-
1
-
-
33847014539
-
A chance-constrained approach to stochastic line balancing problem
-
Agpak, K., and, H. Gokcen. 2007. " A Chance-constrained Approach to Stochastic Line Balancing Problem." European Journal of Operational Research 180: 1098-1115
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 1098-1115
-
-
Agpak, K.1
Gokcen, H.2
-
2
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model u-shaped disassembly line balancing and sequencing problem
-
Agrawal, S., and, M. K. Tiwari. 2008. " A Collaborative Ant Colony Algorithm to Stochastic Mixed-model U-shaped Disassembly Line Balancing and Sequencing Problem." International Journal of Production Research 46 (6): 1405-1429
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
4
-
-
84893943458
-
A fuzzy ahp and promethee method-based heuristic for disassembly line balancing problems
-
Avikal, S., P. K. Mishra, and, R. Jain. 2014. " A Fuzzy AHP and PROMETHEE Method-based Heuristic for Disassembly Line Balancing Problems." International Journal of Production Research 52: 1306-1317
-
(2014)
International Journal of Production Research
, vol.52
, pp. 1306-1317
-
-
Avikal, S.1
Mishra, P.K.2
Jain, R.3
-
5
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Aydemir-Karadag, A., and, O. Turkbey. 2013. " Multi-objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling." Computers & Industrial Engineering 65 (3): 413-425.
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Aydemir-Karadag, A.1
Turkbey, O.2
-
6
-
-
84874540167
-
A taxonomy of line balancing problems and their solutionapproaches
-
Battaiä, O., and, A. Dolgui. 2013. " A Taxonomy of Line Balancing Problems and Their Solutionapproaches." International Journal of Production Economics 142 (2): 259-277
-
(2013)
International Journal of Production Economics
, vol.142
, Issue.2
, pp. 259-277
-
-
Battaiä, O.1
Dolgui, A.2
-
8
-
-
84896097591
-
A stochastic formulation of the disassembly line balancing problem
-
edited by C. Emmanouilidis, M. Taisch, and D. Kiritsis Rhodes: Springer
-
Bentaha, M. L., O. Battaiä, and, A. Dolgui. 2013a. " A Stochastic Formulation of the Disassembly Line Balancing Problem." In Advances in Production Management Systems Competitive Manufacturing for Innovative Products and Services, edited by C. Emmanouilidis, M. Taisch, and D. Kiritsis., 397-404. Rhodes: Springer.
-
(2013)
Advances in Production Management Systems Competitive Manufacturing for Innovative Products and Services
, pp. 397-404
-
-
Bentaha, M.L.1
Battaiä, O.2
Dolgui, A.3
-
9
-
-
84922236941
-
Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts
-
edited by V. Prabhu, M. Taisch, and D. Kiritsis State College, PA: Springer
-
Bentaha, M. L., O. Battaia, and, A. Dolgui. 2013b. " Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts." In Advances in Production Management Systems Sustainable Production and Service Supply Chains, edited by V. Prabhu, M. Taisch, and D. Kiritsis., 103-110. State College, PA: Springer.
-
(2013)
Advances in Production Management Systems Sustainable Production and Service Supply Chains
, pp. 103-110
-
-
Bentaha, M.L.1
Battaia, O.2
Dolgui, A.3
-
10
-
-
84902248564
-
A sample average approximation method for disassembly line balancing problem under uncertainty
-
Bentaha, M. L., O. Battaiä, and, A. Dolgui. 2014a. " A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty." Computers & Operations Research 51: 111-122.
-
(2014)
Computers & Operations Research
, vol.51
, pp. 111-122
-
-
Bentaha, M.L.1
Battaiä, O.2
Dolgui, A.3
-
11
-
-
84903557899
-
Disassembly line balancing and sequencing under uncertainty
-
Bentaha, M. L., O. Battaiä, and, A. Dolgui. 2014b. " Disassembly Line Balancing and Sequencing under Uncertainty." Procedia CIRP 15: 239-244
-
(2014)
Procedia CIRP
, vol.15
, pp. 239-244
-
-
Bentaha, M.L.1
Battaiä, O.2
Dolgui, A.3
-
12
-
-
84904503542
-
Lagrangian relaxation for stochastic disassembly line balancing problem
-
Bentaha, M. L., O. Battaiä, and, A. Dolgui. 2014c. " Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem." Procedia CIRP 17: 56-60.
-
(2014)
Procedia CIRP
, vol.17
, pp. 56-60
-
-
Bentaha, M.L.1
Battaiä, O.2
Dolgui, A.3
-
13
-
-
84902539041
-
Dealing with uncertainty in disassembly line design
-
Bentaha, M. L., O. Battaiä, A. Dolgui, and, S. J. Hu. 2014. " Dealing with Uncertainty in Disassembly Line Design." CIRP Annals-Manufacturing Technology 63 (1): 21-24
-
(2014)
CIRP Annals-Manufacturing Technology
, vol.63
, Issue.1
, pp. 21-24
-
-
Bentaha, M.L.1
Battaiä, O.2
Dolgui, A.3
Hu, S.J.4
-
14
-
-
84864476267
-
A second-order cone programming approach for linear programs with joint probabilistic constraints
-
Cheng, J., and, A. Lisser. 2012. " A Second-order Cone Programming Approach for Linear Programs with Joint Probabilistic Constraints." Operations Research Letters 40 (5): 325-328
-
(2012)
Operations Research Letters
, vol.40
, Issue.5
, pp. 325-328
-
-
Cheng, J.1
Lisser, A.2
-
15
-
-
33748934553
-
The stochastic u-line balancing problem: A heuristic procedure
-
Chiang, W.-C., and, T. L. Urban. 2006. " The Stochastic U-line Balancing Problem: A Heuristic Procedure." European Journal of Operational Research 175: 1767-1781
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 1767-1781
-
-
Chiang, W.-C.1
Urban, T.L.2
-
16
-
-
27744559270
-
Stochastic assembly line balancing using beam search
-
Erel, E., I. Sabuncuoglu, and, H. Sekerci. 2005. " Stochastic Assembly Line Balancing Using Beam Search." International Journal of Production Research 43 (7): 1411-1426
-
(2005)
International Journal of Production Research
, vol.43
, Issue.7
, pp. 1411-1426
-
-
Erel, E.1
Sabuncuoglu, I.2
Sekerci, H.3
-
17
-
-
0001304597
-
Bonferroni inequalities
-
Galambos, J. 1997. " Bonferroni Inequalities." The Annals of Probability 5 (4): 577-581.
-
(1997)
The Annals of Probability
, vol.5
, Issue.4
, pp. 577-581
-
-
Galambos, J.1
-
19
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Güngör, A., and, S. M. Gupta. 2001. " A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures." International Journal of Production Research 39 (7): 1427-1467
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Güngör, A.1
Gupta, S.M.2
-
21
-
-
72149096791
-
Environmentally conscious manufacturing and product recovery (ecmpro): A review of the state of the art
-
Ilgin, M. A., and, S. M. Gupta. 2010. " Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art." Journal of Environmental Management 91 (3): 563-591
-
(2010)
Journal of Environmental Management
, vol.91
, Issue.3
, pp. 563-591
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
22
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an and/or graph
-
Koc, A., I. Sabuncuoglu, and, E. Erel. 2009. " Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph." IIE Transactions 41 (10): 866-881
-
(2009)
IIE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
23
-
-
0033358055
-
Linear programming in disassembly/clustering sequence generation
-
Lamberta, J. D. 1999. " Linear Programming in Disassembly/Clustering Sequence Generation." Computers & Industrial Engineering 36 (4): 723-738.
-
(1999)
Computers & Industrial Engineering
, vol.36
, Issue.4
, pp. 723-738
-
-
Lamberta, J.D.1
-
24
-
-
84862939665
-
Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
-
Ma, Y.-S., H.-B. Jun, H.-W. Kim, and, D.-H. Lee. 2011. " Disassembly Process Planning Algorithms for End-of-Life Product Recovery and Environmentally Conscious Disposal." International Journal of Production Research 49 (23): 7007-7027
-
(2011)
International Journal of Production Research
, vol.49
, Issue.23
, pp. 7007-7027
-
-
Ma, Y.-S.1
Jun, H.-B.2
Kim, H.-W.3
Lee, D.-H.4
-
25
-
-
33845939092
-
Balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S., and, S. A. Gupta. 2007. " Balancing Method and Genetic Algorithm for Disassembly Line Balancing." European Journal of Operational Research 179 (3): 692-708
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.1
Gupta, S.A.2
-
26
-
-
0001754245
-
Optimal disassembly configurations for single and multiple products
-
Meacham, A., R. Uzsoy, and, U. Venkatadri. 1999. " Optimal Disassembly Configurations for Single and Multiple Products." Journal of Manufacturing Systems 18 (5): 311-322
-
(1999)
Journal of Manufacturing Systems
, vol.18
, Issue.5
, pp. 311-322
-
-
Meacham, A.1
Uzsoy, R.2
Venkatadri, U.3
-
27
-
-
84890189031
-
Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing
-
Özceylan, E., T. Paksoy, and, T. Bektaş. 2014. " Modeling and Optimizing the Integrated Problem of Closed-loop Supply Chain Network Design and Disassembly Line Balancing." Transportation Research Part E: Logistics and Transportation Review 61: 142-164
-
(2014)
Transportation Research Part E: Logistics and Transportation Review
, vol.61
, pp. 142-164
-
-
Özceylan, E.1
Paksoy, T.2
Bektaş, T.3
-
28
-
-
84885625406
-
Mixed model disassembly line balancing problem with fuzzy goals
-
Paksoy, T., A. Güngör, E. Özceylan, and, A. Hancilar. 2013. " Mixed Model Disassembly Line Balancing Problem with Fuzzy Goals." International Journal of Production Research 51: 6082-6096
-
(2013)
International Journal of Production Research
, vol.51
, pp. 6082-6096
-
-
Paksoy, T.1
Güngör, A.2
Özceylan, E.3
Hancilar, A.4
-
29
-
-
0041368822
-
Disassembly modeling, planning, and application
-
Tang, Y., M. Zhou, E. Zussman, and, R. Caudill. 2002. " Disassembly Modeling, Planning, and Application." Journal of Manufacturing Systems 21 (3): 200-217
-
(2002)
Journal of Manufacturing Systems
, vol.21
, Issue.3
, pp. 200-217
-
-
Tang, Y.1
Zhou, M.2
Zussman, E.3
Caudill, R.4
-
30
-
-
61349137696
-
Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (asga)
-
Tripathi, M., S. Agrawal, M. K. Pandey, R. Shankar, and, M. K. Tiwari. 2009. " Real World Disassembly Modeling and Sequencing Problem: Optimization by Algorithm of Self-Guided Ants (ASGA)." Robotics and Computer-Integrated Manufacturing 25 (3): 483-496
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.3
, pp. 483-496
-
-
Tripathi, M.1
Agrawal, S.2
Pandey, M.K.3
Shankar, R.4
Tiwari, M.K.5
-
31
-
-
84904390908
-
Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
-
Tuncel, E., A. Zeid, and, S. Kamarthi. 2012. " Solving Large Scale Disassembly Line Balancing Problem with Uncertainty Using Reinforcement Learning." Journal of Intelligent Manufacturing 2: 1-13.
-
(2012)
Journal of Intelligent Manufacturing
, vol.2
, pp. 1-13
-
-
Tuncel, E.1
Zeid, A.2
Kamarthi, S.3
-
32
-
-
25144472327
-
An optimal piecewise-linear program for the u-line balancing problem with stochastic task times
-
Urban, T. L., and, W.-C. Chiang. 2006. " An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task times." European Journal of Operational Research 168: 771-782
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 771-782
-
-
Urban, T.L.1
Chiang, W.-C.2
-
33
-
-
0002386894
-
Disassembly sequence generation using a neural network approach
-
Wang, M. H., and, M. R. Johnson. 2000. " Disassembly Sequence Generation Using a Neural Network Approach." Journal of Manufacturing Systems 19 (2): 73-82.
-
(2000)
Journal of Manufacturing Systems
, vol.19
, Issue.2
, pp. 73-82
-
-
Wang, M.H.1
Johnson, M.R.2
|