A practical applications for a multi project scheduling heuristic
-
Bowers MR, Groom K, Morris R (1996) A practical applications for a multi project scheduling heuristic. Prod Inventory J 37(4): 19-24
-
(1996)
Prod Inventory J
, vol.37
, Issue.4
, pp. 19-24
-
-
Bowers, M.R.1
Groom, K.2
Morris, R.3
-
4
-
-
0015725454
-
Project scheduling under resource constraints: Historical review and categorization of procedures
-
Davies EW (1973) Project scheduling under resource constraints: Historical review and categorization of procedures. AUE Trans 5(4):297-313
-
(1973)
AUE Trans
, vol.5
, Issue.4
, pp. 297-313
-
-
Davies, E.W.1
-
5
-
-
33746101954
-
An exact algorithm for project scheduling with multiple modes
-
Spreacher A, Hartrmann S, Drexl A (1997) An exact algorithm for project scheduling with multiple modes. OR Spectrum 19: 195-203
-
(1997)
OR Spectrum
, vol.19
, pp. 195-203
-
-
Spreacher, A.1
Hartrmann, S.2
Drexl, A.3
-
6
-
-
0022676075
-
Heuristic for resource constrained scheduling
-
Elsayed EA, Nasr NZ (1986) Heuristic for resource constrained scheduling. Int J Prod Res 24(2):299-310
-
(1986)
Int J Prod Res
, vol.24
, Issue.2
, pp. 299-310
-
-
Elsayed, E.A.1
Nasr, N.Z.2
-
7
-
-
0030122629
-
An efficient optimal solution procedure for the pre-emptive resource constrained scheduling problem
-
Demeulemeester SH, Herroelen WS (1996) An efficient optimal solution procedure for the pre-emptive resource constrained scheduling problem. Eur J Oper Res 90:334-348
-
(1996)
Eur J Oper Res
, vol.90
, pp. 334-348
-
-
Demeulemeester, S.H.1
Herroelen, W.S.2
-
8
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource constrained project scheduling
-
Boctor FF (1990) Some efficient multi-heuristic procedures for resource constrained project scheduling. Eur J Oper Res 49: 3-13
-
(1990)
Eur J Oper Res
, vol.49
, pp. 3-13
-
-
Boctor, F.F.1
-
9
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several duration modes
-
Boctor FF (1993) Heuristics for scheduling projects with resource restrictions and several duration modes. Int J Prod Res 31(11):2547-2558
-
(1993)
Int J Prod Res
, vol.31
, Issue.11
, pp. 2547-2558
-
-
Boctor, F.F.1
-
10
-
-
0030124780
-
A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
-
Boctor FF (1996) A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. Eur J Oper Res 90:349-361
-
(1996)
Eur J Oper Res
, vol.90
, pp. 349-361
-
-
Boctor, F.F.1
-
12
-
-
0000698758
-
Characterization and generation of a general class of resource constrained project scheduling problems
-
Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource constrained project scheduling problems. Manage Sci 41:1693-1730
-
(1995)
Manage Sci
, vol.41
, pp. 1693-1730
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
13
-
-
0020193734
-
Resource constrained project scheduling with time trade-offs: The non-preemptive case
-
Talbot FB (1982) Resource constrained project scheduling with time trade-offs: The non-preemptive case. Manage Sci 28: 1197-1210
-
(1982)
Manage Sci
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
14
-
-
0027666457
-
Non-preemptive multi-mode resource constrained project scheduling
-
Drexl A, Grunewald J (1993) Non-preemptive multi-mode resource constrained project scheduling. HE Trans 25:74-81
-
(1993)
HE Trans
, vol.25
, pp. 74-81
-
-
Drexl, A.1
Grunewald, J.2
-
17
-
-
0029224911
-
A genetic algorithm for the job shop problem
-
Croce ED, Tadei R, Volta G (1995) A genetic algorithm for the job shop problem. Comput Oper Res 22(1): 15-24
-
(1995)
Comput Oper Res
, vol.22
, Issue.1
, pp. 15-24
-
-
Croce, E.D.1
Tadei, R.2
Volta, G.3
-
18
-
-
0029224965
-
A genetic algorithm for flow shop sequencing
-
Reeves CR (1995) A genetic algorithm for flow shop sequencing. Comput Oper Res 22(1):5-13
-
(1995)
Comput Oper Res
, vol.22
, Issue.1
, pp. 5-13
-
-
Reeves, C.R.1
-
19
-
-
0003067290
-
Direct chromosome representation and advanced genetic operators for production scheduling
-
(Forrest S ed.), Morgan Kaufmann Publishers, CA
-
Bruns R (1993) Direct chromosome representation and advanced genetic operators for production scheduling. In: (Forrest S ed.) Proc Fourth International Conference of Genetic Algorithms, Morgan Kaufmann Publishers, CA, pp 352-359
-
(1993)
Proc Fourth International Conference of Genetic Algorithms
, pp. 352-359
-
-
Bruns, R.1
-
21
-
-
0031192667
-
A genetic algorithm for multimode resource constrained scheduling problem
-
Masoa M, Ching CT (1997) A genetic algorithm for multimode resource constrained scheduling problem. Eur J Oper Res 100:134-141
-
(1997)
Eur J Oper Res
, vol.100
, pp. 134-141
-
-
Masoa, M.1
Ching, C.T.2
-
22
-
-
0033312040
-
GA based multicriteria optimal model for construction scheduling
-
Leu S-S, Yang C-H (1999) GA based multicriteria optimal model for construction scheduling. J Constr Eng Manage 125: 420-427
-
(1999)
J Constr Eng Manage
, vol.125
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
23
-
-
0032642926
-
Optimization of resource allocation and leveling using Genetic algorithm
-
Hegazy T (1999) Optimization of resource allocation and leveling using Genetic algorithm. J Constr Eng Manage 125:167-175
-
(1999)
J Constr Eng Manage
, vol.125
, pp. 167-175
-
-
Hegazy, T.1
-
24
-
-
0034813379
-
Application of Perti-nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling
-
Reddy JP, Kumanan S, Chetty OVK (2001) Application of Perti-nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling. Int J Adv Manuf Technol 17: 305-314
-
(2001)
Int J Adv Manuf Technol
, vol.17
, pp. 305-314
-
-
Reddy, J.P.1
Kumanan, S.2
Chetty, O.V.K.3
|