Volumn 178, Issue 2, 2007, Pages 374-390

Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting

Author keywords

Heuristics; Moving resource strength; Priority rules; Project scheduling

Indexed keywords

COMPUTATION THEORY; PROJECT MANAGEMENT; RESOURCE ALLOCATION; SCHEDULING;

EID: 33750989916     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.02.010     Document Type: Article
Times cited : (87)

References (23)
  • 1
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • Alcaraz J., Maroto C., and Ruiz R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society 54 (2003) 614-626
    • (2003) Journal of the Operational Research Society , vol.54 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 2
    • 33751008964 scopus 로고    scopus 로고
    • Alvarez-Valdes, R., Tamarit, J.M., 1989. Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski, R., We{ogonek}glarz, J. (Eds.), Advances in Project Scheduling, pp. 113-134.
  • 3
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor F.F. Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research 49 (1990) 3-13
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 4
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor F.F. Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research 31 11 (1993) 2547-2558
    • (1993) International Journal of Production Research , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 5
    • 0030124780 scopus 로고    scopus 로고
    • A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    • Boctor F.F. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. European Journal of Operational Research 90 (1996) 349-361
    • (1996) European Journal of Operational Research , vol.90 , pp. 349-361
    • Boctor, F.F.1
  • 6
    • 18144452822 scopus 로고    scopus 로고
    • Project scheduling under partially renewable resource constraints
    • Böttcher J., Drexl A., Kolisch R., and Salewski F. Project scheduling under partially renewable resource constraints. Management Science 45 (1999) 543-559
    • (1999) Management Science , vol.45 , pp. 543-559
    • Böttcher, J.1    Drexl, A.2    Kolisch, R.3    Salewski, F.4
  • 7
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 9
    • 33749155193 scopus 로고    scopus 로고
    • Buddhakulsomsiri, J., Kim, D.S., in press. Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research, doi:10.1016/j.ejor.2005.04.030.
  • 10
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis E., and Patterson J.H. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Science 21 8 (1975) 944-955
    • (1975) Management Science , vol.21 , Issue.8 , pp. 944-955
    • Davis, E.1    Patterson, J.H.2
  • 11
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexel A., and Grünewald J. Nonpreemptive multi-mode resource-constrained project scheduling. IIE Transaction 25 5 (1993) 74-81
    • (1993) IIE Transaction , vol.25 , Issue.5 , pp. 74-81
    • Drexel, A.1    Grünewald, J.2
  • 12
    • 0026376478 scopus 로고
    • Scheduling of project networks by job assignment
    • Drexl A. Scheduling of project networks by job assignment. Management Science 37 12 (1991) 1590-1602
    • (1991) Management Science , vol.37 , Issue.12 , pp. 1590-1602
    • Drexl, A.1
  • 14
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • Hartmann S. Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research 102 1 (2001) 111-135
    • (2001) Annals of Operations Research , vol.102 , Issue.1 , pp. 111-135
    • Hartmann, S.1
  • 15
    • 0442269144 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A heuristic of the multi-mode case
    • Heilmann R. Resource-constrained project scheduling: A heuristic of the multi-mode case. OR Spektrum 23 (2001) 335-357
    • (2001) OR Spektrum , vol.23 , pp. 335-357
    • Heilmann, R.1
  • 17
    • 33751020400 scopus 로고    scopus 로고
    • Kelley Jr., J.E., 1963. The critical path method. In: Muth, J.F., Thompson, G.L. (Eds.), Resource Planning and Scheduling, Industrial Scheduling, pp. 347-365.
  • 18
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research 90 (1996) 320-333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 19
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch R. Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operational Management 14 (1996) 179-192
    • (1996) Journal of Operational Management , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 20
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • Kolisch R., and Drexl A. Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 29 (1997) 987-999
    • (1997) IIE Transactions , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 21
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 10 (1995) 1693-1703
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 22
    • 12244289668 scopus 로고    scopus 로고
    • Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
    • Mika M., Waligóra G., and We{ogonek}glarz J. Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research 164 3 (2005) 639-668
    • (2005) European Journal of Operational Research , vol.164 , Issue.3 , pp. 639-668
    • Mika, M.1    Waligóra, G.2    Weglarz, J.3
  • 23
    • 33750996856 scopus 로고    scopus 로고
    • Schirmer, A., Riesenberg, S., 1997. Parameterized heuristics for project scheduling-Biased random sampling methods. Manuskripte aus den Instituten für Betriebswirtschaftslehre, Kiel, No. 456.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.