-
1
-
-
57849086458
-
New variants of genetic algorithms applied to problems of combinatorial optimization
-
Vienna, Austria
-
Affenzeller, M., 2002a. New variants of genetic algorithms applied to problems of combinatorial optimization. Proceedings of the EMCSR 2002, Vol. 1, Vienna, Austria, pp. 75–80.
-
(2002)
Proceedings of the EMCSR 2002
, vol.1
, pp. 75-80
-
-
Affenzeller, M.1
-
2
-
-
0036954272
-
A generic evolutionary computation approach based upon genetic algorithms and evolution strategies
-
Affenzeller, M., 2002b. A generic evolutionary computation approach based upon genetic algorithms and evolution strategies. Journal of Systems Science 28, 59–72.
-
(2002)
Journal of Systems Science
, vol.28
, pp. 59-72
-
-
Affenzeller, M.1
-
4
-
-
0042287689
-
A robust genetic algorithm for resource allocation in project scheduling
-
Alcaraz, J., Maroto, C., 2001. A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research 102, 83–109.
-
(2001)
Annals of Operations Research
, vol.102
, pp. 83-109
-
-
Alcaraz, J.1
Maroto, C.2
-
5
-
-
33745759198
-
Improving the performance of genetic algorithms for the resource constrained project scheduling problem
-
Nancy
-
Alcaraz, J., Maroto, C., Ruiz, R., 2004. Improving the performance of genetic algorithms for the resource constrained project scheduling problem. Proceedings of the 9th International Workshop on Project Management and Scheduling, Nancy, pp. 40–43.
-
(2004)
Proceedings of the 9th International Workshop on Project Management and Scheduling
, pp. 40-43
-
-
Alcaraz, J.1
Maroto, C.2
Ruiz, R.3
-
7
-
-
0003131416
-
Tabu-search algorithms and lower bounds for the resource constrained project scheduling problem
-
Voss, S., Martello, S., Osman, I., Roucairol, C., (Eds.), Kluwer, Dordrecht
-
Baar, T., Brucker, P., Knust, S., 1998. Tabu-search algorithms and lower bounds for the resource constrained project scheduling problem. In: Voss, S., Martello, S., Osman, I., Roucairol, C. (Eds.), Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization. Kluwer, Dordrecht, pp. 1–8.
-
(1998)
Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization
, pp. 1-8
-
-
Baar, T.1
Brucker, P.2
Knust, S.3
-
8
-
-
0002095797
-
Metaphor or reality
-
a case study where agents bid with actual costs to schedule a factory. In, Clearwater, S.H., (Ed.), World Scientific, Singapore
-
Baker, A.D., 1996. Metaphor or reality: a case study where agents bid with actual costs to schedule a factory. In: Clearwater, S.H. (Ed.), Marked-Based Control – A Paradigm for Distributed Resource Allocation. World Scientific, Singapore, pp. 184–223.
-
(1996)
Marked-Based Control – A Paradigm for Distributed Resource Allocation
, pp. 184-223
-
-
Baker, A.D.1
-
11
-
-
0019342681
-
Scheduling subject to resource constraints
-
classification and complexity
-
Blazewicz, J., Lenstra, J.K., Rinnooy Kan, A.H.G., 1983. Scheduling subject to resource constraints: classification and complexity. Discrete Applied Mathematics 5, 11–24.
-
(1983)
Discrete Applied Mathematics
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
12
-
-
0030216966
-
An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems
-
Boctor, F.F., 1996. An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems. International Journal of Production Research 34, 2335–2351.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2335-2351
-
-
Boctor, F.F.1
-
13
-
-
0000692965
-
A new adaptive multi-start technique for combinatorial global optimizations
-
Boese, K.D., Kahng, A.B., Muddu, S., 1994. A new adaptive multi-start technique for combinatorial global optimizations. Operations Research Letters 16, 101–113.
-
(1994)
Operations Research Letters
, vol.16
, pp. 101-113
-
-
Boese, K.D.1
Kahng, A.B.2
Muddu, S.3
-
14
-
-
33749170920
-
An improved adaptive multi-start approach to finding near-optimal solutions to the Euclidean TSP
-
Las Vegas
-
Bonachea, D., Ingerman, E., Levy, J., McPeak, S., 2000. An improved adaptive multi-start approach to finding near-optimal solutions to the Euclidean TSP. Proceedings of the Genetic and Evolutionary Computation Conference 2000, Las Vegas, pp. 143–150.
-
(2000)
Proceedings of the Genetic and Evolutionary Computation Conference 2000
, pp. 143-150
-
-
Bonachea, D.1
Ingerman, E.2
Levy, J.3
McPeak, S.4
-
15
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource constrained project scheduling problem and its multiple mode version
-
Bouleimen, K., Lecocq, H., 2003. A new efficient simulated annealing algorithm for the resource constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149, 268–281.
-
(2003)
European Journal of Operational Research
, vol.149
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
16
-
-
0032736579
-
Resource-constrained project scheduling
-
notation, classification, models and methods
-
Brucker, P., Drexl, A., Moehring, R., Neumann, K., Pesch, E., 1999. Resource-constrained project scheduling: notation, classification, models and methods. European Journal of Operational Research 112, 3–41.
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Moehring, R.3
Neumann, K.4
Pesch, E.5
-
18
-
-
33144473688
-
Issues in multiagent resource allocation
-
Chevaleyre, Y., Dunne, P.E., Endriss, U., Lang, J., Lemaître, M., Maudet, N., Padget, J., Phelps, S., Rodríguez-Aguilar, J.A., Sousa, P., 2006. Issues in multiagent resource allocation. Informatica 30, 3–31.
-
(2006)
Informatica
, vol.30
, pp. 3-31
-
-
Chevaleyre, Y.1
Dunne, P.E.2
Endriss, U.3
Lang, J.4
Lemaître, M.5
Maudet, N.6
Padget, J.7
Phelps, S.8
Rodríguez-Aguilar, J.A.9
Sousa, P.10
-
19
-
-
0031188915
-
A simulated annealing algorithm for resource constrained project scheduling problems
-
Cho, J.H., Kim, Y.D., 1997. A simulated annealing algorithm for resource constrained project scheduling problems. Journal of the Operational Research Society 48, 736–744.
-
(1997)
Journal of the Operational Research Society
, vol.48
, pp. 736-744
-
-
Cho, J.H.1
Kim, Y.D.2
-
20
-
-
24944581849
-
-
Technical Report, Department of Civil Engineering, Instituto Superior Tecnico, Portugal
-
Coelho, J., Tavares, L., 2003. Comparative analysis of meta-heuristics for the resource constrained project scheduling problem. Technical Report, Department of Civil Engineering, Instituto Superior Tecnico, Portugal.
-
(2003)
Comparative analysis of meta-heuristics for the resource constrained project scheduling problem
-
-
Coelho, J.1
Tavares, L.2
-
21
-
-
17444420771
-
Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
-
Cohen, I., Golany, B., Shtub, A., 2005. Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology. Annals of Operations Research 134, 183–199.
-
(2005)
Annals of Operations Research
, vol.134
, pp. 183-199
-
-
Cohen, I.1
Golany, B.2
Shtub, A.3
-
22
-
-
79957836864
-
An auction based approach in decentralized project scheduling
-
Valencia
-
Confessore, G., Giordani, S., Rismondo, S., 2002. An auction based approach in decentralized project scheduling. Proceedings of PMS 2002 – International Workshop on Project Management and Scheduling, Valencia, pp. 110–113.
-
(2002)
Proceedings of PMS 2002 – International Workshop on Project Management and Scheduling
, pp. 110-113
-
-
Confessore, G.1
Giordani, S.2
Rismondo, S.3
-
23
-
-
33846864716
-
A market-based multi-agent system model for decentralized multi-project scheduling
-
Confessore, G., Giordani, S., Rismondo, S., 2007. A market-based multi-agent system model for decentralized multi-project scheduling. Annals of Operations Research 150, 115–135.
-
(2007)
Annals of Operations Research
, vol.150
, pp. 115-135
-
-
Confessore, G.1
Giordani, S.2
Rismondo, S.3
-
24
-
-
24944476690
-
A bi-population based genetic algorithm for the resource-constrained project scheduling problem
-
Debels, D., Vanhoucke, M., 2005. A bi-population based genetic algorithm for the resource-constrained project scheduling problem. Lecture Notes in Computer Sciences 2483, 378–387.
-
(2005)
Lecture Notes in Computer Sciences
, vol.2483
, pp. 378-387
-
-
Debels, D.1
Vanhoucke, M.2
-
26
-
-
38549091692
-
A decomposition-based genetic algorithm for the resource-constrained project scheduling problem
-
Debels, D., Vanhoucke, M., 2007a. A decomposition-based genetic algorithm for the resource-constrained project scheduling problem. Operations Research 55, 457–469.
-
(2007)
Operations Research
, vol.55
, pp. 457-469
-
-
Debels, D.1
Vanhoucke, M.2
-
27
-
-
85040402702
-
-
Personal email correspondence. March 5, 2007
-
Debels, D., Vanhoucke, M., 2007b. Personal email correspondence. March 5, 2007.
-
(2007)
-
-
Debels, D.1
Vanhoucke, M.2
-
28
-
-
85040425639
-
-
Download of the RG300 instances, accessed March 5, 2007
-
Debels, D., Vanhoucke, M., 2007c. Download of the RG300 instances, http://www.projectmanagement.ugent.be/RG300Instances.php, accessed March 5, 2007.
-
(2007)
-
-
Debels, D.1
Vanhoucke, M.2
-
29
-
-
25444456205
-
A hybrid scatter/electromagnetism meta-heuristic for project scheduling
-
Debels, D., De Reyck, B., Leus, R., Vanhoucke, M., 2006. A hybrid scatter/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research 169, 2, 638–653.
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.2
, pp. 638-653
-
-
Debels, D.1
De Reyck, B.2
Leus, R.3
Vanhoucke, M.4
-
30
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl, A., 1991. Scheduling of project networks by job assignment. Management Science 37, 1590–1602.
-
(1991)
Management Science
, vol.37
, pp. 1590-1602
-
-
Drexl, A.1
-
34
-
-
0011717163
-
Towards the development of a complete multiproject scheduling system
-
Fendley, L.G., 1968. Towards the development of a complete multiproject scheduling system. Journal of Industrial Engineering 19, 505–515.
-
(1968)
Journal of Industrial Engineering
, vol.19
, pp. 505-515
-
-
Fendley, L.G.1
-
37
-
-
0003722376
-
-
Addison-Wesley, Reading, MA
-
Goldberg, D.E., 1989. Genetic Algorithms in Search, Optimization, and Machine Learning. Addison-Wesley, Reading, MA.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
39
-
-
33144455229
-
-
AT&T Labs Technical Report TD-668LM4, Portugal
-
Goncalves, J.F., Mendes, J.J.M., Resende, M.G.C., 2004. A genetic algorithm for the resource constrained multi-project scheduling problem. AT&T Labs Technical Report TD-668LM4, Portugal.
-
(2004)
A genetic algorithm for the resource constrained multi-project scheduling problem
-
-
Goncalves, J.F.1
Mendes, J.J.M.2
Resende, M.G.C.3
-
40
-
-
33751531856
-
A hierarchical approach to multi-project planning under uncertainty
-
Hans, E.W., Leus, R., Wullink, G., Herroelen, W., 2007. A hierarchical approach to multi-project planning under uncertainty. OMEGA, International Journal of Management Science 35, 563–577.
-
(2007)
OMEGA, International Journal of Management Science
, vol.35
, pp. 563-577
-
-
Hans, E.W.1
Leus, R.2
Wullink, G.3
Herroelen, W.4
-
41
-
-
0032188522
-
A competitive genetic algorithm for the resource-constrained project scheduling
-
Hartmann, S., 1998. A competitive genetic algorithm for the resource-constrained project scheduling. Naval Research Logistics 45, 733–750.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
42
-
-
0036684673
-
A self-adaptive genetic algorithm for project scheduling under resource constraints
-
Hartmann, S., 2002. A self-adaptive genetic algorithm for project scheduling under resource constraints. Naval Research Logistics 49, 433–448.
-
(2002)
Naval Research Logistics
, vol.49
, pp. 433-448
-
-
Hartmann, S.1
-
43
-
-
84968295504
-
Application of the ‘Evolutionsstrategie’ to discrete optimization problems
-
Schwefel, H.-P., Männer, R., (Eds.), Springer, Berlin
-
Herdy, M., 1990. Application of the ‘Evolutionsstrategie’ to discrete optimization problems. In: Schwefel, H.-P., Männer, R. (Eds.), Parallel Problem Solving from Nature 1. Springer, Berlin, pp. 188–192.
-
(1990)
Parallel Problem Solving from Nature 1
, pp. 188-192
-
-
Herdy, M.1
-
45
-
-
85040433873
-
-
Agentcopp downloads., accessed March 5, 2007
-
Homberger, J., 2007. Agentcopp downloads. http://www.agentcopp.de/EN/agentcopp/downloads/, accessed March 5, 2007.
-
(2007)
-
-
Homberger, J.1
-
46
-
-
8444235112
-
A two-phase hybrid metaheuristic for the vehicle routing problem with time windows
-
Homberger, J., Gehring, H., 2005. A two-phase hybrid metaheuristic for the vehicle routing problem with time windows. European Journal of Operational Research 162, 220–238.
-
(2005)
European Journal of Operational Research
, vol.162
, pp. 220-238
-
-
Homberger, J.1
Gehring, H.2
-
47
-
-
85040416410
-
Eine Web-Service basierte Architektur zur collaborativen Projektplanung
-
Karlsruhe
-
Homberger, J., Kistler, S., Vullriede, R., Horstmann, J., Lanzl, R., Göttlich, T., 2005. Eine Web-Service basierte Architektur zur collaborativen Projektplanung. Proceedings of the 3rd doIT Software-Award & doIT Software-Forschungstag, Karlsruhe, pp. 87–104.
-
(2005)
Proceedings of the 3rd doIT Software-Award & doIT Software-Forschungstag
, pp. 87-104
-
-
Homberger, J.1
Kistler, S.2
Vullriede, R.3
Horstmann, J.4
Lanzl, R.5
Göttlich, T.6
-
49
-
-
0027569485
-
Multi-project scheduling with explicit lateness costs
-
Kim, S.Y., Leachman, R.C., 1993. Multi-project scheduling with explicit lateness costs. IIE Transactions 25, 34–44.
-
(1993)
IIE Transactions
, vol.25
, pp. 34-44
-
-
Kim, S.Y.1
Leachman, R.C.2
-
50
-
-
0033894478
-
Agent-based project scheduling
-
Knotts, G., Dror, M., Hartman, B.C., 2000. Agent-based project scheduling. IIE Transactions 32, 387–401.
-
(2000)
IIE Transactions
, vol.32
, pp. 387-401
-
-
Knotts, G.1
Dror, M.2
Hartman, B.C.3
-
51
-
-
24944457410
-
Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem
-
Russia, accessed April 16, 2007
-
Kochetov, Y., Stolyar, A., 2003. Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem. Proceedings of the 3rd International Workshop on Computer Science and Information Technologies, Russia, 4pp. http://www.math.nsc.ru/LBRT/k5/Kochetov/Papers/Kjchetov-Ufa-03.doc, accessed April 16, 2007.
-
(2003)
Proceedings of the 3rd International Workshop on Computer Science and Information Technologies
-
-
Kochetov, Y.1
Stolyar, A.2
-
53
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited
-
theory and computation
-
Kolisch, R., 1996. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. European Journal of Operational Research 90, 320–333.
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
55
-
-
0001896880
-
Adaptive search for solving hard project scheduling problems
-
Kolisch, R., Drexl, A., 1996. Adaptive search for solving hard project scheduling problems. Naval Research Logistics 43, 23–40.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 23-40
-
-
Kolisch, R.1
Drexl, A.2
-
56
-
-
0002030301
-
Heuristic algorithms for solving the resource-constrained project scheduling problem
-
classification and computational analysis. In, Weglarz, J., (Ed.), Kluwer, Dordrecht
-
Kolisch, R., Hartmann, S., 1999. Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. In: Weglarz, J. (Ed.), Project Scheduling: Recent Models, Algorithms and Applications. Kluwer, Dordrecht, 147–178.
-
(1999)
Project Scheduling: Recent Models, Algorithms and Applications
, pp. 147-178
-
-
Kolisch, R.1
Hartmann, S.2
-
57
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling
-
an update
-
Kolisch, R., Hartmann, S., 2006. Experimental investigation of heuristics for resource-constrained project scheduling: an update. European Journal of Operational Research 174, 23–37.
-
(2006)
European Journal of Operational Research
, vol.174
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
58
-
-
78751623836
-
E-Collaboration im unternehmensübergreifenden Projekt-management
-
Krüger, A., Hilz, C., Haas, O., 2002. E-Collaboration im unternehmensübergreifenden Projekt-management. Fachzeitschrift für Information Management and Consulting 17, 46–51.
-
(2002)
Fachzeitschrift für Information Management and Consulting
, vol.17
, pp. 46-51
-
-
Krüger, A.1
Hilz, C.2
Haas, O.3
-
59
-
-
0020087944
-
Multi-project scheduling
-
categorization of heuristic rules performance
-
Kurtulus, I.S., Davis, E.W., 1982. Multi-project scheduling: categorization of heuristic rules performance. Management Science 28, 161–172.
-
(1982)
Management Science
, vol.28
, pp. 161-172
-
-
Kurtulus, I.S.1
Davis, E.W.2
-
60
-
-
0022025928
-
Multi-project scheduling
-
analysis of project performance
-
Kurtulus, I.S., Narula, S.C., 1985. Multi-project scheduling: analysis of project performance. IIE Transactions 17, 58–66.
-
(1985)
IIE Transactions
, vol.17
, pp. 58-66
-
-
Kurtulus, I.S.1
Narula, S.C.2
-
61
-
-
0346986531
-
An aggregate model for multi-project resource allocation
-
Dean, B.V., (Ed.), North-Holland, Amsterdam
-
Leachman, R.C., Boysen, J., 1985. An aggregate model for multi-project resource allocation. In: Dean, B.V. (Ed.), Project Management: Methods and Studies. North-Holland, Amsterdam, pp. 43–64.
-
(1985)
Project Management: Methods and Studies
, pp. 43-64
-
-
Leachman, R.C.1
Boysen, J.2
-
63
-
-
0141885117
-
Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism
-
Lee, Y.-H., Kumara, S.R., Chatterjee, K., 2003. Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism. Journal of Intelligent Manufacturing 14, 471–484.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, pp. 471-484
-
-
Lee, Y.-H.1
Kumara, S.R.2
Chatterjee, K.3
-
64
-
-
33845274958
-
Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
-
Leon, V.J., Ramamoorthy, B., 1995. Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling. OR Spektrum 17, 173–182.
-
(1995)
OR Spektrum
, vol.17
, pp. 173-182
-
-
Leon, V.J.1
Ramamoorthy, B.2
-
65
-
-
0026822242
-
An iterative scheduling technique for resource constrained project scheduling
-
Li, K.Y., Willis, R.J., 1992. An iterative scheduling technique for resource constrained project scheduling. European Journal of Operational Research 56, 370–379.
-
(1992)
European Journal of Operational Research
, vol.56
, pp. 370-379
-
-
Li, K.Y.1
Willis, R.J.2
-
66
-
-
0035599853
-
Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
-
Lova, A., Tormos, P., 2001. Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling. Annals of Operations Research 102, 263–286.
-
(2001)
Annals of Operations Research
, vol.102
, pp. 263-286
-
-
Lova, A.1
Tormos, P.2
-
67
-
-
0034559445
-
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
-
Lova, A., Maroto, C., Tormos, P., 2000. A multicriteria heuristic method to improve resource allocation in multiproject scheduling. European Journal of Operational Research 127, 408–424.
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 408-424
-
-
Lova, A.1
Maroto, C.2
Tormos, P.3
-
68
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
Merkle, D., Middendorf, M., Schmeck, H., 2002. Ant colony optimization for resource-constrained project scheduling. IEEE Transaction on Evolutionary Computation 6, 333–346.
-
(2002)
IEEE Transaction on Evolutionary Computation
, vol.6
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
70
-
-
33847671359
-
Active-guided evolution strategies for large-scale capacitated vehicle routing problems
-
Mester, D., Bräysy, O., 2007. Active-guided evolution strategies for large-scale capacitated vehicle routing problems. Computers and Operations Research 34, 2964–2975.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 2964-2975
-
-
Mester, D.1
Bräysy, O.2
-
71
-
-
0012361022
-
-
2nd edn, Springer, Berlin
-
Neumann, K., Schwindt, C., Zimmermann, J., 2003. Project Scheduling with Time Windows and Scarce Resources (2nd edn), Springer, Berlin.
-
(2003)
Project Scheduling with Time Windows and Scarce Resources
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
72
-
-
0011167325
-
-
Deutscher-Universitätsverlag, Wiesbaden, Germany
-
Nissen, V., 1994. Evolutionäre Algorithmen. Deutscher-Universitätsverlag, Wiesbaden, Germany.
-
(1994)
Evolutionäre Algorithmen
-
-
Nissen, V.1
-
73
-
-
84888782064
-
Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP)
-
Ribeiro, C.C., Hansen, P., (Eds.), Kluwer, Boston
-
Nonobe, K., Ibaraki, T., 2002. Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP). In: Ribeiro, C.C., Hansen, P. (Eds.), Essays and Surveys in Metaheuristics. Kluwer, Boston, pp. 557–588.
-
(2002)
Essays and Surveys in Metaheuristics
, pp. 557-588
-
-
Nonobe, K.1
Ibaraki, T.2
-
74
-
-
0014574409
-
Multiproject scheduling with limited resources
-
a zero-one programming approach
-
Pritsker, A.A.B., Watters, L.J., Wolfe, P.M., 1969. Multiproject scheduling with limited resources: a zero-one programming approach. Management Science 16, 93–108.
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
75
-
-
85040408885
-
-
Habilitationsschrift, Fakultät für Technische Naturwissenschaften und Informatik, Technische Universität Wien
-
Raidl, G., 2002. Hybrid evolutionary algorithms. Habilitationsschrift, Fakultät für Technische Naturwissenschaften und Informatik, Technische Universität Wien.
-
(2002)
Hybrid evolutionary algorithms
-
-
Raidl, G.1
-
77
-
-
85040420227
-
-
Personal email correspondence, September 5, 2006
-
Rismondo, S., 2006. Personal email correspondence, September 5, 2006.
-
(2006)
-
-
Rismondo, S.1
-
78
-
-
0000685151
-
Distributed rational decision making
-
Weiss, G., (Ed.), MIT Press, Cambridge, MA
-
Sandholm, T.W., 1999. Distributed rational decision making. In: Weiss, G. (Ed.), Multiagent Systems: A Modern Approach to Distributed Artificial Intelligence. MIT Press, Cambridge, MA, 201–258.
-
(1999)
Multiagent Systems: A Modern Approach to Distributed Artificial Intelligence
, pp. 201-258
-
-
Sandholm, T.W.1
-
79
-
-
0000103290
-
Case-based reasoning and improved adaptive search for project scheduling
-
Schirmer, A., 2000. Case-based reasoning and improved adaptive search for project scheduling. Naval Research Logistics 47, 201–222.
-
(2000)
Naval Research Logistics
, vol.47
, pp. 201-222
-
-
Schirmer, A.1
-
81
-
-
0030368509
-
A flexible optimization approach to multi-resource, multi-project planning and scheduling
-
Minneapolis
-
Shankar, V., Nagi, R., 1996. A flexible optimization approach to multi-resource, multi-project planning and scheduling. Proceedings of the 5th Industrial Engineering Research Conference, Minneapolis, pp. 263–267.
-
(1996)
Proceedings of the 5th Industrial Engineering Research Conference
, pp. 263-267
-
-
Shankar, V.1
Nagi, R.2
-
82
-
-
32444444268
-
Niching in evolution strategies
-
Washington, DC
-
Shir, O.M., Bäck, T., 2005. Niching in evolution strategies. Proceedings of the Genetic and Evolutionary Computation Conference, Washington, DC, pp. 915–916.
-
(2005)
Proceedings of the Genetic and Evolutionary Computation Conference
, pp. 915-916
-
-
Shir, O.M.1
Bäck, T.2
-
83
-
-
0029636114
-
Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
-
Sprecher, A., Kolisch, R., Drexl, A., 1995. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research 80, 94–102.
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 94-102
-
-
Sprecher, A.1
Kolisch, R.2
Drexl, A.3
-
84
-
-
25144450584
-
Decentralized planning for multiobjective resource allocation and project selection
-
Stummer, C., Vetschera, R., 2003. Decentralized planning for multiobjective resource allocation and project selection. Central European Journal of Operations Research 11, 253–279.
-
(2003)
Central European Journal of Operations Research
, vol.11
, pp. 253-279
-
-
Stummer, C.1
Vetschera, R.2
-
85
-
-
0035900272
-
Adaptive memory programming
-
a unified view of metaheuristics
-
Taillard, E.D., Gambardella, L.M., Gendreau, M., Potvin, J.-Y., 2001. Adaptive memory programming: a unified view of metaheuristics. European Journal of Operational Research 134, 1–16.
-
(2001)
European Journal of Operational Research
, vol.134
, pp. 1-16
-
-
Taillard, E.D.1
Gambardella, L.M.2
Gendreau, M.3
Potvin, J.-Y.4
-
86
-
-
0035617605
-
A competitive heuristic solution technique for resource-constrained project scheduling
-
Tormos, P., Lova, A., 2001. A competitive heuristic solution technique for resource-constrained project scheduling. Annals of Operations Research 102, 65–81.
-
(2001)
Annals of Operations Research
, vol.102
, pp. 65-81
-
-
Tormos, P.1
Lova, A.2
-
87
-
-
24944527635
-
-
Technical Report, Department of Statistics and Operations Research, University of Valencia, Spain
-
Tormos, P., Lova, A., 2003a. Integrating heuristics for resource constrained project scheduling: one step forward. Technical Report, Department of Statistics and Operations Research, University of Valencia, Spain.
-
(2003)
Integrating heuristics for resource constrained project scheduling: one step forward
-
-
Tormos, P.1
Lova, A.2
-
88
-
-
0242364615
-
An efficient multi-pass heuristic for project scheduling with constrained resources
-
Tormos, P., Lova, A., 2003b. An efficient multi-pass heuristic for project scheduling with constrained resources. International Journal of Production Research 41, 1071–1086.
-
(2003)
International Journal of Production Research
, vol.41
, pp. 1071-1086
-
-
Tormos, P.1
Lova, A.2
-
89
-
-
0025701908
-
A heuristic for multi-project scheduling with limited resources in the housing industry
-
Tsubakitani, S., Deckro, R.F., 1990. A heuristic for multi-project scheduling with limited resources in the housing industry. European Journal of Operational Research 49, 80–91.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 80-91
-
-
Tsubakitani, S.1
Deckro, R.F.2
-
90
-
-
24944581032
-
A hybrid genetic algorithm for the resource constrained project scheduling problem with the peak crossover operator
-
Valencia
-
Valls, V., Ballestin, F., Quintanilla, M.S., 2002. A hybrid genetic algorithm for the resource constrained project scheduling problem with the peak crossover operator. Proceedings of the 8th International Workshop on Project Management and Scheduling, Valencia, pp. 368–371.
-
(2002)
Proceedings of the 8th International Workshop on Project Management and Scheduling
, pp. 368-371
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, M.S.3
-
91
-
-
13444257593
-
Justification and RCPSP
-
a technique that pays
-
Valls, V., Ballestin, F., Quintanilla, M.S., 2005. Justification and RCPSP: a technique that pays. European Journal of Operational Research 165, 375–386.
-
(2005)
European Journal of Operational Research
, vol.165
, pp. 375-386
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, M.S.3
-
92
-
-
0000205848
-
Auction protocols for decentralized scheduling
-
Wellman, M.P., Walsh, W.E., Wurman, P.R., MacKie-Mason, J.K., 2001. Auction protocols for decentralized scheduling. Games and Economic Behavior 35, 271–303.
-
(2001)
Games and Economic Behavior
, vol.35
, pp. 271-303
-
-
Wellman, M.P.1
Walsh, W.E.2
Wurman, P.R.3
MacKie-Mason, J.K.4
-
93
-
-
79953709455
-
Evolution strategies for engineering design optimization
-
Cambridge, MA
-
Willmes, L., Bäck, T., 2003. Evolution strategies for engineering design optimization. Proceedings of the 2nd MIT Conference on Computational Fluid and Solid Mechanics, Vol. 2, Cambridge, MA, pp. 2394–2397.
-
(2003)
Proceedings of the 2nd MIT Conference on Computational Fluid and Solid Mechanics
, vol.2
, pp. 2394-2397
-
-
Willmes, L.1
Bäck, T.2
-
94
-
-
14044256646
-
Task scheduling of parallel development projects using genetic algorithms
-
Salt Lake City, Utah, accessed April 16, 2007
-
Zhuang, M., Yassine, A.A., 2004. Task scheduling of parallel development projects using genetic algorithms. Proceedings of the 30th Design Automation Conference, ASME 2004 International Design Engineering Technical Conferences and Computers and Information, Salt Lake City, Utah, 11pp. http://www.iese.uiuc.edu/pdlab/Papers/DETC2004-57159.pdf, accessed April 16, 2007.
-
(2004)
Proceedings of the 30th Design Automation Conference, ASME 2004 International Design Engineering Technical Conferences and Computers and Information
-
-
Zhuang, M.1
Yassine, A.A.2
|