-
1
-
-
0003754285
-
-
Chichester, U.K., John Wiley
-
Aarts, E. and Korst, J., 1989. Simulated Annealing and Boltzmann Machines, Chichester, U.K., John Wiley.
-
(1989)
Simulated Annealing and Boltzmann Machines
-
-
Aarts, E.1
Korst, J.2
-
2
-
-
0025725556
-
Constructing school timetables using simulated annealing: Sequential and parallel algorithms
-
Abramson, D., 1991. Constructing School Timetables Using Simulated Annealing: Sequential and Parallel Algorithms. Management Science, 37(1), 98-113.
-
(1991)
Management Science
, vol.37
, Issue.1
, pp. 98-113
-
-
Abramson, D.1
-
3
-
-
0042861111
-
An operation portioning problem for automated assembly system design
-
Ahmade, R.H. and Tang, C., 1991. An Operation Portioning Problem for Automated Assembly System Design. Operations Research, 39(5), 824-835.
-
(1991)
Operations Research
, vol.39
, Issue.5
, pp. 824-835
-
-
Ahmade, R.H.1
Tang, C.2
-
4
-
-
0026807327
-
A practical approach to the apparel production and scheduling problem
-
Chen, C., Racine, R. and Swift, F., 1992. A Practical Approach to the Apparel Production and Scheduling Problem. Journal of Clothing Science and Technology, 4(2), 9-17.
-
(1992)
Journal of Clothing Science and Technology
, vol.4
, Issue.2
, pp. 9-17
-
-
Chen, C.1
Racine, R.2
Swift, F.3
-
6
-
-
0017478425
-
Scheduling a project to maximize its present value: A zero-one programming approach
-
Doersch, R.H. and Patterson, J.H., 1977. Scheduling a Project to Maximize Its Present Value: A Zero-one Programming Approach. Management Science 23(8) 882-889.
-
(1977)
Management Science
, vol.23
, Issue.8
, pp. 882-889
-
-
Doersch, R.H.1
Patterson, J.H.2
-
9
-
-
0026223971
-
Optimizing interconnection of Local Area Networks: A simulated annealing approach
-
Fetterolf, P. and Anandalingam, G., 1991. Optimizing Interconnection of Local Area Networks: A Simulated Annealing Approach. ORSA Journal on Computing, 3, 275-287.
-
(1991)
ORSA Journal on Computing
, vol.3
, pp. 275-287
-
-
Fetterolf, P.1
Anandalingam, G.2
-
10
-
-
0026820330
-
A simulated annealing approach to the network design problem with variational inequality constraints
-
Friesz, T.L., Cho, H.J., Mehta, N.J., Tobin, R.L. and Anandalingam, G., 1993. A Simulated Annealing Approach to the Network Design Problem With Variational Inequality Constraints. Transportation Science, 26(1), 18-26.
-
(1993)
Transportation Science
, vol.26
, Issue.1
, pp. 18-26
-
-
Friesz, T.L.1
Cho, H.J.2
Mehta, N.J.3
Tobin, R.L.4
Anandalingam, G.5
-
12
-
-
0027553638
-
Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects
-
Herroelen, W.S., and Gallens, E., 1993. Computational Experience with an Optimal Procedure for the Scheduling of Activities to Maximize the Net Present Value of Projects. European Journal of Operational Research, 65, 274-277.
-
(1993)
European Journal of Operational Research
, vol.65
, pp. 274-277
-
-
Herroelen, W.S.1
Gallens, E.2
-
13
-
-
0024770085
-
Optimization by simulated annealing: An experimental evaluation; Part 1, graph partitioning
-
Johnson, D.S., Aragon, C.A., McGeoch, L.A. and Schevon, C., 1989. Optimization by Simulated Annealing: An Experimental Evaluation; Part 1, Graph Partitioning. Operations Research, 37(6), 865-892.
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 865-892
-
-
Johnson, D.S.1
Aragon, C.A.2
McGeoch, L.A.3
Schevon, C.4
-
14
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C. and Vecchi, M., 1983. Optimization by Simulated Annealing. Science, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.2
Vecchi, M.3
-
16
-
-
0000637036
-
Cash flows in networks
-
Russell, A.H., 1970. Cash Flows in Networks. Management Science, 16(5), 357-373.
-
(1970)
Management Science
, vol.16
, Issue.5
, pp. 357-373
-
-
Russell, A.H.1
-
17
-
-
0022794872
-
A comparison of heuristics for scheduling projects with cash flows and resource restrictions
-
Russell, R.A., 1986. A Comparison of Heuristics for Scheduling Projects With Cash Flows and Resource Restrictions. Management Science, 32(10), 1291-1300.
-
(1986)
Management Science
, vol.32
, Issue.10
, pp. 1291-1300
-
-
Russell, R.A.1
-
18
-
-
0028374253
-
Comment on Elmaghraby and Herroelen's the scheduling of activities to maximize the net present value of projects
-
Sepil, C., 1994. Comment on Elmaghraby and Herroelen's The Scheduling of Activities to Maximize The Net Present Value of Projects. European Journal of Operational Research, 73, 185-187.
-
(1994)
European Journal of Operational Research
, vol.73
, pp. 185-187
-
-
Sepil, C.1
-
19
-
-
84985756242
-
Using a late-start resource-constrained project schedule to improve project net present value
-
Smith-Daniels, D.E. and Aquilano, N.J., 1987. Using a Late-start Resource-Constrained Project Schedule to Improve Project Net Present Value. Decision Sciences, 18, 617-630.
-
(1987)
Decision Sciences
, vol.18
, pp. 617-630
-
-
Smith-Daniels, D.E.1
Aquilano, N.J.2
-
20
-
-
0026905656
-
Simulated annealing applied to the processor allocation problem
-
Sofianopoulos, S., 1992. Simulated Annealing Applied to the Processor Allocation Problem. European Journal of Operational Research, 60(3), 327-334.
-
(1992)
European Journal of Operational Research
, vol.60
, Issue.3
, pp. 327-334
-
-
Sofianopoulos, S.1
-
21
-
-
0026461248
-
Job shop scheduling by simulated annealing
-
Van Laarhoven, P.J.M., Aarts, E.H.L. and Lenstra, J.K., 1992. Job Shop Scheduling By Simulated Annealing. Operations Research, 40(1), 113-125.
-
(1992)
Operations Research
, vol.40
, Issue.1
, pp. 113-125
-
-
Van Laarhoven, P.J.M.1
Aarts, E.H.L.2
Lenstra, J.K.3
|