-
1
-
-
0003309003
-
Automation of disassembly processes of consumer goods
-
Ansems, A. M. M., Fugger, E. and Scheidt, L.-G., 1994, Automation of disassembly processes of consumer goods. Proceedings of the IEEE International Symposium on Electronics and the Environment, San Francisco, CA, 2-4 May.
-
(1994)
Proceedings of the IEEE International Symposium on Electronics and the Environment, San Francisco, CA, 2-4 May
-
-
Ansems, A.M.M.1
Fugger, E.2
Scheidt, L.-G.3
-
2
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
Brennan, L., Gupta, S. M. and Taleb, K. N., 1994, Operations planning issues in an assembly/disassembly environment. International Journal of Operations and Production Management, 14(9), 57-67.
-
(1994)
International Journal of Operations and Production Management
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
3
-
-
0029356018
-
Disassembly and recycling of electronic consumer products: An overview
-
de Ron, A. and Penev, K., 1995, Disassembly and recycling of electronic consumer products: an overview. Technovation, 15(6), 363-374.
-
(1995)
Technovation
, vol.15
, Issue.6
, pp. 363-374
-
-
De Ron, A.1
Penev, K.2
-
4
-
-
0032677007
-
Shortest-path formulation of mixed-model assembly line balancing problem
-
Erel, E. and Gokcen, H., 1999, Shortest-path formulation of mixed-model assembly line balancing problem. European Journal of Operational Research, 116, 194-204.
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 194-204
-
-
Erel, E.1
Gokcen, H.2
-
5
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
Ghosh, S. and Gagnon, R. J., 1989, A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 27(4), 637-670.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
6
-
-
0031247813
-
An evaluation methodology for disassembly processes
-
Gungor, A. and Gupta, S. M., 1997, An evaluation methodology for disassembly processes. Computers and Industrial Engineering, 33(1-2), 329-332.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.1-2
, pp. 329-332
-
-
Gungor, A.1
Gupta, S.M.2
-
7
-
-
0002101703
-
Disassembly sequence planning for complete disassembly in product recovery
-
Gungor, A. and Gupta, S. M., 1998a, Disassembly sequence planning for complete disassembly in product recovery. Proceedings of the Northeast Decision Sciences Institute - 27th Annual Meeting, Boston, MA, 25-27 March, pp. 250-252.
-
(1998)
Proceedings of the Northeast Decision Sciences Institute - 27th Annual Meeting, Boston, MA, 25-27 March
, pp. 250-252
-
-
Gungor, A.1
Gupta, S.M.2
-
8
-
-
0032183779
-
Disassembly sequence planning for products with defective parts in product recovery
-
Gungor, A. and Gupta, S. M., 1998b, Disassembly sequence planning for products with defective parts in product recovery. Computers and Industrial Engineering, 35(1-2), pp. 161-164.
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.1-2
, pp. 161-164
-
-
Gungor, A.1
Gupta, S.M.2
-
9
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Gungor, A. and Gupta, S. M., 1999, Issues in environmentally conscious manufacturing and product recovery: a survey. Computers and Industrial Engineering, 36(4), 811-853.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
10
-
-
0030270858
-
Disassembly of products
-
Gupta, S. M. and McLean, C. R., 1996, Disassembly of products. Computers and Industrial Engineering, 31, 225-228.
-
(1996)
Computers and Industrial Engineering
, vol.31
, pp. 225-228
-
-
Gupta, S.M.1
McLean, C.R.2
-
11
-
-
0001353411
-
Scheduling disassembly
-
Gupta, S. M. and Taleb, K. N., 1994, Scheduling disassembly. International Journal of Production Research, 32(8), 1857-1866.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.8
, pp. 1857-1866
-
-
Gupta, S.M.1
Taleb, K.N.2
-
12
-
-
0010909018
-
An algorithm to disassemble multiple product structures with multiple occurrence of parts
-
Gupta, S. M. and Taleb, K. N., 1996, An algorithm to disassemble multiple product structures with multiple occurrence of parts. Proceedings of the International Seminar on Reuse, Eindhoven, The Netherlands, 11-13 November, pp. 153-162.
-
(1996)
Proceedings of the International Seminar on Reuse, Eindhoven, The Netherlands, 11-13 November
, pp. 153-162
-
-
Gupta, S.M.1
Taleb, K.N.2
-
13
-
-
0010850439
-
A case-based reasoning approach for the optimal planning of disassembly processes
-
Gupta, S. M. and Veerakamolmal, P., 1999, A case-based reasoning approach for the optimal planning of disassembly processes. Proceedings of the Second International Seminar on Reuse, Eindhoven, The Netherlands, 1-3 March, pp. 141-150.
-
(1999)
Proceedings of the Second International Seminar on Reuse, Eindhoven, The Netherlands, 1-3 March
, pp. 141-150
-
-
Gupta, S.M.1
Veerakamolmal, P.2
-
14
-
-
0001474336
-
An algorithm for the line balancing problem
-
Gutjahr, A. L. and Nemhauser, G. L., 1964, An algorithm for the line balancing problem. Management Science, 11(2), 308-315.
-
(1964)
Management Science
, vol.11
, Issue.2
, pp. 308-315
-
-
Gutjahr, A.L.1
Nemhauser, G.L.2
-
15
-
-
0346446051
-
Disassembly simulation for an effective recycling of electrical scrap
-
Hesselbach, J. and von Westernhagen, K., 1999, Disassembly simulation for an effective recycling of electrical scrap. Proceedings of the First International Symposium on Environmentally Conscious Design and Inverse Manufacturing, Tokyo, Japan, 1-3 February, pp. 582-585.
-
(1999)
Proceedings of the First International Symposium on Environmentally Conscious Design and Inverse Manufacturing, Tokyo, Japan, 1-3 February
, pp. 582-585
-
-
Hesselbach, J.1
Von Westernhagen, K.2
-
16
-
-
0032183325
-
Material flow control and scheduling in a disassembly environment
-
Kizilkaya, E. A. and Gupta, S. M., 1998, Material flow control and scheduling in a disassembly environment. Computers and Industrial Engineering, 35(1-2), 93-96.
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.1-2
, pp. 93-96
-
-
Kizilkaya, E.A.1
Gupta, S.M.2
-
17
-
-
0029482139
-
In search of a disassembly factory
-
Kochan, A., 1995, In search of a disassembly factory. Assembly Automation, 15(4), 16-17.
-
(1995)
Assembly Automation
, vol.15
, Issue.4
, pp. 16-17
-
-
Kochan, A.1
-
18
-
-
0030411015
-
Semi-automated robotized disassembling of personal computers
-
Kopacek, P. and Kronreif, G., 1996, Semi-automated robotized disassembling of personal computers. IEEE Conference on Emerging Technologies and Factory Automation, Kauai, Hawaii, 18-21 November, pp. 567-572.
-
(1996)
IEEE Conference on Emerging Technologies and Factory Automation, Kauai, Hawaii, 18-21 November
, pp. 567-572
-
-
Kopacek, P.1
Kronreif, G.2
-
19
-
-
0001769416
-
Aspects of industrial recycling of electr(on)ic appliances
-
Menrad, W., Grieger, S. and Schlogl, M., 1999, Aspects of industrial recycling of electr(on)ic appliances. Proceesings of the Second International Working Seminar on Re-Use, Eindhoven, The Netherlands, 1-3 March, pp. 81-90.
-
(1999)
Proceesings of the Second International Working Seminar on Re-Use, Eindhoven, The Netherlands, 1-3 March
, pp. 81-90
-
-
Menrad, W.1
Grieger, S.2
Schlogl, M.3
-
20
-
-
0031703202
-
Disassembly process planning using Petri nets
-
Moore, K. E., Gungor, A. and Gupta, S. M., 1998a, Disassembly process planning using Petri nets. Proceedings of the IEEE International Symposium on Electronics and the Environment, Oak Brook, IL, 4-6 May, pp. 88-93.
-
(1998)
Proceedings of the IEEE International Symposium on Electronics and the Environment, Oak Brook, IL, 4-6 May
, pp. 88-93
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
21
-
-
0032183016
-
A Petri net approach to disassembly process planning
-
Moore, K. E., Gungor, A. and Gupta, S. M., 1998b, A Petri net approach to disassembly process planning. Computers and Industrial Engineering, 35(1-2), 165-168.
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.1-2
, pp. 165-168
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
22
-
-
7044252312
-
Environmental concerns and recycling/disassembly efforts in the electronics industry
-
Moyer, L. and Gupta, S. M., 1997, Environmental concerns and recycling/disassembly efforts in the electronics industry. Journal of Electronics Manufacturing, 7(1), 1-22.
-
(1997)
Journal of Electronics Manufacturing
, vol.7
, Issue.1
, pp. 1-22
-
-
Moyer, L.1
Gupta, S.M.2
-
23
-
-
21344494294
-
The recovery problem in product design
-
Navin-Chandra, D., 1994, The recovery problem in product design. Journal of Engineering Design, 5(1), 65-86.
-
(1994)
Journal of Engineering Design
, vol.5
, Issue.1
, pp. 65-86
-
-
Navin-Chandra, D.1
-
24
-
-
0028548138
-
Development of disassembly line for refrigerators
-
Penev, K. D. and de Ron, A. J., 1994, Development of disassembly line for refrigerators. Industrial Engineering, 26(11), 50-53.
-
(1994)
Industrial Engineering
, vol.26
, Issue.11
, pp. 50-53
-
-
Penev, K.D.1
De Ron, A.J.2
-
25
-
-
0030085256
-
Determination of a disassembly strategy
-
Penev, K. D. and de Ron, A. J., 1996, Determination of a disassembly strategy. International Journal of Production Research, 34(2), 495-506.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.2
, pp. 495-506
-
-
Penev, K.D.1
De Ron, A.J.2
-
26
-
-
85135755631
-
The assembly-line balancing problem
-
Salveson, M. E., 1955, The assembly-line balancing problem. Transactions of ASME, 77, 939-948.
-
(1955)
Transactions of ASME
, vol.77
, pp. 939-948
-
-
Salveson, M.E.1
-
27
-
-
0025462434
-
Development of cost model for the single-model stochastic assembly line balancing problem
-
Sarin, S. C. and Erel, E., 1990, Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research, 28(7), 1305-1316.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.7
, pp. 1305-1316
-
-
Sarin, S.C.1
Erel, E.2
-
29
-
-
0010907645
-
Algorithms for disassembly
-
Taleb, K. N. and Gupta, S. M., 1995, Algorithms for disassembly. Proceedings of the Northeast Decision Sciences Institute Conference, Providence, RI, 22-24 March, pp. 406-408.
-
(1995)
Proceedings of the Northeast Decision Sciences Institute Conference, Providence, RI, 22-24 March
, pp. 406-408
-
-
Taleb, K.N.1
Gupta, S.M.2
-
30
-
-
0031219811
-
Disassembly of multiple product structures
-
Taleb, K. N. and Gupta, S. M., 1997, Disassembly of multiple product structures. Computers and Industrial Engineering, 32(4), 949-961.
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.4
, pp. 949-961
-
-
Taleb, K.N.1
Gupta, S.M.2
-
31
-
-
0031119840
-
Disassembly of complex products with parts and material commonality
-
Taleb, K. N., Gupta, S. M. and Brennan, L., 1997, Disassembly of complex products with parts and material commonality. Production Planning and Control, 8(3), 255-269.
-
(1997)
Production Planning and Control
, vol.8
, Issue.3
, pp. 255-269
-
-
Taleb, K.N.1
Gupta, S.M.2
Brennan, L.3
-
32
-
-
0031336432
-
Concept of an autonomous disassembly system using behavior-based robotics
-
Tani K. and Güner, E., 1997, Concept of an autonomous disassembly system using behavior-based robotics. Advanced Robotics, 11(2), 187-198.
-
(1997)
Advanced Robotics
, vol.11
, Issue.2
, pp. 187-198
-
-
Tani, K.1
Güner, E.2
-
33
-
-
0003846779
-
-
(Englewood Cliffs, NJ: Prentice-Hall)
-
Tanebaum, A. M., Langsam, Y. and Augestein, M. J., 1990, Data Structures Using C (Englewood Cliffs, NJ: Prentice-Hall).
-
(1990)
Data Structures Using C
-
-
Tanebaum, A.M.1
Langsam, Y.2
Augestein, M.J.3
-
34
-
-
0031373570
-
Three-dimensional vision system for mechanical assembly/disassembly
-
Umeda, K. and Arai T., 1997, Three-dimensional vision system for mechanical assembly/disassembly. Advanced Robotics, 11(2), 147-167.
-
(1997)
Advanced Robotics
, vol.11
, Issue.2
, pp. 147-167
-
-
Umeda, K.1
Arai, T.2
-
35
-
-
0032182884
-
High-mix/low-volume batch of electronic equipment disassembly
-
Veerakamolmal, P. and Gupta, S. M., 1998a, High-mix/low-volume batch of electronic equipment disassembly. Computers and Industrial Engineering, 35(1/2), 65-68.
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.1-2
, pp. 65-68
-
-
Veerakamolmal, P.1
Gupta, S.M.2
-
36
-
-
0032284905
-
Optimal analysis of lot size balancing for multi-products selective disassembly
-
Veerakamolmal, P. and Gupta, S. M., 1998b, Optimal analysis of lot size balancing for multi-products selective disassembly. International Journal of Flexible Automation and Integrated Manufacturing, 6(3/4), 245-269.
-
(1998)
International Journal of Flexible Automation and Integrated Manufacturing
, vol.6
, Issue.3-4
, pp. 245-269
-
-
Veerakamolmal, P.1
Gupta, S.M.2
-
37
-
-
0002217464
-
Planning components recovery from multiple products
-
Veerakamolmal, P. and Gupta, S. M., 1998c, Planning components recovery from multiple products. Northeast Decision Sciences Institute - 27th Annual Meeting, Boston, MA, 25-27 March, pp, 270-272.
-
(1998)
Northeast Decision Sciences Institute - 27th Annual Meeting, Boston, MA, 25-27 March
, pp. 270-272
-
-
Veerakamolmal, P.1
Gupta, S.M.2
-
38
-
-
0004944786
-
Analysis of design efficiency for the disassembly of modular electronic products
-
Veerakamolmal, P. and Gupta, S. M., 1999a, Analysis of design efficiency for the disassembly of modular electronic products. Journal of Electronics Manufacturing, 9(1), 79-95.
-
(1999)
Journal of Electronics Manufacturing
, vol.9
, Issue.1
, pp. 79-95
-
-
Veerakamolmal, P.1
Gupta, S.M.2
-
39
-
-
0002597508
-
Automating multiple products process planning with case-based reasoning
-
Veerakamolmal, P. and Gupta, S. M., 1999b, Automating multiple products process planning with case-based reasoning. Proceedings of the Second International Conference on Operations and Quantitative Management, Ahmedabad, India, 3-6 January, pp. 24-33.
-
(1999)
Proceedings of the Second International Conference on Operations and Quantitative Management, Ahmedabad, India, 3-6 January
, pp. 24-33
-
-
Veerakamolmal, P.1
Gupta, S.M.2
-
41
-
-
0002650402
-
Disassembly process planning
-
Veerakamolmal, P., Gupta, S. M. and McLean, C. R., 1997, Disassembly process planning. Proceedings of the International Conference on Engineering Design and Automation, Bangkok, Thailand, 18-21 March, pp. 162-165.
-
(1997)
Proceedings of the International Conference on Engineering Design and Automation, Bangkok, Thailand, 18-21 March
, pp. 162-165
-
-
Veerakamolmal, P.1
Gupta, S.M.2
McLean, C.R.3
-
42
-
-
0001827476
-
Planning and control in disassembly: The key to an increased profitability
-
Wiendahl, H.-P. and Bürkner, S., 1999, Planning and control in disassembly: the key to an increased profitability. Proceedings of the Second International Working Seminar on Re-Use, Eindhoven, The Netherlands, 1-3 March, pp. 247-256.
-
(1999)
Proceedings of the Second International Working Seminar on Re-Use, Eindhoven, The Netherlands, 1-3 March
, pp. 247-256
-
-
Wiendahl, H.-P.1
Bürkner, S.2
-
43
-
-
0002651945
-
The necessity for flexible and modular structures in hybrid disassembly processes
-
Wiendahl, H.-P., Lorenz, B. and Bürkner, S., 1998, The necessity for flexible and modular structures in hybrid disassembly processes. Production Engineering, 5, 71-76.
-
(1998)
Production Engineering
, vol.5
, pp. 71-76
-
-
Wiendahl, H.-P.1
Lorenz, B.2
Bürkner, S.3
-
44
-
-
0031122213
-
A case-based reasoning approach to planning for disassembly
-
Zeid, I., Gupta, S. M. and Bardasz, T., 1997, A case-based reasoning approach to planning for disassembly. Journal of Intelligent Manufacturing, 8(2), 97-106.
-
(1997)
Journal of Intelligent Manufacturing
, vol.8
, Issue.2
, pp. 97-106
-
-
Zeid, I.1
Gupta, S.M.2
Bardasz, T.3
|