메뉴 건너뛰기




Volumn 13, Issue 5, 2007, Pages 403-433

Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry

Author keywords

Decomposition; Dual block angular matrix; Integer programming; Lagrangian dual; Resource constrained multi project scheduling

Indexed keywords

DRUG PRODUCTS PLANTS; INTEGER PROGRAMMING; LAGRANGE MULTIPLIERS; PRODUCT DEVELOPMENT; RESOURCE ALLOCATION; SCHEDULING;

EID: 34548564553     PISSN: 13811231     EISSN: 15729397     Source Type: Journal    
DOI: 10.1007/s10732-007-9016-4     Document Type: Article
Times cited : (14)

References (40)
  • 1
    • 0030231623 scopus 로고    scopus 로고
    • The development of cash flow weight procedures for maximizing the net present value of a project
    • 3
    • Baroum, S., Patterson, J.: The development of cash flow weight procedures for maximizing the net present value of a project. J. Oper. Manag. 14(3), 209-228 (1996)
    • (1996) J. Oper. Manag. , vol.14 , pp. 209-228
    • Baroum, S.1    Patterson, J.2
  • 2
    • 3342998636 scopus 로고    scopus 로고
    • Selecting a portfolio of dependent new product candidates in the pharmaceutical industry
    • 4
    • Blau, G.E., Pekny, J.F., Varma, V.A., Bunch, P.: Selecting a portfolio of dependent new product candidates in the pharmaceutical industry. J. Prod. Innov. Manag. 21(4), 227-245 (2004)
    • (2004) J. Prod. Innov. Manag. , vol.21 , pp. 227-245
    • Blau, G.E.1    Pekny, J.F.2    Varma, V.A.3    Bunch, P.4
  • 4
    • 0032096810 scopus 로고    scopus 로고
    • A branch and bound algorithm for resource constrained project scheduling problem
    • 2
    • Brucker, P., Knust, S., Schoo, A., Thiele, O.: A branch and bound algorithm for resource constrained project scheduling problem. Eur. J. Oper. Res. 107(2), 272-288 (1998)
    • (1998) Eur. J. Oper. Res. , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 5
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models and methods
    • 1
    • Brucker, P., Drexl, A., Möhring, R., Neumann, K., Pesch, E.: Resource-constrained project scheduling: notation, classification, models and methods. Eur. J. Oper. Res. 112(1), 3-41 (1999)
    • (1999) Eur. J. Oper. Res. , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Möhring, R.3    Neumann, K.4    Pesch, E.5
  • 6
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource constrained project scheduling
    • 8
    • Davis, E.W., Patterson, J.H., A comparison of heuristic and optimum solutions in resource constrained project scheduling. Manag. Sci. 21(8), 944-955 (1975)
    • (1975) Manag. Sci. , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 8
    • 0002907360 scopus 로고
    • A branch and bound procedure for the multiple resource-constrained project scheduling problem
    • 12
    • Demeulemeester, E., Herroelen, W.: A branch and bound procedure for the multiple resource-constrained project scheduling problem. Manag. Sci. 38(12), 1803-1818 (1992)
    • (1992) Manag. Sci. , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 9
    • 0031097802 scopus 로고    scopus 로고
    • A branch and bound procedure for the generalized resource-constrained project scheduling problem
    • 2
    • Demeulemeester, E., Herroelen, W.: A branch and bound procedure for the generalized resource-constrained project scheduling problem. Oper. Res. 45(2), 201-212 (1997)
    • (1997) Oper. Res. , vol.45 , pp. 201-212
    • Demeulemeester, E.1    Herroelen, W.2
  • 12
    • 14844310419 scopus 로고    scopus 로고
    • Development of a decision support model for scheduling clinical studies and assigning medical personnel
    • 4
    • Grunow, M., Gunther, H., Yang, G.: Development of a decision support model for scheduling clinical studies and assigning medical personnel. Heal. Care Manag. Sci. 7(4), 305-317 (2004)
    • (2004) Heal. Care Manag. Sci. , vol.7 , pp. 305-317
    • Grunow, M.1    Gunther, H.2    Yang, G.3
  • 13
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • Hartmann, S.: Project scheduling with multiple modes: a genetic algorithm. Ann. Oper. Res. 102, 111-135 (2001)
    • (2001) Ann. Oper. Res. , vol.102 , pp. 111-135
    • Hartmann, S.1
  • 14
    • 11644273489 scopus 로고    scopus 로고
    • Robust planning and scheduling of process development projects under stochastic conditions
    • Los Angeles, CA
    • Honkomp, S.J., Reklaitis, G.V., Pekny, J.F.: Robust planning and scheduling of process development projects under stochastic conditions. In: AIChE Annual Meeting, Los Angeles, CA, 1997
    • (1997) AIChE Annual Meeting
    • Honkomp, S.J.1    Reklaitis, G.V.2    Pekny, J.F.3
  • 15
    • 0030262162 scopus 로고    scopus 로고
    • A branch and bound procedure for resource constrained project scheduling problem with discounted cash flows
    • 10
    • Icmeli, O., Erenguc, S.: A branch and bound procedure for resource constrained project scheduling problem with discounted cash flows. Manag. Sci. 42(10), 1395-1408 (1996a)
    • (1996) Manag. Sci. , vol.42 , pp. 1395-1408
    • Icmeli, O.1    Erenguc, S.2
  • 16
    • 0030233586 scopus 로고    scopus 로고
    • The resource-constrained time/cost trade-off project scheduling problem with discounted cash flows
    • 3
    • Icmeli, O., Erenguc, S.S.: The resource-constrained time/cost trade-off project scheduling problem with discounted cash flows. J. Oper. Manag. 14(3), 255-275 (1996b)
    • (1996) J. Oper. Manag. , vol.14 , pp. 255-275
    • Icmeli, O.1    Erenguc, S.S.2
  • 18
    • 0032818905 scopus 로고    scopus 로고
    • Resource constrained scheduling of tests in new product development
    • Jain, V., Grossmann, I.E.: Resource constrained scheduling of tests in new product development. Ind. Eng. Chem. Res. 38, 3013-3026 (1999)
    • (1999) Ind. Eng. Chem. Res. , vol.38 , pp. 3013-3026
    • Jain, V.1    Grossmann, I.E.2
  • 19
    • 0032256280 scopus 로고    scopus 로고
    • Efficient Lagrangian relaxation algorithms for industry size job-shop scheduling problems
    • Kaskavelis, C., Caramanis, M.: Efficient Lagrangian relaxation algorithms for industry size job-shop scheduling problems. IIE Trans. 30, 1085-1097 (1998)
    • (1998) IIE Trans. , vol.30 , pp. 1085-1097
    • Kaskavelis, C.1    Caramanis, M.2
  • 20
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for resource-constrained project scheduling problem
    • 3
    • Kolisch, R.: Efficient priority rules for resource-constrained project scheduling problem. J. Oper. Manag. 14(3), 179-192 (1996a)
    • (1996) J. Oper. Manag. , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 21
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • 2
    • Kolisch, R.: Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. Eur. J. Oper. Res. 90(2), 320-333 (1996b)
    • (1996) Eur. J. Oper. Res. , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 22
    • 0031276875 scopus 로고    scopus 로고
    • Local search for non-preemptive multi-mode resource constrained project scheduling
    • 11
    • Kolisch, R., Drexl, A.: Local search for non-preemptive multi-mode resource constrained project scheduling. IIE Trans. 29(11), 987-999 (1997)
    • (1997) IIE Trans. , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 23
    • 0035664243 scopus 로고    scopus 로고
    • Simultaneous planning for new product development and batch manufacturing facilties
    • Maravelias, C., Grossman, I.: Simultaneous planning for new product development and batch manufacturing facilties. Ind. Eng. Chem. Res. 40, 6147-6164 (2001)
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 6147-6164
    • Maravelias, C.1    Grossman, I.2
  • 25
    • 0033037070 scopus 로고    scopus 로고
    • Continuous time representation approach to batch and continuous process scheduling 2. Computational issues
    • Mockus, L., Reklaitis, G.V.: Continuous time representation approach to batch and continuous process scheduling 2. Computational issues. Ind. Eng. Chem. Res. 38, 204-210 (1999)
    • (1999) Ind. Eng. Chem. Res. , vol.38 , pp. 204-210
    • Mockus, L.1    Reklaitis, G.V.2
  • 26
    • 0037871958 scopus 로고    scopus 로고
    • Solving project scheduling problems by minimum cut computations
    • 3
    • Möhring, R.H., Schulz, A.S., Stork, F., Uetz, M.: Solving project scheduling problems by minimum cut computations. Manag. Sci. 49(3), 330-350 (2003)
    • (2003) Manag. Sci. , vol.49 , pp. 330-350
    • Möhring, R.H.1    Schulz, A.S.2    Stork, F.3    Uetz, M.4
  • 27
    • 0031487153 scopus 로고    scopus 로고
    • Problem space search algorithms for resource-constrained project scheduling
    • Naphade, K.S., Wu, S.D., Storer, R.H.: Problem space search algorithms for resource-constrained project scheduling. Ann. Oper. Res. 70, 307-326 (1997)
    • (1997) Ann. Oper. Res. , vol.70 , pp. 307-326
    • Naphade, K.S.1    Wu, S.D.2    Storer, R.H.3
  • 29
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • 7
    • Patterson, J.H.: A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Manag. Sci. 30(7), 854-867 (1984)
    • (1984) Manag. Sci. , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 31
    • 0014574409 scopus 로고
    • Multi-project scheduling with limited resources: A zero-one programming approach
    • Pritsker, A.A.B., Watters, L.J., Wolfe, P.M.: Multi-project scheduling with limited resources: A zero-one programming approach. Manag. Sci. 16, 93-107 (1969)
    • (1969) Manag. Sci. , vol.16 , pp. 93-107
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 33
    • 0031250372 scopus 로고    scopus 로고
    • Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
    • 1
    • Salewski, F., Schirmer, A., Drexl, A.: Project scheduling under resource and mode identity constraints: model, complexity, methods, and application. Eur. J. Oper. Res. 102(1), 88-110 (1997)
    • (1997) Eur. J. Oper. Res. , vol.102 , pp. 88-110
    • Salewski, F.1    Schirmer, A.2    Drexl, A.3
  • 34
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling problem library
    • Sprecher, A., Kolisch, R.: PSPLIB - a project scheduling problem library. Eur. J. Oper. Res. 96, 205-216 (1996)
    • (1996) Eur. J. Oper. Res. , vol.96 , pp. 205-216
    • Sprecher, A.1    Kolisch, R.2
  • 35
    • 0037236678 scopus 로고    scopus 로고
    • A simulation-optimization framework for stochastic optimization of R&D pipelines
    • 1
    • Subramanian, D.S., Pekny, J.F., Reklaitis, G.V.: A simulation- optimization framework for stochastic optimization of R&D pipelines. AIChE J. 49(1), 96-112 (2003)
    • (2003) AIChE J. , vol.49 , pp. 96-112
    • Subramanian, D.S.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 36
    • 0035335852 scopus 로고    scopus 로고
    • Experimental evaluation of heuristic optimization algorithms: A tutorial
    • 3
    • Uzsoy, R., Rardin, R.L.: Experimental evaluation of heuristic optimization algorithms: a tutorial. J. Heuristics 7(3), 261-304 (2001)
    • (2001) J. Heuristics , vol.7 , pp. 261-304
    • Uzsoy, R.1    Rardin, R.L.2
  • 37
    • 0028517491 scopus 로고
    • Constrained multi-project planning problems: A Lagrangian decomposition approach
    • Vercellis, C.: Constrained multi-project planning problems: A Lagrangian decomposition approach. Eur. J. Oper. Res. 78, 267-275 (1994)
    • (1994) Eur. J. Oper. Res. , vol.78 , pp. 267-275
    • Vercellis, C.1
  • 38
    • 0035916061 scopus 로고    scopus 로고
    • Queueing network modelling and lead time compression of pharmaceutical drug development
    • 2
    • Viswanadham, N., Narahari, Y.: Queueing network modelling and lead time compression of pharmaceutical drug development. Int. J. Prod. Res. 39(2), 395-412 (2001)
    • (2001) Int. J. Prod. Res. , vol.39 , pp. 395-412
    • Viswanadham, N.1    Narahari, Y.2
  • 39
    • 0032096812 scopus 로고    scopus 로고
    • Optimization analysis for design and planning of multi-project programs
    • 2
    • Wiley, V.D., Deckro, R.F., Jackson Jr., J.A.: Optimization analysis for design and planning of multi-project programs. Eur. J. Oper. Res. 107(2), 492-506 (1998)
    • (1998) Eur. J. Oper. Res. , vol.107 , pp. 492-506
    • Wiley, V.D.1    Deckro, R.F.2    Jackson Jr., J.A.3
  • 40
    • 0041805288 scopus 로고    scopus 로고
    • Decomposition approaches for the efficient solution of short-term scheduling problems
    • 8-9
    • Wu, D., Ierapetritou, M.G.: Decomposition approaches for the efficient solution of short-term scheduling problems. Comput. Chem. Eng. 27(8-9), 1261-1276 (2003)
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1261-1276
    • Wu, D.1    Ierapetritou, M.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.