-
1
-
-
0019047699
-
Two approaches to problems of resource allocation among project activities: A comparative study
-
Slowinski R (1980). Two approaches to problems of resource allocation among project activities: a comparative study. J Opl Res Soc 31: 711-723.
-
(1980)
J Opl Res Soc
, vol.31
, pp. 711-723
-
-
Slowinski, R.1
-
2
-
-
0031276875
-
Local search for nonpreemptive multi-mode resource-constrained project scheduling
-
Kolisch R and Drexl A (1997). Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Trans 29: 987-999.
-
(1997)
IIE Trans
, vol.29
, pp. 987-999
-
-
Kolisch, R.1
Drexl, A.2
-
3
-
-
0020193734
-
Resource-constrained project scheduling with time-resource trade-offs: The nonpreemptive case
-
Talbot FB (1982). Resource-constrained project scheduling with time-resource trade-offs: the nonpreemptive case. Mng Sci 28: 1197-1210.
-
(1982)
Mng Sci
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
4
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problem
-
Slowinskiy R, Weglarz J (eds). Elsevier: Amsterdam
-
Patterson JH, Slowinski R, Talbot FB and Weglarz J (1989). An algorithm for a general class of precedence and resource constrained scheduling problem. In: Slowinskiy R, Weglarz J (eds). Advances in Project Scheduling. Elsevier: Amsterdam, pp 3-28.
-
(1989)
Advances in Project Scheduling
, pp. 3-28
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
5
-
-
33746101954
-
An exact algorithm for project scheduling with multiple modes
-
Sprecher A, Hartmann S and Drexl A (1997). An exact algorithm for project scheduling with multiple modes. OR Spektrum 19: 195-203.
-
(1997)
OR Spektrum
, vol.19
, pp. 195-203
-
-
Sprecher, A.1
Hartmann, S.2
Drexl, A.3
-
6
-
-
0040577754
-
Project scheduling with multiple modes: A comparison of exact algorithms
-
Hartmann S and Drexl A (1998). Project scheduling with multiple modes: a comparison of exact algorithms. Networks 32: 283-297.
-
(1998)
Networks
, vol.32
, pp. 283-297
-
-
Hartmann, S.1
Drexl, A.2
-
7
-
-
0032096811
-
Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm
-
Sprecher A and Drexl A (1998). Solving multi-mode resource-constrained project scheduling problems by a simple, general and powerful sequencing algorithm. Eur J Opl Res 107: 431-450.
-
(1998)
Eur J Opl Res
, vol.107
, pp. 431-450
-
-
Sprecher, A.1
Drexl, A.2
-
9
-
-
0043114397
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem
-
Istanbul, Turkey
-
Bouleimen K and Lecocq H (1998). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem. Presented at the Sixth International Workshop on Project Management and Scheduling, Istanbul, Turkey.
-
(1998)
Sixth International Workshop on Project Management and Scheduling
-
-
Bouleimen, K.1
Lecocq, H.2
-
10
-
-
0030216966
-
Resource-constrained project scheduling by simulated annealing
-
Boctor FF (1996). Resource-constrained project scheduling by simulated annealing. Int J Prod Res 34: 2335-2351.
-
(1996)
Int J Prod Res
, vol.34
, pp. 2335-2351
-
-
Boctor, F.F.1
-
11
-
-
0035612931
-
Simulated annealing for multi-mode resource-constrained project scheduling
-
Jozefowska J, Mika M, Rozycki R, Waligora G and Weglarz J (2001). Simulated annealing for multi-mode resource-constrained project scheduling. Ann Opns Res 102: 137-155.
-
(2001)
Ann Opns Res
, vol.102
, pp. 137-155
-
-
Jozefowska, J.1
Mika, M.2
Rozycki, R.3
Waligora, G.4
Weglarz, J.5
-
12
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
Mori M and Tseng CC (1997). A genetic algorithm for multi-mode resource constrained project scheduling problem. Eur J Opl Res 100: 134-141.
-
(1997)
Eur J Opl Res
, vol.100
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
13
-
-
0002614325
-
A genetic algorithm approach to a general category project scheduling problem
-
Özdamar L (1999). A genetic algorithm approach to a general category project scheduling problem. IEEE Trails Syst Man Cybern 29: 44-59.
-
(1999)
IEEE Trails Syst Man Cybern
, vol.29
, pp. 44-59
-
-
Özdamar, L.1
-
14
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
Hartmann S (2001). Project scheduling with multiple modes: a genetic algorithm. Ann Opns Res 102: 111-135.
-
(2001)
Ann Opns Res
, vol.102
, pp. 111-135
-
-
Hartmann, S.1
-
16
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
Drexl A and Grünewald J (1993). Nonpreemptive multi-mode resource-constrained project scheduling. IIE Trans 25: 74-81.
-
(1993)
IIE Trans
, vol.25
, pp. 74-81
-
-
Drexl, A.1
Grünewald, J.2
-
17
-
-
0009627197
-
A local constraint based analysis approach to project scheduling under general resource constraints
-
Özdamar L and Ulusoy G (1994). A local constraint based analysis approach to project scheduling under general resource constraints. Eur J Opl Res 79: 287-298.
-
(1994)
Eur J Opl Res
, vol.79
, pp. 287-298
-
-
Özdamar, L.1
Ulusoy, G.2
-
18
-
-
0042287689
-
A robust genetic algorithm for resource allocation in project scheduling
-
Alcaraz J and Maroto C (2001). A robust genetic algorithm for resource allocation in project scheduling. Ann Opns Res 102: 83-109.
-
(2001)
Ann Opns Res
, vol.102
, pp. 83-109
-
-
Alcaraz, J.1
Maroto, C.2
-
20
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker P, Drexl A, Mohring R, Neumann K and Pesch E (1998). Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Opl Res 112: 3-41.
-
(1998)
Eur J Opl Res
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Mohring, R.3
Neumann, K.4
Pesch, E.5
-
21
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch R and Padman R (2001). An integrated survey of deterministic project scheduling. Omega-Int J Mngt Sci 29: 249-272.
-
(2001)
Omega-Int J Mngt Sci
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
22
-
-
0012361022
-
Project scheduling with time windows and scarce resources
-
Neumann K, Schwindt C and Zimmermann J (2002). Project scheduling with time windows and scarce resources. Lect Notes Econ Math 508: 1-335.
-
(2002)
Lect Notes Econ Math
, vol.508
, pp. 1-335
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
23
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
Kolisch R (1996). Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. Eur J Opl Res 90: 320-333.
-
(1996)
Eur J Opl Res
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
25
-
-
0030788844
-
PSPLIB - A project scheduling problem library
-
Kolisch R and Sprecher A (1996). PSPLIB - a project scheduling problem library. Eur J Opl Res 96: 205-216.
-
(1996)
Eur J Opl Res
, vol.96
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
26
-
-
0038709782
-
Resource allocation in project management by an adaptive genetic algorithm
-
Cincinnati, USA
-
Alcaraz J and Maroto C (1999). Resource allocation in project management by an adaptive genetic algorithm. Presented at the Informs Cincinnati Spring 1999 Meeting, Cincinnati, USA.
-
(1999)
Informs Cincinnati Spring 1999 Meeting
-
-
Alcaraz, J.1
Maroto, C.2
-
27
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several resource-duration modes
-
Boctor FF (1993). Heuristics for scheduling projects with resource restrictions and several resource-duration modes. Int J Prod Res 31:2547-2558.
-
(1993)
Int J Prod Res
, vol.31
, pp. 2547-2558
-
-
Boctor, F.F.1
|