메뉴 건너뛰기




Volumn 32, Issue 1, 1997, Pages 227-242

Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COST EFFECTIVENESS; INTEGER PROGRAMMING; MATHEMATICAL MODELS; RESOURCE ALLOCATION;

EID: 0030830501     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(96)00212-4     Document Type: Article
Times cited : (62)

References (43)
  • 4
    • 0345368274 scopus 로고
    • The resource scheduling problem in construction
    • Department of Civil Engineering, University of Illinois, Urbana
    • J. D. Brand, W. L. Meyer and L. R. Shaffer. The resource scheduling problem in construction. Civil Engineering Studies Report No. 5, Department of Civil Engineering, University of Illinois, Urbana (1964).
    • (1964) Civil Engineering Studies Report , vol.5
    • Brand, J.D.1    Meyer, W.L.2    Shaffer, L.R.3
  • 5
    • 0002679297 scopus 로고
    • Variation in activity level on a cyclic arrow diagram
    • A. R. Burgess and J. B. Killebrew. Variation in activity level on a cyclic arrow diagram. J. Ind. Engng 13, 76-83 (1962).
    • (1962) J. Ind. Engng , vol.13 , pp. 76-83
    • Burgess, A.R.1    Killebrew, J.B.2
  • 7
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints - Historical review and categorization of procedures
    • E. W. Davis. Project scheduling under resource constraints - historical review and categorization of procedures. AIIE Trans. 5, 297-313 (1973).
    • (1973) AIIE Trans. , vol.5 , pp. 297-313
    • Davis, E.W.1
  • 8
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • E. W. Davis and G. E. Heidorn. An algorithm for optimal project scheduling under multiple resource constraints. Mgmt Sci. 17, B803-B816 (1971).
    • (1971) Mgmt Sci. , vol.17
    • Davis, E.W.1    Heidorn, G.E.2
  • 9
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • E. W. Davis and J. H. Patterson. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Mgmt Sci. 21, 944-955 (1975).
    • (1975) Mgmt Sci. , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 10
    • 0001195356 scopus 로고
    • Resource leveling in construction by optimization
    • S. M. Easa. Resource leveling in construction by optimization. J. Construction Engng Mgmt 115, 302-316 (1989).
    • (1989) J. Construction Engng Mgmt , vol.115 , pp. 302-316
    • Easa, S.M.1
  • 14
    • 0042549616 scopus 로고
    • Computer program for leveling resource usage
    • R. Galbreath. Computer program for leveling resource usage. J. Construction Div. ASCE 91, 107-124 (1965).
    • (1965) J. Construction Div. ASCE , vol.91 , pp. 107-124
    • Galbreath, R.1
  • 15
    • 0043050470 scopus 로고
    • Project planning and manpower scheduling
    • Addison-Wesley, Reading, MA
    • G. Hadley. Project planning and manpower scheduling. Nonlinear and Dynamic Programming (Sec. 8.8). Addison-Wesley, Reading, MA (1964).
    • (1964) Nonlinear and Dynamic Programming (Sec. 8.8)
    • Hadley, G.1
  • 16
    • 0042549611 scopus 로고
    • Management science update column: Multiproject scheduling through zero-one programming
    • J. R. Hall Jr. (Ed.). Management science update column: multiproject scheduling through zero-one programming. Mgmt Sci. 26, 228-229 (1980).
    • (1980) Mgmt Sci. , vol.26 , pp. 228-229
    • Hall J.R., Jr.1
  • 17
    • 0042122526 scopus 로고
    • The application of goal programming techniques to the CPM problem
    • E. L. Hannan. The application of goal programming techniques to the CPM problem. Socio-Econ. Planning Sci. 12, 267-270 (1978).
    • (1978) Socio-Econ. Planning Sci. , vol.12 , pp. 267-270
    • Hannan, E.L.1
  • 20
    • 0022025928 scopus 로고
    • Multi-project scheduling: Analysis of project performance
    • I. S. Kurtulus and S. C. Narula. Multi-project scheduling: analysis of project performance. LIE Trans. 17, 58-66 (1985).
    • (1985) LIE Trans. , vol.17 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 23
    • 0043050469 scopus 로고
    • A zero-one goal programming approach to multi-project scheduling
    • S. M. Lee and D. L. Olson, A zero-one goal programming approach to multi-project scheduling. Project Mgmt J. 15, 61-71 (1984).
    • (1984) Project Mgmt J. , vol.15 , pp. 61-71
    • Lee, S.M.1    Olson, D.L.2
  • 25
    • 0024608832 scopus 로고
    • Multiple projects-multiple resources-constrained scheduling: Some studies
    • R. P. Mohanty and M. K. Siddiq. Multiple projects-multiple resources-constrained scheduling: some studies. Int. J. Prod. Res. 27, 261-280 (1989).
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 261-280
    • Mohanty, R.P.1    Siddiq, M.K.2
  • 26
    • 0043050468 scopus 로고
    • Project resource balancing by assembly line balancing techniques
    • C. L. Moodie and D. W. Mandeville. Project resource balancing by assembly line balancing techniques. J. Ind. Engng XVII, 377-383 (1966).
    • (1966) J. Ind. Engng , vol.17 , pp. 377-383
    • Moodie, C.L.1    Mandeville, D.W.2
  • 27
    • 0023825887 scopus 로고
    • A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
    • M. I. Norbis and J. M. Smith. A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems. Eur. J. Opl Res. 33, 30-41 (1988).
    • (1988) Eur. J. Opl Res. , vol.33 , pp. 30-41
    • Norbis, M.I.1    Smith, J.M.2
  • 29
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multi constrained resource, project scheduling problem
    • J. H. Patterson. A comparison of exact approaches for solving the multi constrained resource, project scheduling problem. Mgmt Sci. 30, 854-867 (1984).
    • (1984) Mgmt Sci. , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 30
    • 0015742216 scopus 로고
    • Alternate methods of project scheduling with limited resources
    • J. H. Patterson. Alternate methods of project scheduling with limited resources. Naval Res. Logistics Q. 20, 767-784 (1973).
    • (1973) Naval Res. Logistics Q. , vol.20 , pp. 767-784
    • Patterson, J.H.1
  • 31
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • J. H. Patterson and W. D. Huber. A horizon-varying, zero-one approach to project scheduling. Mgmt Sci. 20, 990-998 (1974).
    • (1974) Mgmt Sci. , vol.20 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 32
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one programming approach
    • J. H. Patterson and G. W. Roth. Scheduling a project under multiple resource constraints: a zero-one programming approach. AIIE Trans. 8, 449-455 (1976).
    • (1976) AIIE Trans. , vol.8 , pp. 449-455
    • Patterson, J.H.1    Roth, G.W.2
  • 33
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • A. A. B. Pritsker, L. J. Watters and P. M. Wolfe. Multiproject scheduling with limited resources: a zero-one programming approach. Mgmt Sci. 16, 93-108 (1969).
    • (1969) Mgmt Sci. , vol.16 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 35
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and non-renewable resources
    • R. Slowinski. Multiobjective network scheduling with efficient use of renewable and non-renewable resources. Eur. J. Opl Res. 7, 265-273 (1981).
    • (1981) Eur. J. Opl Res. , vol.7 , pp. 265-273
    • Slowinski, R.1
  • 37
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • J. P. Stinson, E. W. Davis and B. M. Khumawala. Multiple resource-constrained scheduling using branch and bound. AIIE Trans. 10, 252-259 (1978).
    • (1978) AIIE Trans. , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 39
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The non-preemptive case
    • F. B. Talbot. Resource-constrained project scheduling with time-resource tradeoffs: the non-preemptive case. Mgmt Sci. 28, 1197-1210 (1982).
    • (1982) Mgmt Sci. , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 40
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • F. B. Talbot and J. H. Patterson. An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems. Mgmt Sci. 24, 1163-1174 (1978).
    • (1978) Mgmt Sci. , vol.24 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 42
    • 0018685022 scopus 로고
    • Allocation of resources among competing projects using CPM and integer goal programming
    • 19-21 November, New Orleans Hilton, New Orleans, LA
    • C. D. Wieters. Allocation of resources among competing projects using CPM and integer goal programming. Proc. 11th Annual Meeting, American Institute for Decision Sciences, 19-21 November, New Orleans Hilton, New Orleans, LA, pp. 371-373 (1979).
    • (1979) Proc. 11th Annual Meeting, American Institute for Decision Sciences , pp. 371-373
    • Wieters, C.D.1
  • 43
    • 84989436573 scopus 로고
    • A heuristic algorithm for resource leveling in multi-resource scheduling
    • B. M. Woodworth and C. J. Willie. A heuristic algorithm for resource leveling in multi-resource scheduling. Decis. Sci. 6, 525-540 (1975).
    • (1975) Decis. Sci. , vol.6 , pp. 525-540
    • Woodworth, B.M.1    Willie, C.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.