-
1
-
-
0034298269
-
Order planning for networked make-to-order enterprises - A case study
-
Azevedo, A.L. and Sousa, J.P., Order planning for networked make-to-order enterprises - a case study. J. Oper. Res. Soc., 2000, 51, 1116-1127.
-
(2000)
J. Oper. Res. Soc.
, vol.51
, pp. 1116-1127
-
-
Azevedo, A.L.1
Sousa, J.P.2
-
2
-
-
4344592743
-
Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction
-
Billington, P., McClain, J. and Thomas, L., Mathematical programming approaches to capacity-constrained MRP systems: review formulation and problem reduction. Management Science, 1983, 32, 989-1006.
-
(1983)
Management Science
, vol.32
, pp. 989-1006
-
-
Billington, P.1
McClain, J.2
Thomas, L.3
-
3
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker, P., Drexl, A., Möhring, R., Neumann, K. and Pesch, E., Resource-constrained project scheduling: notation, classification, models, and methods. Eur. J. Oper. Res., 1999, 112, 3-41.
-
(1999)
Eur. J. Oper. Res.
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
4
-
-
13244284430
-
Auftragsorientierte Produktionsprogrammplanung auf der Grundlage der opportunistischen Koordinierung
-
Corsten, H., Gössinger, R. and Schneiker, K., Auftragsorientierte Produktionsprogrammplanung auf der Grundlage der opportunistischen Koordinierung. Zeitschrift für Planung, 2001, 12, 307-328.
-
(2001)
Zeitschrift für Planung
, vol.12
, pp. 307-328
-
-
Corsten, H.1
Gössinger, R.2
Schneiker, K.3
-
5
-
-
0030574803
-
Modelling set-up times, process batches and transfer batches using activity network logic
-
Demeulemeester, E.L. and Herroelen, W.S., Modelling set-up times, process batches and transfer batches using activity network logic. Eur. J. Oper. Res., 1996, 89, 355-365.
-
(1996)
Eur. J. Oper. Res.
, vol.89
, pp. 355-365
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
6
-
-
4243886604
-
Fließbandaustaktung, Maschinenbelegung und Kapazitätsplanung in Netzwerken, ein integrierender Ansatz
-
Drexl, A., Fließbandaustaktung, Maschinenbelegung und Kapazitätsplanung in Netzwerken, ein integrierender Ansatz. Zeitschrift für Betriebswirtschaft, 1990, 60, 53-70.
-
(1990)
Zeitschrift für Betriebswirtschaft
, vol.60
, pp. 53-70
-
-
Drexl, A.1
-
7
-
-
0031170482
-
Lot sizing and scheduling - Survey and extensions
-
Drexl, A. and Kimms, A., Lot sizing and scheduling - survey and extensions. Eur. J. Oper. Res., 1997, 99, 221-235.
-
(1997)
Eur. J. Oper. Res.
, vol.99
, pp. 221-235
-
-
Drexl, A.1
Kimms, A.2
-
8
-
-
0009996502
-
Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme
-
Drexl, A., Fleischmann, B., Günther, H.-O., Stadtler, H. and Tempelmeier, H., Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme. Zeitschrift für betriebswirtschaftliche Forschung, 1994, 46, 1022-1045.
-
(1994)
Zeitschrift für Betriebswirtschaftliche Forschung
, vol.46
, pp. 1022-1045
-
-
Drexl, A.1
Fleischmann, B.2
Günther, H.-O.3
Stadtler, H.4
Tempelmeier, H.5
-
10
-
-
0025384312
-
The discrete lot-sizing and scheduling problem
-
Fleischmann, B., The discrete lot-sizing and scheduling problem. Eur. J. Oper. Res., 1990, 44, 337-348.
-
(1990)
Eur. J. Oper. Res.
, vol.44
, pp. 337-348
-
-
Fleischmann, B.1
-
11
-
-
0012712572
-
A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
-
Franck, B., Neumann, K. and Schwindt, C., A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods. OR Spektrum, 1997, 19, 77-85.
-
(1997)
OR Spektrum
, vol.19
, pp. 77-85
-
-
Franck, B.1
Neumann, K.2
Schwindt, C.3
-
12
-
-
0035382004
-
A tabu-search heuristic for the capacitated lot-sizing problem with set-up carry over
-
Gopalakrishnan, M., Dong, K., Bourjolly, J.-M. and Mohan, S., A tabu-search heuristic for the capacitated lot-sizing problem with set-up carry over. Manag. Sci., 2001, 47, 851-863.
-
(2001)
Manag. Sci.
, vol.47
, pp. 851-863
-
-
Gopalakrishnan, M.1
Dong, K.2
Bourjolly, J.-M.3
Mohan, S.4
-
13
-
-
1342290327
-
Plant co-ordination in pharmaceutical networks
-
Grunow, M., Günther, H.-O. and Yang, G., Plant co-ordination in pharmaceutical networks. OR Spectrum, 2003, 25, 109-141.
-
(2003)
OR Spectrum
, vol.25
, pp. 109-141
-
-
Grunow, M.1
Günther, H.-O.2
Yang, G.3
-
15
-
-
23044518893
-
Packing problems and project scheduling models: An integrating perspective
-
Hartmann, S., Packing problems and project scheduling models: an integrating perspective. J. Oper. Res. Soc., 2000, 51, 1083-1092.
-
(2000)
J. Oper. Res. Soc.
, vol.51
, pp. 1083-1092
-
-
Hartmann, S.1
-
16
-
-
0017320423
-
Hierarchical integration of production planning and scheduling
-
edited by M.A. Geisler, North Holland/American Elsevier, Amsterdam
-
Hax, A. C. and Meal, H. C., Hierarchical integration of production planning and scheduling. In TIMS Studies in Management Science, Logistics, edited by M.A. Geisler, Vol. 1: pp. 53-69, 1975 (North Holland/American Elsevier, Amsterdam).
-
(1975)
TIMS Studies in Management Science, Logistics
, vol.1
, pp. 53-69
-
-
Hax, A.C.1
Meal, H.C.2
-
17
-
-
0007097316
-
The concept of continguity in models based on time-indexed formulations
-
edited by F. Keil, W. Mackens and J. Werther, Springer, Berlin
-
Kallrath, J., The concept of continguity in models based on time-indexed formulations. In: Scientific Computing in Chemical Engineering II, edited by F. Keil, W. Mackens and J. Werther, pp. 330-337, 1999 (Springer, Berlin).
-
(1999)
Scientific Computing in Chemical Engineering II
, pp. 330-337
-
-
Kallrath, J.1
-
21
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch, R. and Padman, R., An integrated survey of deterministic project scheduling. OMEGA, 2001, 29, 249-272.
-
(2001)
OMEGA
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
22
-
-
0002180205
-
Plant location set covering and economic lot sizing: An O(nm) algorithm for structured problems
-
edited by L. Collatz. Birkhäuser, Basle
-
Krarup, J. and Bilde, O., Plant location set covering and economic lot sizing: an O(nm) algorithm for structured problems. In Numerische Methoden bei Optimierungsaufgaben, Band 3, Optimierung bei graphentheoretischen und ganzzahligen Problemen, edited by L. Collatz. pp. 155-180, 1977 (Birkhäuser, Basle).
-
(1977)
Numerische Methoden Bei Optimierungsaufgaben, Band 3, Optimierung Bei Graphentheoretischen und Ganzzahligen Problemen
, pp. 155-180
-
-
Krarup, J.1
Bilde, O.2
-
23
-
-
0442264225
-
Advanced production scheduling for batch plants in process industries
-
Neumann, K., Schwindt, C. and Trautmann, N., Advanced production scheduling for batch plants in process industries. OR Spectrum, 2002, 24, S251-S279.
-
(2002)
OR Spectrum
, vol.24
-
-
Neumann, K.1
Schwindt, C.2
Trautmann, N.3
-
24
-
-
0012361022
-
-
Springer, Berlin
-
Neumann, K., Schwindt, C. and Zimmermann, J., In Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Non-regular Objective Functions, 2nd edn, 2003 (Springer, Berlin).
-
(2003)
Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Non-regular Objective Functions, 2nd Edn
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
25
-
-
0000763707
-
Unified frameworks for optimal process planning and scheduling
-
edited by D. W. T. Rippin, J. C. Hale and J. F. Davis, CACHE, Austin, TX
-
Pantelides, C.C., Unified frameworks for optimal process planning and scheduling. In Foundations of Computer-aided Process Operations, edited by D. W. T. Rippin, J. C. Hale and J. F. Davis, pp. 253-274, 1994 (CACHE, Austin, TX).
-
(1994)
Foundations of Computer-aided Process Operations
, pp. 253-274
-
-
Pantelides, C.C.1
-
26
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
Pritsker, A.A.B., Watters, W.D. and Wolfe, P.M., Multiproject scheduling with limited resources: a zero-one programming approach. Manag. Sci., 1969, 16, 93-108.
-
(1969)
Manag. Sci.
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, W.D.2
Wolfe, P.M.3
-
27
-
-
0005253662
-
Optimal lot-sizing for dynamic assembly systems
-
edited by S. Axsäter, D. Schneeweiss and E.A. Silver, Springer, Berlin
-
Rosling, K., Optimal lot-sizing for dynamic assembly systems. In: Multi-stage Productions Planning and Inventory Control, edited by S. Axsäter, D. Schneeweiss and E.A. Silver, pp. 119-131, 1986 (Springer, Berlin).
-
(1986)
Multi-stage Productions Planning and Inventory Control
, pp. 119-131
-
-
Rosling, K.1
-
29
-
-
0001775820
-
Batch scheduling in process industries: An application of resource-constrained project scheduling
-
Schwindt, C. and Trautmann, N., Batch scheduling in process industries: an application of resource-constrained project scheduling. OR Spektrum, 2000, 22, 501-524.
-
(2000)
OR Spektrum
, vol.22
, pp. 501-524
-
-
Schwindt, C.1
Trautmann, N.2
-
30
-
-
4243522952
-
-
Technical Report, University of Florida, Gainesville, FL
-
Simpson, N. and Erenguc, S., Production Planning in Multiple Stage Manufacturing Environments with Joint Costs, Limited Resources and Set-up Times, 1998. Technical Report, University of Florida, Gainesville, FL.
-
(1998)
Production Planning in Multiple Stage Manufacturing Environments with Joint Costs, Limited Resources and Set-up Times
-
-
Simpson, N.1
Erenguc, S.2
-
31
-
-
84889978958
-
-
Springer, Berlin
-
Stadtler H. and Kilger, C., Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 3rd ed, 2005 (Springer, Berlin).
-
(2005)
Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 3rd Ed
-
-
Stadtler, H.1
Kilger, C.2
-
32
-
-
0030575684
-
Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
-
Stadtler, H., Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing. Eur. J. Oper. Res., 1996, 94, 561-581.
-
(1996)
Eur. J. Oper. Res.
, vol.94
, pp. 561-581
-
-
Stadtler, H.1
-
33
-
-
27844524492
-
Campaign planning in time-indexed model formulations
-
Suerie, C., Campaign planning in time-indexed model formulations. Int. J. Prod. Res., 2005b, 43, 49-66.
-
(2005)
Int. J. Prod. Res.
, vol.43
, pp. 49-66
-
-
Suerie, C.1
-
35
-
-
0141675994
-
The capacitated lot-sizing problem with linked lot sizes
-
Suerie, C. and Stadtler, H., The capacitated lot-sizing problem with linked lot sizes. Man. Sci., 2003, 49, 1039-1054.
-
(2003)
Man. Sci.
, vol.49
, pp. 1039-1054
-
-
Suerie, C.1
Stadtler, H.2
-
36
-
-
11144227512
-
-
Springer, Berlin
-
Tempelmeier, H., Material-Logistik, Modelle und Algorithmen für die Produktionsplanung und -steuerung und das Supply Chain Management, 5th ed, 2003 (Springer, Berlin).
-
(2003)
Material-Logistik, Modelle und Algorithmen für Die Produktionsplanung und -Steuerung und das Supply Chain Management, 5th Ed
-
-
Tempelmeier, H.1
-
37
-
-
0442268855
-
Solving planning and scheduling problems with combined integer and constraint programming
-
Timpe, C., Solving planning and scheduling problems with combined integer and constraint programming. OR Spectrum, 2002, 24, 431-448.
-
(2002)
OR Spectrum
, vol.24
, pp. 431-448
-
-
Timpe, C.1
-
39
-
-
29344447708
-
Solving the bucketless-MRP problems using RCPSP methods
-
edited by G. Barbarosglu et al., 7-9 July 1998, Bogazici University, Istanbul
-
Tukel, O.I. and Rom, W.O., Solving the bucketless-MRP problems using RCPSP methods. In: Sixth International Workshop on Project Management and Scheduling, edited by G. Barbarosglu et al., 7-9 July 1998, pp. 309-312, 1998 (Bogazici University, Istanbul).
-
(1998)
Sixth International Workshop on Project Management and Scheduling
, pp. 309-312
-
-
Tukel, O.I.1
Rom, W.O.2
|