A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling

Author keywords

Priority rules; Resource constrained project scheduling; Robustness; Stability; Two stage algorithm

Indexed keywords

ALGORITHMS; BOOLEAN FUNCTIONS; EVOLUTIONARY ALGORITHMS; HEURISTIC ALGORITHMS; HEURISTIC PROGRAMMING; INTEGER PROGRAMMING; KETONES; OPTIMIZATION; SCHEDULING; SET THEORY; STAGES; STANDARDS;

EID: 44649128530     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2007.11.017     Document Type: Article
Times cited : (123)

References (32)
  • 1
    • 33748299537 scopus 로고    scopus 로고
    • Bi-objective resource-constrained project scheduling with robustness and makespan criteria
    • Abbasi B., Shadrokh S., and Arkat J. Bi-objective resource-constrained project scheduling with robustness and makespan criteria. Applied Mathematics and Computation 180 1 (2006) 146-152
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 146-152
    • Abbasi, B.1    Shadrokh, S.2    Arkat, J.3
  • 2
    • 13444254192 scopus 로고    scopus 로고
    • A bi-objective model for robust resource-constrained project scheduling
    • Al Fawzan M., and Haouari M. A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics 96 (2005) 175-187
    • (2005) International Journal of Production Economics , vol.96 , pp. 175-187
    • Al Fawzan, M.1    Haouari, M.2
  • 3
    • 44649198426 scopus 로고    scopus 로고
    • Aloulou, M. A., Portmann, M. -C, & Vignier, A. (2002). Predictive reactive scheduling for the single machine problem. In Proceedings of the 8th Workshop on Project Management and Scheduling, Valencia, Spain.
    • Aloulou, M. A., Portmann, M. -C, & Vignier, A. (2002). Predictive reactive scheduling for the single machine problem. In Proceedings of the 8th Workshop on Project Management and Scheduling, Valencia, Spain.
  • 4
    • 0034561509 scopus 로고    scopus 로고
    • A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
    • Artigues C., and Roubellat F. A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. European Journal of Operational Research 127 (2000) 297-316
    • (2000) European Journal of Operational Research , vol.127 , pp. 297-316
    • Artigues, C.1    Roubellat, F.2
  • 6
    • 44649086852 scopus 로고    scopus 로고
    • Cavalcante, C. B. C., Cavalcante, V. C., Ribeiro, C. C., & De Souza, C. C. (2000). Parallel cooperative approaches for the labor constrained scheduling problem. Preprint, Instituto de Computaçao, UNICAMP, Campinas, Brazil, 2000.
    • Cavalcante, C. B. C., Cavalcante, V. C., Ribeiro, C. C., & De Souza, C. C. (2000). Parallel cooperative approaches for the labor constrained scheduling problem. Preprint, Instituto de Computaçao, UNICAMP, Campinas, Brazil, 2000.
  • 8
    • 0030270836 scopus 로고    scopus 로고
    • The role of the non-anticipativity constraint in commercial software for stochastic project scheduling
    • Fernandez A.A., Armacost R.L., and Pet-Edwards J. The role of the non-anticipativity constraint in commercial software for stochastic project scheduling. Computers and Industrial Engineering 31 (1996) 233-236
    • (1996) Computers and Industrial Engineering , vol.31 , pp. 233-236
    • Fernandez, A.A.1    Armacost, R.L.2    Pet-Edwards, J.3
  • 9
    • 0003926816 scopus 로고    scopus 로고
    • The North River Press Publishing corporation, Barrington
    • Goldratt E.M. Critical chain (1997), The North River Press Publishing corporation, Barrington
    • (1997) Critical chain
    • Goldratt, E.M.1
  • 10
    • 13444295790 scopus 로고    scopus 로고
    • Fuzzy set approach to multi objective and multi-mode project scheduling under uncertainty
    • Slowinski R., and Hapke M. (Eds), Physica-Verlag, Heidelberg
    • Hapke M., and Slowinski R. Fuzzy set approach to multi objective and multi-mode project scheduling under uncertainty. In: Slowinski R., and Hapke M. (Eds). Scheduling under fuzziness (2000), Physica-Verlag, Heidelberg 197-221
    • (2000) Scheduling under fuzziness , pp. 197-221
    • Hapke, M.1    Slowinski, R.2
  • 11
    • 0034559432 scopus 로고    scopus 로고
    • Experimental state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., and Kolisch R. Experimental state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 (2000) 394-407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 12
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen W., and Leus R. On the merits and pitfalls of critical chain scheduling. Journal of Operations Management 19 (2001) 559-577
    • (2001) Journal of Operations Management , vol.19 , pp. 559-577
    • Herroelen, W.1    Leus, R.2
  • 14
    • 1542502674 scopus 로고    scopus 로고
    • Robust and reactive project scheduling: A review and classification of procedures
    • Herroelen W., and Leus R. Robust and reactive project scheduling: A review and classification of procedures. International Journal of Production Research 42 8 (2004) 1599-1620
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1599-1620
    • Herroelen, W.1    Leus, R.2
  • 15
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty, survey and research potentials
    • Herroelen W., and Leus R. Project scheduling under uncertainty, survey and research potentials. European Journal of Operational Research 165 2 (2005) 289-306
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 16
    • 0031639845 scopus 로고    scopus 로고
    • Analysis of the characteristics of projects in diverse industries
    • Icmeli-Tukel O., and Rom W.O. Analysis of the characteristics of projects in diverse industries. Journal of Operations Management 16 (1998) 43-61
    • (1998) Journal of Operations Management , vol.16 , pp. 43-61
    • Icmeli-Tukel, O.1    Rom, W.O.2
  • 17
    • 40649124587 scopus 로고    scopus 로고
    • Khemekhem, M. A., & Chtourou, H. (2006). Assessing the effects of several parameters of an enhanced multi-pass algorithm for the RCPSP. In Proceedings of the International Conference on Service Systems and Service Management (IEEE ICSSSM'06), 25-27 October, France (pp. 1223-1227).
    • Khemekhem, M. A., & Chtourou, H. (2006). Assessing the effects of several parameters of an enhanced multi-pass algorithm for the RCPSP. In Proceedings of the International Conference on Service Systems and Service Management (IEEE ICSSSM'06), 25-27 October, France (pp. 1223-1227).
  • 18
    • 0032709489 scopus 로고    scopus 로고
    • Computing lower bounds by destructive improvement: An application to Resource-Constrained Project Scheduling Problem
    • Klein R., and Scholl A. Computing lower bounds by destructive improvement: An application to Resource-Constrained Project Scheduling Problem. European Journal of Operational Research 112 (1999) 322-346
    • (1999) European Journal of Operational Research , vol.112 , pp. 322-346
    • Klein, R.1    Scholl, A.2
  • 19
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis
    • Weglarz J. (Ed), Kluwer Academic
    • Kolisch R., and Hartmann S. Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J. (Ed). Project scheduling recent models, algorithm sand applications (1999), Kluwer Academic 147-178
    • (1999) Project scheduling recent models, algorithm sand applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 20
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174 (2006) 23-37
    • (2006) European Journal of Operational Research , vol.174 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 22
    • 44649086213 scopus 로고    scopus 로고
    • Leus, R. (2003). The generation of stable project plans. Ph.D. Thesis, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium.
    • Leus, R. (2003). The generation of stable project plans. Ph.D. Thesis, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium.
  • 23
    • 2942687563 scopus 로고    scopus 로고
    • Stability and resource allocation in project planning
    • Leus R., and Herroelen W. Stability and resource allocation in project planning. IIE Transactions 36 (2004) 667-682
    • (2004) IIE Transactions , vol.36 , pp. 667-682
    • Leus, R.1    Herroelen, W.2
  • 24
    • 44649139639 scopus 로고    scopus 로고
    • Mauguiere, P., Billaut, J. -C., & Artigues, C. (2002). Grouping jobs on a single machine with heads and tails to represent a family of dominant schedules. In Proceedings of the 8th Workshop on Project Management and Scheduling, Valencia, Spain.
    • Mauguiere, P., Billaut, J. -C., & Artigues, C. (2002). Grouping jobs on a single machine with heads and tails to represent a family of dominant schedules. In Proceedings of the 8th Workshop on Project Management and Scheduling, Valencia, Spain.
  • 26
    • 0037871958 scopus 로고    scopus 로고
    • Solving project scheduling problems by minimum cut computations
    • Möhring R.H., Schulz A.S., Stork F., and Uetz M. Solving project scheduling problems by minimum cut computations. Management Science 49 (2003) 330-350
    • (2003) Management Science , vol.49 , pp. 330-350
    • Möhring, R.H.1    Schulz, A.S.2    Stork, F.3    Uetz, M.4
  • 27
    • 44649187271 scopus 로고    scopus 로고
    • Pet-Edwards, J., Selim, B., Armacost, R. L., & Fernandez, A. (1998). Minimizing risk in stochastic resource-constrained project scheduling. In Proceedings of INFORMS Fall Meeting, Seattle, USA.
    • Pet-Edwards, J., Selim, B., Armacost, R. L., & Fernandez, A. (1998). Minimizing risk in stochastic resource-constrained project scheduling. In Proceedings of INFORMS Fall Meeting, Seattle, USA.
  • 31
    • 0141859879 scopus 로고    scopus 로고
    • A fuzzy robust scheduling approach for product development projects
    • Wang J. A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research 152 (2004) 180-194
    • (2004) European Journal of Operational Research , vol.152 , pp. 180-194
    • Wang, J.1
  • 32
    • 0039504558 scopus 로고    scopus 로고
    • A comparison of dispatching rules for executing a resource-constraint project with estimated activity durations
    • Yang K. A comparison of dispatching rules for executing a resource-constraint project with estimated activity durations. Omega 26 6 (1998) 729-738
    • (1998) Omega , vol.26 , Issue.6 , pp. 729-738
    • Yang, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.