메뉴 건너뛰기




Volumn 43, Issue 24, 2005, Pages 5253-5270

Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrating perspective

Author keywords

Multilevel lot sizing; Resource constrained project scheduling

Indexed keywords

MATHEMATICAL MODELS; PROBLEM SOLVING; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 29344475492     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500270406     Document Type: Review
Times cited : (10)

References (39)
  • 1
    • 0034298269 scopus 로고    scopus 로고
    • Order planning for networked make-to-order enterprises - A case study
    • Azevedo, A.L. and Sousa, J.P., Order planning for networked make-to-order enterprises - a case study. J. Oper. Res. Soc., 2000, 51, 1116-1127.
    • (2000) J. Oper. Res. Soc. , vol.51 , pp. 1116-1127
    • Azevedo, A.L.1    Sousa, J.P.2
  • 2
    • 4344592743 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction
    • Billington, P., McClain, J. and Thomas, L., Mathematical programming approaches to capacity-constrained MRP systems: review formulation and problem reduction. Management Science, 1983, 32, 989-1006.
    • (1983) Management Science , vol.32 , pp. 989-1006
    • Billington, P.1    McClain, J.2    Thomas, L.3
  • 3
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models, and methods
    • Brucker, P., Drexl, A., Möhring, R., Neumann, K. and Pesch, E., Resource-constrained project scheduling: notation, classification, models, and methods. Eur. J. Oper. Res., 1999, 112, 3-41.
    • (1999) Eur. J. Oper. Res. , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Möhring, R.3    Neumann, K.4    Pesch, E.5
  • 4
    • 13244284430 scopus 로고    scopus 로고
    • Auftragsorientierte Produktionsprogrammplanung auf der Grundlage der opportunistischen Koordinierung
    • Corsten, H., Gössinger, R. and Schneiker, K., Auftragsorientierte Produktionsprogrammplanung auf der Grundlage der opportunistischen Koordinierung. Zeitschrift für Planung, 2001, 12, 307-328.
    • (2001) Zeitschrift für Planung , vol.12 , pp. 307-328
    • Corsten, H.1    Gössinger, R.2    Schneiker, K.3
  • 5
    • 0030574803 scopus 로고    scopus 로고
    • Modelling set-up times, process batches and transfer batches using activity network logic
    • Demeulemeester, E.L. and Herroelen, W.S., Modelling set-up times, process batches and transfer batches using activity network logic. Eur. J. Oper. Res., 1996, 89, 355-365.
    • (1996) Eur. J. Oper. Res. , vol.89 , pp. 355-365
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 6
    • 4243886604 scopus 로고
    • Fließbandaustaktung, Maschinenbelegung und Kapazitätsplanung in Netzwerken, ein integrierender Ansatz
    • Drexl, A., Fließbandaustaktung, Maschinenbelegung und Kapazitätsplanung in Netzwerken, ein integrierender Ansatz. Zeitschrift für Betriebswirtschaft, 1990, 60, 53-70.
    • (1990) Zeitschrift für Betriebswirtschaft , vol.60 , pp. 53-70
    • Drexl, A.1
  • 7
    • 0031170482 scopus 로고    scopus 로고
    • Lot sizing and scheduling - Survey and extensions
    • Drexl, A. and Kimms, A., Lot sizing and scheduling - survey and extensions. Eur. J. Oper. Res., 1997, 99, 221-235.
    • (1997) Eur. J. Oper. Res. , vol.99 , pp. 221-235
    • Drexl, A.1    Kimms, A.2
  • 10
    • 0025384312 scopus 로고
    • The discrete lot-sizing and scheduling problem
    • Fleischmann, B., The discrete lot-sizing and scheduling problem. Eur. J. Oper. Res., 1990, 44, 337-348.
    • (1990) Eur. J. Oper. Res. , vol.44 , pp. 337-348
    • Fleischmann, B.1
  • 11
    • 0012712572 scopus 로고    scopus 로고
    • A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
    • Franck, B., Neumann, K. and Schwindt, C., A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods. OR Spektrum, 1997, 19, 77-85.
    • (1997) OR Spektrum , vol.19 , pp. 77-85
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 12
    • 0035382004 scopus 로고    scopus 로고
    • A tabu-search heuristic for the capacitated lot-sizing problem with set-up carry over
    • Gopalakrishnan, M., Dong, K., Bourjolly, J.-M. and Mohan, S., A tabu-search heuristic for the capacitated lot-sizing problem with set-up carry over. Manag. Sci., 2001, 47, 851-863.
    • (2001) Manag. Sci. , vol.47 , pp. 851-863
    • Gopalakrishnan, M.1    Dong, K.2    Bourjolly, J.-M.3    Mohan, S.4
  • 13
    • 1342290327 scopus 로고    scopus 로고
    • Plant co-ordination in pharmaceutical networks
    • Grunow, M., Günther, H.-O. and Yang, G., Plant co-ordination in pharmaceutical networks. OR Spectrum, 2003, 25, 109-141.
    • (2003) OR Spectrum , vol.25 , pp. 109-141
    • Grunow, M.1    Günther, H.-O.2    Yang, G.3
  • 15
    • 23044518893 scopus 로고    scopus 로고
    • Packing problems and project scheduling models: An integrating perspective
    • Hartmann, S., Packing problems and project scheduling models: an integrating perspective. J. Oper. Res. Soc., 2000, 51, 1083-1092.
    • (2000) J. Oper. Res. Soc. , vol.51 , pp. 1083-1092
    • Hartmann, S.1
  • 16
    • 0017320423 scopus 로고
    • Hierarchical integration of production planning and scheduling
    • edited by M.A. Geisler, North Holland/American Elsevier, Amsterdam
    • Hax, A. C. and Meal, H. C., Hierarchical integration of production planning and scheduling. In TIMS Studies in Management Science, Logistics, edited by M.A. Geisler, Vol. 1: pp. 53-69, 1975 (North Holland/American Elsevier, Amsterdam).
    • (1975) TIMS Studies in Management Science, Logistics , vol.1 , pp. 53-69
    • Hax, A.C.1    Meal, H.C.2
  • 17
    • 0007097316 scopus 로고    scopus 로고
    • The concept of continguity in models based on time-indexed formulations
    • edited by F. Keil, W. Mackens and J. Werther, Springer, Berlin
    • Kallrath, J., The concept of continguity in models based on time-indexed formulations. In: Scientific Computing in Chemical Engineering II, edited by F. Keil, W. Mackens and J. Werther, pp. 330-337, 1999 (Springer, Berlin).
    • (1999) Scientific Computing in Chemical Engineering II , pp. 330-337
    • Kallrath, J.1
  • 21
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch, R. and Padman, R., An integrated survey of deterministic project scheduling. OMEGA, 2001, 29, 249-272.
    • (2001) OMEGA , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 23
    • 0442264225 scopus 로고    scopus 로고
    • Advanced production scheduling for batch plants in process industries
    • Neumann, K., Schwindt, C. and Trautmann, N., Advanced production scheduling for batch plants in process industries. OR Spectrum, 2002, 24, S251-S279.
    • (2002) OR Spectrum , vol.24
    • Neumann, K.1    Schwindt, C.2    Trautmann, N.3
  • 25
    • 0000763707 scopus 로고
    • Unified frameworks for optimal process planning and scheduling
    • edited by D. W. T. Rippin, J. C. Hale and J. F. Davis, CACHE, Austin, TX
    • Pantelides, C.C., Unified frameworks for optimal process planning and scheduling. In Foundations of Computer-aided Process Operations, edited by D. W. T. Rippin, J. C. Hale and J. F. Davis, pp. 253-274, 1994 (CACHE, Austin, TX).
    • (1994) Foundations of Computer-aided Process Operations , pp. 253-274
    • Pantelides, C.C.1
  • 26
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A.A.B., Watters, W.D. and Wolfe, P.M., Multiproject scheduling with limited resources: a zero-one programming approach. Manag. Sci., 1969, 16, 93-108.
    • (1969) Manag. Sci. , vol.16 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, W.D.2    Wolfe, P.M.3
  • 27
    • 0005253662 scopus 로고
    • Optimal lot-sizing for dynamic assembly systems
    • edited by S. Axsäter, D. Schneeweiss and E.A. Silver, Springer, Berlin
    • Rosling, K., Optimal lot-sizing for dynamic assembly systems. In: Multi-stage Productions Planning and Inventory Control, edited by S. Axsäter, D. Schneeweiss and E.A. Silver, pp. 119-131, 1986 (Springer, Berlin).
    • (1986) Multi-stage Productions Planning and Inventory Control , pp. 119-131
    • Rosling, K.1
  • 29
    • 0001775820 scopus 로고    scopus 로고
    • Batch scheduling in process industries: An application of resource-constrained project scheduling
    • Schwindt, C. and Trautmann, N., Batch scheduling in process industries: an application of resource-constrained project scheduling. OR Spektrum, 2000, 22, 501-524.
    • (2000) OR Spektrum , vol.22 , pp. 501-524
    • Schwindt, C.1    Trautmann, N.2
  • 32
    • 0030575684 scopus 로고    scopus 로고
    • Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
    • Stadtler, H., Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing. Eur. J. Oper. Res., 1996, 94, 561-581.
    • (1996) Eur. J. Oper. Res. , vol.94 , pp. 561-581
    • Stadtler, H.1
  • 33
    • 27844524492 scopus 로고    scopus 로고
    • Campaign planning in time-indexed model formulations
    • Suerie, C., Campaign planning in time-indexed model formulations. Int. J. Prod. Res., 2005b, 43, 49-66.
    • (2005) Int. J. Prod. Res. , vol.43 , pp. 49-66
    • Suerie, C.1
  • 35
    • 0141675994 scopus 로고    scopus 로고
    • The capacitated lot-sizing problem with linked lot sizes
    • Suerie, C. and Stadtler, H., The capacitated lot-sizing problem with linked lot sizes. Man. Sci., 2003, 49, 1039-1054.
    • (2003) Man. Sci. , vol.49 , pp. 1039-1054
    • Suerie, C.1    Stadtler, H.2
  • 37
    • 0442268855 scopus 로고    scopus 로고
    • Solving planning and scheduling problems with combined integer and constraint programming
    • Timpe, C., Solving planning and scheduling problems with combined integer and constraint programming. OR Spectrum, 2002, 24, 431-448.
    • (2002) OR Spectrum , vol.24 , pp. 431-448
    • Timpe, C.1
  • 39
    • 29344447708 scopus 로고    scopus 로고
    • Solving the bucketless-MRP problems using RCPSP methods
    • edited by G. Barbarosglu et al., 7-9 July 1998, Bogazici University, Istanbul
    • Tukel, O.I. and Rom, W.O., Solving the bucketless-MRP problems using RCPSP methods. In: Sixth International Workshop on Project Management and Scheduling, edited by G. Barbarosglu et al., 7-9 July 1998, pp. 309-312, 1998 (Bogazici University, Istanbul).
    • (1998) Sixth International Workshop on Project Management and Scheduling , pp. 309-312
    • Tukel, O.I.1    Rom, W.O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.