Tight LP bounds for resource constrained project scheduling
-
Baptiste P, Demassey S (2004) Tight LP bounds for resource constrained project scheduling. OR Spectr 26:251-262
-
(2004)
OR Spectr
, vol.26
, pp. 251-262
-
-
Baptiste, P.1
Demassey, S.2
-
2
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
Bartuch M, Möhring RH, Radermacher FJ (1988) Scheduling project networks with resource constraints and time windows. Ann Oper Res 16:201-240
-
(1988)
Ann Oper Res
, vol.16
, pp. 201-240
-
-
Bartuch, M.1
Möhring, R.H.2
Radermacher, F.J.3
-
3
-
-
0034563615
-
A linear programming and constraint propagation-based lower bound for RCPSP
-
Brucker P, Knust S (2000) A linear programming and constraint propagation-based lower bound for RCPSP. Eur J Oper Res 127:355-362
-
(2000)
Eur J Oper Res
, vol.127
, pp. 355-362
-
-
Brucker, P.1
Knust, S.2
-
4
-
-
34047116778
-
A new heuristic algorithm for rectangle packing
-
Chen HD, Xu R (2007) A new heuristic algorithm for rectangle packing. Comput Oper Res 34:3270-3280
-
(2007)
Comput Oper Res
, vol.34
, pp. 3270-3280
-
-
Chen, H.D.1
Xu, R.2
-
6
-
-
0033311742
-
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
-
De Reyck B, Herroelen W (1999) The multi-mode resource-constrained project scheduling problem with generalized precedence relations. Eur J Oper Res 119:538-556
-
(1999)
Eur J Oper Res
, vol.119
, pp. 538-556
-
-
De Reyck, B.1
Herroelen, W.2
-
8
-
-
0029635345
-
Activity nets: A guided tour through some recent developments
-
Elmaghraby SE (1995) Activity nets: A guided tour through some recent developments. Eur J Oper Res 82:383-408
-
(1995)
Eur J Oper Res
, vol.82
, pp. 383-408
-
-
Elmaghraby, S.E.1
-
9
-
-
0040577754
-
Project scheduling with multiple modes: A comparison of exact algorithms
-
Hartmann S, Drexl A (1998) Project scheduling with multiple modes: A comparison of exact algorithms. Networks 32:283-298
-
(1998)
Networks
, vol.32
, pp. 283-298
-
-
Hartmann, S.1
Drexl, A.2
-
10
-
-
0037448273
-
A branch-and-bound procedure for the multi-mode resource constrained project scheduling problem with minimum and maximum time lags
-
Heilmann R (2003) A branch-and-bound procedure for the multi-mode resource constrained project scheduling problem with minimum and maximum time lags. Eur J Oper Res 144:348-365
-
(2003)
Eur J Oper Res
, vol.144
, pp. 348-365
-
-
Heilmann, R.1
-
11
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource-constrained project scheduling problems. Manag Sci 41:1693-1703
-
(1995)
Manag Sci
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
15
-
-
0032096811
-
Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
-
Sprecher A, Drexl A (1998) Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. Eur J Oper Res 107:431-450
-
(1998)
Eur J Oper Res
, vol.107
, pp. 431-450
-
-
Sprecher, A.1
Drexl, A.2
-
16
-
-
0020193734
-
Resource-constrained project scheduling problem with time-resource trade-offs: The nonpreemptive case
-
Talbot FB (1982) Resource-constrained project scheduling problem with time-resource trade-offs: the nonpreemptive case. Manag Sci 28:1197-1210
-
(1982)
Manag Sci
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
|