-
1
-
-
0025725556
-
Constructing school timetables using simulated annealing: Sequential and parallel algorithms
-
Abramson, D., 1991. Constructing school timetables using simulated annealing: Sequential and parallel algorithms. Management Science 37, 98-113.
-
(1991)
Management Science
, vol.37
, pp. 98-113
-
-
Abramson, D.1
-
2
-
-
0030269388
-
Constructing good solutions for a school timetabling problem
-
Alvarez-Valdes, R., Martin, G., Tamarit, J.M., 1996. Constructing good solutions for a school timetabling problem. Journal of the Operational Research Society 47, 1203-1215.
-
(1996)
Journal of the Operational Research Society
, vol.47
, pp. 1203-1215
-
-
Alvarez-Valdes, R.1
Martin, G.2
Tamarit, J.M.3
-
4
-
-
0026124744
-
Exact colouring algorithm for weighted graphs applied to timetabling problems of different length
-
Cangalovic, M., Schreuder, J.A.M., 1991. Exact colouring algorithm for weighted graphs applied to timetabling problems of different length. European Journal of Operational Research 51, 248-258.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 248-258
-
-
Cangalovic, M.1
Schreuder, J.A.M.2
-
5
-
-
38249016030
-
Modelling and solving an acyclic multi-period timetabling problem
-
Cangalovic, M., Schreuder, J.A.M., 1992. Modelling and solving an acyclic multi-period timetabling problem. Discrete Applied Mathematics 35, 177-195.
-
(1992)
Discrete Applied Mathematics
, vol.35
, pp. 177-195
-
-
Cangalovic, M.1
Schreuder, J.A.M.2
-
6
-
-
0028766745
-
A tabu search algorithm for computing an operational timetable
-
Costa, D., 1994. A tabu search algorithm for computing an operational timetable. European Journal of Operational Research 76, 98-110.
-
(1994)
European Journal of Operational Research
, vol.76
, pp. 98-110
-
-
Costa, D.1
-
7
-
-
0040701871
-
A computer timetabling system for secondary schools in the Netherlands
-
de Gans, O.B., 1981. A computer timetabling system for secondary schools in the Netherlands. European Journal of Operational Research 7, 175-182.
-
(1981)
European Journal of Operational Research
, vol.7
, pp. 175-182
-
-
De Gans, O.B.1
-
9
-
-
0010775487
-
Capacitated lot-sizing with sequence dependent setup costs
-
Haase, K., 1996. Capacitated lot-sizing with sequence dependent setup costs. Operations Research Spektrum 18, 51-59.
-
(1996)
Operations Research Spektrum
, vol.18
, pp. 51-59
-
-
Haase, K.1
-
10
-
-
54649084864
-
Deckungsbeitragsorientierte lehrgangsplanung bei lufthansa technical training GmbH
-
in German
-
Haase, K., Latteier, J., 1996. Deckungsbeitragsorientierte Lehrgangsplanung bei Lufthansa Technical Training GmbH, Operations Research Spektrum 20, pp. 135-142 (in German).
-
(1996)
Operations Research Spektrum
, vol.20
, pp. 135-142
-
-
Haase, K.1
Latteier, J.2
-
11
-
-
0042161536
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 441
-
Haase, K., Latteier, J., Schirmer, A., 1997a. The course scheduling problem at Lufthansa Technical Training, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 441, ftp://www.wiso.uni-kiel.de/pub/operations-research/wp441.ps.
-
(1997)
The Course Scheduling Problem at Lufthansa Technical Training
-
-
Haase, K.1
Latteier, J.2
Schirmer, A.3
-
12
-
-
85033872763
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 442
-
Haase, K., Latteier, J., Schirmer, A., 1997b. Course planning at Lufthansa Technical Training - Constructing more profitable schedules, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 442, ftp:// www.wiso.uni-kiel.de/pub/operations-research/wp442.ps.
-
(1997)
Course Planning at Lufthansa Technical Training - Constructing More Profitable Schedules
-
-
Haase, K.1
Latteier, J.2
Schirmer, A.3
-
13
-
-
0001644021
-
Finding a feasible course schedule using tabu search
-
Hertz, A., 1992. Finding a feasible course schedule using tabu search. Discrete Applied Mathematics 35, 255-270.
-
(1992)
Discrete Applied Mathematics
, vol.35
, pp. 255-270
-
-
Hertz, A.1
-
14
-
-
0026926482
-
A logic approach to the resolution of constraints in timetabling
-
Kang, L., White, G.M., 1992. A logic approach to the resolution of constraints in timetabling. European Journal of Operational Research 61, 306-317.
-
(1992)
European Journal of Operational Research
, vol.61
, pp. 306-317
-
-
Kang, L.1
White, G.M.2
-
15
-
-
0002866635
-
The critical-path method: Resources planning and scheduling
-
Muth, J.F., Thompson, G.L. (Eds.), Prentice-Hall, Englewood Cliffs, NJ
-
Kelley, J.E., 1963. The critical-path method: Resources planning and scheduling. In: Muth, J.F., Thompson, G.L. (Eds.), Industrial scheduling. Prentice-Hall, Englewood Cliffs, NJ, pp. 347-365.
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley, J.E.1
-
16
-
-
0012364441
-
Project scheduling under resource constraints - Efficient heuristics for several problem classes
-
Heidelberg
-
Kolisch, R., 1995. Project scheduling under resource constraints - Efficient heuristics for several problem classes, Physica, Heidelberg.
-
(1995)
Physica
-
-
Kolisch, R.1
-
17
-
-
0031073792
-
An adaptable problem-space based search method for flexible flow line scheduling
-
Leon, V.J., Ramamoorthy, B., 1997. An adaptable problem-space based search method for flexible flow line scheduling, IIE Transactions 29, pp. 115-125.
-
(1997)
IIE Transactions
, vol.29
, pp. 115-125
-
-
Leon, V.J.1
Ramamoorthy, B.2
-
18
-
-
21844484112
-
Class scheduling to maximize participant satisfaction
-
Sampson, S.E., Freeland, J.R., Weiss, E.N., 1995. Class scheduling to maximize participant satisfaction. Interfaces 25 (3), 30-41.
-
(1995)
Interfaces
, vol.25
, Issue.3
, pp. 30-41
-
-
Sampson, S.E.1
Freeland, J.R.2
Weiss, E.N.3
-
19
-
-
0041611602
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 472
-
Schirmer, A., 1998. Case-based reasoning and improved adaptive search for project scheduling, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 472. ftp://www.wiso.uni-kiel.de/pub/operations-research/ wp472.ps.
-
(1998)
Case-based Reasoning and Improved Adaptive Search for Project Scheduling
-
-
Schirmer, A.1
-
20
-
-
0021603760
-
School timetabling - A case in large binary integer linear programming
-
Tripathy, A., 1984. School timetabling - a case in large binary integer linear programming. Management Science 30, 1473-1489.
-
(1984)
Management Science
, vol.30
, pp. 1473-1489
-
-
Tripathy, A.1
|