메뉴 건너뛰기




Volumn 110, Issue 3, 1998, Pages 441-456

The course scheduling problem at Lufthansa technical training

Author keywords

Aviation; Education; Heuristics; Local search; Professional course scheduling

Indexed keywords

ALGORITHMS; AVIATION; HEURISTIC METHODS; OPERATIONS RESEARCH; PROBLEM SOLVING; SCHEDULING;

EID: 0032210324     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(98)00121-0     Document Type: Article
Times cited : (17)

References (20)
  • 1
    • 0025725556 scopus 로고
    • Constructing school timetables using simulated annealing: Sequential and parallel algorithms
    • Abramson, D., 1991. Constructing school timetables using simulated annealing: Sequential and parallel algorithms. Management Science 37, 98-113.
    • (1991) Management Science , vol.37 , pp. 98-113
    • Abramson, D.1
  • 4
    • 0026124744 scopus 로고
    • Exact colouring algorithm for weighted graphs applied to timetabling problems of different length
    • Cangalovic, M., Schreuder, J.A.M., 1991. Exact colouring algorithm for weighted graphs applied to timetabling problems of different length. European Journal of Operational Research 51, 248-258.
    • (1991) European Journal of Operational Research , vol.51 , pp. 248-258
    • Cangalovic, M.1    Schreuder, J.A.M.2
  • 5
    • 38249016030 scopus 로고
    • Modelling and solving an acyclic multi-period timetabling problem
    • Cangalovic, M., Schreuder, J.A.M., 1992. Modelling and solving an acyclic multi-period timetabling problem. Discrete Applied Mathematics 35, 177-195.
    • (1992) Discrete Applied Mathematics , vol.35 , pp. 177-195
    • Cangalovic, M.1    Schreuder, J.A.M.2
  • 6
    • 0028766745 scopus 로고
    • A tabu search algorithm for computing an operational timetable
    • Costa, D., 1994. A tabu search algorithm for computing an operational timetable. European Journal of Operational Research 76, 98-110.
    • (1994) European Journal of Operational Research , vol.76 , pp. 98-110
    • Costa, D.1
  • 7
    • 0040701871 scopus 로고
    • A computer timetabling system for secondary schools in the Netherlands
    • de Gans, O.B., 1981. A computer timetabling system for secondary schools in the Netherlands. European Journal of Operational Research 7, 175-182.
    • (1981) European Journal of Operational Research , vol.7 , pp. 175-182
    • De Gans, O.B.1
  • 9
    • 0010775487 scopus 로고    scopus 로고
    • Capacitated lot-sizing with sequence dependent setup costs
    • Haase, K., 1996. Capacitated lot-sizing with sequence dependent setup costs. Operations Research Spektrum 18, 51-59.
    • (1996) Operations Research Spektrum , vol.18 , pp. 51-59
    • Haase, K.1
  • 10
    • 54649084864 scopus 로고    scopus 로고
    • Deckungsbeitragsorientierte lehrgangsplanung bei lufthansa technical training GmbH
    • in German
    • Haase, K., Latteier, J., 1996. Deckungsbeitragsorientierte Lehrgangsplanung bei Lufthansa Technical Training GmbH, Operations Research Spektrum 20, pp. 135-142 (in German).
    • (1996) Operations Research Spektrum , vol.20 , pp. 135-142
    • Haase, K.1    Latteier, J.2
  • 13
    • 0001644021 scopus 로고
    • Finding a feasible course schedule using tabu search
    • Hertz, A., 1992. Finding a feasible course schedule using tabu search. Discrete Applied Mathematics 35, 255-270.
    • (1992) Discrete Applied Mathematics , vol.35 , pp. 255-270
    • Hertz, A.1
  • 14
    • 0026926482 scopus 로고
    • A logic approach to the resolution of constraints in timetabling
    • Kang, L., White, G.M., 1992. A logic approach to the resolution of constraints in timetabling. European Journal of Operational Research 61, 306-317.
    • (1992) European Journal of Operational Research , vol.61 , pp. 306-317
    • Kang, L.1    White, G.M.2
  • 15
    • 0002866635 scopus 로고
    • The critical-path method: Resources planning and scheduling
    • Muth, J.F., Thompson, G.L. (Eds.), Prentice-Hall, Englewood Cliffs, NJ
    • Kelley, J.E., 1963. The critical-path method: Resources planning and scheduling. In: Muth, J.F., Thompson, G.L. (Eds.), Industrial scheduling. Prentice-Hall, Englewood Cliffs, NJ, pp. 347-365.
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.E.1
  • 16
    • 0012364441 scopus 로고
    • Project scheduling under resource constraints - Efficient heuristics for several problem classes
    • Heidelberg
    • Kolisch, R., 1995. Project scheduling under resource constraints - Efficient heuristics for several problem classes, Physica, Heidelberg.
    • (1995) Physica
    • Kolisch, R.1
  • 17
    • 0031073792 scopus 로고    scopus 로고
    • An adaptable problem-space based search method for flexible flow line scheduling
    • Leon, V.J., Ramamoorthy, B., 1997. An adaptable problem-space based search method for flexible flow line scheduling, IIE Transactions 29, pp. 115-125.
    • (1997) IIE Transactions , vol.29 , pp. 115-125
    • Leon, V.J.1    Ramamoorthy, B.2
  • 18
    • 21844484112 scopus 로고
    • Class scheduling to maximize participant satisfaction
    • Sampson, S.E., Freeland, J.R., Weiss, E.N., 1995. Class scheduling to maximize participant satisfaction. Interfaces 25 (3), 30-41.
    • (1995) Interfaces , vol.25 , Issue.3 , pp. 30-41
    • Sampson, S.E.1    Freeland, J.R.2    Weiss, E.N.3
  • 19
    • 0041611602 scopus 로고    scopus 로고
    • Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 472
    • Schirmer, A., 1998. Case-based reasoning and improved adaptive search for project scheduling, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 472. ftp://www.wiso.uni-kiel.de/pub/operations-research/ wp472.ps.
    • (1998) Case-based Reasoning and Improved Adaptive Search for Project Scheduling
    • Schirmer, A.1
  • 20
    • 0021603760 scopus 로고
    • School timetabling - A case in large binary integer linear programming
    • Tripathy, A., 1984. School timetabling - a case in large binary integer linear programming. Management Science 30, 1473-1489.
    • (1984) Management Science , vol.30 , pp. 1473-1489
    • Tripathy, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.