메뉴 건너뛰기




Volumn 44, Issue 3, 2008, Pages 257-273

A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags

Author keywords

Multi mode; Rectangle packing; Resource constrained; Time lags; Time windows

Indexed keywords

CONSTRAINT THEORY; MATHEMATICAL MODELS; OPTIMIZATION; RESOURCE ALLOCATION; SCHEDULING;

EID: 42149186441     PISSN: 09208542     EISSN: 15730484     Source Type: Journal    
DOI: 10.1007/s11227-007-0158-9     Document Type: Article
Times cited : (40)

References (16)
  • 1
    • 15344348592 scopus 로고    scopus 로고
    • Tight LP bounds for resource constrained project scheduling
    • Baptiste P, Demassey S (2004) Tight LP bounds for resource constrained project scheduling. OR Spectr 26:251-262
    • (2004) OR Spectr , vol.26 , pp. 251-262
    • Baptiste, P.1    Demassey, S.2
  • 2
    • 34250094949 scopus 로고
    • Scheduling project networks with resource constraints and time windows
    • Bartuch M, Möhring RH, Radermacher FJ (1988) Scheduling project networks with resource constraints and time windows. Ann Oper Res 16:201-240
    • (1988) Ann Oper Res , vol.16 , pp. 201-240
    • Bartuch, M.1    Möhring, R.H.2    Radermacher, F.J.3
  • 3
    • 0034563615 scopus 로고    scopus 로고
    • A linear programming and constraint propagation-based lower bound for RCPSP
    • Brucker P, Knust S (2000) A linear programming and constraint propagation-based lower bound for RCPSP. Eur J Oper Res 127:355-362
    • (2000) Eur J Oper Res , vol.127 , pp. 355-362
    • Brucker, P.1    Knust, S.2
  • 4
    • 34047116778 scopus 로고    scopus 로고
    • A new heuristic algorithm for rectangle packing
    • Chen HD, Xu R (2007) A new heuristic algorithm for rectangle packing. Comput Oper Res 34:3270-3280
    • (2007) Comput Oper Res , vol.34 , pp. 3270-3280
    • Chen, H.D.1    Xu, R.2
  • 6
    • 0033311742 scopus 로고    scopus 로고
    • The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • De Reyck B, Herroelen W (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. Eur J Oper Res 119:538-556
    • (1999) Eur J Oper Res , vol.119 , pp. 538-556
    • De Reyck, B.1    Herroelen, W.2
  • 8
    • 0029635345 scopus 로고
    • Activity nets: A guided tour through some recent developments
    • Elmaghraby SE (1995) Activity nets: A guided tour through some recent developments. Eur J Oper Res 82:383-408
    • (1995) Eur J Oper Res , vol.82 , pp. 383-408
    • Elmaghraby, S.E.1
  • 9
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • Hartmann S, Drexl A (1998) Project scheduling with multiple modes: A comparison of exact algorithms. Networks 32:283-298
    • (1998) Networks , vol.32 , pp. 283-298
    • Hartmann, S.1    Drexl, A.2
  • 10
    • 0037448273 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the multi-mode resource constrained project scheduling problem with minimum and maximum time lags
    • Heilmann R (2003) A branch-and-bound procedure for the multi-mode resource constrained project scheduling problem with minimum and maximum time lags. Eur J Oper Res 144:348-365
    • (2003) Eur J Oper Res , vol.144 , pp. 348-365
    • Heilmann, R.1
  • 11
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource-constrained project scheduling problems. Manag Sci 41:1693-1703
    • (1995) Manag Sci , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 15
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    • Sprecher A, Drexl A (1998) Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. Eur J Oper Res 107:431-450
    • (1998) Eur J Oper Res , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 16
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling problem with time-resource trade-offs: The nonpreemptive case
    • Talbot FB (1982) Resource-constrained project scheduling problem with time-resource trade-offs: the nonpreemptive case. Manag Sci 28:1197-1210
    • (1982) Manag Sci , vol.28 , pp. 1197-1210
    • Talbot, F.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.