메뉴 건너뛰기




Volumn 175, Issue 1, 2006, Pages 279-295

Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting

Author keywords

Activity splitting; Branch and bound; Multi mode resource constrained project scheduling; Time varying resource capacities

Indexed keywords

CONSTRAINT THEORY; PARAMETER ESTIMATION; PROBLEM SOLVING; RESOURCE ALLOCATION; SCHEDULING;

EID: 33749155193     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.04.030     Document Type: Article
Times cited : (81)

References (30)
  • 1
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • Alcaraz J., Maroto C., and Ruiz R. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society 54 (2003) 614-626
    • (2003) Journal of the Operational Research Society , vol.54 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 2
    • 0003873696 scopus 로고    scopus 로고
    • Solving a preemptive project scheduling problem with coloring techniques
    • Weglarz J. (Ed), Kluwer Academic Publishers, Massachusetts
    • Bianco L., Caramia M., and Dell'Olmo P. Solving a preemptive project scheduling problem with coloring techniques. In: Weglarz J. (Ed). Project Scheduling: Recent Models, Algorithms, and Applications (1999), Kluwer Academic Publishers, Massachusetts 135-145
    • (1999) Project Scheduling: Recent Models, Algorithms, and Applications , pp. 135-145
    • Bianco, L.1    Caramia, M.2    Dell'Olmo, P.3
  • 3
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor F. Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research 31 11 (1993) 2547-2558
    • (1993) International Journal of Production Research , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.1
  • 4
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., and Lecocq H. A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 149 (2003) 268-281
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 6
    • 33749150391 scopus 로고    scopus 로고
    • Buddhakulsomsiri, J., Kim, D.A., 2004. Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research, under review.
  • 7
    • 0030122629 scopus 로고    scopus 로고
    • An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
    • Demeulemeester E.L., and Herroelen W.S. An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem. European Journal of Operational Research 90 (1996) 334-338
    • (1996) European Journal of Operational Research , vol.90 , pp. 334-338
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 8
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problems
    • Demeulemeester E.L., and Herroelen W.S. A branch-and-bound procedure for the multiple resource-constrained project scheduling problems. Management Science 38 12 (1992) 1803-1818
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 9
    • 0031272722 scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester E.L., and Herroelen W.S. New benchmark results for the resource-constrained project scheduling problem. Management Science 43 11 (1995) 1485-1492
    • (1995) Management Science , vol.43 , Issue.11 , pp. 1485-1492
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 10
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexl A., and Grünewald J. Nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 25 5 (1993) 74-81
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 74-81
    • Drexl, A.1    Grünewald, J.2
  • 11
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • Hartmann S. Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research 102 (2001) 111-135
    • (2001) Annals of Operations Research , vol.102 , pp. 111-135
    • Hartmann, S.1
  • 12
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • Hartmann S., and Drexl A. Project scheduling with multiple modes: A comparison of exact algorithms. Networks 32 4 (1998) 283-298
    • (1998) Networks , vol.32 , Issue.4 , pp. 283-298
    • Hartmann, S.1    Drexl, A.2
  • 13
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127 (2000) 394-407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 14
    • 0442269144 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A heuristic of the multi-mode case
    • Heilmann R. Resource-constrained project scheduling: A heuristic of the multi-mode case. OR Spektrum 23 (2001) 335-357
    • (2001) OR Spektrum , vol.23 , pp. 335-357
    • Heilmann, R.1
  • 15
    • 0037448273 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
    • Heilmann R. A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags. European Journal of Operational Research 144 (2003) 348-365
    • (2003) European Journal of Operational Research , vol.144 , pp. 348-365
    • Heilmann, R.1
  • 18
    • 0002866635 scopus 로고
    • The critical path method: Resource planning and scheduling
    • Muth J.F., and Thompson G.L. (Eds), Prentice-Hall, New Jersey
    • Kelley Jr. J.E. The critical path method: Resource planning and scheduling. In: Muth J.F., and Thompson G.L. (Eds). Industrial Scheduling (1963), Prentice-Hall, New Jersey 347-365
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley Jr., J.E.1
  • 19
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research 90 (1996) 320-333
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 20
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch R. Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operational Management 14 3 (1996) 179-192
    • (1996) Journal of Operational Management , vol.14 , Issue.3 , pp. 179-192
    • Kolisch, R.1
  • 22
    • 33749158301 scopus 로고    scopus 로고
    • Kolisch, R., Sprecher, A., Drexl, A., 1992. Characterization and generation of a general class of resource-constrained project scheduling problems. Manuskripte aus den Instituten fur Betriebswirtschaftslehre, No. 301, Kiel.
  • 23
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science 41 10 (1995) 1693-1703
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 24
    • 0038527513 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem
    • Ribeiro C.C., and Hansen P. (Eds), Kluwer Academic Publishers, Dordrecht
    • Nonobe K., and Ibaraki T. Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Ribeiro C.C., and Hansen P. (Eds). Essays and Surveys in Metaheuristics (2001), Kluwer Academic Publishers, Dordrecht 557-588
    • (2001) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 25
    • 0021460636 scopus 로고
    • A comparison of exact procedures for solving the multiple constrained resource project scheduling problem
    • Patterson J.H. A comparison of exact procedures for solving the multiple constrained resource project scheduling problem. Management Science 30 7 (1984) 854-867
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 26
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problems
    • Slowinski R., and Weglarz J. (Eds), Elsevier Science Publishers, Amsterdam
    • Patterson J.H., Slowinski R., Talbot F.B., and Weglarz J. An algorithm for a general class of precedence and resource constrained scheduling problems. In: Slowinski R., and Weglarz J. (Eds). Advances in Project Scheduling (1989), Elsevier Science Publishers, Amsterdam 3-28
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 27
    • 0032096811 scopus 로고    scopus 로고
    • Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm
    • Sprecher A., and Drexl A. Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm. European Journal of Operational Research 107 (1998) 431-450
    • (1998) European Journal of Operational Research , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 28
    • 0029636114 scopus 로고
    • Semi-active, active and non-delay schedules for the resource-constrained project scheduling problem
    • Sprecher A., Kolisch R., and Drexl A. Semi-active, active and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research 80 (1995) 94-102
    • (1995) European Journal of Operational Research , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3
  • 29
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • Sprecher A., Hartmann A., and Drexl A. An exact algorithm for project scheduling with multiple modes. OR Spektrum 19 (1997) 195-203
    • (1997) OR Spektrum , vol.19 , pp. 195-203
    • Sprecher, A.1    Hartmann, A.2    Drexl, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.