-
1
-
-
0025725556
-
Constructing school timetables using simulated annealing: Sequential and parallel algorithms
-
Abramson, D. (1991), "Constructing school timetables using simulated annealing: sequential and parallel algorithms", Management Science 37, 98-113.
-
(1991)
Management Science
, vol.37
, pp. 98-113
-
-
Abramson, D.1
-
2
-
-
0001849846
-
Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
-
R. Slowinski and J. Weglarz (eds.), Elsevier, Amsterdam
-
Alvarez-Valdés, R. and J.M. Tamarit (1989), "Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis", in: R. Slowinski and J. Weglarz (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 113-134.
-
(1989)
Advances in Project Scheduling
, pp. 113-134
-
-
Alvarez-Valdés, R.1
Tamarit, J.M.2
-
3
-
-
0024012765
-
Towards the standardization of performance measures for project scheduling heuristics
-
Badiru, A.B. (1988), "Towards the standardization of performance measures for project scheduling heuristics", IEEE Transactions on Engineering Management 35, 82-89.
-
(1988)
IEEE Transactions on Engineering Management
, vol.35
, pp. 82-89
-
-
Badiru, A.B.1
-
4
-
-
0037574416
-
An interactive audit-staff scheduling decision support system
-
Balachandran, B.V. and A.A. Zoltners (1981), "An interactive audit-staff scheduling decision support system", The Accounting Review 56, 801-812.
-
(1981)
The Accounting Review
, vol.56
, pp. 801-812
-
-
Balachandran, B.V.1
Zoltners, A.A.2
-
5
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
Bartusch, M., R.H. Möhring and F.J. Radermacher (1988), "Scheduling project networks with resource constraints and time windows", Annals of Operations Research 16, 201-240.
-
(1988)
Annals of Operations Research
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, F.J.3
-
6
-
-
0003638428
-
-
Baltzer, Basel (Annals of Operations Research 7)
-
Blazewicz, J., W. Cellary, R. Slowinski and J. Weglarz (1986), Scheduling under Resource Constraints - Deterministic Models, Baltzer, Basel (Annals of Operations Research 7).
-
(1986)
Scheduling under Resource Constraints - Deterministic Models
-
-
Blazewicz, J.1
Cellary, W.2
Slowinski, R.3
Weglarz, J.4
-
7
-
-
0025701919
-
Some efficient multi heuristic procedures for resource-constrained project scheduling
-
Boctor, F.F. (1990), "Some efficient multi heuristic procedures for resource-constrained project scheduling", European Journal of Operational Research 49, 3-13.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 3-13
-
-
Boctor, F.F.1
-
8
-
-
30244554260
-
Das zuordnungsproblem von prüfern zu prüffeldern unter berücksichtigung von reihenfolgebedingungen - Ein lösungsansatz der binären optimierung
-
Bolenz, G. and R. Frank (1977), "Das Zuordnungsproblem von Prüfern zu Prüffeldern unter Berücksichtigung von Reihenfolgebedingungen - Ein Lösungsansatz der binären Optimierung", Zeitschrift für betriebswirtschaftliche Forschung 29, 427-447.
-
(1977)
Zeitschrift für Betriebswirtschaftliche Forschung
, vol.29
, pp. 427-447
-
-
Bolenz, G.1
Frank, R.2
-
10
-
-
0038250018
-
A decision support system for audit-staff scheduling with precedence constraints and due dates
-
Chan, K.H. and B. Dodin (1986), "A decision support system for audit-staff scheduling with precedence constraints and due dates", The Accounting Review 61, 726-733.
-
(1986)
The Accounting Review
, vol.61
, pp. 726-733
-
-
Chan, K.H.1
Dodin, B.2
-
11
-
-
0016972372
-
Heuristics for scheduling resource-constrained projects: An experimental investigation
-
Cooper, D.F. (1976), "Heuristics for scheduling resource-constrained projects: An experimental investigation", Management Science 22, 1186-1194.
-
(1976)
Management Science
, vol.22
, pp. 1186-1194
-
-
Cooper, D.F.1
-
12
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis, E.W. and J.H. Patterson (1975), "A comparison of heuristic and optimum solutions in resource-constrained project scheduling", Management Science 21, 944-955.
-
(1975)
Management Science
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
13
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester, E. and W. Herroelen (1992), "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem", Management Science 38, 1803-1818.
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
14
-
-
0026171058
-
Application of production scheduling methods to external and internal audit scheduling
-
Dodin, B. and K.H. Chan (1991), "Application of production scheduling methods to external and internal audit scheduling", European Journal of Operational Research 52, 267-279.
-
(1991)
European Journal of Operational Research
, vol.52
, pp. 267-279
-
-
Dodin, B.1
Chan, K.H.2
-
16
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl, A. (1991), "Scheduling of project networks by job assignment", Management Science 37, 1590-1602.
-
(1991)
Management Science
, vol.37
, pp. 1590-1602
-
-
Drexl, A.1
-
17
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
Drexl, A. and J. Grünewald (1993), "Nonpreemptive multi-mode resource-constrained project scheduling", IIE Transactions 25/5, 74-81.
-
(1993)
IIE Transactions
, vol.25
, Issue.5
, pp. 74-81
-
-
Drexl, A.1
Grünewald, J.2
-
20
-
-
84985849850
-
A multiperiod audit staff planning model using multiple objectives: Development and evaluation
-
Gardner, J.C., R.J. Huefner, and V. Lofti (1990), "A multiperiod audit staff planning model using multiple objectives: Development and evaluation", Decision Sciences 21, 154-170.
-
(1990)
Decision Sciences
, vol.21
, pp. 154-170
-
-
Gardner, J.C.1
Huefner, R.J.2
Lofti, V.3
-
21
-
-
0001627504
-
Complexity results for multiprocessor scheduling under resource constraints
-
Garey, M.R. and D.S. Johnson (1975), "Complexity results for multiprocessor scheduling under resource constraints", SIAM Journal of Computing 4, 397-411.
-
(1975)
SIAM Journal of Computing
, vol.4
, pp. 397-411
-
-
Garey, M.R.1
Johnson, D.S.2
-
23
-
-
0002866635
-
The critical-path method: Resources planning and scheduling
-
J.F. Muth and G.L. Thompson (eds.), Prentice-Hall, Englewood Cliffs, NJ
-
Kelley, J.E.(1963), "The critical-path method: Resources planning and scheduling", in: J.F. Muth and G.L. Thompson (eds.), Industrial Scheduling, Prentice-Hall, Englewood Cliffs, NJ, 347-365.
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley, J.E.1
-
25
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch, R., A. Sprecher and A. Drexl (1995), "Characterization and generation of a general class of resource-constrained project scheduling problems", Management Science 41, 1693-1703.
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
26
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
Kurtulus, I.S. and E.W. Davis (1982), "Multi-project scheduling: Categorization of heuristic rules performance", Management Science 28, 161-172.
-
(1982)
Management Science
, vol.28
, pp. 161-172
-
-
Kurtulus, I.S.1
Davis, E.W.2
-
27
-
-
0022025928
-
Multi-project scheduling: Of project performance
-
Kurtulus, I.S. and S.C. Narula (1985), "Multi-project scheduling: of project performance", IIE Transactions 17, 58-66.
-
(1985)
IIE Transactions
, vol.17
, pp. 58-66
-
-
Kurtulus, I.S.1
Narula, S.C.2
-
28
-
-
0039224572
-
Introduction to the critical-path method
-
J.F. Muth and G.L. Thompson (eds.), Prentice-Hall, Einglewood Cliffs, NJ
-
Levy, F.K., G.L. Thompson and J.D. Wiest (1963), "Introduction to the critical-path method", in: J.F. Muth and G.L. Thompson (eds.), Industrial Scheduling, Prentice-Hall, Einglewood Cliffs, NJ.
-
(1963)
Industrial Scheduling
-
-
Levy, F.K.1
Thompson, G.L.2
Wiest, J.D.3
-
29
-
-
0000647152
-
Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints
-
Neumann, K. and J. Zhan (1995), "Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints", Journal of Intelligent Manufacturing 6, 145-154.
-
(1995)
Journal of Intelligent Manufacturing
, vol.6
, pp. 145-154
-
-
Neumann, K.1
Zhan, J.2
-
32
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource project scheduling problem
-
Patterson, J.H. (1984), "A comparison of exact approaches for solving the multiple constrained resource project scheduling problem", Management Science 30, 854-867.
-
(1984)
Management Science
, vol.30
, pp. 854-867
-
-
Patterson, J.H.1
-
33
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problems
-
R. Slowinski and J. Weglarz (eds.), Elsevier, Amsterdam
-
Patterson, J., R. Slowinski, B. Talbot and J. Weglarz (1989), "An algorithm for a general class of precedence and resource constrained scheduling problems", in: R. Slowinski and J. Weglarz (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 3-28.
-
(1989)
Advances in Project Scheduling
, pp. 3-28
-
-
Patterson, J.1
Slowinski, R.2
Talbot, B.3
Weglarz, J.4
-
34
-
-
0025701909
-
Computational experience with a backtracking algorithm for solving a general class of resource constrained scheduling problems
-
Patterson, J., R. Slowinski, B. Talbot and J. Weglarz (1990), "Computational experience with a backtracking algorithm for solving a general class of resource constrained scheduling problems", European Journal of Operational Research 49, 68-79.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 68-79
-
-
Patterson, J.1
Slowinski, R.2
Talbot, B.3
Weglarz, J.4
-
35
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
Pritsker, A.A.A., W.D. Watters and P.M. Wolfe (1969), "Multiproject scheduling with limited resources: A zero-one programming approach", Management Science 16, 93-108.
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.A.1
Watters, W.D.2
Wolfe, P.M.3
-
37
-
-
30244489505
-
Personaleinsatzplanung in wirtschaftsprüfungsgesellschaften - Bestandsaufnahme und konzeptioneller ansatz
-
Salewski, F. and A. Drexl (1993), "Personaleinsatzplanung in Wirtschaftsprüfungsgesellschaften - Bestandsaufnahme und konzeptioneller Ansatz", Zeitschrift für Betriebswirtschaft 63, 1357-1376.
-
(1993)
Zeitschrift für Betriebswirtschaft
, vol.63
, pp. 1357-1376
-
-
Salewski, F.1
Drexl, A.2
-
38
-
-
85033121156
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 387
-
Salewski, F., A. Schirmer and A. Drexl (1996a), "Project scheduling under resource and mode identity constraints. Part I: Model, complexity status, and methods", Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 387.
-
(1996)
Project Scheduling under Resource and Mode Identity Constraints. Part I: Model, Complexity Status, and Methods
-
-
Salewski, F.1
Schirmer, A.2
Drexl, A.3
-
40
-
-
30244540561
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 381
-
Schirmer, A. (1995), "A guide to complexity theory in operations research", Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 381.
-
(1995)
A Guide to Complexity Theory in Operations Research
-
-
Schirmer, A.1
-
44
-
-
0018011301
-
Multiple resource-constrained scheduling using branch and bound
-
Stinson, J.P., E.W. Davis and B.M. Khumawala (1978), "Multiple resource-constrained scheduling using branch and bound", AIIE Transactions 10, 252-259.
-
(1978)
AIIE Transactions
, vol.10
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
45
-
-
0020193734
-
Resource-constrained project scheduling with time resource tradeoffs: The nonpreemptive case
-
Talbot, R.B. (1982), "Resource-constrained project scheduling with time resource tradeoffs: The nonpreemptive case", Management Science 28, 1197-1210.
-
(1982)
Management Science
, vol.28
, pp. 1197-1210
-
-
Talbot, R.B.1
-
46
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
-
Talbot, R.B. and J.H. Patterson (1978), "An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems", Management Science 24, 1163-1174.
-
(1978)
Management Science
, vol.24
, pp. 1163-1174
-
-
Talbot, R.B.1
Patterson, J.H.2
-
47
-
-
84974870375
-
Heuristic performance and network/resource characteristics in resource-constrained project scheduling
-
Ulusoy, G. and L. Özdamar (1989), "Heuristic performance and network/resource characteristics in resource-constrained project scheduling", Journal of the Operational Research Society 40, 1145-1152.
-
(1989)
Journal of the Operational Research Society
, vol.40
, pp. 1145-1152
-
-
Ulusoy, G.1
Özdamar, L.2
-
48
-
-
0010844250
-
-
Working Paper, Departamento de Estadística e Investigación Operativa, Universitat de València
-
Valls, V., M.A. Perez and M.S. Quintanilla (1992), "Heuristic performance in large resource-constrained projects", Working Paper, Departamento de Estadística e Investigación Operativa, Universitat de València.
-
(1992)
Heuristic Performance in Large Resource-constrained Projects
-
-
Valls, V.1
Perez, M.A.2
Quintanilla, M.S.3
|