-
4
-
-
0345368274
-
The resource scheduling problem in construction
-
Department of Civil Engineering, University of Illinois, Urbana
-
J. D. Brand, W. L. Meyer and L. R. Shaffer. The resource scheduling problem in construction. Civil Engineering Studies Report No. 5, Department of Civil Engineering, University of Illinois, Urbana (1964).
-
(1964)
Civil Engineering Studies Report
, vol.5
-
-
Brand, J.D.1
Meyer, W.L.2
Shaffer, L.R.3
-
5
-
-
0002679297
-
Variation in activity level on a cyclic arrow diagram
-
A. R. Burgess and J. B. Killebrew. Variation in activity level on a cyclic arrow diagram. J. Ind. Engng 13, 76-83 (1962).
-
(1962)
J. Ind. Engng
, vol.13
, pp. 76-83
-
-
Burgess, A.R.1
Killebrew, J.B.2
-
7
-
-
0015725454
-
Project scheduling under resource constraints - Historical review and categorization of procedures
-
E. W. Davis. Project scheduling under resource constraints - historical review and categorization of procedures. AIIE Trans. 5, 297-313 (1973).
-
(1973)
AIIE Trans.
, vol.5
, pp. 297-313
-
-
Davis, E.W.1
-
8
-
-
0000813734
-
An algorithm for optimal project scheduling under multiple resource constraints
-
E. W. Davis and G. E. Heidorn. An algorithm for optimal project scheduling under multiple resource constraints. Mgmt Sci. 17, B803-B816 (1971).
-
(1971)
Mgmt Sci.
, vol.17
-
-
Davis, E.W.1
Heidorn, G.E.2
-
9
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
E. W. Davis and J. H. Patterson. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Mgmt Sci. 21, 944-955 (1975).
-
(1975)
Mgmt Sci.
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
10
-
-
0001195356
-
Resource leveling in construction by optimization
-
S. M. Easa. Resource leveling in construction by optimization. J. Construction Engng Mgmt 115, 302-316 (1989).
-
(1989)
J. Construction Engng Mgmt
, vol.115
, pp. 302-316
-
-
Easa, S.M.1
-
14
-
-
0042549616
-
Computer program for leveling resource usage
-
R. Galbreath. Computer program for leveling resource usage. J. Construction Div. ASCE 91, 107-124 (1965).
-
(1965)
J. Construction Div. ASCE
, vol.91
, pp. 107-124
-
-
Galbreath, R.1
-
15
-
-
0043050470
-
Project planning and manpower scheduling
-
Addison-Wesley, Reading, MA
-
G. Hadley. Project planning and manpower scheduling. Nonlinear and Dynamic Programming (Sec. 8.8). Addison-Wesley, Reading, MA (1964).
-
(1964)
Nonlinear and Dynamic Programming (Sec. 8.8)
-
-
Hadley, G.1
-
16
-
-
0042549611
-
Management science update column: Multiproject scheduling through zero-one programming
-
J. R. Hall Jr. (Ed.). Management science update column: multiproject scheduling through zero-one programming. Mgmt Sci. 26, 228-229 (1980).
-
(1980)
Mgmt Sci.
, vol.26
, pp. 228-229
-
-
Hall J.R., Jr.1
-
17
-
-
0042122526
-
The application of goal programming techniques to the CPM problem
-
E. L. Hannan. The application of goal programming techniques to the CPM problem. Socio-Econ. Planning Sci. 12, 267-270 (1978).
-
(1978)
Socio-Econ. Planning Sci.
, vol.12
, pp. 267-270
-
-
Hannan, E.L.1
-
20
-
-
0022025928
-
Multi-project scheduling: Analysis of project performance
-
I. S. Kurtulus and S. C. Narula. Multi-project scheduling: analysis of project performance. LIE Trans. 17, 58-66 (1985).
-
(1985)
LIE Trans.
, vol.17
, pp. 58-66
-
-
Kurtulus, I.S.1
Narula, S.C.2
-
22
-
-
84974862536
-
Analysis of multi-objective project crashing models
-
San Francisco, CA, 10-12 Nov.
-
S. M. Lee, L. J. Moore and E. R. Clayton. Analysis of multi-objective project crashing models. Proc. 8th Annual Conf. American Institute for Decision Sciences, San Francisco, CA, 10-12 Nov., pp. 114-115 (1976).
-
(1976)
Proc. 8th Annual Conf. American Institute for Decision Sciences
, pp. 114-115
-
-
Lee, S.M.1
Moore, L.J.2
Clayton, E.R.3
-
23
-
-
0043050469
-
A zero-one goal programming approach to multi-project scheduling
-
S. M. Lee and D. L. Olson, A zero-one goal programming approach to multi-project scheduling. Project Mgmt J. 15, 61-71 (1984).
-
(1984)
Project Mgmt J.
, vol.15
, pp. 61-71
-
-
Lee, S.M.1
Olson, D.L.2
-
25
-
-
0024608832
-
Multiple projects-multiple resources-constrained scheduling: Some studies
-
R. P. Mohanty and M. K. Siddiq. Multiple projects-multiple resources-constrained scheduling: some studies. Int. J. Prod. Res. 27, 261-280 (1989).
-
(1989)
Int. J. Prod. Res.
, vol.27
, pp. 261-280
-
-
Mohanty, R.P.1
Siddiq, M.K.2
-
26
-
-
0043050468
-
Project resource balancing by assembly line balancing techniques
-
C. L. Moodie and D. W. Mandeville. Project resource balancing by assembly line balancing techniques. J. Ind. Engng XVII, 377-383 (1966).
-
(1966)
J. Ind. Engng
, vol.17
, pp. 377-383
-
-
Moodie, C.L.1
Mandeville, D.W.2
-
27
-
-
0023825887
-
A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
-
M. I. Norbis and J. M. Smith. A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems. Eur. J. Opl Res. 33, 30-41 (1988).
-
(1988)
Eur. J. Opl Res.
, vol.33
, pp. 30-41
-
-
Norbis, M.I.1
Smith, J.M.2
-
29
-
-
0021460636
-
A comparison of exact approaches for solving the multi constrained resource, project scheduling problem
-
J. H. Patterson. A comparison of exact approaches for solving the multi constrained resource, project scheduling problem. Mgmt Sci. 30, 854-867 (1984).
-
(1984)
Mgmt Sci.
, vol.30
, pp. 854-867
-
-
Patterson, J.H.1
-
30
-
-
0015742216
-
Alternate methods of project scheduling with limited resources
-
J. H. Patterson. Alternate methods of project scheduling with limited resources. Naval Res. Logistics Q. 20, 767-784 (1973).
-
(1973)
Naval Res. Logistics Q.
, vol.20
, pp. 767-784
-
-
Patterson, J.H.1
-
31
-
-
0016028677
-
A horizon-varying, zero-one approach to project scheduling
-
J. H. Patterson and W. D. Huber. A horizon-varying, zero-one approach to project scheduling. Mgmt Sci. 20, 990-998 (1974).
-
(1974)
Mgmt Sci.
, vol.20
, pp. 990-998
-
-
Patterson, J.H.1
Huber, W.D.2
-
32
-
-
0017268482
-
Scheduling a project under multiple resource constraints: A zero-one programming approach
-
J. H. Patterson and G. W. Roth. Scheduling a project under multiple resource constraints: a zero-one programming approach. AIIE Trans. 8, 449-455 (1976).
-
(1976)
AIIE Trans.
, vol.8
, pp. 449-455
-
-
Patterson, J.H.1
Roth, G.W.2
-
33
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
A. A. B. Pritsker, L. J. Watters and P. M. Wolfe. Multiproject scheduling with limited resources: a zero-one programming approach. Mgmt Sci. 16, 93-108 (1969).
-
(1969)
Mgmt Sci.
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
35
-
-
0019586862
-
Multiobjective network scheduling with efficient use of renewable and non-renewable resources
-
R. Slowinski. Multiobjective network scheduling with efficient use of renewable and non-renewable resources. Eur. J. Opl Res. 7, 265-273 (1981).
-
(1981)
Eur. J. Opl Res.
, vol.7
, pp. 265-273
-
-
Slowinski, R.1
-
37
-
-
0018011301
-
Multiple resource-constrained scheduling using branch and bound
-
J. P. Stinson, E. W. Davis and B. M. Khumawala. Multiple resource-constrained scheduling using branch and bound. AIIE Trans. 10, 252-259 (1978).
-
(1978)
AIIE Trans.
, vol.10
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
39
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The non-preemptive case
-
F. B. Talbot. Resource-constrained project scheduling with time-resource tradeoffs: the non-preemptive case. Mgmt Sci. 28, 1197-1210 (1982).
-
(1982)
Mgmt Sci.
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
40
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
-
F. B. Talbot and J. H. Patterson. An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems. Mgmt Sci. 24, 1163-1174 (1978).
-
(1978)
Mgmt Sci.
, vol.24
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
42
-
-
0018685022
-
Allocation of resources among competing projects using CPM and integer goal programming
-
19-21 November, New Orleans Hilton, New Orleans, LA
-
C. D. Wieters. Allocation of resources among competing projects using CPM and integer goal programming. Proc. 11th Annual Meeting, American Institute for Decision Sciences, 19-21 November, New Orleans Hilton, New Orleans, LA, pp. 371-373 (1979).
-
(1979)
Proc. 11th Annual Meeting, American Institute for Decision Sciences
, pp. 371-373
-
-
Wieters, C.D.1
-
43
-
-
84989436573
-
A heuristic algorithm for resource leveling in multi-resource scheduling
-
B. M. Woodworth and C. J. Willie. A heuristic algorithm for resource leveling in multi-resource scheduling. Decis. Sci. 6, 525-540 (1975).
-
(1975)
Decis. Sci.
, vol.6
, pp. 525-540
-
-
Woodworth, B.M.1
Willie, C.J.2
|