-
1
-
-
36448976916
-
A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem
-
Agrawal, S., and M. K., Tiwari. 2008. “A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem.” International Journal of Production Research 46 (6): 1405–1429.10.1080/00207540600943985
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
2
-
-
84992386112
-
A Piecewise Linear Model for Stochastic Disassembly Line Balancing
-
Altekin, F. T., 2016. “A Piecewise Linear Model for Stochastic Disassembly Line Balancing.” IFAC-PapersOnLine 49 (12): 932–937.10.1016/j.ifacol.2016.07.895
-
(2016)
IFAC-PapersOnLine
, vol.49
, Issue.12
, pp. 932-937
-
-
Altekin, F.T.1
-
3
-
-
85026227847
-
A Comparison of Piecewise Linear Programming Formulations for Stochastic Disassembly Line Balancing
-
-
Altekin, F. T., 2017. “A Comparison of Piecewise Linear Programming Formulations for Stochastic Disassembly Line Balancing.” International Journal of Production Research 55 (24): 7412–7434. doi: 10.1080/00207543.2017.1351639.
-
(2017)
International Journal of Production Research
, vol.55
, Issue.24
, pp. 7412-7434
-
-
Altekin, F.T.1
-
4
-
-
84867068820
-
Task-Failure-Driven Rebalancing of Disassembly Lines
-
Altekin, F. T., and C., Akkan. 2012. “Task-Failure-Driven Rebalancing of Disassembly Lines.” International Journal of Production Research 50 (18): 4955–4976.10.1080/00207543.2011.616915
-
(2012)
International Journal of Production Research
, vol.50
, Issue.18
, pp. 4955-4976
-
-
Altekin, F.T.1
Akkan, C.2
-
5
-
-
2142658953
-
Disassembly Line Balancing with Limited Supply and Subassembly Availability
-
Altekin, F. T., L., Kandiller, and N. E., Özdemirel. 2003. “Disassembly Line Balancing with Limited Supply and Subassembly Availability.” Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III, 59–70.
-
(2003)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III
, pp. 59-70
-
-
Altekin, F.T.1
Kandiller, L.2
Özdemirel, N.E.3
-
6
-
-
34548398404
-
Profit-Oriented Disassembly-Line Balancing
-
Altekin, F. T., L., Kandiller, and N. E., Ozdemirel. 2008. “Profit-Oriented Disassembly-Line Balancing.” International Journal of Production Research 46 (10): 2675–2693.10.1080/00207540601137207
-
(2008)
International Journal of Production Research
, vol.46
, Issue.10
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemirel, N.E.3
-
7
-
-
84979255841
-
Remedial Actions for Disassembly Lines with Stochastic Task times
-
Altekin, F. T., Z. P., Bayındır, and V., Gümüşkaya. 2016. “Remedial Actions for Disassembly Lines with Stochastic Task times.” Computers and Industrial Engineering 99: 78–96.10.1016/j.cie.2016.06.027
-
(2016)
Computers and Industrial Engineering
, vol.99
, pp. 78-96
-
-
Altekin, F.T.1
Bayındır, Z.P.2
Gümüşkaya, V.3
-
9
-
-
84922259130
-
A New U-Shaped Heuristic for Disassembly Line Balancing Problems, Pratibha: International Journal of Science
-
Avikal, S., and P. K., Mishra. 2012. “A New U-Shaped Heuristic for Disassembly Line Balancing Problems, Pratibha: International Journal of Science.” Spirituality, Business and Technology 1 (1): 21–27.
-
(2012)
Spirituality, Business and Technology
, vol.1
, Issue.1
, pp. 21-27
-
-
Avikal, S.1
Mishra, P.K.2
-
10
-
-
84893957110
-
A Heuristic for U-Shaped Disassembly Line Balancing Problems
-
Avikal, S., R., Jain, and P., Mishra. 2013a. “A Heuristic for U-Shaped Disassembly Line Balancing Problems.” MIT International Journal of Mechanical Engineering 3 (1): 51–56.
-
(2013)
MIT International Journal of Mechanical Engineering
, vol.3
, Issue.1
, pp. 51-56
-
-
Avikal, S.1
Jain, R.2
Mishra, P.3
-
11
-
-
84908335820
-
An AHP and PROMETHEE Methods-Based Environment Friendly Heuristic for Disassembly Line Balancing Problems
-
Avikal, S., P. K., Mishra, and R., Jain. 2013b. “An AHP and PROMETHEE Methods-Based Environment Friendly Heuristic for Disassembly Line Balancing Problems.” Interdisciplinary Environmental Review 14 (1): 69–85.10.1504/IER.2013.054125
-
(2013)
Interdisciplinary Environmental Review
, vol.14
, Issue.1
, pp. 69-85
-
-
Avikal, S.1
Mishra, P.K.2
Jain, R.3
-
12
-
-
84923188700
-
A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem
-
Avikal, S., P. K., Mishra, R., Jain, and H. C., Yadav. 2013c. “A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem.” Industrial Engineering and Management Systems 12 (3): 254–263.10.7232/iems.2013.12.3.254
-
(2013)
Industrial Engineering and Management Systems
, vol.12
, Issue.3
, pp. 254-263
-
-
Avikal, S.1
Mishra, P.K.2
Jain, R.3
Yadav, H.C.4
-
13
-
-
84893943458
-
A Fuzzy AHP and PROMETHEE Method-Based Heuristic for Disassembly Line Balancing Problems
-
Avikal, S., P. K., Mishra, and R., Jain. 2014a. “A Fuzzy AHP and PROMETHEE Method-Based Heuristic for Disassembly Line Balancing Problems.” International Journal of Production Research 52 (5): 1306–1317.10.1080/00207543.2013.831999
-
(2014)
International Journal of Production Research
, vol.52
, Issue.5
, pp. 1306-1317
-
-
Avikal, S.1
Mishra, P.K.2
Jain, R.3
-
14
-
-
84908355358
-
A Kano Model, AHP and M-TOPSIS Method-Based Technique for Disassembly Line Balancing under Fuzzy Environment
-
Avikal, S., R., Jain, and P. K., Mishra. 2014b. “A Kano Model, AHP and M-TOPSIS Method-Based Technique for Disassembly Line Balancing under Fuzzy Environment.” Applied Soft Computing 25: 519–529.
-
(2014)
Applied Soft Computing
, vol.25
, pp. 519-529
-
-
Avikal, S.1
Jain, R.2
Mishra, P.K.3
-
15
-
-
84928040847
-
A New Heuristic for Disassembly Line Balancing Problems with AND/004FR Precedence Relations
-
New Delhi: Springer
-
Avikal, S., R., Jain, H., Yadav, and P. K., Mishra. 2014c. “A New Heuristic for Disassembly Line Balancing Problems with AND/004FR Precedence Relations.” In Proceedings of the Second International Conference on Soft Computing, 519–525. New Delhi: Springer.
-
(2014)
Proceedings of the Second International Conference on Soft Computing
, pp. 519-525
-
-
Avikal, S.1
Jain, R.2
Yadav, H.3
Mishra, P.K.4
-
16
-
-
84961664586
-
A Fuzzy AHP Approach for Calculating the Weights of Disassembly Line Balancing Criteria
-
Singapore: Springer
-
Avikal, S., S., Sharma, J. S., Kalra, D., Varma, and R., Pandey. 2016. “A Fuzzy AHP Approach for Calculating the Weights of Disassembly Line Balancing Criteria.” In Proceedings of 5th International Conference on Soft Computing for Problem Solving, 723–727. Singapore: Springer.
-
(2016)
Proceedings of 5th International Conference on Soft Computing for Problem Solving
, pp. 723-727
-
-
Avikal, S.1
Sharma, S.2
Kalra, J.S.3
Varma, D.4
Pandey, R.5
-
17
-
-
0027675494
-
Balancing Two-Sided Assembly Lines: A Case Study
-
Bartholdı, J. J., 1993. “Balancing Two-Sided Assembly Lines: A Case Study.” International Journal of Production Research 31 (10): 2447–2461.10.1080/00207549308956868
-
(1993)
International Journal of Production Research
, vol.31
, Issue.10
, pp. 2447-2461
-
-
Bartholdı, J.J.1
-
18
-
-
84922236941
-
Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous Parts
-
State College, PA
-
Bentaha, M. L., O., Battaia, and A., Dolgui. 2013a. “Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous Parts.” In Proceedings of the IFIP International Federation for Information Processing, 103–110, State College, PA.
-
(2013)
Proceedings of the IFIP International Federation for Information Processing
, pp. 103-110
-
-
Bentaha, M.L.1
Battaia, O.2
Dolgui, A.3
-
19
-
-
84929377517
-
A Cone Programming Approach for Stochastic Disassembly Line Balancing in the Presence of Hazardous Parts
-
and,. Iguassu Falls
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2013b. “A Cone Programming Approach for Stochastic Disassembly Line Balancing in the Presence of Hazardous Parts.” In Proceedings of the 22nd International Conference on Production Research, 284, Iguassu Falls.
-
(2013)
Proceedings of the 22nd International Conference on Production Research
, pp. 284
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
20
-
-
84891551126
-
A Decomposition Method for Stochastic Partial Disassembly Line Balancing with Profit Maximization
-
and,. Madison, WI
-
Bentaha, M. L., O., Battaia, and A., Dolgui. 2013c. “A Decomposition Method for Stochastic Partial Disassembly Line Balancing with Profit Maximization.” In Proceedings of the IEEE International Conference on Automation Science, Madison, WI.
-
(2013)
Proceedings of the IEEE International Conference on Automation Science
-
-
Bentaha, M.L.1
Battaia, O.2
Dolgui, A.3
-
21
-
-
84896097591
-
A Stochastic Formulation of the Disassembly Line Balancing Problem
-
Heidelberg, Berlin
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2013d. “A Stochastic Formulation of the Disassembly Line Balancing Problem.” In Proceedings of the IFIP Advances in Information and Communication Technology, 397–404, Heidelberg, Berlin.
-
(2013)
Proceedings of the IFIP Advances in Information and Communication Technology
, pp. 397-404
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
22
-
-
84884302027
-
L–Shaped Algorithm for Stochastic Disassembly Line Balancing Problem
-
Saint Petersburg
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2013e. “L–Shaped Algorithm for Stochastic Disassembly Line Balancing Problem.” In Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 407–411, Saint Petersburg.
-
(2013)
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control
, pp. 407-411
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
23
-
-
84902539041
-
Dealing with Uncertainty in Disassembly Line Design
-
Bentaha, M. L., O., Battaïa, A., Dolgui, and S. J., Hu. 2014a. “Dealing with Uncertainty in Disassembly Line Design.” CIRP Annals 63: 21–24.10.1016/j.cirp.2014.03.004
-
(2014)
CIRP Annals
, vol.63
, pp. 21-24
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
24
-
-
84903557899
-
Disassembly Line Balancing and Sequencing under Uncertainty
-
Trondheim
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2014b. “Disassembly Line Balancing and Sequencing under Uncertainty.” In Proceedings of the 21st CIRP Conference on Life Cycle Engineering, 239–244, Trondheim.
-
(2014)
Proceedings of the 21st CIRP Conference on Life Cycle Engineering
, pp. 239-244
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
25
-
-
84902248564
-
A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2014c. “A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty.” Computers and Operations Research 51: 111–122.10.1016/j.cor.2014.05.006
-
(2014)
Computers and Operations Research
, vol.51
, pp. 111-122
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
26
-
-
84929774090
-
Disassembly Line Balancing Problem with Fixed Number of Workstations under Uncertainty
-
Cape Town
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2014d. “Disassembly Line Balancing Problem with Fixed Number of Workstations under Uncertainty.” In Proceedings of the 19th World Congress on the International Federation of Automatic Control, 3522–3526, Cape Town.
-
(2014)
Proceedings of the 19th World Congress on the International Federation of Automatic Control
, pp. 3522-3526
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
27
-
-
84904503542
-
Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem
-
Windsor, ON
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2014e. “Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem.” In Proceedings of the 47th CIRP Conference on Manufacturing, 56–60, Windsor, ON.
-
(2014)
Proceedings of the 47th CIRP Conference on Manufacturing
, pp. 56-60
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
28
-
-
84961289222
-
An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times
-
Bentaha, M. L., O., Battaïa, and A., Dolgui. 2015a. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times.” International Journal of Production Research 53 (6): 1807–1818.10.1080/00207543.2014.961212
-
(2015)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1807-1818
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
29
-
-
84940610243
-
Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints
-
Bentaha, M. L., O., Battaïa, A., Dolgui, and S. J., Hu. 2015b. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.10.1016/j.ejor.2015.06.019
-
(2015)
European Journal of Operational Research
, vol.247
, Issue.3
, pp. 957-967
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
30
-
-
84953880323
-
A Bibliographic Review of Production Line Design and Balancing under Uncertainty
-
Bentaha, M. L., A., Dolgui, and O., Battaïa. 2015c. “A Bibliographic Review of Production Line Design and Balancing under Uncertainty.” IFAC-PapersOnLine 48 (3): 70–75.10.1016/j.ifacol.2015.06.060
-
(2015)
IFAC-PapersOnLine
, vol.48
, Issue.3
, pp. 70-75
-
-
Bentaha, M.L.1
Dolgui, A.2
Battaïa, O.3
-
31
-
-
34249995941
-
A Classification of Assembly Line Balancing Problems
-
Boysen, N., M., Fliedner, and A., Scholl. 2007. “A Classification of Assembly Line Balancing Problems.” European Journal of Operational Research 183 (2): 674–693.10.1016/j.ejor.2006.10.010
-
(2007)
European Journal of Operational Research
, vol.183
, Issue.2
, pp. 674-693
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
32
-
-
69249245295
-
Multi Objective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm
-
Ding, L.-P., J.-R., Tan, Y.-X., Feng, and Y.-C., Gao. 2009. “Multi Objective Optimization for Disassembly Line Balancing Based on Pareto Ant Colony Algorithm.” Computer Integrated Manufacturing Systems 15 (7): 1406–1413.
-
(2009)
Computer Integrated Manufacturing Systems
, vol.15
, Issue.7
, pp. 1406-1413
-
-
Ding, L.-P.1
Tan, J.-R.2
Feng, Y.-X.3
Gao, Y.-C.4
-
33
-
-
78650595728
-
Multi-Objective Disassembly Line Balancing via Modified Ant Colony Optimization Algorithm
-
Changsha
-
Ding, L., W., Chen, J., Tan, and Y., Feng. 2010a. “Multi-Objective Disassembly Line Balancing via Modified Ant Colony Optimization Algorithm.” In Proceedings of IEEE 5th International Conference on Bio-Inspired Computing: Theories and Applications, 426–430, Changsha.
-
(2010)
Proceedings of IEEE 5th International Conference on Bio-Inspired Computing: Theories and Applications
, pp. 426-430
-
-
Ding, L.1
Chen, W.2
Tan, J.3
Feng, Y.4
-
34
-
-
77953610368
-
A New Multi-Objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problem
-
Ding, L.-P., Y.-X., Feng, J.-R., Tan, and Y.-C., Gao. 2010b. “A New Multi-Objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problem.” International Journal of Advanced Manufacturing Technology 48 (5–8): 761–771.10.1007/s00170-009-2303-5
-
(2010)
International Journal of Advanced Manufacturing Technology
, vol.48
, Issue.5-8
, pp. 761-771
-
-
Ding, L.-P.1
Feng, Y.-X.2
Tan, J.-R.3
Gao, Y.-C.4
-
35
-
-
79960737645
-
Applying Equal Piles Approach to Disassembly Line Balancing Problem
-
Prague
-
Duta, L., F. G., Filip, and J. M., Henrioud. 2007. “Applying Equal Piles Approach to Disassembly Line Balancing Problem.” In Proceedings of the 16th World Congress of the International Federation of Automatic Control, 152–157, Prague.
-
(2007)
Proceedings of the 16th World Congress of the International Federation of Automatic Control
, pp. 152-157
-
-
Duta, L.1
Filip, F.G.2
Henrioud, J.M.3
-
36
-
-
79961018940
-
Real Time Balancing of Complex Disassembly Lines
-
Seoul
-
Duta, L., F. G., Filip, and I., Caciula. 2008. “Real Time Balancing of Complex Disassembly Lines.” In Proceedings of the 17th World Congress the International Federation of Automatic Control, 913–918, Seoul.
-
(2008)
Proceedings of the 17th World Congress the International Federation of Automatic Control
, pp. 913-918
-
-
Duta, L.1
Filip, F.G.2
Caciula, I.3
-
37
-
-
84992315973
-
Column Generation Approach for Disassembly Line Balancing
-
Duta, L., I., Caciula, and P. C., Patic. 2016. “Column Generation Approach for Disassembly Line Balancing.” IFAC-PapersOnLine 49 (12): 916–920.10.1016/j.ifacol.2016.07.892
-
(2016)
IFAC-PapersOnLine
, vol.49
, Issue.12
, pp. 916-920
-
-
Duta, L.1
Caciula, I.2
Patic, P.C.3
-
38
-
-
84937522090
-
Quantitative Models for Managing Supply Chain Risks: A Review
-
Fahimnia, B., C. S., Tang, H., Davarzani, and J., Sarkis. 2015. “Quantitative Models for Managing Supply Chain Risks: A Review.” European Journal of Operational Research 247: 1–15.10.1016/j.ejor.2015.04.034
-
(2015)
European Journal of Operational Research
, vol.247
, pp. 1-15
-
-
Fahimnia, B.1
Tang, C.S.2
Davarzani, H.3
Sarkis, J.4
-
39
-
-
85070435657
-
Remanufacturing Line Balancing: A Literature Review of the Problems and Progress
-
Baltimore, MD
-
Gagnon, R. J., and S. D., Morgan. 2013. “Remanufacturing Line Balancing: A Literature Review of the Problems and Progress.” In Proceedings of the Decision Sciences Institute Conference, 1–28, Baltimore, MD.
-
(2013)
Proceedings of the Decision Sciences Institute Conference
, pp. 1-28
-
-
Gagnon, R.J.1
Morgan, S.D.2
-
40
-
-
84991463586
-
Biomass Supply Chain Network Design: An Optimization-Oriented Review and Analysis
-
Ghaderi, H., M. S., Pishvaee, and A., Moini. 2016. “Biomass Supply Chain Network Design: An Optimization-Oriented Review and Analysis.” Industrial Crops and Products 94: 972–1000.10.1016/j.indcrop.2016.09.027
-
(2016)
Industrial Crops and Products
, vol.94
, pp. 972-1000
-
-
Ghaderi, H.1
Pishvaee, M.S.2
Moini, A.3
-
41
-
-
84907580954
-
Reverse Logistics and Closed-Loop Supply Chain: A Comprehensive Review to Explore the Future
-
Govindan, K., H., Soleimani, and D., Kannan. 2015. “Reverse Logistics and Closed-Loop Supply Chain: A Comprehensive Review to Explore the Future.” European Journal of Operational Research 240: 603–626.10.1016/j.ejor.2014.07.012
-
(2015)
European Journal of Operational Research
, vol.240
, pp. 603-626
-
-
Govindan, K.1
Soleimani, H.2
Kannan, D.3
-
42
-
-
0003669639
-
Disassembly Line Balancing
-
and,. Newport, RI
-
Güngör, A., and S. M., Gupta. 1999a. “Disassembly Line Balancing.” In Proceedings of the Annual Meeting of the Northeast Decision Sciences Institute, 193–195, Newport, RI.
-
(1999)
Proceedings of the Annual Meeting of the Northeast Decision Sciences Institute
, pp. 193-195
-
-
Güngör, A.1
Gupta, S.M.2
-
43
-
-
0003623993
-
A Systematic Solution Approach to the Disassembly Line Balancing Problem
-
New Orleans, LA
-
Güngör, A., and S. M., Gupta. 1999b. “A Systematic Solution Approach to the Disassembly Line Balancing Problem.” In Proceedings of the 25th International Conference on Computers and Industrial Engineering, 70–73, New Orleans, LA.
-
(1999)
Proceedings of the 25th International Conference on Computers and Industrial Engineering
, pp. 70-73
-
-
Güngör, A.1
Gupta, S.M.2
-
44
-
-
0033358107
-
Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey
-
Güngör, A., and S. M., Gupta. 1999c. “Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey.” Computers and Industrial Engineering 36: 811–853.
-
(1999)
Computers and Industrial Engineering
, vol.36
, pp. 811-853
-
-
Güngör, A.1
Gupta, S.M.2
-
45
-
-
0035837942
-
A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
-
Güngör, A., and S. M., Gupta. 2001. “A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures.” International Journal of Production Research 39 (7): 142–1467.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 142-1467
-
-
Güngör, A.1
Gupta, S.M.2
-
47
-
-
0034999518
-
Complications in Disassembly Line Balancing
-
Boston, MA
-
Güngör, A., S. M., Gupta, K., Pochampally, and S. V., Kamarthi. 2000. “Complications in Disassembly Line Balancing.” Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing, 289–298, Boston, MA.
-
(2000)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing
, pp. 289-298
-
-
Güngör, A.1
Gupta, S.M.2
Pochampally, K.3
Kamarthi, S.V.4
-
48
-
-
0034837192
-
Product Recovery Using a Disassembly Line: Challenges and Solution
-
Denver, CO
-
Gupta, S. M., and A., Güngör. 2001. “Product Recovery Using a Disassembly Line: Challenges and Solution.” In IEEE International Symposium on Electronics and the Environment, 36–40, Denver, CO.
-
(2001)
IEEE International Symposium on Electronics and the Environment
, pp. 36-40
-
-
Gupta, S.M.1
Güngör, A.2
-
49
-
-
84906928944
-
Integrated Procurement-Disassembly Problem
-
Ajaccio
-
Habibi, M. K. K., O., Battaïa, V. D., Cung, and A., Dolgui. 2014. “Integrated Procurement-Disassembly Problem.” In Proceedings of the IFIP Advances in Information and Communication Technology, 482–490, Ajaccio.
-
(2014)
Proceedings of the IFIP Advances in Information and Communication Technology
, pp. 482-490
-
-
Habibi, M.K.K.1
Battaïa, O.2
Cung, V.D.3
Dolgui, A.4
-
50
-
-
85021629679
-
An Efficient Two-Phase Iterative Heuristic for Collection-Disassembly Problem
-
Habibi, M. K. K., O., Battaïa, V. D., Cung, and A., Dolgui. 2017. “An Efficient Two-Phase Iterative Heuristic for Collection-Disassembly Problem.” Computers and Industrial Engineering 110: 505–514.10.1016/j.cie.2017.06.031
-
(2017)
Computers and Industrial Engineering
, vol.110
, pp. 505-514
-
-
Habibi, M.K.K.1
Battaïa, O.2
Cung, V.D.3
Dolgui, A.4
-
51
-
-
84971431228
-
The Improvement of Line Efficiency on Disassembly Line Balancing Problem: An HRRCD’s Heuristic Rule
-
Hao, Y. K., and S., Hasan. 2016. “The Improvement of Line Efficiency on Disassembly Line Balancing Problem: An HRRCD’s Heuristic Rule.” ARPN Journal of Engineering and Applied Sciences 11 (10): 6428–6433.
-
(2016)
ARPN Journal of Engineering and Applied Sciences
, vol.11
, Issue.10
, pp. 6428-6433
-
-
Hao, Y.K.1
Hasan, S.2
-
52
-
-
84922251741
-
A Network-Based Shortest Route Model for Parallel Disassembly Line Balancing Problem
-
Hezer, S., and Y., Kara. 2015. “A Network-Based Shortest Route Model for Parallel Disassembly Line Balancing Problem.” International Journal of Production Research 53 (6): 1849–1865.10.1080/00207543.2014.965348
-
(2015)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1849-1865
-
-
Hezer, S.1
Kara, Y.2
-
53
-
-
84923124004
-
2-Stage Optimal Design and Analysis for Disassembly System with Environmental and Economic Parts Selection Using the Recyclability Evaluation Method
-
Igarashi, K., T., Yamada, and M., Inoue. 2014. “2-Stage Optimal Design and Analysis for Disassembly System with Environmental and Economic Parts Selection Using the Recyclability Evaluation Method.” Industrial Engineering and Management Systems 13 (1): 52–66.10.7232/iems.2014.13.1.052
-
(2014)
Industrial Engineering and Management Systems
, vol.13
, Issue.1
, pp. 52-66
-
-
Igarashi, K.1
Yamada, T.2
Inoue, M.3
-
55
-
-
72149096791
-
Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art
-
Ilgin, M. A., and S. M., Gupta. 2010a. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art.” Journal of Environmental Management 91 (3): 563–591.10.1016/j.jenvman.2009.09.037
-
(2010)
Journal of Environmental Management
, vol.91
, Issue.3
, pp. 563-591
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
56
-
-
78049395804
-
Comparison of Economic Benefits of Sensor Embedded Products and Conventional Products in a Multi-Product Disassembly Line
-
Ilgin, M. A., and S. M., Gupta. 2010b. “Comparison of Economic Benefits of Sensor Embedded Products and Conventional Products in a Multi-Product Disassembly Line.” Computers and Industrial Engineering 59 (4): 748–763.10.1016/j.cie.2010.07.031
-
(2010)
Computers and Industrial Engineering
, vol.59
, Issue.4
, pp. 748-763
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
57
-
-
79953029079
-
Evaluating the Impact of Sensor Embedded Products on the Performance of an Air Conditioner Disassembly Line
-
Ilgin, M. A., and S. M., Gupta. 2011a. “Evaluating the Impact of Sensor Embedded Products on the Performance of an Air Conditioner Disassembly Line.” International Journal of Advanced Manufacturing Technology 53 (9–12): 1199–1216.10.1007/s00170-010-2891-0
-
(2011)
International Journal of Advanced Manufacturing Technology
, vol.53
, Issue.9-12
, pp. 1199-1216
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
58
-
-
78649318256
-
Recovery of Sensor Embedded Washing Machines Using a Multi-Kanban Controlled Disassembly Line
-
Ilgin, M. A., and S. M., Gupta. 2011b. “Recovery of Sensor Embedded Washing Machines Using a Multi-Kanban Controlled Disassembly Line.” Robotics and Computer Integrated Manufacturing 27 (2): 318–334.10.1016/j.rcim.2010.07.016
-
(2011)
Robotics and Computer Integrated Manufacturing
, vol.27
, Issue.2
, pp. 318-334
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
59
-
-
85019101648
-
Disassembly Line Balancing Using Linear Physical Programming
-
Ilgin, M. A., H., Akçay, and C., Araz. 2017. “Disassembly Line Balancing Using Linear Physical Programming.” International Journal of Production Research 55 (20): 6108–6119.10.1080/00207543.2017.1324225
-
(2017)
International Journal of Production Research
, vol.55
, Issue.20
, pp. 6108-6119
-
-
Ilgin, M.A.1
Akçay, H.2
Araz, C.3
-
60
-
-
85024383853
-
A Proposed Multi-Objective Optimization Model for Sequence-Dependent Disassembly Line Balancing Problem
-
Chengdu
-
Jia, L., and W., Shuwei. 2017. “A Proposed Multi-Objective Optimization Model for Sequence-Dependent Disassembly Line Balancing Problem.” In Proceedings of the 3rd International Conference on Information Management, 421–425, Chengdu.
-
(2017)
Proceedings of the 3rd International Conference on Information Management
, pp. 421-425
-
-
Jia, L.1
Shuwei, W.2
-
61
-
-
84881183258
-
A Hybrid Genetic Algorithm Approach for Disassembly Line Balancing
-
Boston, MA
-
Kalayci, C. B., and S. M., Gupta. 2011a. “A Hybrid Genetic Algorithm Approach for Disassembly Line Balancing.” In Proceedings of the 42nd Annual Meeting of Decision Science Institute, 2142–2148, Boston, MA.
-
(2011)
Proceedings of the 42nd Annual Meeting of Decision Science Institute
, pp. 2142-2148
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
62
-
-
84886885972
-
Tabu Search for Disassembly Line Balancing with Multiple Objectives
-
Los Angeles, CA:, and,.
-
Kalayci, C. B., and S. M., Gupta. 2011b. “Tabu Search for Disassembly Line Balancing with Multiple Objectives.” In Proceedings of the 41st International Conference on Computers and Industrial Engineering, 160–165. Los Angeles, CA.
-
(2011)
Proceedings of the 41st International Conference on Computers and Industrial Engineering
, pp. 160-165
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
63
-
-
84887821595
-
A Particle Swarm Optimization Algorithm with Neighborhood-Based Mutation for Sequence-Dependent Disassembly Line Balancing Problem
-
Kalayci, C. B., and S. M., Gupta. 2013a. “A Particle Swarm Optimization Algorithm with Neighborhood-Based Mutation for Sequence-Dependent Disassembly Line Balancing Problem.” The International Journal of Advanced Manufacturing Technology 69 (1–4): 197–209.10.1007/s00170-013-4990-1
-
(2013)
The International Journal of Advanced Manufacturing Technology
, vol.69
, Issue.1-4
, pp. 197-209
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
64
-
-
84878666440
-
Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem
-
Kalayci, C. B., and S. M., Gupta. 2013b. “Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem.” Journal of Manufacturing Technology Management 24 (3): 413–427.10.1108/17410381311318909
-
(2013)
Journal of Manufacturing Technology Management
, vol.24
, Issue.3
, pp. 413-427
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
65
-
-
84881185298
-
Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem
-
Kalayci, C. B., and S. M., Gupta. 2013c. “Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40 (18): 7231–7241.10.1016/j.eswa.2013.06.067
-
(2013)
Expert Systems with Applications
, vol.40
, Issue.18
, pp. 7231-7241
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
66
-
-
84887413772
-
Balancing a Sequence-Dependent Disassembly Line Using Simulated Annealing Algorithm
-
Kalayci, C. B., and S. M., Gupta. 2013d. “Balancing a Sequence-Dependent Disassembly Line Using Simulated Annealing Algorithm.” Applications of Management Science 16: 81–103.10.1108/mansc
-
(2013)
Applications of Management Science
, vol.16
, pp. 81-103
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
67
-
-
85123268499
-
River Formation Dynamics Approach for Sequence-Dependent Disassembly Line Balancing Problem
-
S. M. G., (ed), and,. In, edited by. Boca Raton, FL: CRC Press
-
Kalayci, C. B., and S. M., Gupta. 2013e. “River Formation Dynamics Approach for Sequence-Dependent Disassembly Line Balancing Problem.” In Reverse Supply Chains: Issues and Analysis, edited by S. M. Gupta, 289–312. Boca Raton, FL: CRC Press.
-
(2013)
Reverse Supply Chains: Issues and Analysis
, pp. 289-312
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
68
-
-
84884314644
-
Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem
-
Saint Petersburg
-
Kalayci, C. B., and S. M., Gupta. 2013f. “Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.” In Proceedings of IFAC Conference on Manufacturing Modelling, Management, and Control, 93–98, Saint Petersburg.
-
(2013)
Proceedings of IFAC Conference on Manufacturing Modelling, Management, and Control
, pp. 93-98
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
69
-
-
84889821707
-
A Tabu Search Algorithm for Balancing a Sequence-Dependent Disassembly Line
-
Kalayci, C. B., and S. M., Gupta. 2014. “A Tabu Search Algorithm for Balancing a Sequence-Dependent Disassembly Line.” Production Planning and Control 25 (2): 149–160.10.1080/09537287.2013.782949
-
(2014)
Production Planning and Control
, vol.25
, Issue.2
, pp. 149-160
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
70
-
-
84881125718
-
Bees Colony Intelligence in Solving Disassembly Line Balancing Problem
-
Sanya, Hainan
-
Kalayci, C. B., S. M., Gupta, and K., Nakashima. 2011. “Bees Colony Intelligence in Solving Disassembly Line Balancing Problem.” In Proceedings of the 2011 Asian Conference of Management Science and Applications, 34–41, Sanya, Hainan.
-
(2011)
Proceedings of the 2011 Asian Conference of Management Science and Applications
, pp. 34-41
-
-
Kalayci, C.B.1
Gupta, S.M.2
Nakashima, K.3
-
71
-
-
84923648548
-
A Variable Neighbourhood Search Algorithm for Disassembly Lines
-
Kalayci, C. B., O., Polat, and S. M., Gupta. 2015a. “A Variable Neighbourhood Search Algorithm for Disassembly Lines.” Journal of Manufacturing Technology Management 26 (2): 182–194.10.1108/JMTM-11-2013-0168
-
(2015)
Journal of Manufacturing Technology Management
, vol.26
, Issue.2
, pp. 182-194
-
-
Kalayci, C.B.1
Polat, O.2
Gupta, S.M.3
-
72
-
-
84954047904
-
Multi-Objective Fuzzy Disassembly Line Balancing Using a Hybrid Discrete Artificial Bee Colony Algorithm
-
Kalayci, C. B., A., Hancilar, A., Gungor, and S. M., Gupta. 2015b. “Multi-Objective Fuzzy Disassembly Line Balancing Using a Hybrid Discrete Artificial Bee Colony Algorithm.” Journal of Manufacturing Systems 37 (3): 672–682.10.1016/j.jmsy.2014.11.015
-
(2015)
Journal of Manufacturing Systems
, vol.37
, Issue.3
, pp. 672-682
-
-
Kalayci, C.B.1
Hancilar, A.2
Gungor, A.3
Gupta, S.M.4
-
73
-
-
84902301531
-
A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem
-
Kalayci, C. B., O., Polat, and S. M., Gupta. 2016. “A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem.” Annals of Operations Research 242 (2): 321–354.10.1007/s10479-014-1641-3
-
(2016)
Annals of Operations Research
, vol.242
, Issue.2
, pp. 321-354
-
-
Kalayci, C.B.1
Polat, O.2
Gupta, S.M.3
-
74
-
-
84952984791
-
A Disassembly Line Balancing Problem with Fixed Number of Workstations
-
Kalaycılar, E. G., M., Azizoğlu, and S., Yeralan. 2016. “A Disassembly Line Balancing Problem with Fixed Number of Workstations.” European Journal of Operational Research 249 (2): 592–604.10.1016/j.ejor.2015.09.004
-
(2016)
European Journal of Operational Research
, vol.249
, Issue.2
, pp. 592-604
-
-
Kalaycılar, E.G.1
Azizoğlu, M.2
Yeralan, S.3
-
75
-
-
84982311122
-
Integrating Disassembly Line Balancing in the Planning of a Reverse Logistics Network from the Perspective of a Third Party Provider
-
Kannan, D., K., Garg, P. C., Jha, and A., Diabat. 2017. “Integrating Disassembly Line Balancing in the Planning of a Reverse Logistics Network from the Perspective of a Third Party Provider.” Annals of Operations Research 253 (1): 353–376.10.1007/s10479-016-2272-7
-
(2017)
Annals of Operations Research
, vol.253
, Issue.1
, pp. 353-376
-
-
Kannan, D.1
Garg, K.2
Jha, P.C.3
Diabat, A.4
-
76
-
-
84876972240
-
Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling
-
Karadağ, A. A., and O., Türkbey. 2013. “Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling.” Computers and Industrial Engineering 65 (3): 413–425.
-
(2013)
Computers and Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Karadağ, A.A.1
Türkbey, O.2
-
77
-
-
0742323768
-
Reconfiguring a Remanufacturing Line at Visteon, Mexico
-
Kekre, S., U. S., Rao, J. M., Swaminathan, and J., Zhang. 2003. “Reconfiguring a Remanufacturing Line at Visteon, Mexico.” Interfaces 33 (6): 30–43.10.1287/inte.33.6.30.25184
-
(2003)
Interfaces
, vol.33
, Issue.6
, pp. 30-43
-
-
Kekre, S.1
Rao, U.S.2
Swaminathan, J.M.3
Zhang, J.4
-
78
-
-
0742316813
-
Mixed Assembly and Disassembly Operations for Remanufacturing
-
Ketzenberg, M. E., G. C., Souza, and V. D. R., Guide. 2003. “Mixed Assembly and Disassembly Operations for Remanufacturing.” Production and Operations Management 12 (3): 320–335.
-
(2003)
Production and Operations Management
, vol.12
, Issue.3
, pp. 320-335
-
-
Ketzenberg, M.E.1
Souza, G.C.2
Guide, V.D.R.3
-
79
-
-
34548418090
-
Disassembly Scheduling: Literature Review and Future Research Directions
-
Kim, H.-J., D.-H., Lee, and P., Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Future Research Directions.” International Journal of Production Research 45 (18–19): 4465–4484.10.1080/00207540701440097
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4465-4484
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
-
80
-
-
17044399009
-
Modelling Operational Behaviour of a Disassembly Line
-
Philadelphia, PA
-
Kizilkaya, E. A., and S. M., Gupta. 2004. “Modelling Operational Behaviour of a Disassembly Line.” Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing IV, 79–93, Philadelphia, PA.
-
(2004)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing IV
, pp. 79-93
-
-
Kizilkaya, E.A.1
Gupta, S.M.2
-
81
-
-
33644628847
-
Impact of Different Disassembly Line Balancing Algorithms on the Performance of Dynamic Kanban System for Disassembly Line
-
Boston, MA
-
Kizilkaya, E. A., and S. M., Gupta. 2005. “Impact of Different Disassembly Line Balancing Algorithms on the Performance of Dynamic Kanban System for Disassembly Line.” In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing V, 103–110, Boston, MA.
-
(2005)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing V
, pp. 103-110
-
-
Kizilkaya, E.A.1
Gupta, S.M.2
-
82
-
-
70749116514
-
Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph
-
Koç, A., I., Sabuncuoğlu, and E., Erel. 2009. “Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph.” IIE Transactions 41 (10): 866–881.
-
(2009)
IIE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koç, A.1
Sabuncuoğlu, I.2
Erel, E.3
-
83
-
-
0033358055
-
Linear Programming in Disassembly/Clustering Sequence Generation
-
Lambert, A. J. D., 1999. “Linear Programming in Disassembly/Clustering Sequence Generation.” Computers and Industrial Engineering 36: 723–738.10.1016/S0360-8352(99)00162-X
-
(1999)
Computers and Industrial Engineering
, vol.36
, pp. 723-738
-
-
Lambert, A.J.D.1
-
84
-
-
0038156629
-
Disassembly Sequencing: A Survey
-
Lambert, A. J. D., 2003. “Disassembly Sequencing: A Survey.” International Journal of Production Research 41 (16): 3721–3759.10.1080/0020754031000120078
-
(2003)
International Journal of Production Research
, vol.41
, Issue.16
, pp. 3721-3759
-
-
Lambert, A.J.D.1
-
86
-
-
33644622040
-
A Heuristic Solution for the Disassembly Line Balancing Problem Incorporating Sequence Dependent Costs
-
Boston, MA
-
Lambert, A. J. D., and S. M., Gupta. 2005a. “A Heuristic Solution for the Disassembly Line Balancing Problem Incorporating Sequence Dependent Costs.” In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing V, 73–80, Boston, MA.
-
(2005)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing V
, pp. 73-80
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
87
-
-
33644618730
-
Determining Optimum and Suboptimum Disassembly Sequences with an Application to a Cell Phone
-
Montreal, Que
-
Lambert, A. J. D., and S. M., Gupta. 2005b. “Determining Optimum and Suboptimum Disassembly Sequences with an Application to a Cell Phone.” In Proceedings of the IEEE International Symposium on Assembly and Task Planning, 260–265, Montreal, Que.
-
(2005)
Proceedings of the IEEE International Symposium on Assembly and Task Planning
, pp. 260-265
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
88
-
-
29344464281
-
-
and,. Boca Raton, FL: CRC Press
-
Lambert, A. J. D., and S. M., Gupta. 2005c. Disassembly Modelling for Assembly, Maintenance, Reuse and Recycling. Boca Raton, FL: CRC Press.
-
(2005)
Disassembly Modelling for Assembly, Maintenance, Reuse and Recycling
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
89
-
-
33747286457
-
Disassembly Planning and Scheduling: Review and Further Research
-
Lee, D. H., J. G., Kang, and P., Xirouchakis. 2001. “Disassembly Planning and Scheduling: Review and Further Research.” Journal of Engineering Manufacture 215 (5): 695–709.10.1243/0954405011518629
-
(2001)
Journal of Engineering Manufacture
, vol.215
, Issue.5
, pp. 695-709
-
-
Lee, D.H.1
Kang, J.G.2
Xirouchakis, P.3
-
90
-
-
85013489134
-
Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment
-
Liu, J., and S., Wang. 2017. “Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment.” Sustainability 9 (309): 1–15.
-
(2017)
Sustainability
, vol.9
, Issue.309
, pp. 1-15
-
-
Liu, J.1
Wang, S.2
-
91
-
-
84891761309
-
Research on Disassembly Line Balancing Problem in the Presence of Uncertain Cycle Time
-
Berlin-Heidelberg
-
Liu, B. Y., W. D., Chen, and S., Huang. 2013. “Research on Disassembly Line Balancing Problem in the Presence of Uncertain Cycle Time.” In Proceedings of the International Asia Conference on Industrial Engineering and Management Innovation, 497–507, Berlin-Heidelberg.
-
(2013)
Proceedings of the International Asia Conference on Industrial Engineering and Management Innovation
, pp. 497-507
-
-
Liu, B.Y.1
Chen, W.D.2
Huang, S.3
-
92
-
-
84862939665
-
Disassembly Process Planning Algorithms for End of Life Product Recovery and Environmentally Conscious Disposal
-
Ma, Y.-S., H.-B., Jun, H.-W., Kim, and D.-H., Lee. 2011. “Disassembly Process Planning Algorithms for End of Life Product Recovery and Environmentally Conscious Disposal.” International Journal of Production Research 49 (23): 7007–7027.10.1080/00207543.2010.495089
-
(2011)
International Journal of Production Research
, vol.49
, Issue.23
, pp. 7007-7027
-
-
Ma, Y.-S.1
Jun, H.-B.2
Kim, H.-W.3
Lee, D.-H.4
-
93
-
-
2142661748
-
2-Opt Heuristic for the Disassembly Line Balancing Problem
-
Providence, RI
-
McGovern, S. M., and S. M., Gupta. 2003a. “2-Opt Heuristic for the Disassembly Line Balancing Problem.” In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III, 71–84, Providence, RI.
-
(2003)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III
, pp. 71-84
-
-
McGovern, S.M.1
Gupta, S.M.2
-
94
-
-
0242492016
-
Greedy Algorithm for Disassembly Line Scheduling
-
Washington, DC
-
McGovern, S. M., and S. M., Gupta. 2003b. “Greedy Algorithm for Disassembly Line Scheduling.” In Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, 1737–1744, Washington, DC.
-
(2003)
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics
, pp. 1737-1744
-
-
McGovern, S.M.1
Gupta, S.M.2
-
95
-
-
17044367526
-
Combinatorial Optimization Methods for Disassembly Line Balancing
-
Philadelphia, PA
-
McGovern, S. M., and S. M., Gupta. 2004. “Combinatorial Optimization Methods for Disassembly Line Balancing.” In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing IV, 53–66, Philadelphia, PA.
-
(2004)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing IV
, pp. 53-66
-
-
McGovern, S.M.1
Gupta, S.M.2
-
97
-
-
85070435209
-
Stochastic and Deterministic Combinatorial Optimization Solutions to an Electronic Product Disassembly Flow Shop
-
and,. Philadelphia, PA
-
McGovern, S. M., and S. M., Gupta. 2005b. “Stochastic and Deterministic Combinatorial Optimization Solutions to an Electronic Product Disassembly Flow Shop.” In Proceedings of the 2005 Northeast Decision Sciences Institute Conference, (CD-ROM), Philadelphia, PA.
-
(2005)
Proceedings of the 2005 Northeast Decision Sciences Institute Conference, (CD-ROM)
-
-
McGovern, S.M.1
Gupta, S.M.2
-
98
-
-
33644615165
-
Uninformed and Probabilistic Distributed Agent Combinatorial Searches for the Unary NP-Complete Disassembly Line Balancing Problem
-
Boston, MA
-
McGovern, S. M., and S. M., Gupta. 2005c. “Uninformed and Probabilistic Distributed Agent Combinatorial Searches for the Unary NP-Complete Disassembly Line Balancing Problem.” In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing V, 81–92, Boston, MA.
-
(2005)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing V
, pp. 81-92
-
-
McGovern, S.M.1
Gupta, S.M.2
-
99
-
-
33748559516
-
Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives
-
McGovern, S. M., and S. M., Gupta. 2006a. “Ant Colony Optimization for Disassembly Sequencing with Multiple Objectives.” International Journal of Advanced Manufacturing Technology 30 (5–6): 481–496.10.1007/s00170-005-0037-6
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.5-6
, pp. 481-496
-
-
McGovern, S.M.1
Gupta, S.M.2
-
100
-
-
33846213910
-
Computational Complexity of a Reverse Manufacturing Line
-
Boston, MA
-
McGovern, S. M., and S. M., Gupta. 2006b. “Computational Complexity of a Reverse Manufacturing Line.” In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing VI, 1–12, Boston, MA.
-
(2006)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing VI
, pp. 1-12
-
-
McGovern, S.M.1
Gupta, S.M.2
-
101
-
-
34548389185
-
Deterministic Hybrid and Stochastic Combinatorial Optimization Treatments of an Electronic Product Disassembly Line
-
Kenneth D.L., Ronald K.K., (eds), and,. edited by. Amsterdam: Emerald Group
-
McGovern, S. M., and S. M., Gupta. 2006c. “Deterministic Hybrid and Stochastic Combinatorial Optimization Treatments of an Electronic Product Disassembly Line.” In Applications of Management ScienceProductivity, Finance, and Operations, edited by D. L., Kenneth and K. K., Ronald, 175–197. Amsterdam: Emerald Group.
-
(2006)
Applications of Management ScienceProductivity, Finance, and Operations
, pp. 175-197
-
-
McGovern, S.M.1
Gupta, S.M.2
-
102
-
-
33845939092
-
A Balancing Method and Genetic Algorithm for Disassembly Line Balancing
-
McGovern, S. M., and S. M., Gupta. 2007a. “A Balancing Method and Genetic Algorithm for Disassembly Line Balancing.” European Journal of Operational Research 179 (3): 692–708.10.1016/j.ejor.2005.03.055
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
104
-
-
34548449384
-
Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem
-
McGovern, S. M., and S. M., Gupta. 2007c. “Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem.” International Journal of Production Research 45 (18–19): 4485–4511.10.1080/00207540701476281
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
107
-
-
84923695788
-
Unified Assembly- and Disassembly-Line Model Formulae
-
McGovern, S. M., and S. M., Gupta. 2015. “Unified Assembly- and Disassembly-Line Model Formulae.” Journal of Manufacturing Technology Management 26 (2): 195–212.10.1108/JMTM-11-2013-0169
-
(2015)
Journal of Manufacturing Technology Management
, vol.26
, Issue.2
, pp. 195-212
-
-
McGovern, S.M.1
Gupta, S.M.2
-
108
-
-
0242665170
-
Solving Disassembly Sequence Planning Problems Using Combinatorial Optimization
-
xa0; 178–, Providence, RI
-
McGovern, S. M., S. M., Gupta, and S. V., Kamarthi. 2003. “Solving Disassembly Sequence Planning Problems Using Combinatorial Optimization.” In Proceedings of the 2003 Annual Meeting of the Northeast Decision Sciences Institute, 178–180, Providence, RI.
-
(2003)
Proceedings of the 2003 Annual Meeting of the Northeast Decision Sciences Institute
, pp. 180
-
-
McGovern, S.M.1
Gupta, S.M.2
Kamarthi, S.V.3
-
109
-
-
84992410451
-
Resource Constrained Disassembly Line Balancing Problem
-
Mete, S., Z. A., Çil, E., Özceylan, and K., Ağpak. 2016a. “Resource Constrained Disassembly Line Balancing Problem.” IFAC-PapersOnLine 49 (12): 921–925.10.1016/j.ifacol.2016.07.893
-
(2016)
IFAC-PapersOnLine
, vol.49
, Issue.12
, pp. 921-925
-
-
Mete, S.1
Çil, Z.A.2
Özceylan, E.3
Ağpak, K.4
-
110
-
-
84988918149
-
A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem
-
Mete, S., Z. A., Çil, K., Ağpak, E., Özceylan, and A., Dolgui. 2016b. “A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem.” Journal of Manufacturing Systems 41 (1): 188–200.10.1016/j.jmsy.2016.09.002
-
(2016)
Journal of Manufacturing Systems
, vol.41
, Issue.1
, pp. 188-200
-
-
Mete, S.1
Çil, Z.A.2
Ağpak, K.3
Özceylan, E.4
Dolgui, A.5
-
111
-
-
84906494517
-
Modelling and Control of an Assembly/Disassembly Mechatronics Line Served by Mobile Robot with Manipulator
-
Minca, E., A., Filipescu, and A., Voda. 2014. “Modelling and Control of an Assembly/Disassembly Mechatronics Line Served by Mobile Robot with Manipulator.” Control Engineering Practice 31: 50–62.10.1016/j.conengprac.2014.06.005
-
(2014)
Control Engineering Practice
, vol.31
, pp. 50-62
-
-
Minca, E.1
Filipescu, A.2
Voda, A.3
-
112
-
-
85070433301
-
A Mathematical Model of Non-Destructive Disassembly Process
-
Mircheski, I., T., Kandikjan, and B., Prangoski. 2012. “A Mathematical Model of Non-Destructive Disassembly Process.” International Journal of Mechanical and Production Engineering Research and Development 2 (4): 61–72.
-
(2012)
International Journal of Mechanical and Production Engineering Research and Development
, vol.2
, Issue.4
, pp. 61-72
-
-
Mircheski, I.1
Kandikjan, T.2
Prangoski, B.3
-
113
-
-
84939885218
-
Management of a Disassembly Line Using Two Types of Kanban
-
Nakashima, K., M., Kojima, and S. M., Gupta. 2012. “Management of a Disassembly Line Using Two Types of Kanban.” International Journal of Supply Chain Management 1 (3): 11–19.
-
(2012)
International Journal of Supply Chain Management
, vol.1
, Issue.3
, pp. 11-19
-
-
Nakashima, K.1
Kojima, M.2
Gupta, S.M.3
-
114
-
-
84885635477
-
Reverse Supply Chain Optimisation with Disassembly Line Balancing
-
Özceylan, E., and T., Paksoy. 2013. “Reverse Supply Chain Optimisation with Disassembly Line Balancing.” International Journal of Production Research 51 (20): 5985–6001.10.1080/00207543.2013.784405
-
(2013)
International Journal of Production Research
, vol.51
, Issue.20
, pp. 5985-6001
-
-
Özceylan, E.1
Paksoy, T.2
-
115
-
-
84897679104
-
Fuzzy Mathematical Programming Approaches for Reverse Supply Chain Optimization with Disassembly Line Balancing Problem
-
Özceylan, E., and T., Paksoy. 2014a. “Fuzzy Mathematical Programming Approaches for Reverse Supply Chain Optimization with Disassembly Line Balancing Problem.” Journal of Intelligent and Fuzzy Systems 26 (4): 1969–1985.
-
(2014)
Journal of Intelligent and Fuzzy Systems
, vol.26
, Issue.4
, pp. 1969-1985
-
-
Özceylan, E.1
Paksoy, T.2
-
117
-
-
84896400446
-
Interactive Fuzzy Programming Approaches to the Strategic and Tactical Planning of a Closed-Loop Supply Chain under Uncertainty
-
Özceylan, E., Paksoy, T. 2014c. “Interactive Fuzzy Programming Approaches to the Strategic and Tactical Planning of a Closed-Loop Supply Chain under Uncertainty.” International Journal of Production Research 52 (8): 2363–2387.10.1080/00207543.2013.865852
-
(2014)
International Journal of Production Research
, vol.52
, Issue.8
, pp. 2363-2387
-
-
Özceylan, E.1
Paksoy, T.2
-
118
-
-
84890189031
-
Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing
-
Özceylan, E., T., Paksoy, and T., Bektaş. 2014. “Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing.” Transportation Research Part E: Logistics and Transportation Review 61: 142–164.10.1016/j.tre.2013.11.001
-
(2014)
Transportation Research Part E: Logistics and Transportation Review
, vol.61
, pp. 142-164
-
-
Özceylan, E.1
Paksoy, T.2
Bektaş, T.3
-
119
-
-
84885625406
-
Mixed Model Disassembly Line Balancing Problem with Fuzzy Goals
-
Paksoy, T., A., Güngör, E., Özceylan, and A., Hancilar. 2013. “Mixed Model Disassembly Line Balancing Problem with Fuzzy Goals.” International Journal of Production Research 51 (20): 6082–6096.10.1080/00207543.2013.795251
-
(2013)
International Journal of Production Research
, vol.51
, Issue.20
, pp. 6082-6096
-
-
Paksoy, T.1
Güngör, A.2
Özceylan, E.3
Hancilar, A.4
-
120
-
-
84958884700
-
An Agent-Based Collaborative Platform for the Design of Assembly Lines
-
Papakostas, N., G., Pintzos, C., Giannoulis, and G., Chryssolouris. 2016. “An Agent-Based Collaborative Platform for the Design of Assembly Lines.” International Journal of Computer Integrated Manufacturing 29 (4): 374–385.10.1080/0951192X.2015.1066862
-
(2016)
International Journal of Computer Integrated Manufacturing
, vol.29
, Issue.4
, pp. 374-385
-
-
Papakostas, N.1
Pintzos, G.2
Giannoulis, C.3
Chryssolouris, G.4
-
121
-
-
85070435129
-
Comparisons of Different Fuzzy Multi Criteria Decision-Making Methods on Closed Loop Supply Chain Networks with Disassembly Line Balancing Problem
-
and,. 65, Rome
-
Pehlivan, N. Y., E., Özceylan, and T., Paksoy. 2013. “Comparisons of Different Fuzzy Multi Criteria Decision-Making Methods on Closed Loop Supply Chain Networks with Disassembly Line Balancing Problem.” In Proceedings of the 26th European Conference on Operational Conference, 65, Rome.
-
(2013)
Proceedings of the 26th European Conference on Operational Conference
-
-
Pehlivan, N.Y.1
Özceylan, E.2
Paksoy, T.3
-
122
-
-
33244467057
-
Solving a Disassembly Line Balancing with Task Failure a Psycho-Clonal Algorithm
-
and,. Long Beach, CA
-
Prakash, A., and M. K., Tiwari. 2005. “Solving a Disassembly Line Balancing with Task Failure a Psycho-Clonal Algorithm.” In Proceedings of the ASME International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, 393–399, Long Beach, CA.
-
(2005)
Proceedings of the ASME International Design Engineering Technical Conferences and Computers and Information in Engineering Conference
, pp. 393-399
-
-
Prakash, A.1
Tiwari, M.K.2
-
123
-
-
0038351785
-
Dynamic Scheduling and Line Balancing Methods, and Software Tools for Lean and Reconfigurable Disassembly Cells and Lines
-
and,. Boston, MA
-
Ranky, P. G., M., Subramanyam, R. J., Caudill, K., Limaye, and N., Alli. 2003. “Dynamic Scheduling and Line Balancing Methods, and Software Tools for Lean and Reconfigurable Disassembly Cells and Lines.” In Proceedings of the IEEE International Symposium on Electronics and the Environment, 234–239, Boston, MA.
-
(2003)
Proceedings of the IEEE International Symposium on Electronics and the Environment
, pp. 234-239
-
-
Ranky, P.G.1
Subramanyam, M.2
Caudill, R.J.3
Limaye, K.4
Alli, N.5
-
124
-
-
85021834806
-
An Improved Gravitational Search Algorithm for Profit-Oriented Partial Disassembly Line Balancing Problem
-
and,. 55 (24): 7302–7316.
-
Ren, Y., D., Yu, C., Zhang, G., Tian, L., Meng, and X., Zhou. 2017. “An Improved Gravitational Search Algorithm for Profit-Oriented Partial Disassembly Line Balancing Problem.” International Journal of Production Research 55 (24): 7302–7316. doi:10.1080/00207543.2017.1341066.
-
(2017)
International Journal of Production Research
-
-
Ren, Y.1
Yu, D.2
Zhang, C.3
Tian, G.4
Meng, L.5
Zhou, X.6
-
125
-
-
85038841097
-
Disassembly Line Balancing Problem Using Interdependent Weights-Based Multi-Criteria Decision Making and 2-Optimal Algorithm
-
Ren, Y., C., Zhang, F., Zhao, G., Tian, W., Lin, L., Meng, and H., Li. 2018. “Disassembly Line Balancing Problem Using Interdependent Weights-Based Multi-Criteria Decision Making and 2-Optimal Algorithm.” Journal of Cleaner Production 174 (1): 1475–1486.10.1016/j.jclepro.2017.10.308
-
(2018)
Journal of Cleaner Production
, vol.174
, Issue.1
, pp. 1475-1486
-
-
Ren, Y.1
Zhang, C.2
Zhao, F.3
Tian, G.4
Lin, W.5
Meng, L.6
Li, H.7
-
126
-
-
84954070118
-
Disassembly Line Balancing under High Variety of End of Life States Using a Joint Precedence Graph Approach
-
Riggs, R. J., O., Battaïa, and S. J., Hu. 2015. “Disassembly Line Balancing under High Variety of End of Life States Using a Joint Precedence Graph Approach.” Journal of Manufacturing Systems 37 (3): 638–648.10.1016/j.jmsy.2014.11.002
-
(2015)
Journal of Manufacturing Systems
, vol.37
, Issue.3
, pp. 638-648
-
-
Riggs, R.J.1
Battaïa, O.2
Hu, S.J.3
-
127
-
-
85012256190
-
The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment
-
Seidi, M., and S., Saghari. 2016. “The Balancing of Disassembly Line of Automobile Engine Using Genetic Algorithm (GA) in Fuzzy Environment.” Industrial Engineering and Management Systems 15 (4): 364–373.10.7232/iems.2016.15.4.364
-
(2016)
Industrial Engineering and Management Systems
, vol.15
, Issue.4
, pp. 364-373
-
-
Seidi, M.1
Saghari, S.2
-
128
-
-
33746432209
-
A Systematic Approach to Design and Operation of Disassembly Lines
-
Tang, Y., and M. C., Zhou. 2006. “A Systematic Approach to Design and Operation of Disassembly Lines.” IEEE Transactions on Automation Science and Engineering 3 (3): 324–329.10.1109/TASE.2005.860989
-
(2006)
IEEE Transactions on Automation Science and Engineering
, vol.3
, Issue.3
, pp. 324-329
-
-
Tang, Y.1
Zhou, M.C.2
-
129
-
-
0034828875
-
A Systematic Approach to Disassembly Line Design
-
Denver, CO
-
Tang, Y., M., Zhou, and R., Caudill. 2001. “A Systematic Approach to Disassembly Line Design.” In Proceedings of the IEEE International Symposium on Electronics and the Environment, 173–178, Denver, CO.
-
(2001)
Proceedings of the IEEE International Symposium on Electronics and the Environment
, pp. 173-178
-
-
Tang, Y.1
Zhou, M.2
Caudill, R.3
-
130
-
-
84904384763
-
Solving Large Scale Disassembly Line Balancing Problem with Uncertainty Using Reinforcement Learning
-
Tuncel, E., A., Zeid, and S., Kamarthi. 2014. “Solving Large Scale Disassembly Line Balancing Problem with Uncertainty Using Reinforcement Learning.” Journal of Intelligent Manufacturing 25 (4): 647–659.10.1007/s10845-012-0711-0
-
(2014)
Journal of Intelligent Manufacturing
, vol.25
, Issue.4
, pp. 647-659
-
-
Tuncel, E.1
Zeid, A.2
Kamarthi, S.3
-
131
-
-
27944510108
-
Disassembly Line Design with Uncertainty
-
and,. 954–, The Big Island
-
Turowski, M., M., Morgan, and Y., Tang. 2005. “Disassembly Line Design with Uncertainty.” In Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, 954–959, The Big Island.
-
(2005)
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics
, pp. 959
-
-
Turowski, M.1
Morgan, M.2
Tang, Y.3
-
132
-
-
84885655160
-
Disassembly Planning and Sequencing for End-of-Life Products with RFID Enriched Information
-
Wan, H., and V. K., Gonnuru. 2013. “Disassembly Planning and Sequencing for End-of-Life Products with RFID Enriched Information.” Robotics and Computer-Integrated Manufacturing 29: 112–118.10.1016/j.rcim.2012.05.001
-
(2013)
Robotics and Computer-Integrated Manufacturing
, vol.29
, pp. 112-118
-
-
Wan, H.1
Gonnuru, V.K.2
-
133
-
-
84885645606
-
Solving Disassembly Line Balancing Problem Using Immune Algorithm
-
Los Angeles, CA
-
Wang, X., T., Tuncel, A., Zeid, and S., Kamarthi. 2011. “Solving Disassembly Line Balancing Problem Using Immune Algorithm.” In Proceedings of the 41st International Conference on Computers and Industrial Engineering, 980–985, Los Angeles, CA.
-
(2011)
Proceedings of the 41st International Conference on Computers and Industrial Engineering
, pp. 980-985
-
-
Wang, X.1
Tuncel, T.2
Zeid, A.3
Kamarthi, S.4
-
134
-
-
85060859053
-
An Improved Adaptive Multi-Objective Particle Swarm Optimization for Disassembly Line Balancing Problem
-
Xiao, S., and S.-K., Nie. 2017. “An Improved Adaptive Multi-Objective Particle Swarm Optimization for Disassembly Line Balancing Problem.” International Journal of Research in Engineering and Science 5 (5): 55–61.
-
(2017)
International Journal of Research in Engineering and Science
, vol.5
, Issue.5
, pp. 55-61
-
-
Xiao, S.1
Nie, S.-K.2
-
135
-
-
85034211939
-
An Entropy-Based Adaptive Hybrid Particle Swarm Optimization for Disassembly Line Balancing Problems
-
Xiao, S., Y., Wang, H., Yu, and S., Nie. 2017. “An Entropy-Based Adaptive Hybrid Particle Swarm Optimization for Disassembly Line Balancing Problems.” Entropy 19 (11): 1–14.
-
(2017)
Entropy
, vol.19
, Issue.11
, pp. 1-14
-
-
Xiao, S.1
Wang, Y.2
Yu, H.3
Nie, S.4
-
136
-
-
85020004694
-
A Pareto Improved Artificial Fish Swarm Algorithm for Solving a Multi-Objective Fuzzy Disassembly Line Balancing Problem
-
Zhang, Z., K., Wang, L., Zhu, and Y., Wang. 2017. “A Pareto Improved Artificial Fish Swarm Algorithm for Solving a Multi-Objective Fuzzy Disassembly Line Balancing Problem.” Expert Systems with Applications 86 (1): 165–176.10.1016/j.eswa.2017.05.053
-
(2017)
Expert Systems with Applications
, vol.86
, Issue.1
, pp. 165-176
-
-
Zhang, Z.1
Wang, K.2
Zhu, L.3
Wang, Y.4
-
137
-
-
84900007770
-
An Ant Colony Optimization Algorithm for Multi-Objective Disassembly Line Balancing Problem
-
Zhu, X., Z., Zhang, and J., Hu. 2014. “An Ant Colony Optimization Algorithm for Multi-Objective Disassembly Line Balancing Problem.” China Mechanical Engineering 25 (8): 1075–1079.
-
(2014)
China Mechanical Engineering
, vol.25
, Issue.8
, pp. 1075-1079
-
-
Zhu, X.1
Zhang, Z.2
Hu, J.3
|