메뉴 건너뛰기




Volumn 52, Issue 8, 2014, Pages 2363-2387

Interactive fuzzy programming approaches to the strategic and tactical planning of a closed-loop supply chain under uncertainty

Author keywords

Closed loop supply chain network design; Disassembly line balancing; Interactive fuzzy programming; Multi objective non linear programming; Uncertainty

Indexed keywords

FUZZY SYSTEMS; NONLINEAR PROGRAMMING;

EID: 84896400446     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.865852     Document Type: Article
Times cited : (67)

References (44)
  • 1
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed model u-shaped disassembly line balancing and sequencing problem
    • Agrawal, S., and M. K. Tiwari. 2008. "A Collaborative Ant Colony Algorithm to Stochastic Mixed Model U-shaped Disassembly Line Balancing and Sequencing Problem." International Journal of Production Research 46 (6): 1405-1429
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 2
    • 79551650944 scopus 로고    scopus 로고
    • Quantitative models for inventory and production planning in closed-loop supply chains
    • Akçali, E., and S. Çetinkaya. 2011. "Quantitative Models for Inventory and Production Planning in Closed-loop Supply Chains." International Journal of Production Research 49 (8): 2373-2407
    • (2011) International Journal of Production Research , vol.49 , Issue.8 , pp. 2373-2407
    • Akçali, E.1    Çetinkaya, S.2
  • 5
    • 84862789524 scopus 로고    scopus 로고
    • An integrated model for closed-loop supply chain configuration and supplier selection: Multiobjective approach
    • Amin, S. H., and G. Zhang. 2012. "An Integrated Model for Closed-loop Supply Chain Configuration and Supplier Selection: Multiobjective Approach." Expert Systems with Applications 39 (8): 6782-6791
    • (2012) Expert Systems with Applications , vol.39 , Issue.8 , pp. 6782-6791
    • Amin, S.H.1    Zhang, G.2
  • 7
    • 36849007473 scopus 로고    scopus 로고
    • A bi-objective reverse logistics network analysis for post-sale service
    • Du, F., and G. W. Evans. 2008. "A Bi-objective Reverse Logistics Network Analysis for Post-sale Service." Computers and Operations Research 35 (8): 2617-2634
    • (2008) Computers and Operations Research , vol.35 , Issue.8 , pp. 2617-2634
    • Du, F.1    Evans, G.W.2
  • 8
    • 70449625485 scopus 로고    scopus 로고
    • Tabu search and benders decomposition approaches for a capacitated closed-loop supply chain network design problem
    • Easwaran, G., and H. Üster. 2009. "Tabu Search and Benders Decomposition Approaches for a Capacitated Closed-loop Supply Chain Network Design Problem." Transportation Science 43 (3): 301-320
    • (2009) Transportation Science , vol.43 , Issue.3 , pp. 301-320
    • Easwaran, G.1    Üster, H.2
  • 9
    • 77956931319 scopus 로고    scopus 로고
    • A closed-loop supply chain network design problem with integrated forward and reverse channel decisions
    • Easwaran, G., and H. Üster. 2010. "A Closed-loop Supply Chain Network Design Problem with Integrated Forward and Reverse Channel Decisions." IIE Transactions 42 (11): 779-792
    • (2010) IIE Transactions , vol.42 , Issue.11 , pp. 779-792
    • Easwaran, G.1    Üster, H.2
  • 13
    • 70350378692 scopus 로고    scopus 로고
    • A genetic algorithm approach for solving a closed loop supply chain model: A case of battery recycling
    • Kannan, G., P. Sasikumar, and K. Devika. 2010. "A Genetic Algorithm Approach for Solving a Closed Loop Supply Chain Model: A Case of Battery Recycling." Applied Mathematical Modeling 34 (3): 655-670
    • (2010) Applied Mathematical Modeling , vol.34 , Issue.3 , pp. 655-670
    • Kannan, G.1    Sasikumar, P.2    Devika, K.3
  • 14
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an a nd/or graph
    • Koç, A., I. Sabuncuoǧlu, and E. Erel. 2009. "Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an a ND/oR Graph." IIE Transactions 41 (10): 866-881
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koç, A.1    Sabuncuoǧlu, I.2    Erel, E.3
  • 15
    • 0026898945 scopus 로고
    • A new approach to some possibilistic linear programming problems
    • Lai, Y. J., and C. L. Hwang. 1992. "A New Approach to Some Possibilistic Linear Programming Problems." Fuzzy Sets and Systems 49 (2): 121-133
    • (1992) Fuzzy Sets and Systems , vol.49 , Issue.2 , pp. 121-133
    • Lai, Y.J.1    Hwang, C.L.2
  • 16
    • 56349085911 scopus 로고    scopus 로고
    • Application of fuzzy sets to manufacturing/distribution planning decisions with multi-product and multi-Time period in supply chains
    • Liang, T. F., and H. W. Cheng. 2009. "Application of Fuzzy Sets to Manufacturing/Distribution Planning Decisions with Multi-product and Multi-Time Period in Supply Chains." Expert Systems with Applications 36 (2): 3367-3377
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 , pp. 3367-3377
    • Liang, T.F.1    Cheng, H.W.2
  • 17
    • 34548733647 scopus 로고    scopus 로고
    • Remaining life estimation of used components in consumer products: Life cycle data analysis by weibull and artificial neural networks
    • Mazhar, M. I., S. Kara, and H. Kaebernick. 2007. "Remaining Life Estimation of Used Components in Consumer Products: Life Cycle Data Analysis by Weibull and Artificial Neural Networks." Journal of Operations Management 25 (6): 1184-1193
    • (2007) Journal of Operations Management , vol.25 , Issue.6 , pp. 1184-1193
    • Mazhar, M.I.1    Kara, S.2    Kaebernick, H.3
  • 19
  • 20
    • 84871191449 scopus 로고    scopus 로고
    • A mixed integer programming model for a closed-loop supply chain network
    • Özceylan, E., and E. Paksoy. 2013a. "A Mixed Integer Programming Model for a Closed-loop Supply Chain Network." International Journal of Production Research 51 (3): 718-734
    • (2013) International Journal of Production Research , vol.51 , Issue.3 , pp. 718-734
    • Özceylan, E.1    Paksoy, E.2
  • 21
    • 84885635477 scopus 로고    scopus 로고
    • Reverse supply chain optimisation with disassembly line balancing
    • Özceylan, E., and E. Paksoy. 2013b. "Reverse Supply Chain Optimisation with Disassembly Line Balancing." International Journal of Production Research 51 (20): 5985-6001
    • (2013) International Journal of Production Research , vol.51 , Issue.20 , pp. 5985-6001
    • Özceylan, E.1    Paksoy, E.2
  • 22
    • 84896394417 scopus 로고    scopus 로고
    • Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing
    • in press
    • Özceylan, E., T. Paksoy, and T. Bektaş. 2013. "Modeling and Optimizing the Integrated Problem of Closed-loop Supply Chain Network Design and Disassembly Line Balancing." Transportation Research Part E, in press
    • (2013) Transportation Research Part e
    • Özceylan, E.1    Paksoy, T.2    Bektaş, T.3
  • 23
    • 79952043621 scopus 로고    scopus 로고
    • Operational and environmental performance measures in a multi-product closed-loop supply chain
    • Paksoy, T., T. Bektaş, and E. Özceylan. 2011. "Operational and Environmental Performance Measures in a Multi-product Closed-loop Supply Chain." Transportation Research Part E 47 (4): 532-546
    • (2011) Transportation Research Part e , vol.47 , Issue.4 , pp. 532-546
    • Paksoy, T.1    Bektaş, T.2    Özceylan, E.3
  • 26
    • 84859808210 scopus 로고    scopus 로고
    • Environmental supply chain network design using multi-objective fuzzy mathematical programming
    • Pishvaee, S. M., and J. Razmi. 2012. "Environmental Supply Chain Network Design Using Multi-objective Fuzzy Mathematical Programming." Applied Mathematical Modelling 36 (8): 3433-3446
    • (2012) Applied Mathematical Modelling , vol.36 , Issue.8 , pp. 3433-3446
    • Pishvaee, S.M.1    Razmi, J.2
  • 27
    • 77955681026 scopus 로고    scopus 로고
    • A possibilistic programming approach for closed-loop supply chain network design under uncertainty
    • Pishvaee, M. S., and S. A. Torabi. 2010. "A Possibilistic Programming Approach for Closed-loop Supply Chain Network Design under Uncertainty." Fuzzy Sets and Systems 161 (20): 2668-2683
    • (2010) Fuzzy Sets and Systems , vol.161 , Issue.20 , pp. 2668-2683
    • Pishvaee, M.S.1    Torabi, S.A.2
  • 28
    • 84855814683 scopus 로고    scopus 로고
    • Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty
    • Pishvaee, S. M., S. A. Torabi, and J. Razmi. 2012. "Credibility- based Fuzzy Mathematical Programming Model for Green Logistics Design under Uncertainty." Computers & Industrial Engineering 62 (2): 624-632
    • (2012) Computers & Industrial Engineering , vol.62 , Issue.2 , pp. 624-632
    • Pishvaee, S.M.1    Torabi, S.A.2    Razmi, J.3
  • 29
    • 84867022368 scopus 로고    scopus 로고
    • The closed-loop supply chain network with competition, distribution channel investment, and uncertainties
    • Qiang, Q., K. Ke, T. Anderson, and J. Dong. 2013. "The Closed-loop Supply Chain Network with Competition, Distribution Channel Investment, and Uncertainties." Omega 41 (2): 186-194
    • (2013) Omega , vol.41 , Issue.2 , pp. 186-194
    • Qiang, Q.1    Ke, K.2    Anderson, T.3    Dong, J.4
  • 30
    • 67349137534 scopus 로고    scopus 로고
    • A strategic and tactical model for closed loop supply chains
    • Salema, M. I. G., A. P. B. Póvoa, and A. Q. Novais. 2009. "A Strategic and Tactical Model for Closed Loop Supply Chains." OR Spectrum 31 (3): 573-599
    • (2009) OR Spectrum , vol.31 , Issue.3 , pp. 573-599
    • Salema, M.I.G.1    Póvoa, A.P.B.2    Novais, A.Q.3
  • 32
    • 39049110961 scopus 로고    scopus 로고
    • A supply chain distribution network design model: An interactive fuzzy goal programmingbased solution approach
    • Selim, H., and İ. Özkarahan. 2008. "A Supply Chain Distribution Network Design Model: An Interactive Fuzzy Goal Programmingbased Solution Approach." International Journal of Advanced Manufacturing Technology 36 (3-4): 401-418
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.3-4 , pp. 401-418
    • Selim, H.1    Özkarahan, I.2
  • 33
    • 38649141544 scopus 로고    scopus 로고
    • Collaborative production-distribution planning in supply chain: A fuzzy goal programming approach
    • Selim, H., C. Araz, and İ. Özkarahan. 2008. "Collaborative Production-Distribution Planning in Supply Chain: A Fuzzy Goal Programming Approach." Transportation Research Part E 44 (3): 396-419
    • (2008) Transportation Research Part e , vol.44 , Issue.3 , pp. 396-419
    • Selim, H.1    Araz, C.2    Özkarahan, I.3
  • 34
    • 84881629517 scopus 로고    scopus 로고
    • Prism: Priority based simulated annealing for a closed loop supply chain network design problem
    • Subramanian, P., N. Ramkumar, T. T. Narendran, and K. Ganesh. 2013. "PRISM: Priority Based Simulated Annealing for a Closed Loop Supply Chain Network Design Problem." Applied Soft Computing 13 (2): 1121-1135
    • (2013) Applied Soft Computing , vol.13 , Issue.2 , pp. 1121-1135
    • Subramanian, P.1    Ramkumar, N.2    Narendran, T.T.3    Ganesh, K.4
  • 35
    • 84872281165 scopus 로고    scopus 로고
    • Fuzzy mixed integer programming model for medium-Term planning in a closed-loop supply chain with remanufacturing option
    • Subulan, K., A. S. Taşan, and A. Baykasoǧlu. 2012. "Fuzzy Mixed Integer Programming Model for Medium-Term Planning in a Closed-loop Supply Chain with Remanufacturing Option." Journal of Intelligent and Fuzzy Systems 23 (6): 345-368
    • (2012) Journal of Intelligent and Fuzzy Systems , vol.23 , Issue.6 , pp. 345-368
    • Subulan, K.1    Taşan, A.S.2    Baykasoǧlu, A.3
  • 37
    • 35649000310 scopus 로고    scopus 로고
    • An interactive possibilistic programming approach for multiple objective supply chain master planning
    • Torabi, S. A., and E. Hassini. 2008. "An Interactive Possibilistic Programming Approach for Multiple Objective Supply Chain Master Planning." Fuzzy Sets and Systems 159 (2): 193-214
    • (2008) Fuzzy Sets and Systems , vol.159 , Issue.2 , pp. 193-214
    • Torabi, S.A.1    Hassini, E.2
  • 38
    • 84868669874 scopus 로고    scopus 로고
    • Fuzzy possibilistic modeling for closed loop recycling collection networks
    • Vahdani, B., J. Razmi, and R. Tavakkoli-Moghaddam. 2012. "Fuzzy Possibilistic Modeling for Closed Loop Recycling Collection Networks." Environmental Modeling & Assessment 17 (6): 623-637
    • (2012) Environmental Modeling & Assessment , vol.17 , Issue.6 , pp. 623-637
    • Vahdani, B.1    Razmi, J.2    Tavakkoli-Moghaddam, R.3
  • 39
    • 79955616735 scopus 로고    scopus 로고
    • Pricing decisions with retail competition in a fuzzy closed-loop supply chain
    • Wei, J., and J. Zhao. 2011. "Pricing Decisions with Retail Competition in a Fuzzy Closed-loop Supply Chain." Expert Systems with Applications 38 (9): 11209-11216
    • (2011) Expert Systems with Applications , vol.38 , Issue.9 , pp. 11209-11216
    • Wei, J.1    Zhao, J.2
  • 40
    • 84870253772 scopus 로고    scopus 로고
    • Reverse channel decisions for a fuzzy closed-loop supply chain
    • Wei, J., and J. Zhao. 2013. "Reverse Channel Decisions for a Fuzzy Closed-loop Supply Chain." Applied Mathematical Modelling 37 (3): 1502-1513
    • (2013) Applied Mathematical Modelling , vol.37 , Issue.3 , pp. 1502-1513
    • Wei, J.1    Zhao, J.2
  • 41
    • 0023381033 scopus 로고
    • An interactive fuzzy programming system
    • Werners, B. 1987. "An Interactive Fuzzy Programming System." Fuzzy Sets and Systems 23 (1): 131-147
    • (1987) Fuzzy Sets and Systems , vol.23 , Issue.1 , pp. 131-147
    • Werners, B.1
  • 43
    • 84865689309 scopus 로고    scopus 로고
    • A lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain
    • Zhang, Z. H., H. Jiang, and X. Pan. 2012. "A Lagrangian Relaxation Based Approach for the Capacitated Lot Sizing Problem in Closed-loop Supply Chain." International Journal of Production Economics 140 (1): 249-255
    • (2012) International Journal of Production Economics , vol.140 , Issue.1 , pp. 249-255
    • Zhang, Z.H.1    Jiang, H.2    Pan, X.3
  • 44
    • 49349136235 scopus 로고
    • Fuzzy programming and linear programming with several objective functions
    • Zimmermann, H. J. 1978. "Fuzzy Programming and Linear Programming with Several Objective Functions." Fuzzy Sets and Systems 1 (1): 45-55
    • (1978) Fuzzy Sets and Systems , vol.1 , Issue.1 , pp. 45-55
    • Zimmermann, H.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.