-
2
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker P, Drexl A, Möhring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research 112: 3-41
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
3
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl A (1991) Scheduling of project networks by job assignment. Management Science 37: 1590-1602
-
(1991)
Management Science
, vol.37
, pp. 1590-1602
-
-
Drexl, A.1
-
5
-
-
0442289051
-
Outline of various demolition methods and their evaluation
-
RILEM International Symposium, Chapman and Hall, London
-
Kaisai Y, Rousseau E, Lindsell P (1988) Outline of various demolition methods and their evaluation. In: Demolition and reuse of concrete and masonry, demolition methods and practice. RILEM International Symposium, Vol 1. Chapman and Hall, London
-
(1988)
Demolition and Reuse of Concrete and Masonry, Demolition Methods and Practice
, vol.1
-
-
Kaisai, Y.1
Rousseau, E.2
Lindsell, P.3
-
8
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problems
-
Slowinski R, Weglarz J (eds) Elsevier, Amsterdam
-
Patterson J H, Slowinski R, Talbot F B, Weglarz J (1989) An algorithm for a general class of precedence and resource constrained scheduling problems. In: Slowinski R, Weglarz J (eds) Advances in project scheduling, pp. 3-28. Elsevier, Amsterdam
-
(1989)
Advances in Project Scheduling
, pp. 3-28
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
9
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
Pritsker AAB, Watters LJ, Wolfe PM (1969) Multiproject scheduling with limited resources: A zero-one programming approach. Management Science 16: 93-108
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
11
-
-
0039205723
-
-
Ecomed, Landsberg
-
Rentz O, Ruch M, Nicolai M, Spengler T, Schultmann F (1994) Selektiver Rückbau und Recycling von Gebäuden, dargestellt am Beispiel des Hotel Post in Dobel. Ecomed, Landsberg
-
(1994)
Selektiver Rückbau und Recycling von Gebäuden, Dargestellt am Beispiel des Hotel Post in Dobel
-
-
Rentz, O.1
Ruch, M.2
Nicolai, M.3
Spengler, T.4
Schultmann, F.5
-
12
-
-
0009972375
-
-
Société Alpine de Publications, Grenoble
-
Rentz O, Ruch M, Schultmann F, Sindt V, Zundel T (1998a) Déconstruction sélective - Etude scientifique de la déconstruction sélective d'un immeuble à Mulhouse. Société Alpine de Publications, Grenoble
-
(1998)
Déconstruction Sélective - Etude Scientifique de la Déconstruction Sélective d'un Immeuble à Mulhouse
-
-
Rentz, O.1
Ruch, M.2
Schultmann, F.3
Sindt, V.4
Zundel, T.5
-
13
-
-
0141765092
-
-
Ecomed, Landsberg
-
Rentz O, Ruch M, Schultmann F, Sindt V, Zundel T, Charlot-Valdieu C, Vimond E (1998b) Selektiver Gebäuderückbau und konventioneller Abbruch - Technisch-wirtschaftliche Analyse eines Pilotprojektes. Ecomed, Landsberg
-
(1998)
Selektiver Gebäuderückbau und Konventioneller Abbruch - Technisch-wirtschaftliche Analyse eines Pilotprojektes
-
-
Rentz, O.1
Ruch, M.2
Schultmann, F.3
Sindt, V.4
Zundel, T.5
Charlot-Valdieu, C.6
Vimond, E.7
-
16
-
-
0442320544
-
Logistikmanagement auf Basis kapazitätsbeschränkter Projektplanungsmodelle-dargestellt am Beispiel der Baustellenfertigung
-
Kopfer H, Bierwirth C (eds) Springer, Berlin Heidelberg New York
-
Schultmann F, Rentz O (1999) Logistikmanagement auf Basis kapazitätsbeschränkter Projektplanungsmodelle-dargestellt am Beispiel der Baustellenfertigung. In: Kopfer H, Bierwirth C (eds) Logistik Management: Intelligente I+K Technologien, pp 51-60. Springer, Berlin Heidelberg New York
-
(1999)
Logistik Management: Intelligente I+K Technologien
, pp. 51-60
-
-
Schultmann, F.1
Rentz, O.2
-
17
-
-
0442320545
-
Recycling and reuse of demolition waste - A case study of an integrated assessment for residential buildings
-
Geneva, February 1-3
-
Schultmann F, Ruch M, Spengler T, Rentz O (1995) Recycling and reuse of demolition waste - a case study of an integrated assessment for residential buildings. In: Proceedings of the R'95 International Congress Recovery, Recycling, Re-integration, Geneva, February 1-3, Vol 1, pp 358-363
-
(1995)
Proceedings of the R'95 International Congress Recovery, Recycling, Re-integration
, vol.1
, pp. 358-363
-
-
Schultmann, F.1
Ruch, M.2
Spengler, T.3
Rentz, O.4
-
18
-
-
0010009633
-
Strategies for the quality improvement of recycling materials
-
Paris, June 9-12
-
Schultmann F, Sindt V, Ruch M, Rentz O. (1997) Strategies for the quality improvement of recycling materials. In: Proceedings of the Second International Conference Buildings and the Environment, Paris, June 9-12 Vol 1, pp 611-618
-
(1997)
Proceedings of the Second International Conference Buildings and the Environment
, vol.1
, pp. 611-618
-
-
Schultmann, F.1
Sindt, V.2
Ruch, M.3
Rentz, O.4
-
19
-
-
0042511276
-
Multiobjective project scheduling under multiple-category resource constraints
-
Slowinski R, Weglarz, J (eds) Elsevier, Amsterdam
-
Slowinski R (1989) Multiobjective project scheduling under multiple-category resource constraints. In: Slowinski R, Weglarz, J (eds) Advances in project scheduling, pp 113-134. Elsevier, Amsterdam
-
(1989)
Advances in Project Scheduling
, pp. 113-134
-
-
Slowinski, R.1
-
23
-
-
33746101954
-
An exact algorithm for project scheduling with multiple resources
-
Sprecher A, Hartmann S, Drexl A (1997) An exact algorithm for project scheduling with multiple resources. OR Spektrum 19: 195-203
-
(1997)
OR Spektrum
, vol.19
, pp. 195-203
-
-
Sprecher, A.1
Hartmann, S.2
Drexl, A.3
-
25
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
Talbot FB (1982) Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case. Management Science 28: 1197-1210
-
(1982)
Management Science
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
26
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
-
Talbot FB, Patterson JH (1978) An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems. Management Science 24: 1163-1174
-
(1978)
Management Science
, vol.24
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
28
-
-
0000794175
-
Towards intelligent manufacturing planning and control systems
-
Zijm WHM (2000) Towards intelligent manufacturing planning and control systems. OR Spektrum 49: 313-345
-
(2000)
OR Spektrum
, vol.49
, pp. 313-345
-
-
Zijm, W.H.M.1
|