메뉴 건너뛰기




Volumn 54, Issue 6, 2003, Pages 614-626

Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms

Author keywords

Heuristics; Multi mode project scheduling; Project management; Resource constrained

Indexed keywords

GENETIC ALGORITHMS; HEURISTIC METHODS; PROJECT MANAGEMENT; RESOURCE ALLOCATION; SCHEDULING;

EID: 0038209741     PISSN: 01605682     EISSN: None     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601563     Document Type: Article
Times cited : (201)

References (27)
  • 1
    • 0019047699 scopus 로고
    • Two approaches to problems of resource allocation among project activities: A comparative study
    • Slowinski R (1980). Two approaches to problems of resource allocation among project activities: a comparative study. J Opl Res Soc 31: 711-723.
    • (1980) J Opl Res Soc , vol.31 , pp. 711-723
    • Slowinski, R.1
  • 2
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • Kolisch R and Drexl A (1997). Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Trans 29: 987-999.
    • (1997) IIE Trans , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 3
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource trade-offs: The nonpreemptive case
    • Talbot FB (1982). Resource-constrained project scheduling with time-resource trade-offs: the nonpreemptive case. Mng Sci 28: 1197-1210.
    • (1982) Mng Sci , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 4
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problem
    • Slowinskiy R, Weglarz J (eds). Elsevier: Amsterdam
    • Patterson JH, Slowinski R, Talbot FB and Weglarz J (1989). An algorithm for a general class of precedence and resource constrained scheduling problem. In: Slowinskiy R, Weglarz J (eds). Advances in Project Scheduling. Elsevier: Amsterdam, pp 3-28.
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 5
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • Sprecher A, Hartmann S and Drexl A (1997). An exact algorithm for project scheduling with multiple modes. OR Spektrum 19: 195-203.
    • (1997) OR Spektrum , vol.19 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 6
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • Hartmann S and Drexl A (1998). Project scheduling with multiple modes: a comparison of exact algorithms. Networks 32: 283-297.
    • (1998) Networks , vol.32 , pp. 283-297
    • Hartmann, S.1    Drexl, A.2
  • 7
    • 0032096811 scopus 로고    scopus 로고
    • Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm
    • Sprecher A and Drexl A (1998). Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm. Eur J Opl Res 107: 431-450.
    • (1998) Eur J Opl Res , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 9
    • 0043114397 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem
    • Istanbul, Turkey
    • Bouleimen K and Lecocq H (1998). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem. Presented at the Sixth International Workshop on Project Management and Scheduling, Istanbul, Turkey.
    • (1998) Sixth International Workshop on Project Management and Scheduling
    • Bouleimen, K.1    Lecocq, H.2
  • 10
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • Boctor FF (1996). Resource-constrained project scheduling by simulated annealing. Int J Prod Res 34: 2335-2351.
    • (1996) Int J Prod Res , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 11
    • 0035612931 scopus 로고    scopus 로고
    • Simulated annealing for multi-mode resource-constrained project scheduling
    • Jozefowska J, Mika M, Rozycki R, Waligora G and Weglarz J (2001). Simulated annealing for multi-mode resource-constrained project scheduling. Ann Opns Res 102: 137-155.
    • (2001) Ann Opns Res , vol.102 , pp. 137-155
    • Jozefowska, J.1    Mika, M.2    Rozycki, R.3    Waligora, G.4    Weglarz, J.5
  • 12
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multi-mode resource constrained project scheduling problem
    • Mori M and Tseng CC (1997). A genetic algorithm for multi-mode resource constrained project scheduling problem. Eur J Opl Res 100: 134-141.
    • (1997) Eur J Opl Res , vol.100 , pp. 134-141
    • Mori, M.1    Tseng, C.C.2
  • 13
    • 0002614325 scopus 로고    scopus 로고
    • A genetic algorithm approach to a general category project scheduling problem
    • Özdamar L (1999). A genetic algorithm approach to a general category project scheduling problem. IEEE Trails Syst Man Cybern 29: 44-59.
    • (1999) IEEE Trails Syst Man Cybern , vol.29 , pp. 44-59
    • Özdamar, L.1
  • 14
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • Hartmann S (2001). Project scheduling with multiple modes: a genetic algorithm. Ann Opns Res 102: 111-135.
    • (2001) Ann Opns Res , vol.102 , pp. 111-135
    • Hartmann, S.1
  • 16
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexl A and Grünewald J (1993). Nonpreemptive multi-mode resource-constrained project scheduling. IIE Trans 25: 74-81.
    • (1993) IIE Trans , vol.25 , pp. 74-81
    • Drexl, A.1    Grünewald, J.2
  • 17
    • 0009627197 scopus 로고
    • A local constraint based analysis approach to project scheduling under general resource constraints
    • Özdamar L and Ulusoy G (1994). A local constraint based analysis approach to project scheduling under general resource constraints. Eur J Opl Res 79: 287-298.
    • (1994) Eur J Opl Res , vol.79 , pp. 287-298
    • Özdamar, L.1    Ulusoy, G.2
  • 18
    • 0042287689 scopus 로고    scopus 로고
    • A robust genetic algorithm for resource allocation in project scheduling
    • Alcaraz J and Maroto C (2001). A robust genetic algorithm for resource allocation in project scheduling. Ann Opns Res 102: 83-109.
    • (2001) Ann Opns Res , vol.102 , pp. 83-109
    • Alcaraz, J.1    Maroto, C.2
  • 20
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models, and methods
    • Brucker P, Drexl A, Mohring R, Neumann K and Pesch E (1998). Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Opl Res 112: 3-41.
    • (1998) Eur J Opl Res , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Mohring, R.3    Neumann, K.4    Pesch, E.5
  • 21
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R and Padman R (2001). An integrated survey of deterministic project scheduling. Omega-Int J Mngt Sci 29: 249-272.
    • (2001) Omega-Int J Mngt Sci , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 22
    • 0012361022 scopus 로고    scopus 로고
    • Project scheduling with time windows and scarce resources
    • Neumann K, Schwindt C and Zimmermann J (2002). Project scheduling with time windows and scarce resources. Lect Notes Econ Math 508: 1-335.
    • (2002) Lect Notes Econ Math , vol.508 , pp. 1-335
    • Neumann, K.1    Schwindt, C.2    Zimmermann, J.3
  • 23
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch R (1996). Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. Eur J Opl Res 90: 320-333.
    • (1996) Eur J Opl Res , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 25
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling problem library
    • Kolisch R and Sprecher A (1996). PSPLIB - a project scheduling problem library. Eur J Opl Res 96: 205-216.
    • (1996) Eur J Opl Res , vol.96 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 26
    • 0038709782 scopus 로고    scopus 로고
    • Resource allocation in project management by an adaptive genetic algorithm
    • Cincinnati, USA
    • Alcaraz J and Maroto C (1999). Resource allocation in project management by an adaptive genetic algorithm. Presented at the Informs Cincinnati Spring 1999 Meeting, Cincinnati, USA.
    • (1999) Informs Cincinnati Spring 1999 Meeting
    • Alcaraz, J.1    Maroto, C.2
  • 27
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor FF (1993). Heuristics for scheduling projects with resource restrictions and several resource-duration modes. Int J Prod Res 31:2547-2558.
    • (1993) Int J Prod Res , vol.31 , pp. 2547-2558
    • Boctor, F.F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.