A heuristic treatment of tardiness and net present value criteria in resource constrained project scheduling

Author keywords

Cash flow; Heuristic; Logistics; Net present value; Project scheduling; Resources

Indexed keywords


EID: 84993081831     PISSN: 09600035     EISSN: None     Source Type: Journal    
DOI: 10.1108/09600039810248181     Document Type: Article
Times cited : (10)

References (20)
  • 1
    • 0042522209 scopus 로고
    • A heuristic algorithm for maximizing the net present value of cash flows in resource constrained project schedule
    • Working Paper, Indiana University.
    • Baroum, S. and Patterson, J.H. (1989), “A heuristic algorithm for maximizing the net present value of cash flows in resource constrained project schedule”, Working Paper, Indiana University.
    • (1989)
    • Baroum, S.1    Patterson, J.H.2
  • 2
    • 84992956037 scopus 로고
    • A multi-objective approach to resource-constrained project scheduling
    • unpublished MSc Thesis, Department of Industrial Engineering, Bo’Ðaziçi University, Turkey.
    • Bayyigˇit, M. (1994), “A multi-objective approach to resource-constrained project scheduling”, unpublished MSc Thesis, Department of Industrial Engineering, Bo’Ðaziçi University, Turkey.
    • (1994)
    • Bayyigˇit, M.1
  • 3
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: classification and complexity
    • Blazewicz, J., Lenstra, J.K. and Rinnooy Kan, A.H.G. (1983), “Scheduling subject to resource constraints: classification and complexity”, Discrete Applied Mathematics, Vol. 5, pp. 11-24.
    • (1983) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 4
    • 0002907360 scopus 로고
    • A branch and bound procedure for the multiple resource constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W. (1992), “A branch and bound procedure for the multiple resource constrained project scheduling problem”, Management Science, Vol. 38, pp. 1803-18.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 5
    • 0025701916 scopus 로고
    • The scheduling of activities to maximize the net present value of projects
    • Elmaghraby, S.E. and Herroelen, W.S. (1990), “The scheduling of activities to maximize the net present value of projects”, European Journal of Operational Research, Vol. 49, pp. 35-40.
    • (1990) European Journal of Operational Research , vol.49 , pp. 35-40
    • Elmaghraby, S.E.1    Herroelen, W.S.2
  • 6
    • 0020087944 scopus 로고
    • Multi project scheduling: categorization of heuristic rule performance
    • Kurtulus, I.S. and Davis, E.W. (1982), “Multi project scheduling: categorization of heuristic rule performance”, Management Science, Vol. 28, pp. 161-72.
    • (1982) Management Science , vol.28 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 7
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained poject scheduling
    • Li, K.Y. and Willis, R.J. (1992), “An iterative scheduling technique for resource-constrained poject scheduling”, European Journal of Operational Research, Vol. 56, pp. 370-9.
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 8
    • 0030574808 scopus 로고    scopus 로고
    • A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
    • Özdamar, L. and Ulusoy, G. (1996), “A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis”, European Journal of Operational Research, Vol. 89, pp. 400-7.
    • (1996) European Journal of Operational Research , vol.89 , pp. 400-407
    • Özdamar, L.1    Ulusoy, G.2
  • 9
    • 84993051006 scopus 로고
    • A heuristic with a branch and bound structure for the resource constrained project scheduling problem
    • Working Paper, Marmara University, Department of Industrial Engineering, Istanbul.
    • Özdamar, L. and Ulusoy, G. (1993), “A heuristic with a branch and bound structure for the resource constrained project scheduling problem”, Working Paper, Marmara University, Department of Industrial Engineering, Istanbul.
    • (1993)
    • Özdamar, L.1    Ulusoy, G.2
  • 10
    • 0029393209 scopus 로고
    • A survey on the resource constrained project scheduling problem
    • Özdamar, L. and Ulusoy, G. (1995), “A survey on the resource constrained project scheduling problem”, IIE Transactions, Vol. 27, pp. 574-86.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 11
    • 0042010465 scopus 로고
    • Heuristic scheduling of resource constrained projects with cash flows: an optimization based approach
    • Working Paper 90-6, Carnegie Mellon University.
    • Padman, R., Smith-Daniels, D.E. and Smith-Daniels, V.L. (1990), “Heuristic scheduling of resource constrained projects with cash flows: an optimization based approach”, Working Paper 90-6, Carnegie Mellon University.
    • (1990)
    • Padman, R.1    Smith-Daniels, D.E.2    Smith-Daniels, V.L.3
  • 12
    • 0027240748 scopus 로고
    • Early-tardy cost trade-offs in resource constrained projects with cash flows: an optimization-guided heuristic approach
    • Padman, R. and Smith-Daniels, D.E. (1993), “Early-tardy cost trade-offs in resource constrained projects with cash flows: an optimization-guided heuristic approach”, European Journal of Operational Research, Vol. 64, pp. 295-311.
    • (1993) European Journal of Operational Research , vol.64 , pp. 295-311
    • Padman, R.1    Smith-Daniels, D.E.2
  • 13
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J.H. (1984), “A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem”, Management Science, Vol. 30, pp. 854-67.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 14
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems
    • Patterson, J.H., Slowinski, R., Talbot, F.B. and Weglarz, J. (1990), “Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems”, European Journal of Operational Research, Vol. 49, pp. 68-79.
    • (1990) European Journal of Operational Research , vol.49 , pp. 68-79
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 15
    • 0000637036 scopus 로고
    • Cash flows in networks
    • Russell, A.H. (1970), “Cash flows in networks”, Management Science, Vol. 16, pp. 357-73.
    • (1970) Management Science , vol.16 , pp. 357-373
    • Russell, A.H.1
  • 16
    • 0022794872 scopus 로고
    • A comparison of heuristics for scheduling projects with cash flows and resource restrictions
    • Russell, R.A. (1986), “A comparison of heuristics for scheduling projects with cash flows and resource restrictions”, Management Science, Vol. 32, pp. 1291-300.
    • (1986) Management Science , vol.32 , pp. 1291-1300
    • Russell, R.A.1
  • 17
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy, G. and Özdamar, L. (1989), “Heuristic performance and network/resource characteristics in resource-constrained project scheduling”, Journal of the Operational Research Society, Vol. 40, pp. 1145-52.
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2
  • 18
    • 0028396719 scopus 로고
    • A constraint based perspective in resource constrained project scheduling
    • Ulusoy, G. and Özdamar, L. (1994), “A constraint based perspective in resource constrained project scheduling”, International Journal of Production Research, Vol. 32, pp. 693-705.
    • (1994) International Journal of Production Research , vol.32 , pp. 693-705
    • Ulusoy, G.1    Özdamar, L.2
  • 19
    • 3543056985 scopus 로고
    • A heuristic scheduling algorithm for improving a project’s duration and net present value
    • Ulusoy, G. and Özdamar, L. (1995), “A heuristic scheduling algorithm for improving a project’s duration and net present value”, International Journal of Operations & Production Management, Vol. 15, pp. 90-9.
    • (1995) International Journal of Operations & Production Management , vol.15 , pp. 90-99
    • Ulusoy, G.1    Özdamar, L.2
  • 20
    • 0027235016 scopus 로고
    • Scheduling a project to maximize its net present value: an integer programming approach
    • Yang, K.K., Talbot, F.B. and Patterson, J.H. (1993), “Scheduling a project to maximize its net present value: an integer programming approach”, European Journal of Operational Research, Vol. 64, pp. 188-98.
    • (1993) European Journal of Operational Research , vol.64 , pp. 188-198
    • Yang, K.K.1    Talbot, F.B.2    Patterson, J.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.