메뉴 건너뛰기




Volumn 14, Issue 6, 2007, Pages 565-589

A multi-agent system for the decentralized resource-constrained multi-project scheduling problem

Author keywords

Decentralized project scheduling; Evolution strategy; Multi agent system; Restart model

Indexed keywords


EID: 77953872113     PISSN: 09696016     EISSN: 14753995     Source Type: Journal    
DOI: 10.1111/j.1475-3995.2007.00614.x     Document Type: Article
Times cited : (101)

References (94)
  • 1
    • 57849086458 scopus 로고    scopus 로고
    • New variants of genetic algorithms applied to problems of combinatorial optimization
    • Vienna, Austria
    • Affenzeller, M., 2002a. New variants of genetic algorithms applied to problems of combinatorial optimization. Proceedings of the EMCSR 2002, Vol. 1, Vienna, Austria, pp. 75–80.
    • (2002) Proceedings of the EMCSR 2002 , vol.1 , pp. 75-80
    • Affenzeller, M.1
  • 2
    • 0036954272 scopus 로고    scopus 로고
    • A generic evolutionary computation approach based upon genetic algorithms and evolution strategies
    • Affenzeller, M., 2002b. A generic evolutionary computation approach based upon genetic algorithms and evolution strategies. Journal of Systems Science 28, 59–72.
    • (2002) Journal of Systems Science , vol.28 , pp. 59-72
    • Affenzeller, M.1
  • 4
    • 0042287689 scopus 로고    scopus 로고
    • A robust genetic algorithm for resource allocation in project scheduling
    • Alcaraz, J., Maroto, C., 2001. A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research 102, 83–109.
    • (2001) Annals of Operations Research , vol.102 , pp. 83-109
    • Alcaraz, J.1    Maroto, C.2
  • 7
    • 0003131416 scopus 로고    scopus 로고
    • Tabu-search algorithms and lower bounds for the resource constrained project scheduling problem
    • Voss, S., Martello, S., Osman, I., Roucairol, C., (Eds.), Kluwer, Dordrecht
    • Baar, T., Brucker, P., Knust, S., 1998. Tabu-search algorithms and lower bounds for the resource constrained project scheduling problem. In: Voss, S., Martello, S., Osman, I., Roucairol, C. (Eds.), Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization. Kluwer, Dordrecht, pp. 1–8.
    • (1998) Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization , pp. 1-8
    • Baar, T.1    Brucker, P.2    Knust, S.3
  • 8
    • 0002095797 scopus 로고    scopus 로고
    • Metaphor or reality
    • a case study where agents bid with actual costs to schedule a factory. In, Clearwater, S.H., (Ed.), World Scientific, Singapore
    • Baker, A.D., 1996. Metaphor or reality: a case study where agents bid with actual costs to schedule a factory. In: Clearwater, S.H. (Ed.), Marked-Based Control – A Paradigm for Distributed Resource Allocation. World Scientific, Singapore, pp. 184–223.
    • (1996) Marked-Based Control – A Paradigm for Distributed Resource Allocation , pp. 184-223
    • Baker, A.D.1
  • 12
    • 0030216966 scopus 로고    scopus 로고
    • An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems
    • Boctor, F.F., 1996. An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems. International Journal of Production Research 34, 2335–2351.
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 13
    • 0000692965 scopus 로고
    • A new adaptive multi-start technique for combinatorial global optimizations
    • Boese, K.D., Kahng, A.B., Muddu, S., 1994. A new adaptive multi-start technique for combinatorial global optimizations. Operations Research Letters 16, 101–113.
    • (1994) Operations Research Letters , vol.16 , pp. 101-113
    • Boese, K.D.1    Kahng, A.B.2    Muddu, S.3
  • 15
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource constrained project scheduling problem and its multiple mode version
    • Bouleimen, K., Lecocq, H., 2003. A new efficient simulated annealing algorithm for the resource constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149, 268–281.
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 19
    • 0031188915 scopus 로고    scopus 로고
    • A simulated annealing algorithm for resource constrained project scheduling problems
    • Cho, J.H., Kim, Y.D., 1997. A simulated annealing algorithm for resource constrained project scheduling problems. Journal of the Operational Research Society 48, 736–744.
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 736-744
    • Cho, J.H.1    Kim, Y.D.2
  • 21
    • 17444420771 scopus 로고    scopus 로고
    • Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
    • Cohen, I., Golany, B., Shtub, A., 2005. Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology. Annals of Operations Research 134, 183–199.
    • (2005) Annals of Operations Research , vol.134 , pp. 183-199
    • Cohen, I.1    Golany, B.2    Shtub, A.3
  • 23
    • 33846864716 scopus 로고    scopus 로고
    • A market-based multi-agent system model for decentralized multi-project scheduling
    • Confessore, G., Giordani, S., Rismondo, S., 2007. A market-based multi-agent system model for decentralized multi-project scheduling. Annals of Operations Research 150, 115–135.
    • (2007) Annals of Operations Research , vol.150 , pp. 115-135
    • Confessore, G.1    Giordani, S.2    Rismondo, S.3
  • 24
    • 24944476690 scopus 로고    scopus 로고
    • A bi-population based genetic algorithm for the resource-constrained project scheduling problem
    • Debels, D., Vanhoucke, M., 2005. A bi-population based genetic algorithm for the resource-constrained project scheduling problem. Lecture Notes in Computer Sciences 2483, 378–387.
    • (2005) Lecture Notes in Computer Sciences , vol.2483 , pp. 378-387
    • Debels, D.1    Vanhoucke, M.2
  • 26
    • 38549091692 scopus 로고    scopus 로고
    • A decomposition-based genetic algorithm for the resource-constrained project scheduling problem
    • Debels, D., Vanhoucke, M., 2007a. A decomposition-based genetic algorithm for the resource-constrained project scheduling problem. Operations Research 55, 457–469.
    • (2007) Operations Research , vol.55 , pp. 457-469
    • Debels, D.1    Vanhoucke, M.2
  • 27
    • 85040402702 scopus 로고    scopus 로고
    • Personal email correspondence. March 5, 2007
    • Debels, D., Vanhoucke, M., 2007b. Personal email correspondence. March 5, 2007.
    • (2007)
    • Debels, D.1    Vanhoucke, M.2
  • 28
    • 85040425639 scopus 로고    scopus 로고
    • Download of the RG300 instances, accessed March 5, 2007
    • Debels, D., Vanhoucke, M., 2007c. Download of the RG300 instances, http://www.projectmanagement.ugent.be/RG300Instances.php, accessed March 5, 2007.
    • (2007)
    • Debels, D.1    Vanhoucke, M.2
  • 30
    • 0026376478 scopus 로고
    • Scheduling of project networks by job assignment
    • Drexl, A., 1991. Scheduling of project networks by job assignment. Management Science 37, 1590–1602.
    • (1991) Management Science , vol.37 , pp. 1590-1602
    • Drexl, A.1
  • 34
    • 0011717163 scopus 로고
    • Towards the development of a complete multiproject scheduling system
    • Fendley, L.G., 1968. Towards the development of a complete multiproject scheduling system. Journal of Industrial Engineering 19, 505–515.
    • (1968) Journal of Industrial Engineering , vol.19 , pp. 505-515
    • Fendley, L.G.1
  • 41
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for the resource-constrained project scheduling
    • Hartmann, S., 1998. A competitive genetic algorithm for the resource-constrained project scheduling. Naval Research Logistics 45, 733–750.
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 42
    • 0036684673 scopus 로고    scopus 로고
    • A self-adaptive genetic algorithm for project scheduling under resource constraints
    • Hartmann, S., 2002. A self-adaptive genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49, 433–448.
    • (2002) Naval Research Logistics , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 43
    • 84968295504 scopus 로고
    • Application of the ‘Evolutionsstrategie’ to discrete optimization problems
    • Schwefel, H.-P., Männer, R., (Eds.), Springer, Berlin
    • Herdy, M., 1990. Application of the ‘Evolutionsstrategie’ to discrete optimization problems. In: Schwefel, H.-P., Männer, R. (Eds.), Parallel Problem Solving from Nature 1. Springer, Berlin, pp. 188–192.
    • (1990) Parallel Problem Solving from Nature 1 , pp. 188-192
    • Herdy, M.1
  • 45
    • 85040433873 scopus 로고    scopus 로고
    • Agentcopp downloads., accessed March 5, 2007
    • Homberger, J., 2007. Agentcopp downloads. http://www.agentcopp.de/EN/agentcopp/downloads/, accessed March 5, 2007.
    • (2007)
    • Homberger, J.1
  • 46
    • 8444235112 scopus 로고    scopus 로고
    • A two-phase hybrid metaheuristic for the vehicle routing problem with time windows
    • Homberger, J., Gehring, H., 2005. A two-phase hybrid metaheuristic for the vehicle routing problem with time windows. European Journal of Operational Research 162, 220–238.
    • (2005) European Journal of Operational Research , vol.162 , pp. 220-238
    • Homberger, J.1    Gehring, H.2
  • 49
    • 0027569485 scopus 로고
    • Multi-project scheduling with explicit lateness costs
    • Kim, S.Y., Leachman, R.C., 1993. Multi-project scheduling with explicit lateness costs. IIE Transactions 25, 34–44.
    • (1993) IIE Transactions , vol.25 , pp. 34-44
    • Kim, S.Y.1    Leachman, R.C.2
  • 51
    • 24944457410 scopus 로고    scopus 로고
    • Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem
    • Russia, accessed April 16, 2007
    • Kochetov, Y., Stolyar, A., 2003. Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem. Proceedings of the 3rd International Workshop on Computer Science and Information Technologies, Russia, 4pp. http://www.math.nsc.ru/LBRT/k5/Kochetov/Papers/Kjchetov-Ufa-03.doc, accessed April 16, 2007.
    • (2003) Proceedings of the 3rd International Workshop on Computer Science and Information Technologies
    • Kochetov, Y.1    Stolyar, A.2
  • 53
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited
    • theory and computation
    • Kolisch, R., 1996. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. European Journal of Operational Research 90, 320–333.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 55
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive search for solving hard project scheduling problems
    • Kolisch, R., Drexl, A., 1996. Adaptive search for solving hard project scheduling problems. Naval Research Logistics 43, 23–40.
    • (1996) Naval Research Logistics , vol.43 , pp. 23-40
    • Kolisch, R.1    Drexl, A.2
  • 56
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem
    • classification and computational analysis. In, Weglarz, J., (Ed.), Kluwer, Dordrecht
    • Kolisch, R., Hartmann, S., 1999. Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. In: Weglarz, J. (Ed.), Project Scheduling: Recent Models, Algorithms and Applications. Kluwer, Dordrecht, 147–178.
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 57
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling
    • an update
    • Kolisch, R., Hartmann, S., 2006. Experimental investigation of heuristics for resource-constrained project scheduling: an update. European Journal of Operational Research 174, 23–37.
    • (2006) European Journal of Operational Research , vol.174 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 59
    • 0020087944 scopus 로고
    • Multi-project scheduling
    • categorization of heuristic rules performance
    • Kurtulus, I.S., Davis, E.W., 1982. Multi-project scheduling: categorization of heuristic rules performance. Management Science 28, 161–172.
    • (1982) Management Science , vol.28 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 60
    • 0022025928 scopus 로고
    • Multi-project scheduling
    • analysis of project performance
    • Kurtulus, I.S., Narula, S.C., 1985. Multi-project scheduling: analysis of project performance. IIE Transactions 17, 58–66.
    • (1985) IIE Transactions , vol.17 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 61
    • 0346986531 scopus 로고
    • An aggregate model for multi-project resource allocation
    • Dean, B.V., (Ed.), North-Holland, Amsterdam
    • Leachman, R.C., Boysen, J., 1985. An aggregate model for multi-project resource allocation. In: Dean, B.V. (Ed.), Project Management: Methods and Studies. North-Holland, Amsterdam, pp. 43–64.
    • (1985) Project Management: Methods and Studies , pp. 43-64
    • Leachman, R.C.1    Boysen, J.2
  • 63
    • 0141885117 scopus 로고    scopus 로고
    • Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism
    • Lee, Y.-H., Kumara, S.R., Chatterjee, K., 2003. Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism. Journal of Intelligent Manufacturing 14, 471–484.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 471-484
    • Lee, Y.-H.1    Kumara, S.R.2    Chatterjee, K.3
  • 64
    • 33845274958 scopus 로고
    • Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
    • Leon, V.J., Ramamoorthy, B., 1995. Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling. OR Spektrum 17, 173–182.
    • (1995) OR Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Ramamoorthy, B.2
  • 65
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource constrained project scheduling
    • Li, K.Y., Willis, R.J., 1992. An iterative scheduling technique for resource constrained project scheduling. European Journal of Operational Research 56, 370–379.
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 66
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
    • Lova, A., Tormos, P., 2001. Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research 102, 263–286.
    • (2001) Annals of Operations Research , vol.102 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 67
    • 0034559445 scopus 로고    scopus 로고
    • A multicriteria heuristic method to improve resource allocation in multiproject scheduling
    • Lova, A., Maroto, C., Tormos, P., 2000. A multicriteria heuristic method to improve resource allocation in multiproject scheduling. European Journal of Operational Research 127, 408–424.
    • (2000) European Journal of Operational Research , vol.127 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 70
    • 33847671359 scopus 로고    scopus 로고
    • Active-guided evolution strategies for large-scale capacitated vehicle routing problems
    • Mester, D., Bräysy, O., 2007. Active-guided evolution strategies for large-scale capacitated vehicle routing problems. Computers and Operations Research 34, 2964–2975.
    • (2007) Computers and Operations Research , vol.34 , pp. 2964-2975
    • Mester, D.1    Bräysy, O.2
  • 72
    • 0011167325 scopus 로고
    • Deutscher-Universitätsverlag, Wiesbaden, Germany
    • Nissen, V., 1994. Evolutionäre Algorithmen. Deutscher-Universitätsverlag, Wiesbaden, Germany.
    • (1994) Evolutionäre Algorithmen
    • Nissen, V.1
  • 73
    • 84888782064 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP)
    • Ribeiro, C.C., Hansen, P., (Eds.), Kluwer, Boston
    • Nonobe, K., Ibaraki, T., 2002. Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP). In: Ribeiro, C.C., Hansen, P. (Eds.), Essays and Surveys in Metaheuristics. Kluwer, Boston, pp. 557–588.
    • (2002) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 74
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources
    • a zero-one programming approach
    • Pritsker, A.A.B., Watters, L.J., Wolfe, P.M., 1969. Multiproject scheduling with limited resources: a zero-one programming approach. Management Science 16, 93–108.
    • (1969) Management Science , vol.16 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 75
    • 85040408885 scopus 로고    scopus 로고
    • Habilitationsschrift, Fakultät für Technische Naturwissenschaften und Informatik, Technische Universität Wien
    • Raidl, G., 2002. Hybrid evolutionary algorithms. Habilitationsschrift, Fakultät für Technische Naturwissenschaften und Informatik, Technische Universität Wien.
    • (2002) Hybrid evolutionary algorithms
    • Raidl, G.1
  • 77
    • 85040420227 scopus 로고    scopus 로고
    • Personal email correspondence, September 5, 2006
    • Rismondo, S., 2006. Personal email correspondence, September 5, 2006.
    • (2006)
    • Rismondo, S.1
  • 79
    • 0000103290 scopus 로고    scopus 로고
    • Case-based reasoning and improved adaptive search for project scheduling
    • Schirmer, A., 2000. Case-based reasoning and improved adaptive search for project scheduling. Naval Research Logistics 47, 201–222.
    • (2000) Naval Research Logistics , vol.47 , pp. 201-222
    • Schirmer, A.1
  • 81
    • 0030368509 scopus 로고    scopus 로고
    • A flexible optimization approach to multi-resource, multi-project planning and scheduling
    • Minneapolis
    • Shankar, V., Nagi, R., 1996. A flexible optimization approach to multi-resource, multi-project planning and scheduling. Proceedings of the 5th Industrial Engineering Research Conference, Minneapolis, pp. 263–267.
    • (1996) Proceedings of the 5th Industrial Engineering Research Conference , pp. 263-267
    • Shankar, V.1    Nagi, R.2
  • 83
    • 0029636114 scopus 로고
    • Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
    • Sprecher, A., Kolisch, R., Drexl, A., 1995. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research 80, 94–102.
    • (1995) European Journal of Operational Research , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3
  • 84
    • 25144450584 scopus 로고    scopus 로고
    • Decentralized planning for multiobjective resource allocation and project selection
    • Stummer, C., Vetschera, R., 2003. Decentralized planning for multiobjective resource allocation and project selection. Central European Journal of Operations Research 11, 253–279.
    • (2003) Central European Journal of Operations Research , vol.11 , pp. 253-279
    • Stummer, C.1    Vetschera, R.2
  • 86
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • Tormos, P., Lova, A., 2001. A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research 102, 65–81.
    • (2001) Annals of Operations Research , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 88
    • 0242364615 scopus 로고    scopus 로고
    • An efficient multi-pass heuristic for project scheduling with constrained resources
    • Tormos, P., Lova, A., 2003b. An efficient multi-pass heuristic for project scheduling with constrained resources. International Journal of Production Research 41, 1071–1086.
    • (2003) International Journal of Production Research , vol.41 , pp. 1071-1086
    • Tormos, P.1    Lova, A.2
  • 89
    • 0025701908 scopus 로고
    • A heuristic for multi-project scheduling with limited resources in the housing industry
    • Tsubakitani, S., Deckro, R.F., 1990. A heuristic for multi-project scheduling with limited resources in the housing industry. European Journal of Operational Research 49, 80–91.
    • (1990) European Journal of Operational Research , vol.49 , pp. 80-91
    • Tsubakitani, S.1    Deckro, R.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.