An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times

Author keywords

chance constraints; disassembly process planning; line design; Sustainable manufacturing; uncertainty

Indexed keywords

COSTS; DECISION MAKING; HAZARDS; PIECEWISE LINEAR TECHNIQUES;

EID: 84961289222     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.961212     Document Type: Article
Times cited : (148)

References (33)
  • 1
    • 33847014539 scopus 로고    scopus 로고
    • A chance-constrained approach to stochastic line balancing problem
    • Agpak, K., and, H. Gokcen. 2007. " A Chance-constrained Approach to Stochastic Line Balancing Problem." European Journal of Operational Research 180: 1098-1115
    • (2007) European Journal of Operational Research , vol.180 , pp. 1098-1115
    • Agpak, K.1    Gokcen, H.2
  • 2
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model u-shaped disassembly line balancing and sequencing problem
    • Agrawal, S., and, M. K. Tiwari. 2008. " A Collaborative Ant Colony Algorithm to Stochastic Mixed-model U-shaped Disassembly Line Balancing and Sequencing Problem." International Journal of Production Research 46 (6): 1405-1429
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 4
    • 84893943458 scopus 로고    scopus 로고
    • A fuzzy ahp and promethee method-based heuristic for disassembly line balancing problems
    • Avikal, S., P. K. Mishra, and, R. Jain. 2014. " A Fuzzy AHP and PROMETHEE Method-based Heuristic for Disassembly Line Balancing Problems." International Journal of Production Research 52: 1306-1317
    • (2014) International Journal of Production Research , vol.52 , pp. 1306-1317
    • Avikal, S.1    Mishra, P.K.2    Jain, R.3
  • 5
    • 84876972240 scopus 로고    scopus 로고
    • Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    • Aydemir-Karadag, A., and, O. Turkbey. 2013. " Multi-objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling." Computers & Industrial Engineering 65 (3): 413-425.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.3 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 6
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solutionapproaches
    • Battaiä, O., and, A. Dolgui. 2013. " A Taxonomy of Line Balancing Problems and Their Solutionapproaches." International Journal of Production Economics 142 (2): 259-277
    • (2013) International Journal of Production Economics , vol.142 , Issue.2 , pp. 259-277
    • Battaiä, O.1    Dolgui, A.2
  • 9
    • 84922236941 scopus 로고    scopus 로고
    • Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts
    • edited by V. Prabhu, M. Taisch, and D. Kiritsis State College, PA: Springer
    • Bentaha, M. L., O. Battaia, and, A. Dolgui. 2013b. " Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts." In Advances in Production Management Systems Sustainable Production and Service Supply Chains, edited by V. Prabhu, M. Taisch, and D. Kiritsis., 103-110. State College, PA: Springer.
    • (2013) Advances in Production Management Systems Sustainable Production and Service Supply Chains , pp. 103-110
    • Bentaha, M.L.1    Battaia, O.2    Dolgui, A.3
  • 10
    • 84902248564 scopus 로고    scopus 로고
    • A sample average approximation method for disassembly line balancing problem under uncertainty
    • Bentaha, M. L., O. Battaiä, and, A. Dolgui. 2014a. " A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty." Computers & Operations Research 51: 111-122.
    • (2014) Computers & Operations Research , vol.51 , pp. 111-122
    • Bentaha, M.L.1    Battaiä, O.2    Dolgui, A.3
  • 11
    • 84903557899 scopus 로고    scopus 로고
    • Disassembly line balancing and sequencing under uncertainty
    • Bentaha, M. L., O. Battaiä, and, A. Dolgui. 2014b. " Disassembly Line Balancing and Sequencing under Uncertainty." Procedia CIRP 15: 239-244
    • (2014) Procedia CIRP , vol.15 , pp. 239-244
    • Bentaha, M.L.1    Battaiä, O.2    Dolgui, A.3
  • 12
    • 84904503542 scopus 로고    scopus 로고
    • Lagrangian relaxation for stochastic disassembly line balancing problem
    • Bentaha, M. L., O. Battaiä, and, A. Dolgui. 2014c. " Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem." Procedia CIRP 17: 56-60.
    • (2014) Procedia CIRP , vol.17 , pp. 56-60
    • Bentaha, M.L.1    Battaiä, O.2    Dolgui, A.3
  • 14
    • 84864476267 scopus 로고    scopus 로고
    • A second-order cone programming approach for linear programs with joint probabilistic constraints
    • Cheng, J., and, A. Lisser. 2012. " A Second-order Cone Programming Approach for Linear Programs with Joint Probabilistic Constraints." Operations Research Letters 40 (5): 325-328
    • (2012) Operations Research Letters , vol.40 , Issue.5 , pp. 325-328
    • Cheng, J.1    Lisser, A.2
  • 15
    • 33748934553 scopus 로고    scopus 로고
    • The stochastic u-line balancing problem: A heuristic procedure
    • Chiang, W.-C., and, T. L. Urban. 2006. " The Stochastic U-line Balancing Problem: A Heuristic Procedure." European Journal of Operational Research 175: 1767-1781
    • (2006) European Journal of Operational Research , vol.175 , pp. 1767-1781
    • Chiang, W.-C.1    Urban, T.L.2
  • 17
    • 0001304597 scopus 로고    scopus 로고
    • Bonferroni inequalities
    • Galambos, J. 1997. " Bonferroni Inequalities." The Annals of Probability 5 (4): 577-581.
    • (1997) The Annals of Probability , vol.5 , Issue.4 , pp. 577-581
    • Galambos, J.1
  • 19
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • Güngör, A., and, S. M. Gupta. 2001. " A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures." International Journal of Production Research 39 (7): 1427-1467
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Güngör, A.1    Gupta, S.M.2
  • 21
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ecmpro): A review of the state of the art
    • Ilgin, M. A., and, S. M. Gupta. 2010. " Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art." Journal of Environmental Management 91 (3): 563-591
    • (2010) Journal of Environmental Management , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 22
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an and/or graph
    • Koc, A., I. Sabuncuoglu, and, E. Erel. 2009. " Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph." IIE Transactions 41 (10): 866-881
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 23
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • Lamberta, J. D. 1999. " Linear Programming in Disassembly/Clustering Sequence Generation." Computers & Industrial Engineering 36 (4): 723-738.
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.4 , pp. 723-738
    • Lamberta, J.D.1
  • 24
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
    • Ma, Y.-S., H.-B. Jun, H.-W. Kim, and, D.-H. Lee. 2011. " Disassembly Process Planning Algorithms for End-of-Life Product Recovery and Environmentally Conscious Disposal." International Journal of Production Research 49 (23): 7007-7027
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.-S.1    Jun, H.-B.2    Kim, H.-W.3    Lee, D.-H.4
  • 25
    • 33845939092 scopus 로고    scopus 로고
    • Balancing method and genetic algorithm for disassembly line balancing
    • McGovern, S., and, S. A. Gupta. 2007. " Balancing Method and Genetic Algorithm for Disassembly Line Balancing." European Journal of Operational Research 179 (3): 692-708
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 692-708
    • McGovern, S.1    Gupta, S.A.2
  • 26
    • 0001754245 scopus 로고    scopus 로고
    • Optimal disassembly configurations for single and multiple products
    • Meacham, A., R. Uzsoy, and, U. Venkatadri. 1999. " Optimal Disassembly Configurations for Single and Multiple Products." Journal of Manufacturing Systems 18 (5): 311-322
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.5 , pp. 311-322
    • Meacham, A.1    Uzsoy, R.2    Venkatadri, U.3
  • 27
    • 84890189031 scopus 로고    scopus 로고
    • Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing
    • Özceylan, E., T. Paksoy, and, T. Bektaş. 2014. " Modeling and Optimizing the Integrated Problem of Closed-loop Supply Chain Network Design and Disassembly Line Balancing." Transportation Research Part E: Logistics and Transportation Review 61: 142-164
    • (2014) Transportation Research Part E: Logistics and Transportation Review , vol.61 , pp. 142-164
    • Özceylan, E.1    Paksoy, T.2    Bektaş, T.3
  • 30
    • 61349137696 scopus 로고    scopus 로고
    • Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (asga)
    • Tripathi, M., S. Agrawal, M. K. Pandey, R. Shankar, and, M. K. Tiwari. 2009. " Real World Disassembly Modeling and Sequencing Problem: Optimization by Algorithm of Self-Guided Ants (ASGA)." Robotics and Computer-Integrated Manufacturing 25 (3): 483-496
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , Issue.3 , pp. 483-496
    • Tripathi, M.1    Agrawal, S.2    Pandey, M.K.3    Shankar, R.4    Tiwari, M.K.5
  • 31
    • 84904390908 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • Tuncel, E., A. Zeid, and, S. Kamarthi. 2012. " Solving Large Scale Disassembly Line Balancing Problem with Uncertainty Using Reinforcement Learning." Journal of Intelligent Manufacturing 2: 1-13.
    • (2012) Journal of Intelligent Manufacturing , vol.2 , pp. 1-13
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 32
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the u-line balancing problem with stochastic task times
    • Urban, T. L., and, W.-C. Chiang. 2006. " An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task times." European Journal of Operational Research 168: 771-782
    • (2006) European Journal of Operational Research , vol.168 , pp. 771-782
    • Urban, T.L.1    Chiang, W.-C.2
  • 33
    • 0002386894 scopus 로고    scopus 로고
    • Disassembly sequence generation using a neural network approach
    • Wang, M. H., and, M. R. Johnson. 2000. " Disassembly Sequence Generation Using a Neural Network Approach." Journal of Manufacturing Systems 19 (2): 73-82.
    • (2000) Journal of Manufacturing Systems , vol.19 , Issue.2 , pp. 73-82
    • Wang, M.H.1    Johnson, M.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.