P. Kischka, U. Leopold-Wildburger, R.H. Möhring, & F.-J. Radermacher. Heidelberg: Physica-Verlag
-
Neumann K., Schwindt C., Trautmann N. Short-term planning of batch plants in process industries. Kischka P., Leopold-Wildburger U., Möhring R.H., Radermacher F.-J. Models, Methods and Decision Support in Management. 2001;211-226 Physica-Verlag, Heidelberg
-
(2001)
Models, Methods and Decision Support in Management
, pp. 211-226
-
-
Neumann, K.1
Schwindt, C.2
Trautmann, N.3
-
20
-
-
0032649738
-
The permutation flow shop with buffers: A tabu search approach
-
Nowicki E. The permutation flow shop with buffers: A tabu search approach. European Journal of Operational Research. 116:1999;205-219
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 205-219
-
-
Nowicki, E.1
-
22
-
-
0028500039
-
Optimal cyclic scheduling of multistage continuous multiproduct plants
-
Pinto M., Grossmann I.E. Optimal cyclic scheduling of multistage continuous multiproduct plants. Computers and Chemical Engineering. 18:1994;797-816
-
(1994)
Computers and Chemical Engineering
, vol.18
, pp. 797-816
-
-
Pinto, M.1
Grossmann, I.E.2
-
23
-
-
0001690679
-
A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
-
Pinto M., Grossmann I.E. A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research. 34:1995;3037-3051
-
(1995)
Industrial and Engineering Chemistry Research
, vol.34
, pp. 3037-3051
-
-
Pinto, M.1
Grossmann, I.E.2
-
24
-
-
0026108226
-
MINLP model for cyclic multiproduct scheduling on continuous parallel lines
-
Sahinides N.V., Grossmann I.E. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Computers and Chemical Engineering. 15:1991;85-103
-
(1991)
Computers and Chemical Engineering
, vol.15
, pp. 85-103
-
-
Sahinides, N.V.1
Grossmann, I.E.2
-
26
-
-
0037851112
-
Minimizing earliness-tardiness costs of resource-constrained projects
-
K. Inderfurth, G. Schwödiauer, W. Domschke, F. Juhnke, P. Kleinschmidt, & G. Wäscher. Berlin: Springer
-
Schwindt C. Minimizing earliness-tardiness costs of resource-constrained projects. Inderfurth K., Schwödiauer G., Domschke W., Juhnke F., Kleinschmidt P., Wäscher G. Operations Research Proceedings 1999. 2000;402-407 Springer, Berlin
-
(2000)
Operations Research Proceedings 1999
, pp. 402-407
-
-
Schwindt, C.1
-
27
-
-
0001775820
-
Batch scheduling in process industries: An application of resource-constrained project scheduling
-
Schwindt C., Trautmann N. Batch scheduling in process industries: An application of resource-constrained project scheduling. OR Spektrum. 22:2000;501-524
-
(2000)
OR Spektrum
, vol.22
, pp. 501-524
-
-
Schwindt, C.1
Trautmann, N.2
-
29
-
-
0344528710
-
The optimal operation of mixed production facilities: Extensions and improvements
-
Zhang X., Sargent R.W.H. The optimal operation of mixed production facilities: Extensions and improvements. Computers and Chemical Engineering. 22:1998;1287-1296
-
(1998)
Computers and Chemical Engineering
, vol.22
, pp. 1287-1296
-
-
Zhang, X.1
Sargent, R.W.H.2
|