메뉴 건너뛰기




Volumn 23, Issue 3, 2001, Pages 335-357

Resource-constrained project scheduling: A heuristic for the multi-mode case

Author keywords

Heuristic; Maximum time lags; Multi mode case; Resource constrained project scheduling

Indexed keywords


EID: 0442269144     PISSN: 01716468     EISSN: None     Source Type: Journal    
DOI: 10.1007/PL00013354     Document Type: Article
Times cited : (45)

References (28)
  • 1
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling: A review and empirical analysis
    • Słowiński R, Wȩglarz J (eds) Elsevier Science, Amsterdam
    • Alvarez-Valdes R, Tamarit JM (1989) Heuristic algorithms for resource-constrained project scheduling: a review and empirical analysis. In: Słowiński R, Wȩglarz J (eds) Advances in project scheduling, pp 113-134. Elsevier Science, Amsterdam
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 7
    • 0026376478 scopus 로고
    • Scheduling of project networks by job assignment
    • Drexl A (1991) Scheduling of project networks by job assignment. Management Science 37: 1590-1602
    • (1991) Management Science , vol.37 , pp. 1590-1602
    • Drexl, A.1
  • 8
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexl A, Grünewald J (1993) Nonpreemptive multi-mode resource-constrained project scheduling. IEE Transactions 25: 74-81
    • (1993) IEE Transactions , vol.25 , pp. 74-81
    • Drexl, A.1    Grünewald, J.2
  • 12
    • 0442273389 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
    • Report WIOR-578, University of Karlsruhe
    • Heilmann R (2000) A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags. Report WIOR-578, University of Karlsruhe (submitted to: European Journal of Operational Research)
    • (2000) European Journal of Operational Research
    • Heilmann, R.1
  • 14
    • 0012364441 scopus 로고
    • Project scheduling under resource constraints: Efficient heuristics for several problem classes
    • Heidelberg
    • Kolisch R (1995) Project scheduling under resource constraints: efficient heuristics for several problem classes. Physica, Heidelberg
    • (1995) Physica
    • Kolisch, R.1
  • 15
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • Kolisch R, Drexl A (1997) Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 29: 987-999
    • (1997) IIE Transactions , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 17
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41: 1693-1703
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 26
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    • Sprecher A, Drexl A (1998) Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. European Journal of Operational Research 107: 431-450
    • (1998) European Journal of Operational Research , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 27
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • Sprecher A, Hartmann S, Drexl A (1997) An exact algorithm for project scheduling with multiple modes. OR Spektrum 19: 195-203
    • (1997) OR Spektrum , vol.19 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 28
    • 0011016744 scopus 로고    scopus 로고
    • Multi-modal project scheduling with generalized precedence constraints
    • Van Hove JC, Deckro R (1998) Multi-modal project scheduling with generalized precedence constraints. Proceedings of the PMS Workshop: 137-140
    • (1998) Proceedings of the PMS Workshop , pp. 137-140
    • Van Hove, J.C.1    Deckro, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.