-
1
-
-
34548398404
-
Profit-oriented disassembly-line balancing
-
Altekin, F.T., Kandiller, L., Ozdemirel, N.E., Profit-oriented disassembly-line balancing. Int. J. Prod. Res. 46:10 (2008), 2675–2693.
-
(2008)
Int. J. Prod. Res.
, vol.46
, Issue.10
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemirel, N.E.3
-
2
-
-
84908355358
-
A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment
-
Avikal, S., Jain, R., Mishra, P.K., A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment. Appl. Soft. Comput. 25 (2014), 519–529.
-
(2014)
Appl. Soft. Comput.
, vol.25
, pp. 519-529
-
-
Avikal, S.1
Jain, R.2
Mishra, P.K.3
-
3
-
-
84893943458
-
A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems
-
Avikal, S., Mishra, P.K., Jain, R., A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems. Int. J. Prod. Res. 52:5 (2013), 1306–1317.
-
(2013)
Int. J. Prod. Res.
, vol.52
, Issue.5
, pp. 1306-1317
-
-
Avikal, S.1
Mishra, P.K.2
Jain, R.3
-
4
-
-
84922236941
-
Chance constrained programming model for stochastic profit–oriented disassembly line balancing in the presence of hazardous parts
-
Springer
-
Bentaha, M.L., Battaïa, O., Dolgui, A., Chance constrained programming model for stochastic profit–oriented disassembly line balancing in the presence of hazardous parts. IFIP International Conference on Advances in Production Management Systems, 2013, Springer, 103–110.
-
(2013)
IFIP International Conference on Advances in Production Management Systems
, pp. 103-110
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
5
-
-
0033492114
-
Intensifying a heuristic forest harvest scheduling search procedure with 2-opt decision choices
-
Bettinger, P., Boston, K., Sessions, J., Intensifying a heuristic forest harvest scheduling search procedure with 2-opt decision choices. Can. J. For. Res. 29:11 (1999), 1784–1792.
-
(1999)
Can. J. For. Res.
, vol.29
, Issue.11
, pp. 1784-1792
-
-
Bettinger, P.1
Boston, K.2
Sessions, J.3
-
6
-
-
84995470117
-
A hybrid multi-criteria decision making method approach for selecting a sustainable location of healthcare waste disposal facility
-
Chauhan, A., Singh, A., A hybrid multi-criteria decision making method approach for selecting a sustainable location of healthcare waste disposal facility. J. Clean. Prod. 139 (2016), 1001–1010.
-
(2016)
J. Clean. Prod.
, vol.139
, pp. 1001-1010
-
-
Chauhan, A.1
Singh, A.2
-
7
-
-
0035502047
-
Identification of λ-fuzzy measures using sampling design and genetic algorithms
-
Chen, T.-Y., Wang, J.-C., Identification of λ-fuzzy measures using sampling design and genetic algorithms. Fuzzy Sets Syst. 123:3 (2001), 321–341.
-
(2001)
Fuzzy Sets Syst.
, vol.123
, Issue.3
, pp. 321-341
-
-
Chen, T.-Y.1
Wang, J.-C.2
-
8
-
-
34248587910
-
A fuzzy optimization method for multicriteria decision making: an application to reservoir flood control operation
-
Fu, G., A fuzzy optimization method for multicriteria decision making: an application to reservoir flood control operation. Expert. Syst. Appl. 34:1 (2008), 145–149.
-
(2008)
Expert. Syst. Appl.
, vol.34
, Issue.1
, pp. 145-149
-
-
Fu, G.1
-
9
-
-
0037143030
-
Disassembly line in product recovery
-
Güngör, A., Gupta, S.M., Disassembly line in product recovery. Int. J. Prod. Res. 40:11 (2002), 2569–2589.
-
(2002)
Int. J. Prod. Res.
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Güngör, A.1
Gupta, S.M.2
-
11
-
-
17044375963
-
Disassembly sequencing problem: a case study of a cell phone
-
Gupta, S.M., Erbis, E., McGovern, S.M., Disassembly sequencing problem: a case study of a cell phone. Proc. SPIE 5583 (2004), 43–52.
-
(2004)
Proc. SPIE
, vol.5583
, pp. 43-52
-
-
Gupta, S.M.1
Erbis, E.2
McGovern, S.M.3
-
12
-
-
0001353411
-
Scheduling disassembly
-
Gupta, S.M., Taleb, K.N., Scheduling disassembly. Int. J. Prod. Res. 32:8 (1994), 1857–1866.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.8
, pp. 1857-1866
-
-
Gupta, S.M.1
Taleb, K.N.2
-
13
-
-
0001709711
-
Combination of chaotic neurodynamics with the 2-opt algorithm to solve traveling salesman problems
-
Hasegawa, M., Ikeguchi, T., Aihara, K., Combination of chaotic neurodynamics with the 2-opt algorithm to solve traveling salesman problems. Phys. Rev. Lett. 79:12 (1997), 2344–2347.
-
(1997)
Phys. Rev. Lett.
, vol.79
, Issue.12
, pp. 2344-2347
-
-
Hasegawa, M.1
Ikeguchi, T.2
Aihara, K.3
-
14
-
-
84881185298
-
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
-
Kalayci, C.B., Gupta, S.M., Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem. Expert. Syst. Appl. 40:18 (2013), 7231–7241.
-
(2013)
Expert. Syst. Appl.
, vol.40
, Issue.18
, pp. 7231-7241
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
15
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koc, A., Sabuncuoglu, I., Erel, E., Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Trans. 41:10 (2009), 866–881.
-
(2009)
IIE Trans.
, vol.41
, Issue.10
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
16
-
-
0035764186
-
A Genetic Algorithm for Disassembly Process Planning
-
SPIE
-
Kongar, E., Gupta, S.M., A Genetic Algorithm for Disassembly Process Planning. 2001, SPIE, 54–62.
-
(2001)
, pp. 54-62
-
-
Kongar, E.1
Gupta, S.M.2
-
17
-
-
84866735210
-
Tabu search for the single row facility layout problem using exhaustive 2-opt and insertion neighborhoods
-
Kothari, R., Ghosh, D., Tabu search for the single row facility layout problem using exhaustive 2-opt and insertion neighborhoods. Eur. J. Oper. Res. 224:1 (2013), 93–100.
-
(2013)
Eur. J. Oper. Res.
, vol.224
, Issue.1
, pp. 93-100
-
-
Kothari, R.1
Ghosh, D.2
-
18
-
-
77955416142
-
A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations
-
Lee, H.B., Cho, N.W., Hong, Y.S., A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations. J. Clean. Prod. 18:13 (2010), 1276–1283.
-
(2010)
J. Clean. Prod.
, vol.18
, Issue.13
, pp. 1276-1283
-
-
Lee, H.B.1
Cho, N.W.2
Hong, Y.S.3
-
19
-
-
84995545787
-
An energy-saving method to solve the mismatch between installed and demanded power in hydraulic press
-
Li, L., Huang, H., Liu, Z., Li, X., Triebe, M.J., Zhao, F., An energy-saving method to solve the mismatch between installed and demanded power in hydraulic press. J. Clean. Prod. 139 (2016), 636–645.
-
(2016)
J. Clean. Prod.
, vol.139
, pp. 636-645
-
-
Li, L.1
Huang, H.2
Liu, Z.3
Li, X.4
Triebe, M.J.5
Zhao, F.6
-
20
-
-
85028028536
-
Operation scheduling of multi-hydraulic press system for energy consumption reduction
-
Li, L., Huang, H., Zhao, F., Liu, Z., Operation scheduling of multi-hydraulic press system for energy consumption reduction. J. Clean. Prod. 165 (2017), 1407–1419.
-
(2017)
J. Clean. Prod.
, vol.165
, pp. 1407-1419
-
-
Li, L.1
Huang, H.2
Zhao, F.3
Liu, Z.4
-
21
-
-
85038836422
-
2-Opt heuristic for the disassembly line balancing problem, Photonics Technologies for Robotics, Automation, and Manufacturing
-
McGovern, S.M., Gupta, S.M., 2-Opt heuristic for the disassembly line balancing problem, Photonics Technologies for Robotics, Automation, and Manufacturing. Int. Soc. Opt. Photonics, 2003, 71–84.
-
(2003)
Int. Soc. Opt. Photonics
, pp. 71-84
-
-
McGovern, S.M.1
Gupta, S.M.2
-
22
-
-
33748559516
-
Ant colony optimization for disassembly sequencing with multiple objectives
-
McGovern, S.M., Gupta, S.M., Ant colony optimization for disassembly sequencing with multiple objectives. Int. J. Adv. Manuf. Tech. 30:5 (2006), 481–496.
-
(2006)
Int. J. Adv. Manuf. Tech.
, vol.30
, Issue.5
, pp. 481-496
-
-
McGovern, S.M.1
Gupta, S.M.2
-
23
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S.M., Gupta, S.M., A balancing method and genetic algorithm for disassembly line balancing. Eur. J. Oper. Res. 179:3 (2007), 692–708.
-
(2007)
Eur. J. Oper. Res.
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
24
-
-
34548449384
-
Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
-
McGovern, S.M., Gupta, S.M., Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. Int. J. Prod. Res. 45:18–19 (2007), 4485–4511.
-
(2007)
Int. J. Prod. Res.
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
25
-
-
0000210201
-
An interpretation of fuzzy measures and the Choquet integral as an integral with respect to a fuzzy measure
-
Murofushi, T., Sugeno, M., An interpretation of fuzzy measures and the Choquet integral as an integral with respect to a fuzzy measure. Fuzzy Sets Syst. 29:2 (1989), 201–227.
-
(1989)
Fuzzy Sets Syst.
, vol.29
, Issue.2
, pp. 201-227
-
-
Murofushi, T.1
Sugeno, M.2
-
26
-
-
85026353915
-
Selective cooperative disassembly planning based on multi-objective discrete artificial bee colony algorithm
-
Ren, Y., Tian, G., Zhao, F., Yu, D., Zhang, C., Selective cooperative disassembly planning based on multi-objective discrete artificial bee colony algorithm. Eng. Appl. Artif. Intel. 64 (2017), 415–431.
-
(2017)
Eng. Appl. Artif. Intel.
, vol.64
, pp. 415-431
-
-
Ren, Y.1
Tian, G.2
Zhao, F.3
Yu, D.4
Zhang, C.5
-
27
-
-
85021834806
-
An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem
-
Ren, Y., Yu, D., Zhang, C., Tian, G., Meng, L., Zhou, X., An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem. Int. J. Prod. Res., 2017, 1–15.
-
(2017)
Int. J. Prod. Res.
, pp. 1-15
-
-
Ren, Y.1
Yu, D.2
Zhang, C.3
Tian, G.4
Meng, L.5
Zhou, X.6
-
28
-
-
85027932853
-
Improving corporate sustainable development by using an interdependent closed-loop hierarchical structure
-
Shi, L., Wu, K.-J., Tseng, M.-L., Improving corporate sustainable development by using an interdependent closed-loop hierarchical structure. Resour. Conserv. Recy 119 (2017), 24–35.
-
(2017)
Resour. Conserv. Recy
, vol.119
, pp. 24-35
-
-
Shi, L.1
Wu, K.-J.2
Tseng, M.-L.3
-
29
-
-
0041368822
-
Disassembly modeling, planning, and application
-
Tang, Y., Zhou, M., Zussman, E., Caudill, R., Disassembly modeling, planning, and application. J. Manuf. Syst. 21:3 (2002), 200–217.
-
(2002)
J. Manuf. Syst.
, vol.21
, Issue.3
, pp. 200-217
-
-
Tang, Y.1
Zhou, M.2
Zussman, E.3
Caudill, R.4
-
30
-
-
0141935620
-
The evaluation of airline service quality by fuzzy MCDM
-
Tsaur, S.-H., Chang, T.-Y., Yen, C.-H., The evaluation of airline service quality by fuzzy MCDM. Tour. Manage 23:2 (2002), 107–115.
-
(2002)
Tour. Manage
, vol.23
, Issue.2
, pp. 107-115
-
-
Tsaur, S.-H.1
Chang, T.-Y.2
Yen, C.-H.3
-
31
-
-
84869090408
-
Sustainable consumption and production for Asia: sustainability through green design and practice
-
Tseng, M.-L., Chiu, S.F., Tan, R.R., Siriban-Manalang, A.B., Sustainable consumption and production for Asia: sustainability through green design and practice. J. Clean. Prod. 40 (2013), 1–5.
-
(2013)
J. Clean. Prod.
, vol.40
, pp. 1-5
-
-
Tseng, M.-L.1
Chiu, S.F.2
Tan, R.R.3
Siriban-Manalang, A.B.4
-
32
-
-
84964658336
-
Toward sustainability: using big data to explore the decisive attributes of supply chain risks and uncertainties
-
Wu, K.-J., Liao, C.-J., Tseng, M.-L., Lim, M.K., Hu, J., Tan, K., Toward sustainability: using big data to explore the decisive attributes of supply chain risks and uncertainties. J. Clean. Prod. 142 (2017), 663–676.
-
(2017)
J. Clean. Prod.
, vol.142
, pp. 663-676
-
-
Wu, K.-J.1
Liao, C.-J.2
Tseng, M.-L.3
Lim, M.K.4
Hu, J.5
Tan, K.6
-
33
-
-
84994813265
-
Achieving competitive advantage through supply chain agility under uncertainty: a novel multi-criteria decision-making structure
-
Wu, K.-J., Tseng, M.-L., Chiu, A.S., Lim, M.K., Achieving competitive advantage through supply chain agility under uncertainty: a novel multi-criteria decision-making structure. Int. J. Prod. Econ. 190:2017 (2016), 96–107.
-
(2016)
Int. J. Prod. Econ.
, vol.190
, Issue.2017
, pp. 96-107
-
-
Wu, K.-J.1
Tseng, M.-L.2
Chiu, A.S.3
Lim, M.K.4
-
34
-
-
34248666540
-
Fuzzy sets
-
Zadeh, L.A., Fuzzy sets. Inf. Control 8:3 (1965), 338–353.
-
(1965)
Inf. Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
35
-
-
84969560157
-
City sustainability evaluation using multi-criteria decision making with objective weights of interdependent criteria
-
Zhang, L., Xu, Y., Yeh, C.-H., Liu, Y., Zhou, D., City sustainability evaluation using multi-criteria decision making with objective weights of interdependent criteria. J. Clean. Prod. 131 (2016), 491–499.
-
(2016)
J. Clean. Prod.
, vol.131
, pp. 491-499
-
-
Zhang, L.1
Xu, Y.2
Yeh, C.-H.3
Liu, Y.4
Zhou, D.5
-
36
-
-
0033078088
-
A methodology for modeling and adaptive planning of disassembly processes
-
Zussman, E., Zhou, M., A methodology for modeling and adaptive planning of disassembly processes. IEEE T. Robot. Autom. 15:1 (1999), 190–194.
-
(1999)
IEEE T. Robot. Autom.
, vol.15
, Issue.1
, pp. 190-194
-
-
Zussman, E.1
Zhou, M.2
|