-
1
-
-
25144480454
-
Optimizing the supply chain configuration for new products
-
Graves S.C., and Willems S.P. Optimizing the supply chain configuration for new products. Manage Sci 51 8 (2005) 1165-1180
-
(2005)
Manage Sci
, vol.51
, Issue.8
, pp. 1165-1180
-
-
Graves, S.C.1
Willems, S.P.2
-
2
-
-
0018923627
-
On certain models of resource allocation problems
-
Weglarz J. On certain models of resource allocation problems. Kybernetics 9 (1981) 61-66
-
(1981)
Kybernetics
, vol.9
, pp. 61-66
-
-
Weglarz, J.1
-
3
-
-
67650838448
-
Supply chain design and planning - applications of optimization techniques for strategic tactical models
-
Kok A.G.D., and Graves S.C. (Eds), Elsevier, Amsterdam
-
Muriel A., and Simchi-Levi D. Supply chain design and planning - applications of optimization techniques for strategic tactical models. In: Kok A.G.D., and Graves S.C. (Eds). Supply chain management: design, coordination and operation (2003), Elsevier, Amsterdam 17-93
-
(2003)
Supply chain management: design, coordination and operation
, pp. 17-93
-
-
Muriel, A.1
Simchi-Levi, D.2
-
4
-
-
77950489471
-
Design for postponement
-
Kok A.G.D., and Graves S.C. (Eds), Elsevier, Amsterdam
-
Swaminathan J.M., and Lee H.L. Design for postponement. In: Kok A.G.D., and Graves S.C. (Eds). Supply chain management: design, coordination and operation (2003), Elsevier, Amsterdam 199-226
-
(2003)
Supply chain management: design, coordination and operation
, pp. 199-226
-
-
Swaminathan, J.M.1
Lee, H.L.2
-
5
-
-
77950469189
-
Supply chain design: flexibility considerations
-
Kok A.G.D., and Graves S.C. (Eds), Elsevier, Amsterdam
-
Bertrand J.W.M. Supply chain design: flexibility considerations. In: Kok A.G.D., and Graves S.C. (Eds). Supply chain management: design, coordination and operation (2003), Elsevier, Amsterdam 133-198
-
(2003)
Supply chain management: design, coordination and operation
, pp. 133-198
-
-
Bertrand, J.W.M.1
-
7
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case
-
Talbot F.B. Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case. Manage Sci 28 10 (1982) 1197-1210
-
(1982)
Manage Sci
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.B.1
-
12
-
-
84867925682
-
Scheduling and constraint propagation
-
Bruker P. Scheduling and constraint propagation. Discrete Appl Math 123 1-3 (2002) 227-256
-
(2002)
Discrete Appl Math
, vol.123
, Issue.1-3
, pp. 227-256
-
-
Bruker, P.1
-
13
-
-
0001013257
-
A practical use of Jackson's preemptive schedule for solving the task-shop problem
-
Carlier J., and Pinson E. A practical use of Jackson's preemptive schedule for solving the task-shop problem. Ann Oper Res 26 (1990) 269-287
-
(1990)
Ann Oper Res
, vol.26
, pp. 269-287
-
-
Carlier, J.1
Pinson, E.2
-
14
-
-
49349096120
-
-
Baptiste P, Le Pape C. Edge-finding constraint propagation algorithms for disjunctive and cumulative scheduling. In: Proceedings of the 15th workshop of the UK planning special interest group, Liverpool, UK; 1996.
-
Baptiste P, Le Pape C. Edge-finding constraint propagation algorithms for disjunctive and cumulative scheduling. In: Proceedings of the 15th workshop of the UK planning special interest group, Liverpool, UK; 1996.
-
-
-
-
15
-
-
0033479482
-
Satisfiability tests and time-bound adjustments for cumulative scheduling problems
-
Baptiste P., Le Pape C., and Nuijten W. Satisfiability tests and time-bound adjustments for cumulative scheduling problems. Ann Oper Res 92 (1999) 305-333
-
(1999)
Ann Oper Res
, vol.92
, pp. 305-333
-
-
Baptiste, P.1
Le Pape, C.2
Nuijten, W.3
-
16
-
-
49349086308
-
-
Torres P, Lopez P. Overview and possible extensions of shaving techniques for job-shop problems. In: Proceedings of the 2nd international workshop on integration of AI and OR techniques (CP-AI-OR'2000); 2000.
-
Torres P, Lopez P. Overview and possible extensions of shaving techniques for job-shop problems. In: Proceedings of the 2nd international workshop on integration of AI and OR techniques (CP-AI-OR'2000); 2000.
-
-
-
-
17
-
-
49349095644
-
-
Harvey W, Ginsberg M. Limited discrepancy search. In: The fourteenth international joint conference on artificial intelligence (IJCAI-95); 1995.
-
Harvey W, Ginsberg M. Limited discrepancy search. In: The fourteenth international joint conference on artificial intelligence (IJCAI-95); 1995.
-
-
-
-
19
-
-
2542528067
-
Logic, optimization and constraint programming
-
Hooker J. Logic, optimization and constraint programming. INFORMS J Comput 14 4 (2002) 285-321
-
(2002)
INFORMS J Comput
, vol.14
, Issue.4
, pp. 285-321
-
-
Hooker, J.1
-
22
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl A. Scheduling of project networks by job assignment. Manage Sci 37 12 (1991) 1590-1602
-
(1991)
Manage Sci
, vol.37
, Issue.12
, pp. 1590-1602
-
-
Drexl, A.1
-
23
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
Drexl A., and Grunewald J. Nonpreemptive multi-mode resource-constrained project scheduling. IIE Trans 25 (1993) 74-81
-
(1993)
IIE Trans
, vol.25
, pp. 74-81
-
-
Drexl, A.1
Grunewald, J.2
-
24
-
-
0030124780
-
A new and efficient heuristics for scheduling projects with resource restrictions and multiple execution modes
-
Boctor F.F. A new and efficient heuristics for scheduling projects with resource restrictions and multiple execution modes. Eur J Oper Res 90 (1996) 349-361
-
(1996)
Eur J Oper Res
, vol.90
, pp. 349-361
-
-
Boctor, F.F.1
-
25
-
-
0030216966
-
Resource-constrained project scheduling by simulated annealing
-
Boctor F.F. Resource-constrained project scheduling by simulated annealing. Int J Prod Res 34 (1996) 2335-2351
-
(1996)
Int J Prod Res
, vol.34
, pp. 2335-2351
-
-
Boctor, F.F.1
-
26
-
-
0009998134
-
Project scheduling under limited resources: models, methods and applications
-
Springer, Berlin
-
Hartmann S. Project scheduling under limited resources: models, methods and applications. Lecture notes in economics and mathematical system vol. 478 (1999), Springer, Berlin
-
(1999)
Lecture notes in economics and mathematical system
, vol.478
-
-
Hartmann, S.1
-
27
-
-
0033311742
-
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
-
De Reyck B., and Herroelen W.S. The multi-mode resource-constrained project scheduling problem with generalized precedence relations. Eur J Oper Res 119 (1999) 538-556
-
(1999)
Eur J Oper Res
, vol.119
, pp. 538-556
-
-
De Reyck, B.1
Herroelen, W.S.2
|