-
3
-
-
84902248564
-
A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty
-
Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014. “A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty.” Computers & Operations Research 51 (3): 111–122.
-
(2014)
Computers & Operations Research
, vol.51
, Issue.3
, pp. 111-122
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
4
-
-
84961289222
-
An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times
-
Bentaha, M. L., O. Battaïa, and A. Dolgui. 2015. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times.” International Journal of Production Research 53 (6): 1807–1818.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1807-1818
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
5
-
-
84940610243
-
Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints
-
Bentaha, M. L., O. Battaïa, A. Dolgui, and S. J. Hu. 2015. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.
-
(2015)
European Journal of Operational Research
, vol.247
, Issue.3
, pp. 957-967
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
6
-
-
84864758524
-
Solution of Multi-objective Optimal Power Flow Using Gravitational Search Algorithm
-
Bhattacharya, A., and P. K. Roy. 2012. “Solution of Multi-objective Optimal Power Flow Using Gravitational Search Algorithm.” IET Generation, Transmission & Distribution 6 (8): 751–763.
-
(2012)
IET Generation, Transmission & Distribution
, vol.6
, Issue.8
, pp. 751-763
-
-
Bhattacharya, A.1
Roy, P.K.2
-
7
-
-
84860487415
-
Optimal Power Flow Using Gravitational Search Algorithm
-
Duman, S., U. Güvenç, Y. Sönmez, and N. Yörükeren. 2012. “Optimal Power Flow Using Gravitational Search Algorithm.” Energy Conversion and Management 59: 86–95.
-
(2012)
Energy Conversion and Management
, vol.59
, pp. 86-95
-
-
Duman, S.1
Güvenç, U.2
Sönmez, Y.3
Yörükeren, N.4
-
11
-
-
17044375963
-
Disassembly Sequencing Problem: A Case Study of a Cell Phone
-
Philadelphia, PA
-
Gupta, S. M., E. Erbis, and S. M. McGovern. 2004. “Disassembly Sequencing Problem: A Case Study of a Cell Phone.” Proceedings of Environmentally Conscious Manufacturing IV, 43–52. Philadelphia, PA.
-
(2004)
Proceedings of Environmentally Conscious Manufacturing IV
, pp. 43-52
-
-
Gupta, S.M.1
Erbis, E.2
McGovern, S.M.3
-
13
-
-
84881185298
-
Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem
-
Kalayci, C. B., and S. M. Gupta. 2013. “Artificial Bee Colony Algorithm for Solving Sequence-dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40 (18): 7231–7241.
-
(2013)
Expert Systems with Applications
, vol.40
, Issue.18
, pp. 7231-7241
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
16
-
-
77955416142
-
A Hierarchical End-of-life Decision Model for Determining the Economic Levels of Remanufacturing and Disassembly under Environmental Regulations
-
Lee, H. B., N. W. Cho, and Y. S. Hong. 2010. “A Hierarchical End-of-life Decision Model for Determining the Economic Levels of Remanufacturing and Disassembly under Environmental Regulations.” Journal of Cleaner Production 18 (13): 1276–1283.
-
(2010)
Journal of Cleaner Production
, vol.18
, Issue.13
, pp. 1276-1283
-
-
Lee, H.B.1
Cho, N.W.2
Hong, Y.S.3
-
17
-
-
85054828517
-
2-Opt Heuristic for the Disassembly Line Balancing Problem
-
McGovern, S. M., and S. M. Gupta. 2004. “2-Opt Heuristic for the Disassembly Line Balancing Problem.” Paper Presented at the Photonics Technologies for Robotics, Automation, and Manufacturing, Providence.
-
(2004)
Paper Presented at the Photonics Technologies for Robotics, Automation, and Manufacturing, Providence
-
-
McGovern, S.M.1
Gupta, S.M.2
-
19
-
-
34548449384
-
Combinatorial Optimization Analysis of the Unary NP-complete Disassembly Line Balancing Problem
-
Mcgovern, S. M., and S. M. Gupta. 2007. “Combinatorial Optimization Analysis of the Unary NP-complete Disassembly Line Balancing Problem.” International Journal of Production Research 45 (18–19): 4485–4511.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
20
-
-
36248986205
-
A Hybrid Multi-objective Particle Swarm Algorithm for a Mixed-model Assembly Line Sequencing Problem
-
Rahimi-Vahed, A. R., S. M. Mirghorbani, and M. Rabbani. 2007. “A Hybrid Multi-objective Particle Swarm Algorithm for a Mixed-model Assembly Line Sequencing Problem.” Engineering Optimization 39 (8): 877–898.
-
(2007)
Engineering Optimization
, vol.39
, Issue.8
, pp. 877-898
-
-
Rahimi-Vahed, A.R.1
Mirghorbani, S.M.2
Rabbani, M.3
-
23
-
-
0041368822
-
Disassembly Modeling, Planning, and Application
-
Tang, Y., M. C. Zhou, E. Zussman, and R. Caudill. 2002. “Disassembly Modeling, Planning, and Application.” Journal of Manufacturing Systems 21 (3): 200–217.
-
(2002)
Journal of Manufacturing Systems
, vol.21
, Issue.3
, pp. 200-217
-
-
Tang, Y.1
Zhou, M.C.2
Zussman, E.3
Caudill, R.4
-
24
-
-
84862794782
-
Probability Evaluation Models of Product Disassembly Cost Subject to Random Removal Time and Different Removal Labor Cost
-
Tian, G., M. C. Zhou, J. Chu, and Y. Liu. 2012. “Probability Evaluation Models of Product Disassembly Cost Subject to Random Removal Time and Different Removal Labor Cost.” IEEE Transactions on Automation Science and Engineering 9 (2): 288–295.
-
(2012)
IEEE Transactions on Automation Science and Engineering
, vol.9
, Issue.2
, pp. 288-295
-
-
Tian, G.1
Zhou, M.C.2
Chu, J.3
Liu, Y.4
-
25
-
-
84885444046
-
A Chance Constrained Programming Approach to Determine the Optimal Disassembly Sequence
-
Tian, G., M. C. Zhou, and J. Chu. 2013. “A Chance Constrained Programming Approach to Determine the Optimal Disassembly Sequence.” IEEE Transactions on Automation Science and Engineering 10 (4): 1004–1013.
-
(2013)
IEEE Transactions on Automation Science and Engineering
, vol.10
, Issue.4
, pp. 1004-1013
-
-
Tian, G.1
Zhou, M.C.2
Chu, J.3
-
26
-
-
84957018971
-
Structural Design of Vehicle Components Using Gravitational Search and Charged System Search Algorithms
-
Yildiz, B. S., H. Lekesiz, and A. R. Yildiz. 2016. “Structural Design of Vehicle Components Using Gravitational Search and Charged System Search Algorithms.” Materials Testing 58 (1): 79–81.
-
(2016)
Materials Testing
, vol.58
, Issue.1
, pp. 79-81
-
-
Yildiz, B.S.1
Lekesiz, H.2
Yildiz, A.R.3
-
27
-
-
84902650480
-
A New Approach for Unit Commitment Problem via Binary Gravitational Search Algorithm
-
Yuan, X., B. Ji, S. Zhang, H. Tian, and Y. Hou. 2014. “A New Approach for Unit Commitment Problem via Binary Gravitational Search Algorithm.” Applied Soft Computing 22: 249–260.
-
(2014)
Applied Soft Computing
, vol.22
, pp. 249-260
-
-
Yuan, X.1
Ji, B.2
Zhang, S.3
Tian, H.4
Hou, Y.5
-
28
-
-
0033078088
-
A Methodology for Modeling and Adaptive Planning of Disassembly Processes
-
Zussman, E., and M. C. Zhou. 1999. “A Methodology for Modeling and Adaptive Planning of Disassembly Processes.” IEEE Transactions on Robotics and Automation 15 (1): 190–194.
-
(1999)
IEEE Transactions on Robotics and Automation
, vol.15
, Issue.1
, pp. 190-194
-
-
Zussman, E.1
Zhou, M.C.2
|