메뉴 건너뛰기




Volumn 174, Issue , 2018, Pages 1475-1486

Disassembly line balancing problem using interdependent weights-based multi-criteria decision making and 2-Optimal algorithm

Author keywords

2 Optimal algorithm; Disassembly line balancing; Interdependent weights; Multi criteria decision making

Indexed keywords

ECONOMIC AND SOCIAL EFFECTS; PROBLEM SOLVING; RECYCLING;

EID: 85038841097     PISSN: 09596526     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jclepro.2017.10.308     Document Type: Article
Times cited : (84)

References (36)
  • 1
  • 2
    • 84908355358 scopus 로고    scopus 로고
    • A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment
    • Avikal, S., Jain, R., Mishra, P.K., A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment. Appl. Soft. Comput. 25 (2014), 519–529.
    • (2014) Appl. Soft. Comput. , vol.25 , pp. 519-529
    • Avikal, S.1    Jain, R.2    Mishra, P.K.3
  • 3
    • 84893943458 scopus 로고    scopus 로고
    • A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems
    • Avikal, S., Mishra, P.K., Jain, R., A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems. Int. J. Prod. Res. 52:5 (2013), 1306–1317.
    • (2013) Int. J. Prod. Res. , vol.52 , Issue.5 , pp. 1306-1317
    • Avikal, S.1    Mishra, P.K.2    Jain, R.3
  • 4
    • 84922236941 scopus 로고    scopus 로고
    • Chance constrained programming model for stochastic profit–oriented disassembly line balancing in the presence of hazardous parts
    • Springer
    • Bentaha, M.L., Battaïa, O., Dolgui, A., Chance constrained programming model for stochastic profit–oriented disassembly line balancing in the presence of hazardous parts. IFIP International Conference on Advances in Production Management Systems, 2013, Springer, 103–110.
    • (2013) IFIP International Conference on Advances in Production Management Systems , pp. 103-110
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 5
    • 0033492114 scopus 로고    scopus 로고
    • Intensifying a heuristic forest harvest scheduling search procedure with 2-opt decision choices
    • Bettinger, P., Boston, K., Sessions, J., Intensifying a heuristic forest harvest scheduling search procedure with 2-opt decision choices. Can. J. For. Res. 29:11 (1999), 1784–1792.
    • (1999) Can. J. For. Res. , vol.29 , Issue.11 , pp. 1784-1792
    • Bettinger, P.1    Boston, K.2    Sessions, J.3
  • 6
    • 84995470117 scopus 로고    scopus 로고
    • A hybrid multi-criteria decision making method approach for selecting a sustainable location of healthcare waste disposal facility
    • Chauhan, A., Singh, A., A hybrid multi-criteria decision making method approach for selecting a sustainable location of healthcare waste disposal facility. J. Clean. Prod. 139 (2016), 1001–1010.
    • (2016) J. Clean. Prod. , vol.139 , pp. 1001-1010
    • Chauhan, A.1    Singh, A.2
  • 7
    • 0035502047 scopus 로고    scopus 로고
    • Identification of λ-fuzzy measures using sampling design and genetic algorithms
    • Chen, T.-Y., Wang, J.-C., Identification of λ-fuzzy measures using sampling design and genetic algorithms. Fuzzy Sets Syst. 123:3 (2001), 321–341.
    • (2001) Fuzzy Sets Syst. , vol.123 , Issue.3 , pp. 321-341
    • Chen, T.-Y.1    Wang, J.-C.2
  • 8
    • 34248587910 scopus 로고    scopus 로고
    • A fuzzy optimization method for multicriteria decision making: an application to reservoir flood control operation
    • Fu, G., A fuzzy optimization method for multicriteria decision making: an application to reservoir flood control operation. Expert. Syst. Appl. 34:1 (2008), 145–149.
    • (2008) Expert. Syst. Appl. , vol.34 , Issue.1 , pp. 145-149
    • Fu, G.1
  • 9
    • 0037143030 scopus 로고    scopus 로고
    • Disassembly line in product recovery
    • Güngör, A., Gupta, S.M., Disassembly line in product recovery. Int. J. Prod. Res. 40:11 (2002), 2569–2589.
    • (2002) Int. J. Prod. Res. , vol.40 , Issue.11 , pp. 2569-2589
    • Güngör, A.1    Gupta, S.M.2
  • 11
    • 17044375963 scopus 로고    scopus 로고
    • Disassembly sequencing problem: a case study of a cell phone
    • Gupta, S.M., Erbis, E., McGovern, S.M., Disassembly sequencing problem: a case study of a cell phone. Proc. SPIE 5583 (2004), 43–52.
    • (2004) Proc. SPIE , vol.5583 , pp. 43-52
    • Gupta, S.M.1    Erbis, E.2    McGovern, S.M.3
  • 12
    • 0001353411 scopus 로고
    • Scheduling disassembly
    • Gupta, S.M., Taleb, K.N., Scheduling disassembly. Int. J. Prod. Res. 32:8 (1994), 1857–1866.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.8 , pp. 1857-1866
    • Gupta, S.M.1    Taleb, K.N.2
  • 13
    • 0001709711 scopus 로고    scopus 로고
    • Combination of chaotic neurodynamics with the 2-opt algorithm to solve traveling salesman problems
    • Hasegawa, M., Ikeguchi, T., Aihara, K., Combination of chaotic neurodynamics with the 2-opt algorithm to solve traveling salesman problems. Phys. Rev. Lett. 79:12 (1997), 2344–2347.
    • (1997) Phys. Rev. Lett. , vol.79 , Issue.12 , pp. 2344-2347
    • Hasegawa, M.1    Ikeguchi, T.2    Aihara, K.3
  • 14
    • 84881185298 scopus 로고    scopus 로고
    • Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
    • Kalayci, C.B., Gupta, S.M., Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem. Expert. Syst. Appl. 40:18 (2013), 7231–7241.
    • (2013) Expert. Syst. Appl. , vol.40 , Issue.18 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 15
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
    • Koc, A., Sabuncuoglu, I., Erel, E., Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Trans. 41:10 (2009), 866–881.
    • (2009) IIE Trans. , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 16
    • 0035764186 scopus 로고    scopus 로고
    • A Genetic Algorithm for Disassembly Process Planning
    • SPIE
    • Kongar, E., Gupta, S.M., A Genetic Algorithm for Disassembly Process Planning. 2001, SPIE, 54–62.
    • (2001) , pp. 54-62
    • Kongar, E.1    Gupta, S.M.2
  • 17
    • 84866735210 scopus 로고    scopus 로고
    • Tabu search for the single row facility layout problem using exhaustive 2-opt and insertion neighborhoods
    • Kothari, R., Ghosh, D., Tabu search for the single row facility layout problem using exhaustive 2-opt and insertion neighborhoods. Eur. J. Oper. Res. 224:1 (2013), 93–100.
    • (2013) Eur. J. Oper. Res. , vol.224 , Issue.1 , pp. 93-100
    • Kothari, R.1    Ghosh, D.2
  • 18
    • 77955416142 scopus 로고    scopus 로고
    • A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations
    • Lee, H.B., Cho, N.W., Hong, Y.S., A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations. J. Clean. Prod. 18:13 (2010), 1276–1283.
    • (2010) J. Clean. Prod. , vol.18 , Issue.13 , pp. 1276-1283
    • Lee, H.B.1    Cho, N.W.2    Hong, Y.S.3
  • 19
    • 84995545787 scopus 로고    scopus 로고
    • An energy-saving method to solve the mismatch between installed and demanded power in hydraulic press
    • Li, L., Huang, H., Liu, Z., Li, X., Triebe, M.J., Zhao, F., An energy-saving method to solve the mismatch between installed and demanded power in hydraulic press. J. Clean. Prod. 139 (2016), 636–645.
    • (2016) J. Clean. Prod. , vol.139 , pp. 636-645
    • Li, L.1    Huang, H.2    Liu, Z.3    Li, X.4    Triebe, M.J.5    Zhao, F.6
  • 20
    • 85028028536 scopus 로고    scopus 로고
    • Operation scheduling of multi-hydraulic press system for energy consumption reduction
    • Li, L., Huang, H., Zhao, F., Liu, Z., Operation scheduling of multi-hydraulic press system for energy consumption reduction. J. Clean. Prod. 165 (2017), 1407–1419.
    • (2017) J. Clean. Prod. , vol.165 , pp. 1407-1419
    • Li, L.1    Huang, H.2    Zhao, F.3    Liu, Z.4
  • 21
    • 85038836422 scopus 로고    scopus 로고
    • 2-Opt heuristic for the disassembly line balancing problem, Photonics Technologies for Robotics, Automation, and Manufacturing
    • McGovern, S.M., Gupta, S.M., 2-Opt heuristic for the disassembly line balancing problem, Photonics Technologies for Robotics, Automation, and Manufacturing. Int. Soc. Opt. Photonics, 2003, 71–84.
    • (2003) Int. Soc. Opt. Photonics , pp. 71-84
    • McGovern, S.M.1    Gupta, S.M.2
  • 22
    • 33748559516 scopus 로고    scopus 로고
    • Ant colony optimization for disassembly sequencing with multiple objectives
    • McGovern, S.M., Gupta, S.M., Ant colony optimization for disassembly sequencing with multiple objectives. Int. J. Adv. Manuf. Tech. 30:5 (2006), 481–496.
    • (2006) Int. J. Adv. Manuf. Tech. , vol.30 , Issue.5 , pp. 481-496
    • McGovern, S.M.1    Gupta, S.M.2
  • 23
    • 33845939092 scopus 로고    scopus 로고
    • A balancing method and genetic algorithm for disassembly line balancing
    • McGovern, S.M., Gupta, S.M., A balancing method and genetic algorithm for disassembly line balancing. Eur. J. Oper. Res. 179:3 (2007), 692–708.
    • (2007) Eur. J. Oper. Res. , vol.179 , Issue.3 , pp. 692-708
    • McGovern, S.M.1    Gupta, S.M.2
  • 24
    • 34548449384 scopus 로고    scopus 로고
    • Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
    • McGovern, S.M., Gupta, S.M., Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. Int. J. Prod. Res. 45:18–19 (2007), 4485–4511.
    • (2007) Int. J. Prod. Res. , vol.45 , Issue.18-19 , pp. 4485-4511
    • McGovern, S.M.1    Gupta, S.M.2
  • 25
    • 0000210201 scopus 로고
    • An interpretation of fuzzy measures and the Choquet integral as an integral with respect to a fuzzy measure
    • Murofushi, T., Sugeno, M., An interpretation of fuzzy measures and the Choquet integral as an integral with respect to a fuzzy measure. Fuzzy Sets Syst. 29:2 (1989), 201–227.
    • (1989) Fuzzy Sets Syst. , vol.29 , Issue.2 , pp. 201-227
    • Murofushi, T.1    Sugeno, M.2
  • 26
    • 85026353915 scopus 로고    scopus 로고
    • Selective cooperative disassembly planning based on multi-objective discrete artificial bee colony algorithm
    • Ren, Y., Tian, G., Zhao, F., Yu, D., Zhang, C., Selective cooperative disassembly planning based on multi-objective discrete artificial bee colony algorithm. Eng. Appl. Artif. Intel. 64 (2017), 415–431.
    • (2017) Eng. Appl. Artif. Intel. , vol.64 , pp. 415-431
    • Ren, Y.1    Tian, G.2    Zhao, F.3    Yu, D.4    Zhang, C.5
  • 27
    • 85021834806 scopus 로고    scopus 로고
    • An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem
    • Ren, Y., Yu, D., Zhang, C., Tian, G., Meng, L., Zhou, X., An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem. Int. J. Prod. Res., 2017, 1–15.
    • (2017) Int. J. Prod. Res. , pp. 1-15
    • Ren, Y.1    Yu, D.2    Zhang, C.3    Tian, G.4    Meng, L.5    Zhou, X.6
  • 28
    • 85027932853 scopus 로고    scopus 로고
    • Improving corporate sustainable development by using an interdependent closed-loop hierarchical structure
    • Shi, L., Wu, K.-J., Tseng, M.-L., Improving corporate sustainable development by using an interdependent closed-loop hierarchical structure. Resour. Conserv. Recy 119 (2017), 24–35.
    • (2017) Resour. Conserv. Recy , vol.119 , pp. 24-35
    • Shi, L.1    Wu, K.-J.2    Tseng, M.-L.3
  • 29
    • 0041368822 scopus 로고    scopus 로고
    • Disassembly modeling, planning, and application
    • Tang, Y., Zhou, M., Zussman, E., Caudill, R., Disassembly modeling, planning, and application. J. Manuf. Syst. 21:3 (2002), 200–217.
    • (2002) J. Manuf. Syst. , vol.21 , Issue.3 , pp. 200-217
    • Tang, Y.1    Zhou, M.2    Zussman, E.3    Caudill, R.4
  • 30
    • 0141935620 scopus 로고    scopus 로고
    • The evaluation of airline service quality by fuzzy MCDM
    • Tsaur, S.-H., Chang, T.-Y., Yen, C.-H., The evaluation of airline service quality by fuzzy MCDM. Tour. Manage 23:2 (2002), 107–115.
    • (2002) Tour. Manage , vol.23 , Issue.2 , pp. 107-115
    • Tsaur, S.-H.1    Chang, T.-Y.2    Yen, C.-H.3
  • 31
    • 84869090408 scopus 로고    scopus 로고
    • Sustainable consumption and production for Asia: sustainability through green design and practice
    • Tseng, M.-L., Chiu, S.F., Tan, R.R., Siriban-Manalang, A.B., Sustainable consumption and production for Asia: sustainability through green design and practice. J. Clean. Prod. 40 (2013), 1–5.
    • (2013) J. Clean. Prod. , vol.40 , pp. 1-5
    • Tseng, M.-L.1    Chiu, S.F.2    Tan, R.R.3    Siriban-Manalang, A.B.4
  • 32
    • 84964658336 scopus 로고    scopus 로고
    • Toward sustainability: using big data to explore the decisive attributes of supply chain risks and uncertainties
    • Wu, K.-J., Liao, C.-J., Tseng, M.-L., Lim, M.K., Hu, J., Tan, K., Toward sustainability: using big data to explore the decisive attributes of supply chain risks and uncertainties. J. Clean. Prod. 142 (2017), 663–676.
    • (2017) J. Clean. Prod. , vol.142 , pp. 663-676
    • Wu, K.-J.1    Liao, C.-J.2    Tseng, M.-L.3    Lim, M.K.4    Hu, J.5    Tan, K.6
  • 33
    • 84994813265 scopus 로고    scopus 로고
    • Achieving competitive advantage through supply chain agility under uncertainty: a novel multi-criteria decision-making structure
    • Wu, K.-J., Tseng, M.-L., Chiu, A.S., Lim, M.K., Achieving competitive advantage through supply chain agility under uncertainty: a novel multi-criteria decision-making structure. Int. J. Prod. Econ. 190:2017 (2016), 96–107.
    • (2016) Int. J. Prod. Econ. , vol.190 , Issue.2017 , pp. 96-107
    • Wu, K.-J.1    Tseng, M.-L.2    Chiu, A.S.3    Lim, M.K.4
  • 34
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh, L.A., Fuzzy sets. Inf. Control 8:3 (1965), 338–353.
    • (1965) Inf. Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 35
    • 84969560157 scopus 로고    scopus 로고
    • City sustainability evaluation using multi-criteria decision making with objective weights of interdependent criteria
    • Zhang, L., Xu, Y., Yeh, C.-H., Liu, Y., Zhou, D., City sustainability evaluation using multi-criteria decision making with objective weights of interdependent criteria. J. Clean. Prod. 131 (2016), 491–499.
    • (2016) J. Clean. Prod. , vol.131 , pp. 491-499
    • Zhang, L.1    Xu, Y.2    Yeh, C.-H.3    Liu, Y.4    Zhou, D.5
  • 36
    • 0033078088 scopus 로고    scopus 로고
    • A methodology for modeling and adaptive planning of disassembly processes
    • Zussman, E., Zhou, M., A methodology for modeling and adaptive planning of disassembly processes. IEEE T. Robot. Autom. 15:1 (1999), 190–194.
    • (1999) IEEE T. Robot. Autom. , vol.15 , Issue.1 , pp. 190-194
    • Zussman, E.1    Zhou, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.