-
1
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
Agrawal, S. and Tiwari, M. K. 2008. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research, 46(6), 1405-1429.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
4
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
Baybars, I. 1986. A survey of exact algorithms for the simple assembly line balancing problem. Management Science, 32(8), 909-932.
-
(1986)
Management Science
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars, I.1
-
5
-
-
77953610368
-
A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
-
Ding, L.-P. et al. 2010. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem. The International Journal of Advanced Manufacturing Technology, 48(5-8), 761-771.
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.48
, Issue.5-8
, pp. 761-771
-
-
Ding, L.-P.1
-
6
-
-
0030082551
-
Ant system: Optimization by a colony of cooperating agents
-
Dorigo, M., Maniezzo, V., and Colorni, A. 1996. Ant system: Optimization by a colony of cooperating agents. IEEE Transactions on Systems Man and Cybernetics Part B: Cybernetics, 26(1), 29-41.
-
(1996)
IEEE Transactions on Systems Man and Cybernetics Part B: Cybernetics
, vol.26
, Issue.1
, pp. 29-41
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
7
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Gungor, A. and Gupta, S. M. 1999. Issues in environmentally conscious manufacturing and product recovery: A survey. Computers & Industrial Engineering, 36(4), 811-853.
-
(1999)
Computers & Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
8
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Gungor, A. and Gupta, S. M. 2001. A solution approach to the disassembly line balancing problem in the presence of task failures. International Journal of Production Research, 39(7), 1427-1467.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
10
-
-
17044375963
-
Disassembly sequencing problem: A case study of a cell phone
-
Gupta, S. M. (Ed.), Bellingham, WA: SPIE-International Society for Optical Engineering
-
Gupta, S. M., Erbis, E., and McGovern, S. M. 2004. Disassembly sequencing problem: A case study of a cell phone. In: Gupta, S. M. (Ed.), Environmentally Conscious Manufacturing IV. Bellingham, WA: SPIE-International Society for Optical Engineering, pp. 43-52.
-
(2004)
Environmentally Conscious Manufacturing IV
, pp. 43-52
-
-
Gupta, S.M.1
Erbis, E.2
McGovern, S.M.3
-
11
-
-
72149096791
-
Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
-
Ilgin, M. A. and Gupta, S. M. 2010. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. Journal of Environmental Management, 91(3), 563-591.
-
(2010)
Journal of Environmental Management
, vol.91
, Issue.3
, pp. 563-591
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
13
-
-
84881183258
-
A hybrid genetic algorithm approach for disassembly line balancing
-
November 19-22, Boston, MA
-
Kalayci, C. B. and Gupta, S. M. 2011a. A hybrid genetic algorithm approach for disassembly line balancing. Proceedings of the 42nd Annual Meeting of Decision Science Institute (DSI2011), November 19-22, Boston, MA, pp. 2142-2148.
-
(2011)
Proceedings of the 42nd Annual Meeting of Decision Science Institute (DSI2011)
, pp. 2142-2148
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
14
-
-
84886885972
-
Tabu search for disassembly line balancing with multiple objectives
-
October 23-26, University of Southern California, Los Angeles, CA
-
Kalayci, C. B. and Gupta, S. M. 2011b. Tabu search for disassembly line balancing with multiple objectives. 41st International Conference on Computers and Industrial Engineering (CIE41), October 23-26, University of Southern California, Los Angeles, CA, pp. 477-482.
-
(2011)
41st International Conference on Computers and Industrial Engineering (CIE41)
, pp. 477-482
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
15
-
-
84881125718
-
Bees colony intelligence in solving disassembly line balancing problem
-
December 21-22, Sanya, Hainan, China
-
Kalayci, C. B., Gupta, S. M., and Nakashima, K. 2011a. Bees colony intelligence in solving disassembly line balancing problem. Proceedings of the 2011 Asian Conference of Management Science and Applications (ACMSA2011), December 21-22, Sanya, Hainan, China, pp. 34-41.
-
(2011)
Proceedings of the 2011 Asian Conference of Management Science and Applications (ACMSA2011)
, pp. 34-41
-
-
Kalayci, C.B.1
Gupta, S.M.2
Nakashima, K.3
-
16
-
-
84887433137
-
A simulated annealing algorithm for balancing a disassembly line
-
November 30-December 2, Kyoto, Japan
-
Kalayci, C. B., Gupta, S. M., and Nakashima, K. 2011b. A simulated annealing algorithm for balancing a disassembly line. Proceedings of the Seventh International Symposium on Environmentally Conscious Design and Inverse Manufacturing (EcoDesign 2011), November 30-December 2, Kyoto, Japan, pp. 713-718.
-
(2011)
Proceedings of the Seventh International Symposium on Environmentally Conscious Design and Inverse Manufacturing (EcoDesign 2011)
, pp. 713-718
-
-
Kalayci, C.B.1
Gupta, S.M.2
Nakashima, K.3
-
17
-
-
84881134234
-
A simulated annealing algorithm for balancing a disassembly line
-
Umeda, Y. (Ed.), Dordrecht, the Netherlands: Springer
-
Kalayci, C. B., Gupta, S. M., and Nakashima, K. 2012. A simulated annealing algorithm for balancing a disassembly line. In: Umeda, Y. (Ed.), Design for Innovative Value towards a Sustainable Society. Dordrecht, the Netherlands: Springer, pp. 714-719.
-
(2012)
Design for Innovative Value towards a Sustainable Society
, pp. 714-719
-
-
Kalayci, C.B.1
Gupta, S.M.2
Nakashima, K.3
-
18
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koc, A., Sabuncuoglu, I., and Erel, E. 2009. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Transactions, 41(10), 866-881.
-
(2009)
IIE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
19
-
-
84977757037
-
Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem
-
Boston, MA
-
McGovern, S. M. and Gupta, S. M. 2005. Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem. Environmentally Conscious Manufacturing V, Boston, MA, pp. 81-92.
-
(2005)
Environmentally Conscious Manufacturing V
, pp. 81-92
-
-
McGovern, S.M.1
Gupta, S.M.2
-
21
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S. M. and Gupta, S. M. 2007a. A balancing method and genetic algorithm for disassembly line balancing. European Journal of Operational Research, 179(3), 692-708.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
22
-
-
34548449384
-
Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
-
McGovern, S. M. and Gupta, S. M. 2007b. Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. International Journal of Production Research, 45(18-19), 4485-4511.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
24
-
-
38049062278
-
Using river formation dynamics to design heuristic algorithms
-
Akl, S. et al. (Eds.), Berlin/ Heidelberg, Germany: Springer
-
Rabanal, P., Rodríguez, I., and Rubio, F. 2007. Using river formation dynamics to design heuristic algorithms. In: Akl, S. et al. (Eds.), Unconventional Computation. Berlin/ Heidelberg, Germany: Springer, pp. 163-177.
-
(2007)
Unconventional Computation
, pp. 163-177
-
-
Rabanal, P.1
Rodríguez, I.2
Rubio, F.3
-
25
-
-
57649223939
-
Solving dynamic TSP by using river formation dynamics
-
October 18-20, Jinan, China
-
Rabanal, P., Rodriguez, I., and Rubio, F. 2008a. Solving dynamic TSP by using river formation dynamics. ICNC '08. Fourth International Conference on Natural Computation, October 18-20, Jinan, China, pp. 246-250.
-
(2008)
ICNC '08. Fourth International Conference on Natural Computation
, pp. 246-250
-
-
Rabanal, P.1
Rodriguez, I.2
Rubio, F.3
-
26
-
-
56449116907
-
Finding minimum spanning/distances trees by using river formation dynamics
-
Dorigo, M. et al. (Eds.), Berlin/Heidelberg, Germany: Springer
-
Rabanal, P., Rodríguez, I., and Rubio, F. 2008b. Finding minimum spanning/distances trees by using river formation dynamics. In: Dorigo, M. et al. (Eds.), Ant Colony Optimization and Swarm Intelligence. Berlin/Heidelberg, Germany: Springer, pp. 60-71.
-
(2008)
Ant Colony Optimization and Swarm Intelligence
, pp. 60-71
-
-
Rabanal, P.1
Rodríguez, I.2
Rubio, F.3
-
27
-
-
65749120513
-
Applying river formation dynamics to solve NP-complete problems
-
Chiong, R. (Ed.), Berlin/Heidelberg, Germany: Springer
-
Rabanal, P., Rodríguez, I., and Rubio, F. 2009. Applying river formation dynamics to solve NP-complete problems. In: Chiong, R. (Ed.), Nature-Inspired Algorithms for Optimisation. Berlin/Heidelberg, Germany: Springer, pp. 333-368.
-
(2009)
Nature-Inspired Algorithms for Optimisation
, pp. 333-368
-
-
Rabanal, P.1
Rodríguez, I.2
Rubio, F.3
-
28
-
-
79952192352
-
Studying the application of ant colony optimization and river formation dynamics to the steiner tree problem
-
Rabanal, P., Rodríguez, I., and Rubio, F. 2011. Studying the application of ant colony optimization and river formation dynamics to the steiner tree problem. Evolutionary Intelligence, 4(1), 51-65.
-
(2011)
Evolutionary Intelligence
, vol.4
, Issue.1
, pp. 51-65
-
-
Rabanal, P.1
Rodríguez, I.2
Rubio, F.3
-
29
-
-
84883053270
-
Testing restorable systems: Formal definition and heuristic solution based on river formation dynamics
-
January, 1-26
-
Rabanal, P., Rodríguez, I., and Rubio, F. 2012. Testing restorable systems: Formal definition and heuristic solution based on river formation dynamics. Formal Aspects of Computing, January, 1-26.
-
(2012)
Formal Aspects of Computing
-
-
Rabanal, P.1
Rodríguez, I.2
Rubio, F.3
-
30
-
-
0036558763
-
Tutorial on computational complexity
-
Tovey, C. A. 2002. Tutorial on computational complexity. Interfaces, 32(3), 30-61.
-
(2002)
Interfaces
, vol.32
, Issue.3
, pp. 30-61
-
-
Tovey, C.A.1
-
31
-
-
61349137696
-
Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA)
-
Tripathi, M. et al. 2009. Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA). Robotics and Computer-Integrated Manufacturing, 25(3), 483-496.
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.3
, pp. 483-496
-
-
Tripathi, M.1
|