메뉴 건너뛰기




Volumn 57, Issue 15-16, 2019, Pages 4805-4827

Disassembly line balancing problem: a review of the state of the art and future directions

Author keywords

disassembly; disassembly line; line balancing; state of the art; survey

Indexed keywords

MATHEMATICAL MODELS; SURVEYING;

EID: 85041125327     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2018.1428775     Document Type: Review
Times cited : (165)

References (137)
  • 1
    • 36448976916 scopus 로고    scopus 로고
    • A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem
    • Agrawal, S., and M. K., Tiwari. 2008. “A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem.” International Journal of Production Research 46 (6): 1405–1429.10.1080/00207540600943985
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 2
    • 84992386112 scopus 로고    scopus 로고
    • A Piecewise Linear Model for Stochastic Disassembly Line Balancing
    • Altekin, F. T., 2016. “A Piecewise Linear Model for Stochastic Disassembly Line Balancing.” IFAC-PapersOnLine 49 (12): 932–937.10.1016/j.ifacol.2016.07.895
    • (2016) IFAC-PapersOnLine , vol.49 , Issue.12 , pp. 932-937
    • Altekin, F.T.1
  • 3
    • 85026227847 scopus 로고    scopus 로고
    • A Comparison of Piecewise Linear Programming Formulations for Stochastic Disassembly Line Balancing
    •  
    • Altekin, F. T., 2017. “A Comparison of Piecewise Linear Programming Formulations for Stochastic Disassembly Line Balancing.” International Journal of Production Research 55 (24): 7412–7434. doi: 10.1080/00207543.2017.1351639.
    • (2017) International Journal of Production Research , vol.55 , Issue.24 , pp. 7412-7434
    • Altekin, F.T.1
  • 4
    • 84867068820 scopus 로고    scopus 로고
    • Task-Failure-Driven Rebalancing of Disassembly Lines
    • Altekin, F. T., and C., Akkan. 2012. “Task-Failure-Driven Rebalancing of Disassembly Lines.” International Journal of Production Research 50 (18): 4955–4976.10.1080/00207543.2011.616915
    • (2012) International Journal of Production Research , vol.50 , Issue.18 , pp. 4955-4976
    • Altekin, F.T.1    Akkan, C.2
  • 9
    • 84922259130 scopus 로고    scopus 로고
    • A New U-Shaped Heuristic for Disassembly Line Balancing Problems, Pratibha: International Journal of Science
    • Avikal, S., and P. K., Mishra. 2012. “A New U-Shaped Heuristic for Disassembly Line Balancing Problems, Pratibha: International Journal of Science.” Spirituality, Business and Technology 1 (1): 21–27.
    • (2012) Spirituality, Business and Technology , vol.1 , Issue.1 , pp. 21-27
    • Avikal, S.1    Mishra, P.K.2
  • 11
    • 84908335820 scopus 로고    scopus 로고
    • An AHP and PROMETHEE Methods-Based Environment Friendly Heuristic for Disassembly Line Balancing Problems
    • Avikal, S., P. K., Mishra, and R., Jain. 2013b. “An AHP and PROMETHEE Methods-Based Environment Friendly Heuristic for Disassembly Line Balancing Problems.” Interdisciplinary Environmental Review 14 (1): 69–85.10.1504/IER.2013.054125
    • (2013) Interdisciplinary Environmental Review , vol.14 , Issue.1 , pp. 69-85
    • Avikal, S.1    Mishra, P.K.2    Jain, R.3
  • 12
    • 84923188700 scopus 로고    scopus 로고
    • A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem
    • Avikal, S., P. K., Mishra, R., Jain, and H. C., Yadav. 2013c. “A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem.” Industrial Engineering and Management Systems 12 (3): 254–263.10.7232/iems.2013.12.3.254
    • (2013) Industrial Engineering and Management Systems , vol.12 , Issue.3 , pp. 254-263
    • Avikal, S.1    Mishra, P.K.2    Jain, R.3    Yadav, H.C.4
  • 13
    • 84893943458 scopus 로고    scopus 로고
    • A Fuzzy AHP and PROMETHEE Method-Based Heuristic for Disassembly Line Balancing Problems
    • Avikal, S., P. K., Mishra, and R., Jain. 2014a. “A Fuzzy AHP and PROMETHEE Method-Based Heuristic for Disassembly Line Balancing Problems.” International Journal of Production Research 52 (5): 1306–1317.10.1080/00207543.2013.831999
    • (2014) International Journal of Production Research , vol.52 , Issue.5 , pp. 1306-1317
    • Avikal, S.1    Mishra, P.K.2    Jain, R.3
  • 14
    • 84908355358 scopus 로고    scopus 로고
    • A Kano Model, AHP and M-TOPSIS Method-Based Technique for Disassembly Line Balancing under Fuzzy Environment
    • Avikal, S., R., Jain, and P. K., Mishra. 2014b. “A Kano Model, AHP and M-TOPSIS Method-Based Technique for Disassembly Line Balancing under Fuzzy Environment.” Applied Soft Computing 25: 519–529.
    • (2014) Applied Soft Computing , vol.25 , pp. 519-529
    • Avikal, S.1    Jain, R.2    Mishra, P.K.3
  • 17
    • 0027675494 scopus 로고
    • Balancing Two-Sided Assembly Lines: A Case Study
    • Bartholdı, J. J., 1993. “Balancing Two-Sided Assembly Lines: A Case Study.” International Journal of Production Research 31 (10): 2447–2461.10.1080/00207549308956868
    • (1993) International Journal of Production Research , vol.31 , Issue.10 , pp. 2447-2461
    • Bartholdı, J.J.1
  • 18
    • 84922236941 scopus 로고    scopus 로고
    • Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous Parts
    • State College, PA
    • Bentaha, M. L., O., Battaia, and A., Dolgui. 2013a. “Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous Parts.” In Proceedings of the IFIP International Federation for Information Processing,  103–110, State College, PA.
    • (2013) Proceedings of the IFIP International Federation for Information Processing , pp.  103-110
    • Bentaha, M.L.1    Battaia, O.2    Dolgui, A.3
  • 23
    • 84902539041 scopus 로고    scopus 로고
    • Dealing with Uncertainty in Disassembly Line Design
    • Bentaha, M. L., O., Battaïa, A., Dolgui, and S. J., Hu. 2014a. “Dealing with Uncertainty in Disassembly Line Design.” CIRP Annals 63: 21–24.10.1016/j.cirp.2014.03.004
    • (2014) CIRP Annals , vol.63 , pp. 21-24
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3    Hu, S.J.4
  • 25
    • 84902248564 scopus 로고    scopus 로고
    • A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty
    • Bentaha, M. L., O., Battaïa, and A., Dolgui. 2014c. “A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty.” Computers and Operations Research 51: 111–122.10.1016/j.cor.2014.05.006
    • (2014) Computers and Operations Research , vol.51 , pp. 111-122
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 28
    • 84961289222 scopus 로고    scopus 로고
    • An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times
    • Bentaha, M. L., O., Battaïa, and A., Dolgui. 2015a. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times.” International Journal of Production Research 53 (6): 1807–1818.10.1080/00207543.2014.961212
    • (2015) International Journal of Production Research , vol.53 , Issue.6 , pp. 1807-1818
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 29
    • 84940610243 scopus 로고    scopus 로고
    • Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints
    • Bentaha, M. L., O., Battaïa, A., Dolgui, and S. J., Hu. 2015b. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.10.1016/j.ejor.2015.06.019
    • (2015) European Journal of Operational Research , vol.247 , Issue.3 , pp. 957-967
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3    Hu, S.J.4
  • 30
    • 84953880323 scopus 로고    scopus 로고
    • A Bibliographic Review of Production Line Design and Balancing under Uncertainty
    • Bentaha, M. L., A., Dolgui, and O., Battaïa. 2015c. “A Bibliographic Review of Production Line Design and Balancing under Uncertainty.” IFAC-PapersOnLine 48 (3): 70–75.10.1016/j.ifacol.2015.06.060
    • (2015) IFAC-PapersOnLine , vol.48 , Issue.3 , pp. 70-75
    • Bentaha, M.L.1    Dolgui, A.2    Battaïa, O.3
  • 31
    • 34249995941 scopus 로고    scopus 로고
    • A Classification of Assembly Line Balancing Problems
    • Boysen, N., M., Fliedner, and A., Scholl. 2007. “A Classification of Assembly Line Balancing Problems.” European Journal of Operational Research 183 (2): 674–693.10.1016/j.ejor.2006.10.010
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 674-693
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 32
    • 69249245295 scopus 로고    scopus 로고
    • Multi Objective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm
    • Ding, L.-P., J.-R., Tan, Y.-X., Feng, and Y.-C., Gao. 2009. “Multi Objective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm.” Computer Integrated Manufacturing Systems 15 (7): 1406–1413.
    • (2009) Computer Integrated Manufacturing Systems , vol.15 , Issue.7 , pp. 1406-1413
    • Ding, L.-P.1    Tan, J.-R.2    Feng, Y.-X.3    Gao, Y.-C.4
  • 34
    • 77953610368 scopus 로고    scopus 로고
    • A New Multi-Objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problem
    • Ding, L.-P., Y.-X., Feng, J.-R., Tan, and Y.-C., Gao. 2010b. “A New Multi-Objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problem.” International Journal of Advanced Manufacturing Technology 48 (5–8): 761–771.10.1007/s00170-009-2303-5
    • (2010) International Journal of Advanced Manufacturing Technology , vol.48 , Issue.5-8 , pp. 761-771
    • Ding, L.-P.1    Feng, Y.-X.2    Tan, J.-R.3    Gao, Y.-C.4
  • 37
    • 84992315973 scopus 로고    scopus 로고
    • Column Generation Approach for Disassembly Line Balancing
    • Duta, L., I., Caciula, and P. C., Patic. 2016. “Column Generation Approach for Disassembly Line Balancing.” IFAC-PapersOnLine 49 (12): 916–920.10.1016/j.ifacol.2016.07.892
    • (2016) IFAC-PapersOnLine , vol.49 , Issue.12 , pp. 916-920
    • Duta, L.1    Caciula, I.2    Patic, P.C.3
  • 39
    • 85070435657 scopus 로고    scopus 로고
    • Remanufacturing Line Balancing: A Literature Review of the Problems and Progress
    • Baltimore, MD
    • Gagnon, R. J., and S. D., Morgan. 2013. “Remanufacturing Line Balancing: A Literature Review of the Problems and Progress.” In Proceedings of the Decision Sciences Institute Conference, 1–28, Baltimore, MD.
    • (2013) Proceedings of the Decision Sciences Institute Conference , pp. 1-28
    • Gagnon, R.J.1    Morgan, S.D.2
  • 40
    • 84991463586 scopus 로고    scopus 로고
    • Biomass Supply Chain Network Design: An Optimization-Oriented Review and Analysis
    • Ghaderi, H., M. S., Pishvaee, and A., Moini. 2016. “Biomass Supply Chain Network Design: An Optimization-Oriented Review and Analysis.” Industrial Crops and Products 94: 972–1000.10.1016/j.indcrop.2016.09.027
    • (2016) Industrial Crops and Products , vol.94 , pp. 972-1000
    • Ghaderi, H.1    Pishvaee, M.S.2    Moini, A.3
  • 41
    • 84907580954 scopus 로고    scopus 로고
    • Reverse Logistics and Closed-Loop Supply Chain: A Comprehensive Review to Explore the Future
    • Govindan, K., H., Soleimani, and D., Kannan. 2015. “Reverse Logistics and Closed-Loop Supply Chain: A Comprehensive Review to Explore the Future.” European Journal of Operational Research 240: 603–626.10.1016/j.ejor.2014.07.012
    • (2015) European Journal of Operational Research , vol.240 , pp. 603-626
    • Govindan, K.1    Soleimani, H.2    Kannan, D.3
  • 44
    • 0033358107 scopus 로고    scopus 로고
    • Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey
    • Güngör, A., and S. M., Gupta. 1999c. “Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey.” Computers and Industrial Engineering 36: 811–853.
    • (1999) Computers and Industrial Engineering , vol.36 , pp. 811-853
    • Güngör, A.1    Gupta, S.M.2
  • 45
    • 0035837942 scopus 로고    scopus 로고
    • A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
    • Güngör, A., and S. M., Gupta. 2001. “A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures.” International Journal of Production Research 39 (7): 142–1467.
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 142-1467
    • Güngör, A.1    Gupta, S.M.2
  • 50
    • 85021629679 scopus 로고    scopus 로고
    • An Efficient Two-Phase Iterative Heuristic for Collection-Disassembly Problem
    • Habibi, M. K. K., O., Battaïa, V. D., Cung, and A., Dolgui. 2017. “An Efficient Two-Phase Iterative Heuristic for Collection-Disassembly Problem.” Computers and Industrial Engineering 110: 505–514.10.1016/j.cie.2017.06.031
    • (2017) Computers and Industrial Engineering , vol.110 , pp. 505-514
    • Habibi, M.K.K.1    Battaïa, O.2    Cung, V.D.3    Dolgui, A.4
  • 51
    • 84971431228 scopus 로고    scopus 로고
    • The Improvement of Line Efficiency on Disassembly Line Balancing Problem: An HRRCD’s Heuristic Rule
    • Hao, Y. K., and S., Hasan. 2016. “The Improvement of Line Efficiency on Disassembly Line Balancing Problem: An HRRCD’s Heuristic Rule.” ARPN Journal of Engineering and Applied Sciences 11 (10): 6428–6433.
    • (2016) ARPN Journal of Engineering and Applied Sciences , vol.11 , Issue.10 , pp. 6428-6433
    • Hao, Y.K.1    Hasan, S.2
  • 52
    • 84922251741 scopus 로고    scopus 로고
    • A Network-Based Shortest Route Model for Parallel Disassembly Line Balancing Problem
    • Hezer, S., and Y., Kara. 2015. “A Network-Based Shortest Route Model for Parallel Disassembly Line Balancing Problem.” International Journal of Production Research 53 (6): 1849–1865.10.1080/00207543.2014.965348
    • (2015) International Journal of Production Research , vol.53 , Issue.6 , pp. 1849-1865
    • Hezer, S.1    Kara, Y.2
  • 53
    • 84923124004 scopus 로고    scopus 로고
    • 2-Stage Optimal Design and Analysis for Disassembly System with Environmental and Economic Parts Selection Using the Recyclability Evaluation Method
    • Igarashi, K., T., Yamada, and M., Inoue. 2014. “2-Stage Optimal Design and Analysis for Disassembly System with Environmental and Economic Parts Selection Using the Recyclability Evaluation Method.” Industrial Engineering and Management Systems 13 (1): 52–66.10.7232/iems.2014.13.1.052
    • (2014) Industrial Engineering and Management Systems , vol.13 , Issue.1 , pp. 52-66
    • Igarashi, K.1    Yamada, T.2    Inoue, M.3
  • 55
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art
    • Ilgin, M. A., and S. M., Gupta. 2010a. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art.” Journal of Environmental Management 91 (3): 563–591.10.1016/j.jenvman.2009.09.037
    • (2010) Journal of Environmental Management , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 56
    • 78049395804 scopus 로고    scopus 로고
    • Comparison of Economic Benefits of Sensor Embedded Products and Conventional Products in a Multi-Product Disassembly Line
    • Ilgin, M. A., and S. M., Gupta. 2010b. “Comparison of Economic Benefits of Sensor Embedded Products and Conventional Products in a Multi-Product Disassembly Line.” Computers and Industrial Engineering 59 (4): 748–763.10.1016/j.cie.2010.07.031
    • (2010) Computers and Industrial Engineering , vol.59 , Issue.4 , pp. 748-763
    • Ilgin, M.A.1    Gupta, S.M.2
  • 57
    • 79953029079 scopus 로고    scopus 로고
    • Evaluating the Impact of Sensor Embedded Products on the Performance of an Air Conditioner Disassembly Line
    • Ilgin, M. A., and S. M., Gupta. 2011a. “Evaluating the Impact of Sensor Embedded Products on the Performance of an Air Conditioner Disassembly Line.” International Journal of Advanced Manufacturing Technology 53 (9–12): 1199–1216.10.1007/s00170-010-2891-0
    • (2011) International Journal of Advanced Manufacturing Technology , vol.53 , Issue.9-12 , pp. 1199-1216
    • Ilgin, M.A.1    Gupta, S.M.2
  • 58
    • 78649318256 scopus 로고    scopus 로고
    • Recovery of Sensor Embedded Washing Machines Using a Multi-Kanban Controlled Disassembly Line
    • Ilgin, M. A., and S. M., Gupta. 2011b. “Recovery of Sensor Embedded Washing Machines Using a Multi-Kanban Controlled Disassembly Line.” Robotics and Computer Integrated Manufacturing 27 (2): 318–334.10.1016/j.rcim.2010.07.016
    • (2011) Robotics and Computer Integrated Manufacturing , vol.27 , Issue.2 , pp. 318-334
    • Ilgin, M.A.1    Gupta, S.M.2
  • 59
    • 85019101648 scopus 로고    scopus 로고
    • Disassembly Line Balancing Using Linear Physical Programming
    • Ilgin, M. A., H., Akçay, and C., Araz. 2017. “Disassembly Line Balancing Using Linear Physical Programming.” International Journal of Production Research 55 (20): 6108–6119.10.1080/00207543.2017.1324225
    • (2017) International Journal of Production Research , vol.55 , Issue.20 , pp. 6108-6119
    • Ilgin, M.A.1    Akçay, H.2    Araz, C.3
  • 60
    • 85024383853 scopus 로고    scopus 로고
    • A Proposed Multi-Objective Optimization Model for Sequence-Dependent Disassembly Line Balancing Problem
    • Chengdu
    • Jia, L., and W., Shuwei. 2017. “A Proposed Multi-Objective Optimization Model for Sequence-Dependent Disassembly Line Balancing Problem.” In Proceedings of the 3rd International Conference on Information Management, 421–425, Chengdu.
    • (2017) Proceedings of the 3rd International Conference on Information Management , pp. 421-425
    • Jia, L.1    Shuwei, W.2
  • 63
    • 84887821595 scopus 로고    scopus 로고
    • A Particle Swarm Optimization Algorithm with Neighborhood-Based Mutation for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M., Gupta. 2013a. “A Particle Swarm Optimization Algorithm with Neighborhood-Based Mutation for Sequence-Dependent Disassembly Line Balancing Problem.” The International Journal of Advanced Manufacturing Technology 69 (1–4): 197–209.10.1007/s00170-013-4990-1
    • (2013) The International Journal of Advanced Manufacturing Technology , vol.69 , Issue.1-4 , pp. 197-209
    • Kalayci, C.B.1    Gupta, S.M.2
  • 64
    • 84878666440 scopus 로고    scopus 로고
    • Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M., Gupta. 2013b. “Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem.” Journal of Manufacturing Technology Management 24 (3): 413–427.10.1108/17410381311318909
    • (2013) Journal of Manufacturing Technology Management , vol.24 , Issue.3 , pp. 413-427
    • Kalayci, C.B.1    Gupta, S.M.2
  • 65
    • 84881185298 scopus 로고    scopus 로고
    • Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M., Gupta. 2013c. “Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40 (18): 7231–7241.10.1016/j.eswa.2013.06.067
    • (2013) Expert Systems with Applications , vol.40 , Issue.18 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 66
    • 84887413772 scopus 로고    scopus 로고
    • Balancing a Sequence-Dependent Disassembly Line Using Simulated Annealing Algorithm
    • Kalayci, C. B., and S. M., Gupta. 2013d. “Balancing a Sequence-Dependent Disassembly Line Using Simulated Annealing Algorithm.” Applications of Management Science 16: 81–103.10.1108/mansc
    • (2013) Applications of Management Science , vol.16 , pp. 81-103
    • Kalayci, C.B.1    Gupta, S.M.2
  • 67
    • 85123268499 scopus 로고    scopus 로고
    • River Formation Dynamics Approach for Sequence-Dependent Disassembly Line Balancing Problem
    • S. M. G., (ed), and,.  In, edited by. Boca Raton, FL: CRC Press
    • Kalayci, C. B., and S. M., Gupta. 2013e. “River Formation Dynamics Approach for Sequence-Dependent Disassembly Line Balancing Problem.” In Reverse Supply Chains: Issues and Analysis, edited by S. M. Gupta, 289–312. Boca Raton, FL: CRC Press.
    • (2013) Reverse Supply Chains: Issues and Analysis , pp. 289-312
    • Kalayci, C.B.1    Gupta, S.M.2
  • 69
    • 84889821707 scopus 로고    scopus 로고
    • A Tabu Search Algorithm for Balancing a Sequence-Dependent Disassembly Line
    • Kalayci, C. B., and S. M., Gupta. 2014. “A Tabu Search Algorithm for Balancing a Sequence-Dependent Disassembly Line.” Production Planning and Control 25 (2): 149–160.10.1080/09537287.2013.782949
    • (2014) Production Planning and Control , vol.25 , Issue.2 , pp. 149-160
    • Kalayci, C.B.1    Gupta, S.M.2
  • 71
    • 84923648548 scopus 로고    scopus 로고
    • A Variable Neighbourhood Search Algorithm for Disassembly Lines
    • Kalayci, C. B., O., Polat, and S. M., Gupta. 2015a. “A Variable Neighbourhood Search Algorithm for Disassembly Lines.” Journal of Manufacturing Technology Management 26 (2): 182–194.10.1108/JMTM-11-2013-0168
    • (2015) Journal of Manufacturing Technology Management , vol.26 , Issue.2 , pp. 182-194
    • Kalayci, C.B.1    Polat, O.2    Gupta, S.M.3
  • 72
    • 84954047904 scopus 로고    scopus 로고
    • Multi-Objective Fuzzy Disassembly Line Balancing Using a Hybrid Discrete Artificial Bee Colony Algorithm
    • Kalayci, C. B., A., Hancilar, A., Gungor, and S. M., Gupta. 2015b. “Multi-Objective Fuzzy Disassembly Line Balancing Using a Hybrid Discrete Artificial Bee Colony Algorithm.” Journal of Manufacturing Systems 37 (3): 672–682.10.1016/j.jmsy.2014.11.015
    • (2015) Journal of Manufacturing Systems , vol.37 , Issue.3 , pp. 672-682
    • Kalayci, C.B.1    Hancilar, A.2    Gungor, A.3    Gupta, S.M.4
  • 73
    • 84902301531 scopus 로고    scopus 로고
    • A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., O., Polat, and S. M., Gupta. 2016. “A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem.” Annals of Operations Research 242 (2): 321–354.10.1007/s10479-014-1641-3
    • (2016) Annals of Operations Research , vol.242 , Issue.2 , pp. 321-354
    • Kalayci, C.B.1    Polat, O.2    Gupta, S.M.3
  • 74
    • 84952984791 scopus 로고    scopus 로고
    • A Disassembly Line Balancing Problem with Fixed Number of Workstations
    • Kalaycılar, E. G., M., Azizoğlu, and S., Yeralan. 2016. “A Disassembly Line Balancing Problem with Fixed Number of Workstations.” European Journal of Operational Research 249 (2): 592–604.10.1016/j.ejor.2015.09.004
    • (2016) European Journal of Operational Research , vol.249 , Issue.2 , pp. 592-604
    • Kalaycılar, E.G.1    Azizoğlu, M.2    Yeralan, S.3
  • 75
    • 84982311122 scopus 로고    scopus 로고
    • Integrating Disassembly Line Balancing in the Planning of a Reverse Logistics Network from the Perspective of a Third Party Provider
    • Kannan, D., K., Garg, P. C., Jha, and A., Diabat. 2017. “Integrating Disassembly Line Balancing in the Planning of a Reverse Logistics Network from the Perspective of a Third Party Provider.” Annals of Operations Research 253 (1): 353–376.10.1007/s10479-016-2272-7
    • (2017) Annals of Operations Research , vol.253 , Issue.1 , pp. 353-376
    • Kannan, D.1    Garg, K.2    Jha, P.C.3    Diabat, A.4
  • 76
    • 84876972240 scopus 로고    scopus 로고
    • Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling
    • Karadağ, A. A., and O., Türkbey. 2013. “Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling.” Computers and Industrial Engineering 65 (3): 413–425.
    • (2013) Computers and Industrial Engineering , vol.65 , Issue.3 , pp. 413-425
    • Karadağ, A.A.1    Türkbey, O.2
  • 77
    • 0742323768 scopus 로고    scopus 로고
    • Reconfiguring a Remanufacturing Line at Visteon, Mexico
    • Kekre, S., U. S., Rao, J. M., Swaminathan, and J., Zhang. 2003. “Reconfiguring a Remanufacturing Line at Visteon, Mexico.” Interfaces 33 (6): 30–43.10.1287/inte.33.6.30.25184
    • (2003) Interfaces , vol.33 , Issue.6 , pp. 30-43
    • Kekre, S.1    Rao, U.S.2    Swaminathan, J.M.3    Zhang, J.4
  • 79
    • 34548418090 scopus 로고    scopus 로고
    • Disassembly Scheduling: Literature Review and Future Research Directions
    • Kim, H.-J., D.-H., Lee, and P., Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Future Research Directions.” International Journal of Production Research 45 (18–19): 4465–4484.10.1080/00207540701440097
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4465-4484
    • Kim, H.-J.1    Lee, D.-H.2    Xirouchakis, P.3
  • 82
    • 70749116514 scopus 로고    scopus 로고
    • Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph
    • Koç, A., I., Sabuncuoğlu, and E., Erel. 2009. “Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph.” IIE Transactions 41 (10): 866–881.
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koç, A.1    Sabuncuoğlu, I.2    Erel, E.3
  • 83
    • 0033358055 scopus 로고    scopus 로고
    • Linear Programming in Disassembly/Clustering Sequence Generation
    • Lambert, A. J. D., 1999. “Linear Programming in Disassembly/Clustering Sequence Generation.” Computers and Industrial Engineering 36: 723–738.10.1016/S0360-8352(99)00162-X
    • (1999) Computers and Industrial Engineering , vol.36 , pp. 723-738
    • Lambert, A.J.D.1
  • 84
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly Sequencing: A Survey
    • Lambert, A. J. D., 2003. “Disassembly Sequencing: A Survey.” International Journal of Production Research 41 (16): 3721–3759.10.1080/0020754031000120078
    • (2003) International Journal of Production Research , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 89
    • 33747286457 scopus 로고    scopus 로고
    • Disassembly Planning and Scheduling: Review and Further Research
    • Lee, D. H., J. G., Kang, and P., Xirouchakis. 2001. “Disassembly Planning and Scheduling: Review and Further Research.” Journal of Engineering Manufacture 215 (5): 695–709.10.1243/0954405011518629
    • (2001) Journal of Engineering Manufacture , vol.215 , Issue.5 , pp. 695-709
    • Lee, D.H.1    Kang, J.G.2    Xirouchakis, P.3
  • 90
    • 85013489134 scopus 로고    scopus 로고
    • Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment
    • Liu, J., and S., Wang. 2017. “Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment.” Sustainability 9 (309): 1–15.
    • (2017) Sustainability , vol.9 , Issue.309 , pp. 1-15
    • Liu, J.1    Wang, S.2
  • 92
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly Process Planning Algorithms for End of Life Product Recovery and Environmentally Conscious Disposal
    • Ma, Y.-S., H.-B., Jun, H.-W., Kim, and D.-H., Lee. 2011. “Disassembly Process Planning Algorithms for End of Life Product Recovery and Environmentally Conscious Disposal.” International Journal of Production Research 49 (23): 7007–7027.10.1080/00207543.2010.495089
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.-S.1    Jun, H.-B.2    Kim, H.-W.3    Lee, D.-H.4
  • 97
  • 98
  • 99
    • 33748559516 scopus 로고    scopus 로고
    • Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives
    • McGovern, S. M., and S. M., Gupta. 2006a. “Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives.” International Journal of Advanced Manufacturing Technology 30 (5–6): 481–496.10.1007/s00170-005-0037-6
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.5-6 , pp. 481-496
    • McGovern, S.M.1    Gupta, S.M.2
  • 101
    • 34548389185 scopus 로고    scopus 로고
    • Deterministic Hybrid and Stochastic Combinatorial Optimization Treatments of an Electronic Product Disassembly Line
    • Kenneth D.L., Ronald K.K., (eds), and,.  edited by. Amsterdam: Emerald Group
    • McGovern, S. M., and S. M., Gupta. 2006c. “Deterministic Hybrid and Stochastic Combinatorial Optimization Treatments of an Electronic Product Disassembly Line.” In Applications of Management ScienceProductivity, Finance, and Operations, edited by D. L., Kenneth and K. K., Ronald, 175–197. Amsterdam: Emerald Group.
    • (2006) Applications of Management ScienceProductivity, Finance, and Operations , pp. 175-197
    • McGovern, S.M.1    Gupta, S.M.2
  • 102
    • 33845939092 scopus 로고    scopus 로고
    • A Balancing Method and Genetic Algorithm for Disassembly Line Balancing
    • McGovern, S. M., and S. M., Gupta. 2007a. “A Balancing Method and Genetic Algorithm for Disassembly Line Balancing.” European Journal of Operational Research 179 (3): 692–708.10.1016/j.ejor.2005.03.055
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 692-708
    • McGovern, S.M.1    Gupta, S.M.2
  • 104
    • 34548449384 scopus 로고    scopus 로고
    • Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem
    • McGovern, S. M., and S. M., Gupta. 2007c. “Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem.” International Journal of Production Research 45 (18–19): 4485–4511.10.1080/00207540701476281
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4485-4511
    • McGovern, S.M.1    Gupta, S.M.2
  • 106
    • 80052195122 scopus 로고    scopus 로고
    • Metrics and Experimental Data for Assessing Unbalanced Disassembly Lines
    • McGovern, S. M., and S. M., Gupta. 2011b. “Metrics and Experimental Data for Assessing Unbalanced Disassembly Lines.” International Journal of Manufacturing Technology and Management 23 (1–2): 82–112.10.1504/IJMTM.2011.042110
    • (2011) International Journal of Manufacturing Technology and Management , vol.23 , Issue.1-2 , pp. 82-112
    • McGovern, S.M.1    Gupta, S.M.2
  • 107
    • 84923695788 scopus 로고    scopus 로고
    • Unified Assembly- and Disassembly-Line Model Formulae
    • McGovern, S. M., and S. M., Gupta. 2015. “Unified Assembly- and Disassembly-Line Model Formulae.” Journal of Manufacturing Technology Management 26 (2): 195–212.10.1108/JMTM-11-2013-0169
    • (2015) Journal of Manufacturing Technology Management , vol.26 , Issue.2 , pp. 195-212
    • McGovern, S.M.1    Gupta, S.M.2
  • 109
    • 84992410451 scopus 로고    scopus 로고
    • Resource Constrained Disassembly Line Balancing Problem
    • Mete, S., Z. A., Çil, E., Özceylan, and K., Ağpak. 2016a. “Resource Constrained Disassembly Line Balancing Problem.” IFAC-PapersOnLine 49 (12): 921–925.10.1016/j.ifacol.2016.07.893
    • (2016) IFAC-PapersOnLine , vol.49 , Issue.12 , pp. 921-925
    • Mete, S.1    Çil, Z.A.2    Özceylan, E.3    Ağpak, K.4
  • 110
    • 84988918149 scopus 로고    scopus 로고
    • A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem
    • Mete, S., Z. A., Çil, K., Ağpak, E., Özceylan, and A., Dolgui. 2016b. “A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem.” Journal of Manufacturing Systems 41 (1): 188–200.10.1016/j.jmsy.2016.09.002
    • (2016) Journal of Manufacturing Systems , vol.41 , Issue.1 , pp. 188-200
    • Mete, S.1    Çil, Z.A.2    Ağpak, K.3    Özceylan, E.4    Dolgui, A.5
  • 111
    • 84906494517 scopus 로고    scopus 로고
    • Modelling and Control of an Assembly/Disassembly Mechatronics Line Served by Mobile Robot with Manipulator
    • Minca, E., A., Filipescu, and A., Voda. 2014. “Modelling and Control of an Assembly/Disassembly Mechatronics Line Served by Mobile Robot with Manipulator.” Control Engineering Practice 31: 50–62.10.1016/j.conengprac.2014.06.005
    • (2014) Control Engineering Practice , vol.31 , pp. 50-62
    • Minca, E.1    Filipescu, A.2    Voda, A.3
  • 114
    • 84885635477 scopus 로고    scopus 로고
    • Reverse Supply Chain Optimisation with Disassembly Line Balancing
    • Özceylan, E., and T., Paksoy. 2013. “Reverse Supply Chain Optimisation with Disassembly Line Balancing.” International Journal of Production Research 51 (20): 5985–6001.10.1080/00207543.2013.784405
    • (2013) International Journal of Production Research , vol.51 , Issue.20 , pp. 5985-6001
    • Özceylan, E.1    Paksoy, T.2
  • 115
    • 84897679104 scopus 로고    scopus 로고
    • Fuzzy Mathematical Programming Approaches for Reverse Supply Chain Optimization with Disassembly Line Balancing Problem
    • Özceylan, E., and T., Paksoy. 2014a. “Fuzzy Mathematical Programming Approaches for Reverse Supply Chain Optimization with Disassembly Line Balancing Problem.” Journal of Intelligent and Fuzzy Systems 26 (4): 1969–1985.
    • (2014) Journal of Intelligent and Fuzzy Systems , vol.26 , Issue.4 , pp. 1969-1985
    • Özceylan, E.1    Paksoy, T.2
  • 116
    • 85070434420 scopus 로고    scopus 로고
    • Optimization of Assembly and Disassembly Planning in a Closed-Loop Supply Chain Network Design Problem
    • Istanbul
    • Özceylan, E., and T., Paksoy. 2014b. “Optimization of Assembly and Disassembly Planning in a Closed-Loop Supply Chain Network Design Problem.” In Proceedings of the 11th International Logistics and Supply Chain Congress, 751–759, Istanbul.
    • (2014) Proceedings of the 11th International Logistics and Supply Chain Congress , pp. 751-759
    • Özceylan, E.1    Paksoy, T.2
  • 117
    • 84896400446 scopus 로고    scopus 로고
    • Interactive Fuzzy Programming Approaches to the Strategic and Tactical Planning of a Closed-Loop Supply Chain under Uncertainty
    • Özceylan, E., Paksoy, T. 2014c. “Interactive Fuzzy Programming Approaches to the Strategic and Tactical Planning of a Closed-Loop Supply Chain under Uncertainty.” International Journal of Production Research 52 (8): 2363–2387.10.1080/00207543.2013.865852
    • (2014) International Journal of Production Research , vol.52 , Issue.8 , pp. 2363-2387
    • Özceylan, E.1    Paksoy, T.2
  • 118
    • 84890189031 scopus 로고    scopus 로고
    • Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing
    • Özceylan, E., T., Paksoy, and T., Bektaş. 2014. “Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing.” Transportation Research Part E: Logistics and Transportation Review 61: 142–164.10.1016/j.tre.2013.11.001
    • (2014) Transportation Research Part E: Logistics and Transportation Review , vol.61 , pp. 142-164
    • Özceylan, E.1    Paksoy, T.2    Bektaş, T.3
  • 121
    • 85070435129 scopus 로고    scopus 로고
    • Comparisons of Different Fuzzy Multi Criteria Decision-Making Methods on Closed Loop Supply Chain Networks with Disassembly Line Balancing Problem
    •  and,.  65, Rome
    • Pehlivan, N. Y., E., Özceylan, and T., Paksoy. 2013. “Comparisons of Different Fuzzy Multi Criteria Decision-Making Methods on Closed Loop Supply Chain Networks with Disassembly Line Balancing Problem.” In Proceedings of the 26th European Conference on Operational Conference, 65, Rome.
    • (2013) Proceedings of the 26th European Conference on Operational Conference
    • Pehlivan, N.Y.1    Özceylan, E.2    Paksoy, T.3
  • 124
    • 85021834806 scopus 로고    scopus 로고
    • An Improved Gravitational Search Algorithm for Profit-Oriented Partial Disassembly Line Balancing Problem
    •  and,.  55 (24): 7302–7316. 
    • Ren, Y., D., Yu, C., Zhang, G., Tian, L., Meng, and X., Zhou. 2017. “An Improved Gravitational Search Algorithm for Profit-Oriented Partial Disassembly Line Balancing Problem.” International Journal of Production Research 55 (24): 7302–7316. doi:10.1080/00207543.2017.1341066.
    • (2017) International Journal of Production Research
    • Ren, Y.1    Yu, D.2    Zhang, C.3    Tian, G.4    Meng, L.5    Zhou, X.6
  • 125
    • 85038841097 scopus 로고    scopus 로고
    • Disassembly Line Balancing Problem Using Interdependent Weights-Based Multi-Criteria Decision Making and 2-Optimal Algorithm
    • Ren, Y., C., Zhang, F., Zhao, G., Tian, W., Lin, L., Meng, and H., Li. 2018. “Disassembly Line Balancing Problem Using Interdependent Weights-Based Multi-Criteria Decision Making and 2-Optimal Algorithm.” Journal of Cleaner Production 174 (1): 1475–1486.10.1016/j.jclepro.2017.10.308
    • (2018) Journal of Cleaner Production , vol.174 , Issue.1 , pp. 1475-1486
    • Ren, Y.1    Zhang, C.2    Zhao, F.3    Tian, G.4    Lin, W.5    Meng, L.6    Li, H.7
  • 126
    • 84954070118 scopus 로고    scopus 로고
    • Disassembly Line Balancing under High Variety of End of Life States Using a Joint Precedence Graph Approach
    • Riggs, R. J., O., Battaïa, and S. J., Hu. 2015. “Disassembly Line Balancing under High Variety of End of Life States Using a Joint Precedence Graph Approach.” Journal of Manufacturing Systems 37 (3): 638–648.10.1016/j.jmsy.2014.11.002
    • (2015) Journal of Manufacturing Systems , vol.37 , Issue.3 , pp. 638-648
    • Riggs, R.J.1    Battaïa, O.2    Hu, S.J.3
  • 127
    • 85012256190 scopus 로고    scopus 로고
    • The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment
    • Seidi, M., and S., Saghari. 2016. “The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment.” Industrial Engineering and Management Systems 15 (4): 364–373.10.7232/iems.2016.15.4.364
    • (2016) Industrial Engineering and Management Systems , vol.15 , Issue.4 , pp. 364-373
    • Seidi, M.1    Saghari, S.2
  • 128
    • 33746432209 scopus 로고    scopus 로고
    • A Systematic Approach to Design and Operation of Disassembly Lines
    • Tang, Y., and M. C., Zhou. 2006. “A Systematic Approach to Design and Operation of Disassembly Lines.” IEEE Transactions on Automation Science and Engineering 3 (3): 324–329.10.1109/TASE.2005.860989
    • (2006) IEEE Transactions on Automation Science and Engineering , vol.3 , Issue.3 , pp. 324-329
    • Tang, Y.1    Zhou, M.C.2
  • 130
    • 84904384763 scopus 로고    scopus 로고
    • Solving Large Scale Disassembly Line Balancing Problem with Uncertainty Using Reinforcement Learning
    • Tuncel, E., A., Zeid, and S., Kamarthi. 2014. “Solving Large Scale Disassembly Line Balancing Problem with Uncertainty Using Reinforcement Learning.” Journal of Intelligent Manufacturing 25 (4): 647–659.10.1007/s10845-012-0711-0
    • (2014) Journal of Intelligent Manufacturing , vol.25 , Issue.4 , pp. 647-659
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 132
    • 84885655160 scopus 로고    scopus 로고
    • Disassembly Planning and Sequencing for End-of-Life Products with RFID Enriched Information
    • Wan, H., and V. K., Gonnuru. 2013. “Disassembly Planning and Sequencing for End-of-Life Products with RFID Enriched Information.” Robotics and Computer-Integrated Manufacturing 29: 112–118.10.1016/j.rcim.2012.05.001
    • (2013) Robotics and Computer-Integrated Manufacturing , vol.29 , pp. 112-118
    • Wan, H.1    Gonnuru, V.K.2
  • 134
    • 85060859053 scopus 로고    scopus 로고
    • An Improved Adaptive Multi-Objective Particle Swarm Optimization for Disassembly Line Balancing Problem
    • Xiao, S., and S.-K., Nie. 2017. “An Improved Adaptive Multi-Objective Particle Swarm Optimization for Disassembly Line Balancing Problem.” International Journal of Research in Engineering and Science 5 (5): 55–61.
    • (2017) International Journal of Research in Engineering and Science , vol.5 , Issue.5 , pp. 55-61
    • Xiao, S.1    Nie, S.-K.2
  • 135
    • 85034211939 scopus 로고    scopus 로고
    • An Entropy-Based Adaptive Hybrid Particle Swarm Optimization for Disassembly Line Balancing Problems
    • Xiao, S., Y., Wang, H., Yu, and S., Nie. 2017. “An Entropy-Based Adaptive Hybrid Particle Swarm Optimization for Disassembly Line Balancing Problems.” Entropy 19 (11): 1–14.
    • (2017) Entropy , vol.19 , Issue.11 , pp. 1-14
    • Xiao, S.1    Wang, Y.2    Yu, H.3    Nie, S.4
  • 136
    • 85020004694 scopus 로고    scopus 로고
    • A Pareto Improved Artificial Fish Swarm Algorithm for Solving a Multi-Objective Fuzzy Disassembly Line Balancing Problem
    • Zhang, Z., K., Wang, L., Zhu, and Y., Wang. 2017. “A Pareto Improved Artificial Fish Swarm Algorithm for Solving a Multi-Objective Fuzzy Disassembly Line Balancing Problem.” Expert Systems with Applications 86 (1): 165–176.10.1016/j.eswa.2017.05.053
    • (2017) Expert Systems with Applications , vol.86 , Issue.1 , pp. 165-176
    • Zhang, Z.1    Wang, K.2    Zhu, L.3    Wang, Y.4
  • 137
    • 84900007770 scopus 로고    scopus 로고
    • An Ant Colony Optimization Algorithm for Multi-Objective Disassembly Line Balancing Problem
    • Zhu, X., Z., Zhang, and J., Hu. 2014. “An Ant Colony Optimization Algorithm for Multi-Objective Disassembly Line Balancing Problem.” China Mechanical Engineering 25 (8): 1075–1079.
    • (2014) China Mechanical Engineering , vol.25 , Issue.8 , pp. 1075-1079
    • Zhu, X.1    Zhang, Z.2    Hu, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.