Volumn 96, Issue 1, 1997, Pages 205-216

PSPLIB - A project scheduling problem library

Author keywords

Benchmark instances; Project scheduling; Resource constraints

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; INFORMATION RETRIEVAL SYSTEMS; ONLINE SEARCHING; PROBLEM SOLVING; RESOURCE ALLOCATION; SUBROUTINES;

EID: 0030788844     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(96)00170-1     Document Type: Article
Times cited : (1108)

References (36)
  • 4
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • Davis, E.W., and Heidorn, G.E., "An algorithm for optimal project scheduling under multiple resource constraints", Management Science 17 (1971) B803-B816.
    • (1971) Management Science , vol.17
    • Davis, E.W.1    Heidorn, G.E.2
  • 5
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E., and Herroelen, W., "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem", Management Science 38/12 (1992) 1803-1818.
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 8
    • 85033122783 scopus 로고    scopus 로고
    • On the use of the complexity index as a measure of complexity in activity networks
    • to appear
    • De Reyck, B., and Herroelen, W., "On the use of the complexity index as a measure of complexity in activity networks", European Journal of Operational Research, to appear.
    • European Journal of Operational Research
    • De Reyck, B.1    Herroelen, W.2
  • 13
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited - Theory and computation
    • Kolisch, R., "Serial and parallel resource-constrained project scheduling methods revisited - Theory and computation", European Journal of Operational Research, 90 (1996) 320-333.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 14
    • 85033119257 scopus 로고    scopus 로고
    • Efficient priority rules for the resource constrained project scheduling problem
    • to appear
    • Kolisch, R., "Efficient priority rules for the resource constrained project scheduling problem", Journal of Operations Management, to appear.
    • Journal of Operations Management
    • Kolisch, R.1
  • 16
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive search for solving hard project scheduling problems
    • Kolisch, R., and Drexl, A., "Adaptive search for solving hard project scheduling problems", Naval Research Logistics 43 (1996) 23-40.
    • (1996) Naval Research Logistics , vol.43 , pp. 23-40
    • Kolisch, R.1    Drexl, A.2
  • 18
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A., and Drexl, A., "Characterization and generation of a general class of resource-constrained project scheduling problems", Management Science 41 (1995) 1693-1703.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 21
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J.H., "A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem", Management Science 30 (1984) 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 22
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problems
    • R. Slowinski and J. Weglarz (eds.): Elsevier, Amsterdam
    • Patterson, J.H., Slowinski, R., Talbot, F.B., and Weglarz, J., "An algorithm for a general class of precedence and resource constrained scheduling problems", in: R. Slowinski and J. Weglarz (eds.): Advances in Project Scheduling. Elsevier, Amsterdam, 1989, 3-28.
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 23
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
    • Patterson, J.H., Slowinski, R., Talbot, F.B., and Weglarz, J., "Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems", European Journal of Operational Research 49 (1990) 68-79.
    • (1990) European Journal of Operational Research , vol.49 , pp. 68-79
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 26
    • 0019047699 scopus 로고
    • Two approaches to problems of resource allocation among project activities: A comparative study
    • Slowinski, R., "Two approaches to problems of resource allocation among project activities: A comparative study", Journal of the Operational Research Society, 31 (1980) 711-723.
    • (1980) Journal of the Operational Research Society , vol.31 , pp. 711-723
    • Slowinski, R.1
  • 27
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
    • Slowinski, R., "Multiobjective network scheduling with efficient use of renewable and nonrenewable resources", European Journal of Operational Research 1 (1981) 265-273.
    • (1981) European Journal of Operational Research , vol.1 , pp. 265-273
    • Slowinski, R.1
  • 32
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • Stinson, J.P., Davis, E.W., and Khumawala, B.M., "Multiple resource-constrained scheduling using branch and bound", AIIE Transactions 10 (1978) 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 33
    • 0026930899 scopus 로고
    • New search spaces for sequencing problems with application to job shop scheduling
    • Storer, R.H., Wu, S.D., and Vaccari, R., "New search spaces for sequencing problems with application to job shop scheduling", Management Science 38 (1992) 1495-1509.
    • (1992) Management Science , vol.38 , pp. 1495-1509
    • Storer, R.H.1    Wu, S.D.2    Vaccari, R.3
  • 34
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
    • Talbot, F.B., "Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case", Management Science 28 (1982) 1197-1210.
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 36
    • 0018923627 scopus 로고
    • On certain models of resource allocation problems
    • Weglarz, J., "On certain models of resource allocation problems", Kybernetics 9 (1980) 61-66.
    • (1980) Kybernetics , vol.9 , pp. 61-66
    • Weglarz, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.