메뉴 건너뛰기




Volumn 31, Issue 3-4, 2006, Pages 360-366

Multi-project scheduling using an heuristic and a genetic algorithm

Author keywords

Genetic algorithm; Heuristic; Multiproject scheduling; Project management; Resource allocation; Resource constraints

Indexed keywords

GENETIC ALGORITHMS; HEURISTIC METHODS; MATHEMATICAL PROGRAMMING; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 33751078289     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-0199-2     Document Type: Article
Times cited : (77)

References (24)
  • 1
    • 0030414507 scopus 로고    scopus 로고
    • A practical applications for a multi project scheduling heuristic
    • Bowers MR, Groom K, Morris R (1996) A practical applications for a multi project scheduling heuristic. Prod Inventory J 37(4): 19-24
    • (1996) Prod Inventory J , vol.37 , Issue.4 , pp. 19-24
    • Bowers, M.R.1    Groom, K.2    Morris, R.3
  • 4
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints: Historical review and categorization of procedures
    • Davies EW (1973) Project scheduling under resource constraints: Historical review and categorization of procedures. AUE Trans 5(4):297-313
    • (1973) AUE Trans , vol.5 , Issue.4 , pp. 297-313
    • Davies, E.W.1
  • 5
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • Spreacher A, Hartrmann S, Drexl A (1997) An exact algorithm for project scheduling with multiple modes. OR Spectrum 19: 195-203
    • (1997) OR Spectrum , vol.19 , pp. 195-203
    • Spreacher, A.1    Hartrmann, S.2    Drexl, A.3
  • 6
    • 0022676075 scopus 로고
    • Heuristic for resource constrained scheduling
    • Elsayed EA, Nasr NZ (1986) Heuristic for resource constrained scheduling. Int J Prod Res 24(2):299-310
    • (1986) Int J Prod Res , vol.24 , Issue.2 , pp. 299-310
    • Elsayed, E.A.1    Nasr, N.Z.2
  • 7
    • 0030122629 scopus 로고    scopus 로고
    • An efficient optimal solution procedure for the pre-emptive resource constrained scheduling problem
    • Demeulemeester SH, Herroelen WS (1996) An efficient optimal solution procedure for the pre-emptive resource constrained scheduling problem. Eur J Oper Res 90:334-348
    • (1996) Eur J Oper Res , vol.90 , pp. 334-348
    • Demeulemeester, S.H.1    Herroelen, W.S.2
  • 8
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource constrained project scheduling
    • Boctor FF (1990) Some efficient multi-heuristic procedures for resource constrained project scheduling. Eur J Oper Res 49: 3-13
    • (1990) Eur J Oper Res , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 9
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several duration modes
    • Boctor FF (1993) Heuristics for scheduling projects with resource restrictions and several duration modes. Int J Prod Res 31(11):2547-2558
    • (1993) Int J Prod Res , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 10
    • 0030124780 scopus 로고    scopus 로고
    • A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    • Boctor FF (1996) A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. Eur J Oper Res 90:349-361
    • (1996) Eur J Oper Res , vol.90 , pp. 349-361
    • Boctor, F.F.1
  • 12
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource constrained project scheduling problems
    • Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource constrained project scheduling problems. Manage Sci 41:1693-1730
    • (1995) Manage Sci , vol.41 , pp. 1693-1730
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 13
    • 0020193734 scopus 로고
    • Resource constrained project scheduling with time trade-offs: The non-preemptive case
    • Talbot FB (1982) Resource constrained project scheduling with time trade-offs: The non-preemptive case. Manage Sci 28: 1197-1210
    • (1982) Manage Sci , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 14
    • 0027666457 scopus 로고
    • Non-preemptive multi-mode resource constrained project scheduling
    • Drexl A, Grunewald J (1993) Non-preemptive multi-mode resource constrained project scheduling. HE Trans 25:74-81
    • (1993) HE Trans , vol.25 , pp. 74-81
    • Drexl, A.1    Grunewald, J.2
  • 17
    • 0029224911 scopus 로고
    • A genetic algorithm for the job shop problem
    • Croce ED, Tadei R, Volta G (1995) A genetic algorithm for the job shop problem. Comput Oper Res 22(1): 15-24
    • (1995) Comput Oper Res , vol.22 , Issue.1 , pp. 15-24
    • Croce, E.D.1    Tadei, R.2    Volta, G.3
  • 18
    • 0029224965 scopus 로고
    • A genetic algorithm for flow shop sequencing
    • Reeves CR (1995) A genetic algorithm for flow shop sequencing. Comput Oper Res 22(1):5-13
    • (1995) Comput Oper Res , vol.22 , Issue.1 , pp. 5-13
    • Reeves, C.R.1
  • 19
    • 0003067290 scopus 로고
    • Direct chromosome representation and advanced genetic operators for production scheduling
    • (Forrest S ed.), Morgan Kaufmann Publishers, CA
    • Bruns R (1993) Direct chromosome representation and advanced genetic operators for production scheduling. In: (Forrest S ed.) Proc Fourth International Conference of Genetic Algorithms, Morgan Kaufmann Publishers, CA, pp 352-359
    • (1993) Proc Fourth International Conference of Genetic Algorithms , pp. 352-359
    • Bruns, R.1
  • 21
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multimode resource constrained scheduling problem
    • Masoa M, Ching CT (1997) A genetic algorithm for multimode resource constrained scheduling problem. Eur J Oper Res 100:134-141
    • (1997) Eur J Oper Res , vol.100 , pp. 134-141
    • Masoa, M.1    Ching, C.T.2
  • 22
    • 0033312040 scopus 로고    scopus 로고
    • GA based multicriteria optimal model for construction scheduling
    • Leu S-S, Yang C-H (1999) GA based multicriteria optimal model for construction scheduling. J Constr Eng Manage 125: 420-427
    • (1999) J Constr Eng Manage , vol.125 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 23
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using Genetic algorithm
    • Hegazy T (1999) Optimization of resource allocation and leveling using Genetic algorithm. J Constr Eng Manage 125:167-175
    • (1999) J Constr Eng Manage , vol.125 , pp. 167-175
    • Hegazy, T.1
  • 24
    • 0034813379 scopus 로고    scopus 로고
    • Application of Perti-nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling
    • Reddy JP, Kumanan S, Chetty OVK (2001) Application of Perti-nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling. Int J Adv Manuf Technol 17: 305-314
    • (2001) Int J Adv Manuf Technol , vol.17 , pp. 305-314
    • Reddy, J.P.1    Kumanan, S.2    Chetty, O.V.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.