-
1
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
Brennan, L., Gupta, S.M. and Taleb, K.N. (1994) 'Operations planning issues in an assembly/disassembly environment', International Journal of Operations and Production Management, Vol. 14, No. 9, pp.57-67.
-
(1994)
International Journal of Operations and Production Management
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
3
-
-
0032677007
-
Shortest-route formulation of mixed-model assembly line balancing problem
-
Erel, E. and Gokcen, H. (1999) 'Shortest-route formulation of mixed-model assembly line balancing problem', European Journal of Operational Research, Vol. 116, pp.194-204.
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 194-204
-
-
Erel, E.1
Gokcen, H.2
-
4
-
-
0037143030
-
Disassembly line in product recovery
-
DOI 10.1080/00207540210135622
-
Güngör, A. and Gupta, S. M. (2002) 'Disassembly line in product recovery', International Journal of Production Research, Vol. 40, No. 11, pp.2569-2589. (Pubitemid 34808265)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Gungor, A.1
Gupta, S.M.2
-
5
-
-
0003623993
-
A systematic solution approach to the disassembly line balancing problem
-
New Orleans, Louisiana
-
Güngör, A. and Gupta, S.M. (1999a) 'A systematic solution approach to the disassembly line balancing problem', Proceedings of the 25th International Conference on Computers and Industrial Engineering, New Orleans, Louisiana, pp.70-73.
-
(1999)
Proceedings of the 25th International Conference on Computers and Industrial Engineering
, pp. 70-73
-
-
Güngör, A.1
Gupta, S.M.2
-
6
-
-
0003669639
-
Disassembly line balancing
-
Newport, Rhode Island
-
Güngör, A. and Gupta, S.M. (1999b) 'Disassembly line balancing', Proceedings of the 1999 Annual Meeting of the Northeast Decision Sciences Institute, Newport, Rhode Island, pp.193-195.
-
(1999)
Proceedings of the 1999 Annual Meeting of the Northeast Decision Sciences Institute
, pp. 193-195
-
-
Güngör, A.1
Gupta, S.M.2
-
7
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
DOI 10.1016/S0360-8352(99)00167-9
-
Güngör, A. and Gupta, S.M. (1999c) 'Issues in environmentally conscious manufacturing and product recovery: a survey', Computers and Industrial Engineering, Vol. 36, No. 4, pp.811-853. (Pubitemid 30527322)
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
8
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
DOI 10.1080/00207540110052157
-
Güngör, A. and Gupta, S.M. (2001) 'A solution approach to the disassembly line problem in the presence of task failures', International Journal of Production Research, Vol. 39, No. 7, pp.1427-1467. (Pubitemid 35165625)
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
9
-
-
0001353411
-
Scheduling disassembly
-
Gupta, S.M. and Taleb, K. (1994) 'Scheduling disassembly', International Journal of Production Research, Vol. 32, No. 8, pp.1857-1866.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.8
, pp. 1857-1866
-
-
Gupta, S.M.1
Taleb, K.2
-
10
-
-
0001474336
-
An algorithm for the line balancing problem
-
Gutjahr, A.L. and Nemhauser, G.L. (1964) 'An algorithm for the line balancing problem', Management Science, Vol. 11, No. 2, pp.308-315.
-
(1964)
Management Science
, vol.11
, Issue.2
, pp. 308-315
-
-
Gutjahr, A.L.1
Nemhauser, G.L.2
-
11
-
-
0024765174
-
Fast, effective algorithms for simple assembly line balancing problems
-
Hackman, S.T., Magazine, M.J. and Wee, T.S. (1989) 'Fast, effective algorithms for simple assembly line balancing problems', Operations Research, Vol. 37, No. 6, pp.916-924. (Pubitemid 20625070)
-
(1989)
Operations Research
, vol.37
, Issue.6
, pp. 916-924
-
-
Hackman Steven, T.1
Magazine Michael, J.2
Wee, T.S.3
-
12
-
-
0001754984
-
The effect of some design factors on the efficiency of production lines with variable operation times
-
Hillier, F.S. and Boling, R.W. (1966) 'The effect of some design factors on the efficiency of production lines with variable operation times', Journal of Industrial Engineering, Vol. 17, pp.651-658.
-
(1966)
Journal of Industrial Engineering
, vol.17
, pp. 651-658
-
-
Hillier, F.S.1
Boling, R.W.2
-
13
-
-
0018509376
-
On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
-
Hillier, F.S. and Boling, R.W. (1979) 'On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times', Management Science, Vol. 25, No. 8, pp.721-728.
-
(1979)
Management Science
, vol.25
, Issue.8
, pp. 721-728
-
-
Hillier, F.S.1
Boling, R.W.2
-
14
-
-
0004129251
-
-
Dover, Publications, Mineola, New York
-
Hu, T.C. and Shing, M.T. (2002) Combinatorial Algorithms, Dover Publications, Mineola, New York.
-
(2002)
Combinatorial Algorithms
-
-
Hu, T.C.1
Shing, M.T.2
-
16
-
-
29344464281
-
-
CRC Press, Boca Raton, Florida
-
Lambert, A.J.D. and Gupta, S.M. (2005) Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling, CRC Press, Boca Raton, Florida.
-
(2005)
Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
17
-
-
25144457210
-
Balancing assembly lines with tabu search
-
DOI 10.1016/j.ejor.2004.07.031, PII S0377221704004886, Balancing Assembly and Transfer Lines
-
Lapierre, S.D., Ruiz, A. and Soriano, P. (2006) 'Balancing assembly lines with tabu search', European Journal of Operational Research, Vol. 168, No. 3, pp.826-837. (Pubitemid 41336595)
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 826-837
-
-
Lapierre, S.D.1
Ruiz, A.2
Soriano, P.3
-
18
-
-
0003408279
-
-
John Wiley & Sons, New York, New York
-
Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G. and Shmoys, D.B. (1985) The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization, John Wiley & Sons, New York, New York.
-
(1985)
The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
19
-
-
34548449384
-
Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
-
DOI 10.1080/00207540701476281, PII 781767801, Sustainable Design and Manufacture
-
McGovern, S.M. and Gupta, S.M. (2007) 'Combinatorial optimization analysis of the unary np-complete disassembly line balancing problem', International Journal of Production Research, Vol. 45, No. 18-19, pp.4485-4511. (Pubitemid 47351669)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
20
-
-
50549097472
-
Deterministic search algorithm for sequencing and scheduling problems
-
in Xhafa, F. and Abraham, A. (Eds Springer, London, UK
-
McGovern, S.M. and Gupta, S.M. (2008) 'Deterministic search algorithm for sequencing and scheduling problems', in Xhafa, F. and Abraham, A. (Eds.): Meta-heuristics for Scheduling in Industrial and Manufacturing Applications, Studies in Computational Intelligence 128, pp.105-124, Springer, London, UK.
-
(2008)
Meta-heuristics for Scheduling in Industrial and Manufacturing Applications, Studies in Computational Intelligence
, vol.128
, pp. 105-124
-
-
McGovern, S.M.1
Gupta, S.M.2
-
21
-
-
0242665170
-
Solving disassembly sequence planning problems using combinatorial optimization
-
Providence, Rhode Island
-
McGovern, S.M., Gupta, S.M. and Kamarthi, S.V. (2003) 'Solving disassembly sequence planning problems using combinatorial optimization', Proceedings of the 2003 Northeast Decision Sciences Institute Conference, Providence, Rhode Island, pp.178-180.
-
(2003)
Proceedings of the 2003 Northeast Decision Sciences Institute Conference
, pp. 178-180
-
-
McGovern, S.M.1
Gupta, S.M.2
Kamarthi, S.V.3
-
22
-
-
0032598162
-
A comparative evaluation of assembly line balancing heuristics
-
Ponnambalam, S.G., Aravindan, P. and Naidu, G.M. (1999) 'A comparative evaluation of assembly line balancing heuristics', The International Journal of Advanced Manufacturing Technology, Vol. 15, pp.577-586.
-
(1999)
The International Journal of Advanced Manufacturing Technology
, vol.15
, pp. 577-586
-
-
Ponnambalam, S.G.1
Aravindan, P.2
Naidu, G.M.3
-
23
-
-
0022097833
-
The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues
-
Stecke, K.E. and Solberg, J.J. (1985) 'The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues', Operations Research, Vol. 33, No. 4, pp.882-910.
-
(1985)
Operations Research
, vol.33
, Issue.4
, pp. 882-910
-
-
Stecke, K.E.1
Solberg, J.J.2
-
24
-
-
0029732559
-
A genetic algorithm for assembly line balancing
-
Suresh, G., Vinod, V.V. and Sahu, S. (1996) 'A genetic algorithm for assembly line balancing', Production Planning and Control, Vol. 7, No. 1, pp.38-46. (Pubitemid 126643637)
-
(1996)
Production Planning and Control
, vol.7
, Issue.1
, pp. 38-46
-
-
Suresh, G.1
Vinod, V.V.2
Sahu, S.3
-
25
-
-
84907439069
-
A methodology to reduce data collection in lean simulation modeling for the assembly line balancing problem
-
Montreal, Canada
-
Tiacci, L., Saetta, S. and Martini, A. (2003) 'A methodology to reduce data collection in lean simulation modeling for the assembly line balancing problem', Proceedings of Summer Computer Simulation Conference 2003, Montreal, Canada, pp.841-846.
-
(2003)
Proceedings of Summer Computer Simulation Conference 2003
, pp. 841-846
-
-
Tiacci, L.1
Saetta, S.2
Martini, A.3
-
26
-
-
0842288951
-
Automatic PC disassembly for component recovery
-
Torres, F., Gil, P., Puente, S.T., Pomares, J. and Aracil, R. (2004) 'Automatic PC disassembly for component recovery', International Journal of Advanced Manufacturing Technology, Vol. 23, No. 1-2, pp.39-46.
-
(2004)
International Journal of Advanced Manufacturing Technology
, vol.23
, Issue.1-2
, pp. 39-46
-
-
Torres, F.1
Gil, P.2
Puente, S.T.3
Pomares, J.4
Aracil, R.5
|