The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects
-
Eden C, Williams T, Ackerman F and Howick S (2000). The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects. J Opl Res Soc 51: 291-300.
-
(2000)
J Opl Res Soc
, vol.51
, pp. 291-300
-
-
Eden, C.1
Williams, T.2
Ackerman, F.3
Howick, S.4
-
4
-
-
0032042933
-
Resource-constrained project scheduling: A survey of recent developments
-
Herroelen W, De Reyck B and Demeulemeester E (1998). Resource-constrained project scheduling: a survey of recent developments. Comput Opns Res 25: 279-302.
-
(1998)
Comput Opns Res
, vol.25
, pp. 279-302
-
-
Herroelen, W.1
De Reyck, B.2
Demeulemeester, E.3
-
5
-
-
18144452822
-
Project scheduling under partially renewable resource constraints
-
Bottcher J, Drexl A, Kolisch R and Salewski F (1999). Project scheduling under partially renewable resource constraints. Mngt Sci 45: 543-559.
-
(1999)
Mngt Sci
, vol.45
, pp. 543-559
-
-
Bottcher, J.1
Drexl, A.2
Kolisch, R.3
Salewski, F.4
-
6
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch R and Padman R (2001), An integrated survey of deterministic project scheduling. OMEGA 29: 249-272.
-
(2001)
OMEGA
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
7
-
-
0035501151
-
Understanding and managing risks in large engineering projects
-
Miller R and Lessard D (2001). Understanding and managing risks in large engineering projects. Int J Project Mngt 19: 437-443.
-
(2001)
Int J Project Mngt
, vol.19
, pp. 437-443
-
-
Miller, R.1
Lessard, D.2
-
8
-
-
0036697280
-
On uncertainty, ambiguity, and complexity in project management
-
Pich MT, Loch CH and De Meyer A (2002). On uncertainty, ambiguity, and complexity in project management. Mngt Sci 48: 1008-1023.
-
(2002)
Mngt Sci
, vol.48
, pp. 1008-1023
-
-
Pich, M.T.1
Loch, C.H.2
De Meyer, A.3
-
10
-
-
0029342363
-
The effects of design changes and delays on project costs
-
Williams T and Eden C (1995). The effects of design changes and delays on project costs. J Opl Res Soc 46: 809-818.
-
(1995)
J Opl Res Soc
, vol.46
, pp. 809-818
-
-
Williams, T.1
Eden, C.2
-
11
-
-
0037210988
-
Assessing extension of time delays on major projects
-
Williams T (2003). Assessing extension of time delays on major projects. Int J Project Mngt 21: 19-26.
-
(2003)
Int J Project Mngt
, vol.21
, pp. 19-26
-
-
Williams, T.1
-
12
-
-
0031258020
-
Project risk analysis and management - PARM the generic process
-
Chapman C (1997). Project risk analysis and management - PARM the generic process. Int J Project Mngt 15: 273-281.
-
(1997)
Int J Project Mngt
, vol.15
, pp. 273-281
-
-
Chapman, C.1
-
13
-
-
0037251369
-
A new era for crew recovery at continental airlines
-
Yu G, Argüello M, Song G, McCowan SM and White A (2003). A new era for crew recovery at continental airlines. Interfaces 33: 5-22.
-
(2003)
Interfaces
, vol.33
, pp. 5-22
-
-
Yu, G.1
Argüello, M.2
Song, G.3
McCowan, S.M.4
White, A.5
-
14
-
-
24144491827
-
A GRASP for aircraft routing in response to groundings and delays
-
Argüello M, Bard JF and Yu G (1997). A GRASP for aircraft routing in response to groundings and delays. J Combin Optim 5: 211-228.
-
(1997)
J Combin Optim
, vol.5
, pp. 211-228
-
-
Argüello, M.1
Bard, J.F.2
Yu, G.3
-
15
-
-
0035324674
-
Multiple fleet aircraft schedule recovery following hub closures
-
Thengvall BG, Bard JF and Yu G (2001). Multiple fleet aircraft schedule recovery following hub closures. Transp Res Part A 35: 289-308.
-
(2001)
Transp Res Part A
, vol.35
, pp. 289-308
-
-
Thengvall, B.G.1
Bard, J.F.2
Yu, G.3
-
16
-
-
0035329641
-
On project scheduling with irregular starting time costs
-
Möhring RH, Schulz AS, Stork F and Uetz M (2001). On project scheduling with irregular starting time costs. Opns Res Lett 28: 149-154.
-
(2001)
Opns Res Lett
, vol.28
, pp. 149-154
-
-
Möhring, R.H.1
Schulz, A.S.2
Stork, F.3
Uetz, M.4
-
17
-
-
0037871958
-
Solving project scheduling problems by minimum cut computations
-
Möhring RH, Schulz AS, Stork F and Uetz M (2003). Solving project scheduling problems by minimum cut computations. Mngt Sci 49: 330-350.
-
(2003)
Mngt Sci
, vol.49
, pp. 330-350
-
-
Möhring, R.H.1
Schulz, A.S.2
Stork, F.3
Uetz, M.4
-
20
-
-
0042094661
-
A new approach to integrating mixed integer programming and constraint logic programming
-
Rodosěk R, Wallace MG and Hajian MT (1999). A new approach to integrating mixed integer programming and constraint logic programming. Ann Opns Res 86: 63-87.
-
(1999)
Ann Opns Res
, vol.86
, pp. 63-87
-
-
Rodosěk, R.1
Wallace, M.G.2
Hajian, M.T.3
-
21
-
-
0000397138
-
Branch and infer: A unifying framework for integer and finite domain constraint programming
-
Bockmayr A and Kasper T (1998). Branch and infer: a unifying framework for integer and finite domain constraint programming. INFORMS J Comput 10: 287-300.
-
(1998)
INFORMS J Comput
, vol.10
, pp. 287-300
-
-
Bockmayr, A.1
Kasper, T.2
-
22
-
-
0010986664
-
Algorithms for hybrid MILP/ CP models for a class of optimization problems
-
Jain V and Grossmann IE (2001). Algorithms for hybrid MILP/ CP models for a class of optimization problems. INFORMS J Comput 13: 258-276.
-
(2001)
INFORMS J Comput
, vol.13
, pp. 258-276
-
-
Jain, V.1
Grossmann, I.E.2
-
24
-
-
0036567019
-
A branch-and-cut procedure for the vehicle routing problem with time windows
-
Bard JF, Kontoravdis G and Yu G (2002). A branch-and-cut procedure for the vehicle routing problem with time windows. Transp Sci 36: 250-269.
-
(2002)
Transp Sci
, vol.36
, pp. 250-269
-
-
Bard, J.F.1
Kontoravdis, G.2
Yu, G.3
-
25
-
-
0000660003
-
Lifted cover inequalities for 0-1 integer programs: Computation
-
Gu Z, Nemhauser GL and Savelsbergh MW (1998). Lifted cover inequalities for 0-1 integer programs: computation. INFORMS J Comput 10: 427-437.
-
(1998)
INFORMS J Comput
, vol.10
, pp. 427-437
-
-
Gu, Z.1
Nemhauser, G.L.2
Savelsbergh, M.W.3
-
26
-
-
15844419394
-
-
Working paper, Department of Management Science and Information Systems, The University of Texas, Austin
-
Zhu G, Bard JF and Yu G (2003). A branch-and-cut procedure for multi-mode resource constraint project scheduling problem Working paper, Department of Management Science and Information Systems, The University of Texas, Austin.
-
(2003)
A Branch-and-cut Procedure for Multi-mode Resource Constraint Project Scheduling Problem
-
-
Zhu, G.1
Bard, J.F.2
Yu, G.3
-
27
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
Bartusch M, Möhring RH and Radermacher EJ (1988). Scheduling project networks with resource constraints and time windows. Ann Opns Res 16: 201-240.
-
(1988)
Ann Opns Res
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, E.J.3
-
28
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch R, Sprecher A and Drexl A (1995). Characterization and generation of a general class of resource-constrained project scheduling problems. Mngt Sci 41: 1693-1703.
-
(1995)
Mngt Sci
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
|