메뉴 건너뛰기




Volumn 15, Issue , 2014, Pages 239-244

Disassembly line balancing and sequencing under uncertainty

Author keywords

Disassembly; End of life (EOL) products; Line balancing and sequencing; Stochastic programming

Indexed keywords

INTEGER PROGRAMMING; LIFE CYCLE; MONTE CARLO METHODS; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS;

EID: 84903557899     PISSN: None     EISSN: 22128271     Source Type: Conference Proceeding    
DOI: 10.1016/j.procir.2014.06.016     Document Type: Conference Paper
Times cited : (63)

References (34)
  • 2
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: A survey
    • Gungor A, Gupta SM. Issues in environmentally conscious manufacturing and product recovery: a survey. Comput Ind Eng. 1999;36:811-53.
    • (1999) Comput Ind Eng. , vol.36 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 3
    • 0037143030 scopus 로고    scopus 로고
    • Disassembly line in product recovery
    • Jan
    • Güngör A, Gupta SM. Disassembly line in product recovery. Int J Prod Res. 2002 Jan;40(11):2569-89.
    • (2002) J Prod Res. , vol.40 , Issue.11 , pp. 2569-2589
    • Güngör, A.1    Gupta, S.M.2
  • 4
    • 0036721661 scopus 로고    scopus 로고
    • Determining optimum disassembly sequences in electronic equipment
    • Lambert AJ. Determining optimum disassembly sequences in electronic equipment. Comput Ind Eng. 2002 Sep;43(3):553-75.
    • (2002) Comput Ind Eng. , vol.43 , Issue.3 , pp. 553-575
    • Lambert, A.J.1
  • 8
    • 79960737645 scopus 로고    scopus 로고
    • Applying equal piles approach to disassembly line balancing problem
    • Duta L, Filip FG, Henrioud JM. Applying Equal Piles Approach to Disassembly Line Balancing Problem. Proc 16th IFAC World Congr. 2005. p. 1449-1449.
    • (2005) Proc 16th IFAC World Congr. , pp. 1449-1449
    • Duta, L.1    Filip, F.G.2    Henrioud, J.M.3
  • 11
    • 33644615165 scopus 로고    scopus 로고
    • Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem
    • In: Gupta SM, editor
    • McGovern SM, Gupta SM. Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem. In: Gupta SM, editor. Proc SPIE 5997, Environ Conscious Manuf V. 2005. p. 59970B1-12.
    • (2005) Proc SPIE 5997, Environ Conscious Manuf V.
    • McGovern, S.M.1    Gupta, S.M.2
  • 12
    • 33748559516 scopus 로고    scopus 로고
    • Ant colony optimization for disassembly sequencing with multiple objectives
    • Dec 14
    • McGovern SM, Gupta SM. Ant colony optimization for disassembly sequencing with multiple objectives. Int J Adv Manuf Technol. 2005 Dec 14;30(5-6):481-96.
    • (2005) J Adv Manuf Technol. , vol.30 , Issue.5-6 , pp. 481-496
    • McGovern, S.M.1    Gupta, S.M.2
  • 13
    • 77953610368 scopus 로고    scopus 로고
    • A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
    • Feb 23
    • Ding L-P, Feng Y-X, Tan J-R, Gao Y-C. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem. Int J Adv Manuf Technol. Springer-Verlag; 2010 Feb 23;48(5-8):761-71.
    • (2010) J Adv Manuf Technol. Springer-Verlag , vol.48 , Issue.5-8 , pp. 761-771
    • Ding, L.-P.1    Feng, Y.-X.2    Tan, J.-R.3    Gao, Y.-C.4
  • 14
    • 85123268499 scopus 로고    scopus 로고
    • River formation dynamics approach for sequence-dependent disassembly line balancing problem
    • In: Gupta SM, editor. CRC Press
    • Kalayci CB, Gupta SM. River Formation Dynamics Approach for Sequence-Dependent Disassembly Line Balancing Problem. In: Gupta SM, editor. Reverse Supply Chain Issues Anal. CRC Press; 2013. p. 289-312.
    • (2013) Reverse Supply Chain Issues Anal , pp. 289-312
    • Kalayci, C.B.1    Gupta, S.M.2
  • 15
    • 84902299330 scopus 로고    scopus 로고
    • A tabu search algorithm for balancing a sequence-dependent disassembly line
    • May 7 (May 2013)
    • Kalayci CB, Gupta SM. A tabu search algorithm for balancing a sequence-dependent disassembly line. Prod Plan Control. 2013 May 7;(May 2013):1-12.
    • (2013) Prod Plan Control. , pp. 1-12
    • Kalayci, C.B.1    Gupta, S.M.2
  • 16
    • 84878666440 scopus 로고    scopus 로고
    • Ant colony optimization for sequence-dependent disassembly line balancing problem
    • Kalayci CB. Ant colony optimization for sequence-dependent disassembly line balancing problem. J Manuf Technol Manag. 2013;24(3):413-27.
    • (2013) J Manuf Technol Manag. , vol.24 , Issue.3 , pp. 413-427
    • Kalayci, C.B.1
  • 17
    • 84887821595 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
    • Springer-Verlag; Apr 28
    • Kalayci CB, Gupta SM. A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem. Int J Adv Manuf Technol. Springer-Verlag; 2013 Apr 28;69(1-4):197-209.
    • (2013) J Adv Manuf Technol , vol.69 , Issue.1-4 , pp. 197-209
    • Kalayci, C.B.1    Gupta, S.M.2
  • 18
    • 33746432209 scopus 로고    scopus 로고
    • A systematic approach to design and operation of disassembly lines
    • Jul
    • Tang Y, Zhou MC. A systematic approach to design and operation of disassembly lines. IEEE Trans Autom Sci Eng. 2006 Jul;3(3):324-9.
    • (2006) IEEE Trans Autom Sci Eng. , vol.3 , Issue.3 , pp. 324-329
    • Tang, Y.1    Zhou, M.C.2
  • 19
    • 34548449384 scopus 로고    scopus 로고
    • Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
    • Sep 15
    • Mcgovern SM, Gupta SM. Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. Int J Prod Res. 2007 Sep 15;45(18-19):4485-511.
    • (2007) J Prod Res. , vol.45 , Issue.18-19 , pp. 4485-4511
    • McGovern, S.M.1    Gupta, S.M.2
  • 20
    • 34548398404 scopus 로고    scopus 로고
    • Profit-oriented disassembly-line balancing
    • May 15
    • Altekin FT, Kandiller L, Ozdemirel NE. Profit-oriented disassembly-line balancing. Int J Prod Res. 2008 May 15;46(10):2675-93.
    • (2008) J Prod Res. , vol.46 , Issue.10 , pp. 2675-2693
    • Altekin, F.T.1    Kandiller, L.2    Ozdemirel, N.E.3
  • 21
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
    • Aug 17
    • Koc A, Sabuncuoglu I, Erel E. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Trans. 2009 Aug 17;41(10):866-81.
    • (2009) IIE Trans. , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 22
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • Jan
    • Gungor A, Gupta SM. A solution approach to the disassembly line balancing problem in the presence of task failures. Int J Prod Res. Taylor &Francis; 2001 Jan;39(7):1427-67.
    • (2001) J Prod Res. Taylor &Francis , vol.39 , Issue.7 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2
  • 23
    • 84867068820 scopus 로고    scopus 로고
    • Task-failure-driven rebalancing of disassembly lines
    • Oct 17 (January 2012)
    • Altekin FT, Akkan C. Task-failure-driven rebalancing of disassembly lines. Int J Prod Res. 2011 Oct 17;(January 2012):1-22.
    • (2011) J Prod Res. , pp. 1-22
    • Altekin, F.T.1    Akkan, C.2
  • 25
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
    • Agrawal S, Tiwari MK. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. Int J Prod Res. Taylor &Francis; 2008;46(6):1405-29.
    • (2008) J Prod Res. Taylor &Francis , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 26
    • 61349137696 scopus 로고    scopus 로고
    • Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (asga)
    • Jun
    • Tripathi M, Agrawal S, Pandey MK, Shankar R, Tiwari MK. Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA). Robot Comput Integr Manuf. 2009 Jun;25(3):483-96.
    • (2009) Robot Comput Integr Manuf. , vol.25 , Issue.3 , pp. 483-496
    • Tripathi, M.1    Agrawal, S.2    Pandey, M.K.3    Shankar, R.4    Tiwari, M.K.5
  • 27
    • 84904390908 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • Dec 2
    • Tuncel E, Zeid A, Kamarthi S. Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning. J Intell Manuf. Springer US; 2012 Dec 2;1-13.
    • (2012) J Intell Manuf. Springer U. S. , pp. 1-13
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 28
    • 84876972240 scopus 로고    scopus 로고
    • Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    • Jul
    • Aydemir-Karadag A, Turkbey O. Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Comput Ind Eng. 2013 Jul;65(3):413-25.
    • (2013) Comput Ind Eng. , vol.65 , Issue.3 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 29
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • Sep
    • Lambert a. JD. Linear programming in disassembly/clustering sequence generation. Comput Ind Eng. 1999 Sep;36(4):723-38.
    • (1999) Comput Ind Eng. , vol.36 , Issue.4 , pp. 723-738
    • Lamberta, J.D.1
  • 31
    • 0032632474 scopus 로고    scopus 로고
    • Monte carlo bounding techniques for determining solution quality in stochastic programs
    • Mak W-K, Morton DP, Wood RK. Monte carlo bounding techniques for determining solution quality in stochastic programs. Oper Res Lett. 1999;24(1-2):47-56.
    • (1999) Oper Res Lett. , vol.24 , Issue.1-2 , pp. 47-56
    • Mak, W.-K.1    Morton, D.P.2    Wood, R.K.3
  • 32
    • 84896097591 scopus 로고    scopus 로고
    • A stochastic formulation of the disassembly line balancing problem
    • In: Emmanouilidis C, Taisch M, Kiritsis D, editors
    • Bentaha ML, Battaïa O, Dolgui A. A stochastic formulation of the disassembly line balancing problem. In: Emmanouilidis C, Taisch M, Kiritsis D, editors. Adv Prod Manag Syst Compet Manuf Innov Prod Serv. Springer; 2013. p. 397-404.
    • (2013) Adv Prod Manag Syst Compet Manuf Innov Prod Serv. Springer , pp. 397-404
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 33
    • 84922236941 scopus 로고    scopus 로고
    • Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts
    • In: Prabhu V, Taisch M, Kiritsis D, editors. Springer
    • Bentaha ML, Battaia O, Dolgui A. Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts. In: Prabhu V, Taisch M, Kiritsis D, editors. Adv Prod Manag Syst Sustain Prod Serv Supply Chain. Springer; 2013. p. 103-10.
    • (2013) Adv Prod Manag Syst Sustain Prod Serv Supply Chain , pp. 103-110
    • Bentaha, M.L.1    Battaia, O.2    Dolgui, A.3
  • 34
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
    • Ma Y-S, Jun H-B, Kim H-W, Lee D-H. Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal. Int J Prod Res. Taylor &Francis; 2011;49(23):7007-27.
    • (2011) J Prod Res. Taylor &Francis , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.-S.1    Jun, H.-B.2    Kim, H.-W.3    Lee, D.-H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.