Volumn 102, Issue 1, 1997, Pages 88-110

Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application

Author keywords

Audit staff scheduling; Mode identity constraints; Precedence constraints; Project management; Project scheduling; Regret based biased random sampling; Resource constraints; Temporal constraints

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTATIONAL METHODS; CONSTRAINT THEORY; MATHEMATICAL MODELS; PERT; RANDOM PROCESSES; RESOURCE ALLOCATION;

EID: 0031250372     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(96)00219-6     Document Type: Article
Times cited : (60)

References (49)
  • 1
    • 0025725556 scopus 로고
    • Constructing school timetables using simulated annealing: Sequential and parallel algorithms
    • Abramson, D. (1991), "Constructing school timetables using simulated annealing: sequential and parallel algorithms", Management Science 37, 98-113.
    • (1991) Management Science , vol.37 , pp. 98-113
    • Abramson, D.1
  • 2
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
    • R. Slowinski and J. Weglarz (eds.), Elsevier, Amsterdam
    • Alvarez-Valdés, R. and J.M. Tamarit (1989), "Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis", in: R. Slowinski and J. Weglarz (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdés, R.1    Tamarit, J.M.2
  • 3
    • 0024012765 scopus 로고
    • Towards the standardization of performance measures for project scheduling heuristics
    • Badiru, A.B. (1988), "Towards the standardization of performance measures for project scheduling heuristics", IEEE Transactions on Engineering Management 35, 82-89.
    • (1988) IEEE Transactions on Engineering Management , vol.35 , pp. 82-89
    • Badiru, A.B.1
  • 4
    • 0037574416 scopus 로고
    • An interactive audit-staff scheduling decision support system
    • Balachandran, B.V. and A.A. Zoltners (1981), "An interactive audit-staff scheduling decision support system", The Accounting Review 56, 801-812.
    • (1981) The Accounting Review , vol.56 , pp. 801-812
    • Balachandran, B.V.1    Zoltners, A.A.2
  • 7
    • 0025701919 scopus 로고
    • Some efficient multi heuristic procedures for resource-constrained project scheduling
    • Boctor, F.F. (1990), "Some efficient multi heuristic procedures for resource-constrained project scheduling", European Journal of Operational Research 49, 3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 8
    • 30244554260 scopus 로고
    • Das zuordnungsproblem von prüfern zu prüffeldern unter berücksichtigung von reihenfolgebedingungen - Ein lösungsansatz der binären optimierung
    • Bolenz, G. and R. Frank (1977), "Das Zuordnungsproblem von Prüfern zu Prüffeldern unter Berücksichtigung von Reihenfolgebedingungen - Ein Lösungsansatz der binären Optimierung", Zeitschrift für betriebswirtschaftliche Forschung 29, 427-447.
    • (1977) Zeitschrift für Betriebswirtschaftliche Forschung , vol.29 , pp. 427-447
    • Bolenz, G.1    Frank, R.2
  • 10
    • 0038250018 scopus 로고
    • A decision support system for audit-staff scheduling with precedence constraints and due dates
    • Chan, K.H. and B. Dodin (1986), "A decision support system for audit-staff scheduling with precedence constraints and due dates", The Accounting Review 61, 726-733.
    • (1986) The Accounting Review , vol.61 , pp. 726-733
    • Chan, K.H.1    Dodin, B.2
  • 11
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource-constrained projects: An experimental investigation
    • Cooper, D.F. (1976), "Heuristics for scheduling resource-constrained projects: An experimental investigation", Management Science 22, 1186-1194.
    • (1976) Management Science , vol.22 , pp. 1186-1194
    • Cooper, D.F.1
  • 12
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis, E.W. and J.H. Patterson (1975), "A comparison of heuristic and optimum solutions in resource-constrained project scheduling", Management Science 21, 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 13
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E. and W. Herroelen (1992), "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem", Management Science 38, 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 14
    • 0026171058 scopus 로고
    • Application of production scheduling methods to external and internal audit scheduling
    • Dodin, B. and K.H. Chan (1991), "Application of production scheduling methods to external and internal audit scheduling", European Journal of Operational Research 52, 267-279.
    • (1991) European Journal of Operational Research , vol.52 , pp. 267-279
    • Dodin, B.1    Chan, K.H.2
  • 16
    • 0026376478 scopus 로고
    • Scheduling of project networks by job assignment
    • Drexl, A. (1991), "Scheduling of project networks by job assignment", Management Science 37, 1590-1602.
    • (1991) Management Science , vol.37 , pp. 1590-1602
    • Drexl, A.1
  • 17
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexl, A. and J. Grünewald (1993), "Nonpreemptive multi-mode resource-constrained project scheduling", IIE Transactions 25/5, 74-81.
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 74-81
    • Drexl, A.1    Grünewald, J.2
  • 20
    • 84985849850 scopus 로고
    • A multiperiod audit staff planning model using multiple objectives: Development and evaluation
    • Gardner, J.C., R.J. Huefner, and V. Lofti (1990), "A multiperiod audit staff planning model using multiple objectives: Development and evaluation", Decision Sciences 21, 154-170.
    • (1990) Decision Sciences , vol.21 , pp. 154-170
    • Gardner, J.C.1    Huefner, R.J.2    Lofti, V.3
  • 21
    • 0001627504 scopus 로고
    • Complexity results for multiprocessor scheduling under resource constraints
    • Garey, M.R. and D.S. Johnson (1975), "Complexity results for multiprocessor scheduling under resource constraints", SIAM Journal of Computing 4, 397-411.
    • (1975) SIAM Journal of Computing , vol.4 , pp. 397-411
    • Garey, M.R.1    Johnson, D.S.2
  • 23
    • 0002866635 scopus 로고
    • The critical-path method: Resources planning and scheduling
    • J.F. Muth and G.L. Thompson (eds.), Prentice-Hall, Englewood Cliffs, NJ
    • Kelley, J.E.(1963), "The critical-path method: Resources planning and scheduling", in: J.F. Muth and G.L. Thompson (eds.), Industrial Scheduling, Prentice-Hall, Englewood Cliffs, NJ, 347-365.
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.E.1
  • 25
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., A. Sprecher and A. Drexl (1995), "Characterization and generation of a general class of resource-constrained project scheduling problems", Management Science 41, 1693-1703.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 26
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus, I.S. and E.W. Davis (1982), "Multi-project scheduling: Categorization of heuristic rules performance", Management Science 28, 161-172.
    • (1982) Management Science , vol.28 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 27
    • 0022025928 scopus 로고
    • Multi-project scheduling: Of project performance
    • Kurtulus, I.S. and S.C. Narula (1985), "Multi-project scheduling: of project performance", IIE Transactions 17, 58-66.
    • (1985) IIE Transactions , vol.17 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 28
    • 0039224572 scopus 로고
    • Introduction to the critical-path method
    • J.F. Muth and G.L. Thompson (eds.), Prentice-Hall, Einglewood Cliffs, NJ
    • Levy, F.K., G.L. Thompson and J.D. Wiest (1963), "Introduction to the critical-path method", in: J.F. Muth and G.L. Thompson (eds.), Industrial Scheduling, Prentice-Hall, Einglewood Cliffs, NJ.
    • (1963) Industrial Scheduling
    • Levy, F.K.1    Thompson, G.L.2    Wiest, J.D.3
  • 29
    • 0000647152 scopus 로고
    • Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints
    • Neumann, K. and J. Zhan (1995), "Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints", Journal of Intelligent Manufacturing 6, 145-154.
    • (1995) Journal of Intelligent Manufacturing , vol.6 , pp. 145-154
    • Neumann, K.1    Zhan, J.2
  • 32
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource project scheduling problem
    • Patterson, J.H. (1984), "A comparison of exact approaches for solving the multiple constrained resource project scheduling problem", Management Science 30, 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 33
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problems
    • R. Slowinski and J. Weglarz (eds.), Elsevier, Amsterdam
    • Patterson, J., R. Slowinski, B. Talbot and J. Weglarz (1989), "An algorithm for a general class of precedence and resource constrained scheduling problems", in: R. Slowinski and J. Weglarz (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 3-28.
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.1    Slowinski, R.2    Talbot, B.3    Weglarz, J.4
  • 34
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of resource constrained scheduling problems
    • Patterson, J., R. Slowinski, B. Talbot and J. Weglarz (1990), "Computational experience with a backtracking algorithm for solving a general class of resource constrained scheduling problems", European Journal of Operational Research 49, 68-79.
    • (1990) European Journal of Operational Research , vol.49 , pp. 68-79
    • Patterson, J.1    Slowinski, R.2    Talbot, B.3    Weglarz, J.4
  • 35
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A.A.A., W.D. Watters and P.M. Wolfe (1969), "Multiproject scheduling with limited resources: A zero-one programming approach", Management Science 16, 93-108.
    • (1969) Management Science , vol.16 , pp. 93-108
    • Pritsker, A.A.A.1    Watters, W.D.2    Wolfe, P.M.3
  • 37
    • 30244489505 scopus 로고
    • Personaleinsatzplanung in wirtschaftsprüfungsgesellschaften - Bestandsaufnahme und konzeptioneller ansatz
    • Salewski, F. and A. Drexl (1993), "Personaleinsatzplanung in Wirtschaftsprüfungsgesellschaften - Bestandsaufnahme und konzeptioneller Ansatz", Zeitschrift für Betriebswirtschaft 63, 1357-1376.
    • (1993) Zeitschrift für Betriebswirtschaft , vol.63 , pp. 1357-1376
    • Salewski, F.1    Drexl, A.2
  • 40
    • 30244540561 scopus 로고
    • Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 381
    • Schirmer, A. (1995), "A guide to complexity theory in operations research", Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 381.
    • (1995) A Guide to Complexity Theory in Operations Research
    • Schirmer, A.1
  • 44
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • Stinson, J.P., E.W. Davis and B.M. Khumawala (1978), "Multiple resource-constrained scheduling using branch and bound", AIIE Transactions 10, 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 45
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time resource tradeoffs: The nonpreemptive case
    • Talbot, R.B. (1982), "Resource-constrained project scheduling with time resource tradeoffs: The nonpreemptive case", Management Science 28, 1197-1210.
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, R.B.1
  • 46
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • Talbot, R.B. and J.H. Patterson (1978), "An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems", Management Science 24, 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, R.B.1    Patterson, J.H.2
  • 47
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy, G. and L. Özdamar (1989), "Heuristic performance and network/resource characteristics in resource-constrained project scheduling", Journal of the Operational Research Society 40, 1145-1152.
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.