메뉴 건너뛰기




Volumn 190, Issue 2, 2007, Pages 1136-1145

A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search

Author keywords

Cost and quality problem; Discrete time; Electromagnetism theory; Project management; Scatter search

Indexed keywords

ELECTROMAGNETISM; HEURISTIC ALGORITHMS; PROBLEM SOLVING; PROJECT MANAGEMENT;

EID: 34250621376     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2007.01.100     Document Type: Article
Times cited : (81)

References (30)
  • 2
    • 0000181338 scopus 로고
    • A network flow computation for project cost curves
    • Fulkerson D.R. A network flow computation for project cost curves. Management Science 7 (1961) 167-178
    • (1961) Management Science , vol.7 , pp. 167-178
    • Fulkerson, D.R.1
  • 3
    • 19244376018 scopus 로고
    • A simple CPM time/cost trade-off algorithm
    • Siemens N. A simple CPM time/cost trade-off algorithm. Management Science 17 (1971) B-354-B-363
    • (1971) Management Science , vol.17
    • Siemens, N.1
  • 4
    • 0000302371 scopus 로고
    • A note on the paper: a simple CPM time/cost trade-off algorithm
    • Goyal S.K. A note on the paper: a simple CPM time/cost trade-off algorithm. Management Science 21 (1975) 718-722
    • (1975) Management Science , vol.21 , pp. 718-722
    • Goyal, S.K.1
  • 5
    • 34250688909 scopus 로고    scopus 로고
    • S.E. Elmaghraby, A. Salem, Optimal linear approximation in project compression. O.R. Technical Report 171, North Carolina State University at Raleigh (1981).
  • 6
    • 32644441687 scopus 로고    scopus 로고
    • An application of randomized minimum cut to the project time/cost tradeoff problem
    • Tareghian H.R., and Taheri H. An application of randomized minimum cut to the project time/cost tradeoff problem. Applied Mathematics and Computation 173 (2005) 1200-1207
    • (2005) Applied Mathematics and Computation , vol.173 , pp. 1200-1207
    • Tareghian, H.R.1    Taheri, H.2
  • 7
    • 0015484051 scopus 로고
    • Critical path problems with concave cost-time curves
    • Falk J.E., and Horowitz J.L. Critical path problems with concave cost-time curves. Management Science 19 (1972) 446-455
    • (1972) Management Science , vol.19 , pp. 446-455
    • Falk, J.E.1    Horowitz, J.L.2
  • 8
    • 0015725441 scopus 로고
    • An algorithm for the project cost/ duration analysis problem with quadratic and convex cost functions
    • Kapur K.C. An algorithm for the project cost/ duration analysis problem with quadratic and convex cost functions. IIE Transactions 5 (1973) 314-322
    • (1973) IIE Transactions , vol.5 , pp. 314-322
    • Kapur, K.C.1
  • 11
    • 0018444440 scopus 로고
    • A dynamic programming algorithm for decision CPM networks
    • Hindelang T.J., and Muth J.F. A dynamic programming algorithm for decision CPM networks. Operations Research 27 (1979) 225-241
    • (1979) Operations Research , vol.27 , pp. 225-241
    • Hindelang, T.J.1    Muth, J.F.2
  • 12
    • 0016566179 scopus 로고
    • A dynamic programming solution to the cost-time for CPM
    • Robinson D.R. A dynamic programming solution to the cost-time for CPM. Management Science 22 (1975) 158-166
    • (1975) Management Science , vol.22 , pp. 158-166
    • Robinson, D.R.1
  • 13
    • 0005764899 scopus 로고
    • An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis
    • Patterson J.H., and Harvey R.T. An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis. Foundations of Control Engineering 4 (1979) 107-117
    • (1979) Foundations of Control Engineering , vol.4 , pp. 107-117
    • Patterson, J.H.1    Harvey, R.T.2
  • 15
    • 0031102411 scopus 로고    scopus 로고
    • Complexity of the discrete time-cost tradeoff problem for project networks
    • De P., Dunne E.J., Ghosh J.B., and Wells C.E. Complexity of the discrete time-cost tradeoff problem for project networks. Operations Research 45 (1997) 302-306
    • (1997) Operations Research , vol.45 , pp. 302-306
    • De, P.1    Dunne, E.J.2    Ghosh, J.B.3    Wells, C.E.4
  • 16
    • 34250623841 scopus 로고    scopus 로고
    • C. Akkan, A Lagrangian heuristic for the discrete time-cost tradeoff problem for activity-on-arc project networks. Working Paper, Koc University, Istanbul (1998).
  • 17
    • 0029772743 scopus 로고    scopus 로고
    • Project management with time, cost and quality considerations
    • Babu A.J.G., and Suresh N. Project management with time, cost and quality considerations. European Journal of Operational 88 (1996) 320-327
    • (1996) European Journal of Operational , vol.88 , pp. 320-327
    • Babu, A.J.G.1    Suresh, N.2
  • 18
    • 0033177842 scopus 로고    scopus 로고
    • Time, cost and quality trade-off in project management: a case study
    • Khang D.B., and Myint Y.M. Time, cost and quality trade-off in project management: a case study. International Journal of Project Management 17 4 (1999) 249-256
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 249-256
    • Khang, D.B.1    Myint, Y.M.2
  • 19
    • 0030735527 scopus 로고    scopus 로고
    • A genetic algorithm for the generalized assignment problem
    • Chu P.C., and Beasley J.E. A genetic algorithm for the generalized assignment problem. Computers and Operations Research 24 (1997) 17-23
    • (1997) Computers and Operations Research , vol.24 , pp. 17-23
    • Chu, P.C.1    Beasley, J.E.2
  • 20
    • 34250668582 scopus 로고    scopus 로고
    • M.P. Hansen, Tabu search for multiobjective optimization:Mots, in: Proceedings of the 13th International Conference on Multiple Criteria Decision Making, University of Cape Town, 1997, pp. 547-586.
  • 21
    • 77949587087 scopus 로고    scopus 로고
    • A template for scatter search and path relinking
    • Hao E., Lutton E., et al. (Eds), Springer-Verlag
    • Glover F. A template for scatter search and path relinking. In: Hao E., Lutton E., et al. (Eds). Artificial Evolution, Lecture Notes in Computer Science 1363 (1998), Springer-Verlag 13-54
    • (1998) Artificial Evolution, Lecture Notes in Computer Science 1363 , pp. 13-54
    • Glover, F.1
  • 22
    • 0035576458 scopus 로고    scopus 로고
    • An experimental evaluation of a scatter search for the linear ordering problem
    • Campos V., Glover F., Laguna M., and Marti R. An experimental evaluation of a scatter search for the linear ordering problem. Journal of Global Optimization 21 4 (2001) 397-414
    • (2001) Journal of Global Optimization , vol.21 , Issue.4 , pp. 397-414
    • Campos, V.1    Glover, F.2    Laguna, M.3    Marti, R.4
  • 23
    • 0039397863 scopus 로고    scopus 로고
    • Genetic algorithms for the traveling salesman problem: a review of representations and operators
    • Larranaga P., Kuijpers C.M.H., Murga R.H., Inza I., and Dizdarevic S. Genetic algorithms for the traveling salesman problem: a review of representations and operators. Artificial Intelligence 13 (1999) 129-170
    • (1999) Artificial Intelligence , vol.13 , pp. 129-170
    • Larranaga, P.1    Kuijpers, C.M.H.2    Murga, R.H.3    Inza, I.4    Dizdarevic, S.5
  • 25
    • 25444456205 scopus 로고    scopus 로고
    • A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
    • 1 March 2006
    • Debels D., Reyck B.D., Leus R., and Vanhoucke M. A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research 169 2 (2006) 638-653 1 March 2006
    • (2006) European Journal of Operational Research , vol.169 , Issue.2 , pp. 638-653
    • Debels, D.1    Reyck, B.D.2    Leus, R.3    Vanhoucke, M.4
  • 26
    • 84867922216 scopus 로고    scopus 로고
    • An electromagnetism-like mechanism for global optimization
    • Birbil S.I., and Fang S.C. An electromagnetism-like mechanism for global optimization. Journal of global optimization 25 (2003) 263-282
    • (2003) Journal of global optimization , vol.25 , pp. 263-282
    • Birbil, S.I.1    Fang, S.C.2
  • 27
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problem
    • Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problem. Management Science 41 (1995) 1693-1703
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 28
    • 3543055794 scopus 로고    scopus 로고
    • Rangen: a random network generator for activity-on-the-node networks
    • Demeulemeester E., Vanhoucke M., and Herroelen W. Rangen: a random network generator for activity-on-the-node networks. Journal of Scheduling 6 (2003) 17-38
    • (2003) Journal of Scheduling , vol.6 , pp. 17-38
    • Demeulemeester, E.1    Vanhoucke, M.2    Herroelen, W.3
  • 30
    • 33750488440 scopus 로고    scopus 로고
    • On the discrete time, cost and quality trade-off problem
    • Tareghian H.R., and Taheri H. On the discrete time, cost and quality trade-off problem. Applied Mathematics and Computation 181 (2006) 1305-1312
    • (2006) Applied Mathematics and Computation , vol.181 , pp. 1305-1312
    • Tareghian, H.R.1    Taheri, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.