-
1
-
-
16244389992
-
Single item lot sizing problems
-
Brahimi, N., Dauzère-Pérès, S., Najid, N.M. and Nordli, A., Single item lot sizing problems. Euro. J. Oper. Res., 2006, 168, 1-16.
-
(2006)
Euro. J. Oper. Res
, vol.168
, pp. 1-16
-
-
Brahimi, N.1
Dauzère-Pérès, S.2
Najid, N.M.3
Nordli, A.4
-
2
-
-
21844513640
-
Operations planning issues in an assembly/ disassembly environment
-
Brennan, L., Gupta, S.M. and Taleb, K.N., Operations planning issues in an assembly/ disassembly environment. Int. J. Oper. Prod. Manage., 1994, 14, 57-67.
-
(1994)
Int. J. Oper. Prod. Manage
, vol.14
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
3
-
-
0029238335
-
Production planning for companies with remanufacturing capability
-
Orlando, Florida, USA
-
Clegg, A.J., Williams, D.J. and Uzsoy, R., Production planning for companies with remanufacturing capability, in Proceedings of the IEEE Symposium on Electronics and the Environment, Orlando, Florida, USA, 1995, pp. 186-191.
-
(1995)
Proceedings of the IEEE Symposium on Electronics and the Environment
, pp. 186-191
-
-
Clegg, A.J.1
Williams, D.J.2
Uzsoy, R.3
-
4
-
-
0001887652
-
Dynamic lot size models for multi-stage assembly systems
-
Crowston, W.B. and Wagner, M.H., Dynamic lot size models for multi-stage assembly systems. Manage. Sci., 1973, 20, 14-21.
-
(1973)
Manage. Sci
, vol.20
, pp. 14-21
-
-
Crowston, W.B.1
Wagner, M.H.2
-
5
-
-
0035501881
-
Economic lot-sizing with remanufacturing options
-
Golany, B., Yang, J. and Yu, G., Economic lot-sizing with remanufacturing options. IIE Trans., 2001, 33, 995-1003.
-
(2001)
IIE Trans
, vol.33
, pp. 995-1003
-
-
Golany, B.1
Yang, J.2
Yu, G.3
-
6
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery
-
Güngör, A. and Gupta, S.M., Issues in environmentally conscious manufacturing and product recovery. Comput. Indust. Eng., 1999, 36, 811-853.
-
(1999)
Comput. Indust. Eng
, vol.36
, pp. 811-853
-
-
Güngör, A.1
Gupta, S.M.2
-
7
-
-
0001353411
-
Scheduling disassembly
-
Gupta, S.M. and Taleb, K.N., Scheduling disassembly. Int. J. Prod. Res., 1994, 32, 1857-1886.
-
(1994)
Int. J. Prod. Res
, vol.32
, pp. 1857-1886
-
-
Gupta, S.M.1
Taleb, K.N.2
-
8
-
-
28944452430
-
Heuristics for solving disassemble-to-order problems with stochastic yields
-
Inderfurth, K. and Langella, I. M., Heuristics for solving disassemble-to-order problems with stochastic yields. OR Spectrum, 2006, 28, 71-97.
-
(2006)
OR Spectrum
, vol.28
, pp. 71-97
-
-
Inderfurth, K.1
Langella, I.M.2
-
9
-
-
0027836570
-
A key issue in product life cycle: Disassembly
-
Jovane, F., Alting, L., Armoillotta, A., Eversheirm, W., Feldmann, K., Seliger, G. and Roth, N., A key issue in product life cycle: disassembly. CIRP Ann. - Manuf. Tech., 1993, 42, 651-658.
-
(1993)
CIRP Ann. - Manuf. Tech
, vol.42
, pp. 651-658
-
-
Jovane, F.1
Alting, L.2
Armoillotta, A.3
Eversheirm, W.4
Feldmann, K.5
Seliger, G.6
Roth, N.7
-
10
-
-
1942518452
-
Disassembly sequencing with imprecise data: A case study
-
Kang, J.-G., Lee, D.-H. and Xirouchakis, P., Disassembly sequencing with imprecise data: a case study. Int. J. Indust. Eng., 2003, 10, 407-412.
-
(2003)
Int. J. Indust. Eng
, vol.10
, pp. 407-412
-
-
Kang, J.-G.1
Lee, D.-H.2
Xirouchakis, P.3
-
11
-
-
1942469261
-
Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states
-
Kang, J.-G., Lee, D.-H., Xirouchakis, P. and Lambert, A.J.D., Optimal disassembly sequencing with sequence dependent operation times based on the directed graph of assembly states. J. Korean Inst. Indust. Eng., 2002, 28, 264-273.
-
(2002)
J. Korean Inst. Indust. Eng
, vol.28
, pp. 264-273
-
-
Kang, J.-G.1
Lee, D.-H.2
Xirouchakis, P.3
Lambert, A.J.D.4
-
12
-
-
0034963174
-
Parallel disassembly sequencing with sequence-dependent operation times
-
Kang, J.-G., Lee, D.-H., Xirouchakis, P. and Persson, J.-G., Parallel disassembly sequencing with sequence-dependent operation times. CIRP Ann. - Manuf. Tech., 2001, 50, 343-346.
-
(2001)
CIRP Ann. - Manuf. Tech
, vol.50
, pp. 343-346
-
-
Kang, J.-G.1
Lee, D.-H.2
Xirouchakis, P.3
Persson, J.-G.4
-
13
-
-
34548394912
-
Disassembly sequencing for maintenance: A survey
-
Kang, J.-G. and Xirouchakis, P., Disassembly sequencing for maintenance: a survey. Proc. Inst. Mech. Eng.: J. Eng. Manuf. Part B, 2006, 220, 1697-1716.
-
(2006)
Proc. Inst. Mech. Eng.: J. Eng. Manuf. Part B
, vol.220
, pp. 1697-1716
-
-
Kang, J.-G.1
Xirouchakis, P.2
-
14
-
-
0041511823
-
The capacitated lot sizing problem: A review of models and algorithms
-
Karimi, B., Fatemi Ghomi, S.M.T. and Wilson, J.M., The capacitated lot sizing problem: a review of models and algorithms. Omega - Int. J. Manage. Sci., 2003, 31, 365-378.
-
(2003)
Omega - Int. J. Manage. Sci
, vol.31
, pp. 365-378
-
-
Karimi, B.1
Fatemi Ghomi, S.M.T.2
Wilson, J.M.3
-
15
-
-
0041341872
-
Disassembly scheduling with multiple product types
-
Kim, H.-J., Lee, D.-H., Xirouchakis, P. and Züst, R., Disassembly scheduling with multiple product types. CIRP Ann. - Manuf. Tech., 2003, 52, 403-406.
-
(2003)
CIRP Ann. - Manuf. Tech
, vol.52
, pp. 403-406
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
Züst, R.4
-
16
-
-
29344457880
-
Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
-
Kim, H.-J., Lee, D.-H. and Xirouchakis, P., Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality. Int. J. Prod. Res., 2006a, 44, 195-212.
-
(2006)
Int. J. Prod. Res
, vol.44
, pp. 195-212
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
-
17
-
-
33748652283
-
A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints
-
Kim, H.-J., Lee, D.-H. and Xirouchakis, P., A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints. J. Oper. Res. Soc., 2006b, 57, 1231-1240.
-
(2006)
J. Oper. Res. Soc
, vol.57
, pp. 1231-1240
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
-
18
-
-
34548402880
-
A polynomial exact algorithm for two-level disassembly scheduling
-
Technical Report, Institute of Production and Robotics, Swiss Federal Institute of Technology, Lausanne EPFL
-
Kim, H.-J., Lee, D.-H. and Xirouchakis, P., A polynomial exact algorithm for two-level disassembly scheduling. Technical Report, Institute of Production and Robotics, Swiss Federal Institute of Technology, Lausanne (EPFL), 2006c.
-
(2006)
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
-
19
-
-
34548405030
-
A branch and bound algorithm for disassembly scheduling with assembly product structure
-
Technical Report, Institute of Production and Robotics, Swiss Federal Institute of Technology, Lausanne EPFL
-
Kim, H.-J., Lee, D.-H. and Xirouchakis, P., A branch and bound algorithm for disassembly scheduling with assembly product structure. Technical Report, Institute of Production and Robotics, Swiss Federal Institute of Technology, Lausanne (EPFL), 2006d.
-
(2006)
-
-
Kim, H.-J.1
Lee, D.-H.2
Xirouchakis, P.3
-
20
-
-
34247104572
-
Disassembly scheduling with capacity constraints: Minimizing the number of products disassembled
-
Kim, J.-G., Jeon, H.-B., Kim, H.-J., Lee, D.-H. and Xirouchakis, P., Disassembly scheduling with capacity constraints: minimizing the number of products disassembled. Proc. Inst. Mech. Eng.: J. Eng. Manuf. - Part B, 2006e, 220, 1473-1481.
-
(2006)
Proc. Inst. Mech. Eng.: J. Eng. Manuf. - Part B
, vol.220
, pp. 1473-1481
-
-
Kim, J.-G.1
Jeon, H.-B.2
Kim, H.-J.3
Lee, D.-H.4
Xirouchakis, P.5
-
21
-
-
0032183325
-
Material flow control and scheduling in a disassembly environment
-
Kisilkaya, E. and Gupta, S.M., Material flow control and scheduling in a disassembly environment. Comput. Indust. Eng., 1998, 35, 93-96.
-
(1998)
Comput. Indust. Eng
, vol.35
, pp. 93-96
-
-
Kisilkaya, E.1
Gupta, S.M.2
-
22
-
-
0036611840
-
A multi-criteria decision making approach for disassembly-to-order systems
-
Kongar, E. and Gupta, S.M., A multi-criteria decision making approach for disassembly-to-order systems. J. Electron. Manuf., 2002, 11, 171-183.
-
(2002)
J. Electron. Manuf
, vol.11
, pp. 171-183
-
-
Kongar, E.1
Gupta, S.M.2
-
23
-
-
31044432230
-
Disassembly to order system under uncertainty
-
Kongar, E. and Gupta, S. M., Disassembly to order system under uncertainty. Omega - Int. J. Manage. Sci., 2006, 34, 550-561.
-
(2006)
Omega - Int. J. Manage. Sci
, vol.34
, pp. 550-561
-
-
Kongar, E.1
Gupta, S.M.2
-
24
-
-
0038156629
-
Disassembly sequencing: A survey
-
Lambert, A.J.D., Disassembly sequencing: a survey. Int. J. Prod. Res., 2003, 41, 3721-3759.
-
(2003)
Int. J. Prod. Res
, vol.41
, pp. 3721-3759
-
-
Lambert, A.J.D.1
-
25
-
-
0036612491
-
Demand-driven disassembly optimisation for electronic products
-
Lambert, A.J.D. and Gupta, S. M., Demand-driven disassembly optimisation for electronic products. J. Electron. Manuf., 2002, 11, 121-135.
-
(2002)
J. Electron. Manuf
, vol.11
, pp. 121-135
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
26
-
-
29344464281
-
-
CRC Press: Florida
-
Lambert, A.J.D. and Gupta, S.M., Disassembly Modeling for Assembly, Maintenance, Re-use and Recycling, 2005 (CRC Press: Florida).
-
(2005)
Disassembly Modeling for Assembly, Maintenance, Re-use and Recycling
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
27
-
-
33746947335
-
Heuristics for demand-driven disassembly planning
-
Langella, I.M., Heuristics for demand-driven disassembly planning. Comput. Oper. Res., 2007, 34, 552-577.
-
(2007)
Comput. Oper. Res
, vol.34
, pp. 552-577
-
-
Langella, I.M.1
-
28
-
-
0000429764
-
An integrated model for job-shop planning and scheduling
-
Lasserre, J.B., An integrated model for job-shop planning and scheduling. Manage. Sci., 1992, 38, 1201-1211.
-
(1992)
Manage. Sci
, vol.38
, pp. 1201-1211
-
-
Lasserre, J.B.1
-
29
-
-
29344442775
-
Disassembly scheduling for products with assembly structure
-
Lee, D.-H., Disassembly scheduling for products with assembly structure. Int. J. Manage. Sci., 2005, 11, 63-78.
-
(2005)
Int. J. Manage. Sci
, vol.11
, pp. 63-78
-
-
Lee, D.-H.1
-
30
-
-
33747286457
-
Disassembly planning and scheduling: Review and further research
-
Lee, D.-H., Kang, J.-G. and Xirouchakis, P., Disassembly planning and scheduling: review and further research. Proc. Inst. Mech. Eng.: J. Eng. Manuf. - Part B, 2001, 215, 695-710.
-
(2001)
Proc. Inst. Mech. Eng.: J. Eng. Manuf. - Part B
, vol.215
, pp. 695-710
-
-
Lee, D.-H.1
Kang, J.-G.2
Xirouchakis, P.3
-
31
-
-
8344257395
-
Disassembly scheduling: Integer programming models
-
Lee, D.-H., Kim, H.-J., Choi, G. and Xirouchakis, P., Disassembly scheduling: Integer programming models. Proc. Inst. Mech. Eng.: J. Eng. Manuf. - Part B, 2004, 218, 1357-1372.
-
(2004)
Proc. Inst. Mech. Eng.: J. Eng. Manuf. - Part B
, vol.218
, pp. 1357-1372
-
-
Lee, D.-H.1
Kim, H.-J.2
Choi, G.3
Xirouchakis, P.4
-
32
-
-
2342594041
-
A two-stage heuristic for disassembly scheduling with assembly product structure
-
Lee, D.-H. and Xirouchakis, P., A two-stage heuristic for disassembly scheduling with assembly product structure. J. Oper. Res. Soc., 2004, 55, 287-297.
-
(2004)
J. Oper. Res. Soc
, vol.55
, pp. 287-297
-
-
Lee, D.-H.1
Xirouchakis, P.2
-
33
-
-
0037501212
-
Disassembly scheduling with capacity constraints
-
Lee, D.-H., Xirouchakis, P. and Züst, R., Disassembly scheduling with capacity constraints. CIRP Ann. - Manuf. Tech., 2002, 51, 387-390.
-
(2002)
CIRP Ann. - Manuf. Tech
, vol.51
, pp. 387-390
-
-
Lee, D.-H.1
Xirouchakis, P.2
Züst, R.3
-
34
-
-
28844475128
-
Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution
-
Li, Y., Chen, J. and Cai, X., Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution. OR Spectrum, 2006, 28, 98-122.
-
(2006)
OR Spectrum
, vol.28
, pp. 98-122
-
-
Li, Y.1
Chen, J.2
Cai, X.3
-
36
-
-
0026185832
-
Multilevel capacitated lot sizing complexity and LP-based heuristics
-
Maes, J., McClain, J.O. and Van Wassenhove, L.N., Multilevel capacitated lot sizing complexity and LP-based heuristics. Euro. J. Oper. Res., 1991, 53, 131-148.
-
(1991)
Euro. J. Oper. Res
, vol.53
, pp. 131-148
-
-
Maes, J.1
McClain, J.O.2
Van Wassenhove, L.N.3
-
37
-
-
0035429278
-
Disassembly scheduling with parts commonality using Petri-nets with timestamps
-
Neuendorf, K.-P., Lee, D.-H., Kiritsis, D. and Xirouchakis, P., Disassembly scheduling with parts commonality using Petri-nets with timestamps. Fundamenta Informaticae, 2001, 47, 295-306.
-
(2001)
Fundamenta Informaticae
, vol.47
, pp. 295-306
-
-
Neuendorf, K.-P.1
Lee, D.-H.2
Kiritsis, D.3
Xirouchakis, P.4
-
38
-
-
0000930416
-
State of the art literature survey on disassembly planning
-
O'Shea, B., Grewal, S. S. and Kaebernick, H., State of the art literature survey on disassembly planning. Conc. Eng.: Res. Applic., 1998, 6, 345-357.
-
(1998)
Conc. Eng.: Res. Applic
, vol.6
, pp. 345-357
-
-
O'Shea, B.1
Grewal, S.S.2
Kaebernick, H.3
-
39
-
-
0033889945
-
Remanufacturing planning for the reverse Wagner/Whitin models
-
Richter, K. and Sombrutzki, M., Remanufacturing planning for the reverse Wagner/Whitin models. Euro. J. Oper. Res., 2000, 121, 304-315.
-
(2000)
Euro. J. Oper. Res
, vol.121
, pp. 304-315
-
-
Richter, K.1
Sombrutzki, M.2
-
40
-
-
0035815837
-
The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
-
Richter, K. and Weber, J., The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost. Int. J. Prod. Econ., 2001, 71, 447-456.
-
(2001)
Int. J. Prod. Econ
, vol.71
, pp. 447-456
-
-
Richter, K.1
Weber, J.2
-
41
-
-
14644397925
-
Scheduling selective disassembly for plastics recovery in an electronics recycling center
-
Rios, P.J. and Stuart, J.A., Scheduling selective disassembly for plastics recovery in an electronics recycling center. IEEE Trans. Electron. Pack. Manuf, 2004, 27, 187-197.
-
(2004)
IEEE Trans. Electron. Pack. Manuf
, vol.27
, pp. 187-197
-
-
Rios, P.J.1
Stuart, J.A.2
-
42
-
-
0036978701
-
Computer aided disassembly planning: State of the art and perspectives
-
Santochi, M., Dini, G. and Failli, F., Computer aided disassembly planning: state of the art and perspectives. CIRP Ann. - Manuf. Tech., 2002, 51, 1-23.
-
(2002)
CIRP Ann. - Manuf. Tech
, vol.51
, pp. 1-23
-
-
Santochi, M.1
Dini, G.2
Failli, F.3
-
43
-
-
0242365478
-
New metrics and scheduling rules for disassembly and bulk recycling
-
Stuart, J.A. and Christina, V., New metrics and scheduling rules for disassembly and bulk recycling. IEEE Trans. Electron. Pack. Manuf., 2003, 26, 133-140.
-
(2003)
IEEE Trans. Electron. Pack. Manuf
, vol.26
, pp. 133-140
-
-
Stuart, J.A.1
Christina, V.2
-
44
-
-
0031119840
-
Disassembly of complex product structures with parts and materials commonality
-
Taleb, K.N., Gupta, S.M. and Brennan, L., Disassembly of complex product structures with parts and materials commonality. Prod. Plan. Cont., 1997, 8, 255-269.
-
(1997)
Prod. Plan. Cont
, vol.8
, pp. 255-269
-
-
Taleb, K.N.1
Gupta, S.M.2
Brennan, L.3
-
45
-
-
0031219811
-
Disassembly of multiple product structures
-
Taleb, K.N. and Gupta, S.M., Disassembly of multiple product structures. Comput. Indust. Eng., 1997, 32, 949-961.
-
(1997)
Comput. Indust. Eng
, vol.32
, pp. 949-961
-
-
Taleb, K.N.1
Gupta, S.M.2
-
46
-
-
0032284905
-
Optimal analysis of lot size balancing for multi-products selective disassembly
-
Veerakamolmal, P. and Gupta, S.M., Optimal analysis of lot size balancing for multi-products selective disassembly. Int. J. Flex. Autom. Integ. Manuf., 1998, 6, 245-269.
-
(1998)
Int. J. Flex. Autom. Integ. Manuf
, vol.6
, pp. 245-269
-
-
Veerakamolmal, P.1
Gupta, S.M.2
-
47
-
-
0000495984
-
Economic lot sizing: An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case
-
Wagelmans, A., Van Hoesel, S. and Kolen, A., Economic lot sizing: An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case. Oper. Res., 1992, 40, S145-S156.
-
(1992)
Oper. Res
, vol.40
-
-
Wagelmans, A.1
Van Hoesel, S.2
Kolen, A.3
-
48
-
-
0001962762
-
Dynamic version of the economic lot-sizing model
-
Wagner, M.H. and Whitin, T.M., Dynamic version of the economic lot-sizing model. Manage. Sci., 1958, 5, 89-96.
-
(1958)
Manage. Sci
, vol.5
, pp. 89-96
-
-
Wagner, M.H.1
Whitin, T.M.2
-
49
-
-
0033339836
-
A general approach to disassembly planning and control
-
Wiendahl, H.-P., Seliger, G., Perlewitz, H. and Bürkner, S., A general approach to disassembly planning and control. Prod. Plan. Cont., 1999, 10, 718-726.
-
(1999)
Prod. Plan. Cont
, vol.10
, pp. 718-726
-
-
Wiendahl, H.-P.1
Seliger, G.2
Perlewitz, H.3
Bürkner, S.4
-
50
-
-
24144492367
-
A concave-cost production planning problem with remanufacturing options
-
Yang, J., Golany, B. and Yu, G., A concave-cost production planning problem with remanufacturing options. Naval Res. Logist., 2005, 52, 443-458.
-
(2005)
Naval Res. Logist
, vol.52
, pp. 443-458
-
-
Yang, J.1
Golany, B.2
Yu, G.3
|