Scheduling project networks with resource constraints and time windows
-
Bartusch, M., Möhring, R. H., and Radermacher, F. J. (1988). "Scheduling project networks with resource constraints and time windows." Ann. Operat. Res., 16, 201-240.
-
(1988)
Ann. Operat. Res.
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, F.J.3
-
2
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker, P., Drexl, A., Möhring, R., Neumann, K., and Pesch, E. (1999). "Resource-constrained project scheduling: Notation, classification, models, and methods." Eur. J. Oper. Res., 112, 3-41.
-
(1999)
Eur. J. Oper. Res.
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
3
-
-
0042410656
-
An integer programming method for CPM time-cost analysis
-
Chassiakos, A. P., Samaras, C. I., and Theodorakopoulos, D. D. (2000). "An integer programming method for CPM time-cost analysis." Comput. Model. Eng. Sci., 1(4), 9-18.
-
(2000)
Comput. Model. Eng. Sci.
, vol.1
, Issue.4
, pp. 9-18
-
-
Chassiakos, A.P.1
Samaras, C.I.2
Theodorakopoulos, D.D.3
-
4
-
-
0021609393
-
Optimal probabilistic compression of PERT networks
-
Coskunoglu, O. (1984). "Optimal probabilistic compression of PERT networks." J. Constr. Eng. Manage., 110(4), 437-446.
-
(1984)
J. Constr. Eng. Manage.
, vol.110
, Issue.4
, pp. 437-446
-
-
Coskunoglu, O.1
-
5
-
-
0029632618
-
The discrete time-cost trade-off problem revisited
-
De, P., Dunne, E. J., Ghosh, J. B., and Wells, C. E. (1995). "The discrete time-cost trade-off problem revisited." Eur. J. Oper. Res., 81, 225-238.
-
(1995)
Eur. J. Oper. Res.
, vol.81
, pp. 225-238
-
-
De, P.1
Dunne, E.J.2
Ghosh, J.B.3
Wells, C.E.4
-
6
-
-
0001215033
-
The analysis of activity networks under generalized precedence relations
-
Elmaghraby, S. E., and Kamburowski, J. (1992). "The analysis of activity networks under generalized precedence relations." Manage. Sci., 38, 1245-1263.
-
(1992)
Manage. Sci.
, vol.38
, pp. 1245-1263
-
-
Elmaghraby, S.E.1
Kamburowski, J.2
-
7
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C. W., Liu, L., and Burns, S. A. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
8
-
-
0034172005
-
Stochastic construction time-cost trade-off analysis
-
Feng, C. W., Liu, L., and Burns, S. A. (2000). "Stochastic construction time-cost trade-off analysis." J. Comput. Civ. Eng., 14(2), 117-126.
-
(2000)
J. Comput. Civ. Eng.
, vol.14
, Issue.2
, pp. 117-126
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
9
-
-
0035509423
-
Probabilistic optimal-cost scheduling
-
Isidore, L. J., and Back, W. E. (2001). "Probabilistic optimal-cost scheduling." J. Constr. Eng. Manage., 127(6), 431-437.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 431-437
-
-
Isidore, L.J.1
Back, W.E.2
-
10
-
-
0037349305
-
Activity time-cost tradeoffs under time and cost chance constraints
-
Laslo, Z. (2003). "Activity time-cost tradeoffs under time and cost chance constraints." Comput. Ind. Eng., 44(3), 365-384.
-
(2003)
Comput. Ind. Eng.
, vol.44
, Issue.3
, pp. 365-384
-
-
Laslo, Z.1
-
11
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu, S. S., and Yang, C. H. (1999). "GA-based multicriteria optimal model for construction scheduling." J. Constr. Eng. Manage., 125(6), 420-427.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.S.1
Yang, C.H.2
-
12
-
-
0032638332
-
Using machine learning and GA to solve time-cost trade-off problems
-
Li, H., Cao, J. N., and Love, P. E. D. (1999). "Using machine learning and GA to solve time-cost trade-off problems." J. Constr. Eng. Manage., 125(5), 347-353.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.N.2
Love, P.E.D.3
-
13
-
-
0029470313
-
Construction time-cost trade-off analysis using LP/IP hybrid method
-
Liu, L., Burns, S. A., and Feng, C. W. (1995). "Construction time-cost trade-off analysis using LP/IP hybrid method." J. Constr. Eng. Manage., 121(4), 446-454.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 446-454
-
-
Liu, L.1
Burns, S.A.2
Feng, C.W.3
-
14
-
-
13944265628
-
Flexible model for time/cost tradeoff problem
-
Moussourakis, J., and Haksever, C. (2004). "Flexible model for time/cost tradeoff problem." J. Constr. Eng. Manage., 130(3), 307-314.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.3
, pp. 307-314
-
-
Moussourakis, J.1
Haksever, C.2
-
15
-
-
0000647152
-
Heuristics for the minimum project duration problem with minimal and maximal time lags under fixed resource constraints
-
Neumann, K., and Zhan, J. (1995). "Heuristics for the minimum project duration problem with minimal and maximal time lags under fixed resource constraints." J. Intell. Manufact., 6, 145-154.
-
(1995)
J. Intell. Manufact.
, vol.6
, pp. 145-154
-
-
Neumann, K.1
Zhan, J.2
-
16
-
-
0034271361
-
Importance of capacity constraints to construction cost and schedule
-
O'Brien, W. J., and Fischer, M. A. (2000). "Importance of capacity constraints to construction cost and schedule." J. Constr. Eng. Manage., 126(5), 366-373.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.5
, pp. 366-373
-
-
O'Brien, W.J.1
Fischer, M.A.2
-
17
-
-
0017506038
-
Cost-time model for large CPM project networks
-
Panagiotakopoulos, D. (1977). "Cost-time model for large CPM project networks." J. Constr. Div., Am. Soc. Civ. Eng., 103(2), 201-211.
-
(1977)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.103
, Issue.2
, pp. 201-211
-
-
Panagiotakopoulos, D.1
-
18
-
-
0019067033
-
Linear programming solution to network compression
-
Perera, S. (1980). "Linear programming solution to network compression." J. Constr. Div., Am. Soc. Civ. Eng., 106(3), 315-326.
-
(1980)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.106
, Issue.3
, pp. 315-326
-
-
Perera, S.1
-
19
-
-
0006690345
-
Time-cost trade-off among related activities
-
Reda, R., and Carr, R. I. (1989). "Time-cost trade-off among related activities." J. Constr. Eng. Manage., 115(3), 475-486.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.3
, pp. 475-486
-
-
Reda, R.1
Carr, R.I.2
-
20
-
-
0016566179
-
A dynamic programming solution to cost-time trade-off for CPM
-
Robinson, D. R. (1975). "A dynamic programming solution to cost-time trade-off for CPM," Manage. Sci., 22(2), 158-166.
-
(1975)
Manage. Sci.
, vol.22
, Issue.2
, pp. 158-166
-
-
Robinson, D.R.1
-
21
-
-
84888902047
-
-
Brooks and Cole, eds., Duxbury Press, Pacific Grove, Calif.
-
Schrage, L. E. (1997). Optimization modeling with Lindo, 5th Ed., Brooks and Cole, eds., Duxbury Press, Pacific Grove, Calif., 299-300.
-
(1997)
Optimization Modeling with Lindo, 5th Ed.
, pp. 299-300
-
-
Schrage, L.E.1
-
22
-
-
0003480493
-
-
Prentice Hall International Eds., Prentice Hall, Englewood Cliffs, N.J.
-
Shtub, A., Bard, J., and Globerson, S. (1994). Project management: Engineering, technology and implementations, Prentice Hall International Eds., Prentice Hall, Englewood Cliffs, N.J., 382-392.
-
(1994)
Project Management: Engineering, Technology and Implementations
, pp. 382-392
-
-
Shtub, A.1
Bard, J.2
Globerson, S.3
-
23
-
-
2342615793
-
Applying a genetic algorithm-based multiobjective approach for time-cost optimization
-
Zheng, D. X. M., Ng, S. T., and Kumaraswamy, M. M. (2004). "Applying a genetic algorithm-based multiobjective approach for time-cost optimization." J. Constr. Eng. Manage., 130(2), 168-176.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.2
, pp. 168-176
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
|