Volumn 125, Issue 1, 2000, Pages 59-72

ProGen/πχ - an instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; MATHEMATICAL MODELS; OPERATIONS RESEARCH; OPTIMIZATION; PERSONNEL; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 0033722085     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00205-2     Document Type: Article
Times cited : (64)

References (25)
  • 2
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
    • In: Slowinski, R., Weglarz, J. (Eds.), Elsevier, Amsterdam
    • Alvarez-Valdés, R., Tamarit, J.M., 1989. Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski, R., Weglarz, J. (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, pp. 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdés, R.1    Tamarit, J.M.2
  • 3
    • 0000185277 scopus 로고
    • A lift-and project cutting plane algorithm for mixed 0-1 programs
    • Balas E., Ceria S., Cornuéjols G. A lift-and project cutting plane algorithm for mixed 0-1 programs. Mathematical Programming. 58:1993;295-324.
    • (1993) Mathematical Programming , vol.58 , pp. 295-324
    • Balas, E.1    Ceria, S.2    Cornuéjols, G.3
  • 4
    • 0037870067 scopus 로고    scopus 로고
    • Mixed 0-1 programming by lift-and-project in a branch-and-cut framework
    • Balas E., Ceria S., Cornuéjols G. Mixed 0-1 programming by lift-and-project in a branch-and-cut framework. Management Science. 42:1996a;1229-1246.
    • (1996) Management Science , vol.42 , pp. 1229-1246
    • Balas, E.1    Ceria, S.2    Cornuéjols, G.3
  • 6
    • 0013141213 scopus 로고
    • M-machine unit time scheduling. A report on ongoing research
    • A. Kurzhanski, K. Neumann, & D. Pallaschke. Heidelberg: Springer Berlin
    • Bartusch M., Möhring R.H., Radermacher F.J. M-machine unit time scheduling. A report on ongoing research. Kurzhanski A., Neumann K., Pallaschke D. Optimization Parallel Processing and Applications. 1988;165-213 Springer Berlin, Heidelberg.
    • (1988) Optimization Parallel Processing and Applications , pp. 165-213
    • Bartusch, M.1    Möhring, R.H.2    Radermacher, F.J.3
  • 7
    • 18144452822 scopus 로고    scopus 로고
    • Project scheduling under partially renewable resource constaints
    • Böttcher, J., Drexl, A., Kolisch, R., Salewski, F., 1999. Project scheduling under partially renewable resource constaints. Management Science 45, 543-559.
    • (1999) Management Science , vol.45 , pp. 543-559
    • Böttcher, J.1    Drexl, A.2    Kolisch, R.3    Salewski, F.4
  • 8
    • 85017021690 scopus 로고    scopus 로고
    • Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The minimum project-duration and resource-levelling problems
    • Brinkmann, K., Neumann, K., 1996. Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The minimum project-duration and resource-levelling problems. Journal of Decision Systems 5, 129-155.
    • (1996) Journal of Decision Systems , vol.5 , pp. 129-155
    • Brinkmann, K.1    Neumann, K.2
  • 9
    • 0043258606 scopus 로고
    • Using the CPLEX callable library, CPLEX Optimization
    • CPLEX Optimization 1995. Using the CPLEX callable library, CPLEX Optimization.
    • (1995) CPLEX Optimization
  • 10
    • 0016520377 scopus 로고
    • Project network summary measures constrained-resource scheduling
    • Davis E.W. Project network summary measures constrained-resource scheduling. AIIE Transactions. 7:1975;132-142.
    • (1975) AIIE Transactions , vol.7 , pp. 132-142
    • Davis, E.W.1
  • 12
    • 0031076814 scopus 로고    scopus 로고
    • Audit scheduling with overlapping activities and sequence-dependent setup costs
    • Dodin B., Elimam A.A. Audit scheduling with overlapping activities and sequence-dependent setup costs. European Journal of Operational Research. 97:1997;22-33.
    • (1997) European Journal of Operational Research , vol.97 , pp. 22-33
    • Dodin, B.1    Elimam, A.A.2
  • 14
    • 0031246797 scopus 로고    scopus 로고
    • Distribution requirements and compactness constraints in school timetabling
    • Drexl A., Salewski F. Distribution requirements and compactness constraints in school timetabling. European Journal of Operational Research. 102:1997;193-214.
    • (1997) European Journal of Operational Research , vol.102 , pp. 193-214
    • Drexl, A.1    Salewski, F.2
  • 15
    • 0027614308 scopus 로고
    • Solving airline crew scheduling problems by branch-and-cut
    • Hoffman K.L., Padberg M. Solving airline crew scheduling problems by branch-and-cut. Management Science. 39:1993;657-682.
    • (1993) Management Science , vol.39 , pp. 657-682
    • Hoffman, K.L.1    Padberg, M.2
  • 17
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R., Sprecher A., Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science. 41:1995;1693-1703.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 18
    • 0000647152 scopus 로고
    • Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints
    • Neumann K., Zhan J. Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints. Journal of Intelligent Manufacturing. 6:1995;145-154.
    • (1995) Journal of Intelligent Manufacturing , vol.6 , pp. 145-154
    • Neumann, K.1    Zhan, J.2
  • 20
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource project scheduling problem
    • Patterson J.H. A comparison of exact approaches for solving the multiple constrained resource project scheduling problem. Management Science. 30:1984;854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 25
    • 0017537769 scopus 로고
    • Measures of the restrictiveness of project networks
    • Thesen A. Measures of the restrictiveness of project networks. Networks. 7:1977;193-208.
    • (1977) Networks , vol.7 , pp. 193-208
    • Thesen, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.