Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
-
In: Slowinski, R., Weglarz, J. (Eds.), Elsevier, Amsterdam
-
Alvarez-Valdés, R., Tamarit, J.M., 1989. Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski, R., Weglarz, J. (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, pp. 113-134.
-
(1989)
Advances in Project Scheduling
, pp. 113-134
-
-
Alvarez-Valdés, R.1
Tamarit, J.M.2
-
3
-
-
0000185277
-
A lift-and project cutting plane algorithm for mixed 0-1 programs
-
Balas E., Ceria S., Cornuéjols G. A lift-and project cutting plane algorithm for mixed 0-1 programs. Mathematical Programming. 58:1993;295-324.
-
(1993)
Mathematical Programming
, vol.58
, pp. 295-324
-
-
Balas, E.1
Ceria, S.2
Cornuéjols, G.3
-
4
-
-
0037870067
-
Mixed 0-1 programming by lift-and-project in a branch-and-cut framework
-
Balas E., Ceria S., Cornuéjols G. Mixed 0-1 programming by lift-and-project in a branch-and-cut framework. Management Science. 42:1996a;1229-1246.
-
(1996)
Management Science
, vol.42
, pp. 1229-1246
-
-
Balas, E.1
Ceria, S.2
Cornuéjols, G.3
-
6
-
-
0013141213
-
M-machine unit time scheduling. A report on ongoing research
-
A. Kurzhanski, K. Neumann, & D. Pallaschke. Heidelberg: Springer Berlin
-
Bartusch M., Möhring R.H., Radermacher F.J. M-machine unit time scheduling. A report on ongoing research. Kurzhanski A., Neumann K., Pallaschke D. Optimization Parallel Processing and Applications. 1988;165-213 Springer Berlin, Heidelberg.
-
(1988)
Optimization Parallel Processing and Applications
, pp. 165-213
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, F.J.3
-
7
-
-
18144452822
-
Project scheduling under partially renewable resource constaints
-
Böttcher, J., Drexl, A., Kolisch, R., Salewski, F., 1999. Project scheduling under partially renewable resource constaints. Management Science 45, 543-559.
-
(1999)
Management Science
, vol.45
, pp. 543-559
-
-
Böttcher, J.1
Drexl, A.2
Kolisch, R.3
Salewski, F.4
-
8
-
-
85017021690
-
Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The minimum project-duration and resource-levelling problems
-
Brinkmann, K., Neumann, K., 1996. Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The minimum project-duration and resource-levelling problems. Journal of Decision Systems 5, 129-155.
-
(1996)
Journal of Decision Systems
, vol.5
, pp. 129-155
-
-
Brinkmann, K.1
Neumann, K.2
-
9
-
-
0043258606
-
-
Using the CPLEX callable library, CPLEX Optimization
-
CPLEX Optimization 1995. Using the CPLEX callable library, CPLEX Optimization.
-
(1995)
CPLEX Optimization
-
-
-
10
-
-
0016520377
-
Project network summary measures constrained-resource scheduling
-
Davis E.W. Project network summary measures constrained-resource scheduling. AIIE Transactions. 7:1975;132-142.
-
(1975)
AIIE Transactions
, vol.7
, pp. 132-142
-
-
Davis, E.W.1
-
12
-
-
0031076814
-
Audit scheduling with overlapping activities and sequence-dependent setup costs
-
Dodin B., Elimam A.A. Audit scheduling with overlapping activities and sequence-dependent setup costs. European Journal of Operational Research. 97:1997;22-33.
-
(1997)
European Journal of Operational Research
, vol.97
, pp. 22-33
-
-
Dodin, B.1
Elimam, A.A.2
-
13
-
-
0343163910
-
-
Research Report, University of Kiel
-
Drexl, A., Juretzka, J., Salewski, F., 1993. Academic course scheduling under workload and changeover constraints. Research Report, University of Kiel.
-
(1993)
Academic Course Scheduling under Workload and Changeover Constraints
-
-
Drexl, A.1
Juretzka, J.2
Salewski, F.3
-
14
-
-
0031246797
-
Distribution requirements and compactness constraints in school timetabling
-
Drexl A., Salewski F. Distribution requirements and compactness constraints in school timetabling. European Journal of Operational Research. 102:1997;193-214.
-
(1997)
European Journal of Operational Research
, vol.102
, pp. 193-214
-
-
Drexl, A.1
Salewski, F.2
-
15
-
-
0027614308
-
Solving airline crew scheduling problems by branch-and-cut
-
Hoffman K.L., Padberg M. Solving airline crew scheduling problems by branch-and-cut. Management Science. 39:1993;657-682.
-
(1993)
Management Science
, vol.39
, pp. 657-682
-
-
Hoffman, K.L.1
Padberg, M.2
-
17
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch R., Sprecher A., Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science. 41:1995;1693-1703.
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
18
-
-
0000647152
-
Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints
-
Neumann K., Zhan J. Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints. Journal of Intelligent Manufacturing. 6:1995;145-154.
-
(1995)
Journal of Intelligent Manufacturing
, vol.6
, pp. 145-154
-
-
Neumann, K.1
Zhan, J.2
-
20
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource project scheduling problem
-
Patterson J.H. A comparison of exact approaches for solving the multiple constrained resource project scheduling problem. Management Science. 30:1984;854-867.
-
(1984)
Management Science
, vol.30
, pp. 854-867
-
-
Patterson, J.H.1
-
23
-
-
0003662483
-
-
Kovac, Hamburg
-
Schirmer, A., 1999. Project scheduling with scarce resources-Models, methods, and applications, Kovac, Hamburg.
-
(1999)
Project Scheduling with Scarce Resources-models, Methods, and Applications
-
-
Schirmer, A.1
-
25
-
-
0017537769
-
Measures of the restrictiveness of project networks
-
Thesen A. Measures of the restrictiveness of project networks. Networks. 7:1977;193-208.
-
(1977)
Networks
, vol.7
, pp. 193-208
-
-
Thesen, A.1
|