Volumn 180, Issue 1, 2006, Pages 146-152

Bi-objective resource-constrained project scheduling with robustness and makespan criteria

Author keywords

multi objective combinatorial optimization; Resource constrained project scheduling; Robust scheduling; Simulated annealing

Indexed keywords

COST EFFECTIVENESS; MATHEMATICAL MODELS; NUMERICAL ANALYSIS; PROBLEM SOLVING; ROBUSTNESS (CONTROL SYSTEMS); SIMULATED ANNEALING;

EID: 33748299537     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2005.11.160     Document Type: Article
Times cited : (103)

References (12)
  • 4
    • 33748328731 scopus 로고    scopus 로고
    • P. Hansen, Tabu search for multiobjective optimization: MOTS. Technical Report, Institute of Mathematical Modelling, Technical University of Denmark, 1997.
  • 7
    • 33748296751 scopus 로고    scopus 로고
    • S. Kirkpatrick, C. Gelatt, M. Vecchi, Optimization by simulated annealing, 1983.
  • 10
    • 0042511276 scopus 로고
    • Multiobjective project scheduling under multiple-category resource constraints
    • Slowinski R., and Weglarz J. (Eds), Elsevier, Amsterdam
    • Slowinski R. Multiobjective project scheduling under multiple-category resource constraints. In: Slowinski R., and Weglarz J. (Eds). Advances in Project Scheduling (1989), Elsevier, Amsterdam
    • (1989) Advances in Project Scheduling
    • Slowinski, R.1
  • 12
    • 0343496853 scopus 로고    scopus 로고
    • Using metaheuristics in multiobjective resource constraints project scheduling
    • Viana A., and de Sousa J.P. Using metaheuristics in multiobjective resource constraints project scheduling. European Journal of Operational Research 120 (2000) 359-374
    • (2000) European Journal of Operational Research , vol.120 , pp. 359-374
    • Viana, A.1    de Sousa, J.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.