메뉴 건너뛰기




Volumn 54, Issue 1, 2008, Pages 140-154

The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects

Author keywords

Lead time minimization; Project scheduling; Resource constraints

Indexed keywords

COMPUTATIONAL METHODS; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 36048993713     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2007.07.001     Document Type: Article
Times cited : (46)

References (20)
  • 1
    • 36048987848 scopus 로고    scopus 로고
    • Ballestin, F., Valls, V., & Quintanilla, S. (2006). Pre-emption in resource-constrained project scheduling. Working paper, Universidad Publica de Navarra, Spain.
  • 3
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester E., and Herroelen W. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science 38 12 (1992) 1803-1818
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 4
    • 0030122629 scopus 로고    scopus 로고
    • An efficient optimal solution procedure for the pre-emptive resource-constrained project scheduling problem
    • Demeulemeester E., and Herroelen W. An efficient optimal solution procedure for the pre-emptive resource-constrained project scheduling problem. European Journal of Operational Research 90 (1996) 334-348
    • (1996) European Journal of Operational Research , vol.90 , pp. 334-348
    • Demeulemeester, E.1    Herroelen, W.2
  • 5
    • 0034311599 scopus 로고    scopus 로고
    • The discrete time/resource trade-off problem in project networks: A branch-and bound approach
    • Demeulemeester E., De Reyck B., and Herroelen W. The discrete time/resource trade-off problem in project networks: A branch-and bound approach. IIE Transactions 32 11 (2000) 1059-1069
    • (2000) IIE Transactions , vol.32 , Issue.11 , pp. 1059-1069
    • Demeulemeester, E.1    De Reyck, B.2    Herroelen, W.3
  • 7
    • 0032166848 scopus 로고    scopus 로고
    • Local search methods for the discrete time/resource trade-off problem in project networks
    • De Reyck B., Demeulemeester E., and Herroelen W. Local search methods for the discrete time/resource trade-off problem in project networks. Naval Research Logistics 45 6 (1998) 553-578
    • (1998) Naval Research Logistics , vol.45 , Issue.6 , pp. 553-578
    • De Reyck, B.1    Demeulemeester, E.2    Herroelen, W.3
  • 8
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 (2000) 394-407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 12
    • 36048948082 scopus 로고    scopus 로고
    • Kaplan, L. (1988). Resource-constrained project scheduling with pre-emption of jobs. Unpublished Ph.D. Dissertation, University of Michigan.
  • 13
    • 36049043572 scopus 로고    scopus 로고
    • Kaplan, L. (1991). Resource-constrained project scheduling with setup times. Unpublished paper, Department of Management, University of Tenessee, Knoxville.
  • 14
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174 (2006) 23-37
    • (2006) European Journal of Operational Research , vol.174 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 15
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 49 3 (2001) 249-272
    • (2001) Omega , vol.49 , Issue.3 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 16
    • 0001636411 scopus 로고
    • An experimental and comparative evaluation of production line balancing techniques
    • Mastor A.A. An experimental and comparative evaluation of production line balancing techniques. Management Science 16 (1970) 728-746
    • (1970) Management Science , vol.16 , pp. 728-746
    • Mastor, A.A.1
  • 17
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Özdamar L., and Ulusoy G. A survey on the resource-constrained project scheduling problem. IIE Transactions 27 (1995) 574-586
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 18
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic scheduling
    • Patterson J.H. Project scheduling: The effects of problem structure on heuristic scheduling. Naval Research Logistics 23 (1976) 95-123
    • (1976) Naval Research Logistics , vol.23 , pp. 95-123
    • Patterson, J.H.1
  • 20
    • 36048978496 scopus 로고    scopus 로고
    • Valls, V., Ballestin, F., & Quintanilla, S. (2002). A hybrid genetic algorithm for the resource-constrained project scheduling problem with the peak crossover operator. In Eighth international workshop on project management and scheduling, pp. 368-371.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.