-
1
-
-
0003990308
-
-
Upper Saddle River, NJ: Prentice-Hall
-
J. Banks, J. S. Carson II, B. L. Nelson, and D. M. Nicol, Discrete-Event System Simulation. Upper Saddle River, NJ: Prentice-Hall, 2000.
-
(2000)
Discrete-event System Simulation
-
-
Banks, J.1
Carson II, J.S.2
Nelson, B.L.3
Nicol, D.M.4
-
2
-
-
0036967254
-
Integration of disassembly leveling and bin assignment for demanufacturing automation
-
Dec.
-
M. M. Gao, M. C. Zhou, and R. Caudill, "Integration of disassembly leveling and bin assignment for demanufacturing automation," IEEE Trans. Robot. Automat., vol. 18, no. 6, pp. 867-874, Dec. 2002.
-
(2002)
IEEE Trans. Robot. Automat.
, vol.18
, Issue.6
, pp. 867-874
-
-
Gao, M.M.1
Zhou, M.C.2
Caudill, R.3
-
3
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
A. Gungor and S. M. Gupta, "A solution approach to the disassembly line balancing problem in the presence of task failures," Int. J. Prod. Res., vol. 39, no. 7, pp. 1427-1467, 2001.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
4
-
-
0344198082
-
Multi-criteria decision-making for optimization of product disassembly under multiple situations
-
A. Hula, K. Jalali, K. Hamza, S. J. Skerlos, and K. Saitou, "Multi-criteria decision-making for optimization of product disassembly under multiple situations,"Environ. Sci. Technol., vol. 37, no. 23, pp. 5303-5313, 2003.
-
(2003)
Environ. Sci. Technol.
, vol.37
, Issue.23
, pp. 5303-5313
-
-
Hula, A.1
Jalali, K.2
Hamza, K.3
Skerlos, S.J.4
Saitou, K.5
-
5
-
-
1442313014
-
Car disassembly and ergonomics in Sweden: Current situation and future perspectives in light of new environmental legislation
-
K. Kazmierczak, J. Winkel, and R. H. Westgaard, "Car disassembly and ergonomics in Sweden: Current situation and future perspectives in light of new environmental legislation," Int. J. Prod. Res., vol. 42, no. 7, pp. 1305-1324, 2004.
-
(2004)
Int. J. Prod. Res.
, vol.42
, Issue.7
, pp. 1305-1324
-
-
Kazmierczak, K.1
Winkel, J.2
Westgaard, R.H.3
-
6
-
-
0036721661
-
Determining optimum disassembly sequences in electronic equipment
-
A. J. D. Lambert, "Determining optimum disassembly sequences in electronic equipment," Comput. Ind. Eng,vol. 43, no. 3, pp. 553-575, 2002.
-
(2002)
Comput. Ind. Eng
, vol.43
, Issue.3
, pp. 553-575
-
-
Lambert, A.J.D.1
-
7
-
-
0036430979
-
A novel representation scheme for disassembly sequence planning
-
J. R. Li, L. P. Khoo, and S. B. Tor, "A novel representation scheme for disassembly sequence planning," Int. J. Adv. Manufact. Technol., vol. 20, no. 8, pp. 621-630, 2002.
-
(2002)
Int. J. Adv. Manufact. Technol.
, vol.20
, Issue.8
, pp. 621-630
-
-
Li, J.R.1
Khoo, L.P.2
Tor, S.B.3
-
8
-
-
0042192046
-
Algorithmic selection of a disassembly sequence of a component by a wave propagation method
-
C. Mascle and B. A. Balasoiu, "Algorithmic selection of a disassembly sequence of a component by a wave propagation method," Robot. Comput. Integr. Manufact. vol. 19, pp. 439-448, 2003.
-
(2003)
Robot. Comput. Integr. Manufact.
, vol.19
, pp. 439-448
-
-
Mascle, C.1
Balasoiu, B.A.2
-
9
-
-
0034250590
-
Reconfigurable manufacturing systems: Key to future manufacturing
-
M. G. Mehrabi, A. G. Ulsoy, and Y. Koren, "Reconfigurable manufacturing systems: Key to future manufacturing," J. Intell. Manufact., vol. 11, no. 4, pp. 403-419, 2000.
-
(2000)
J. Intell. Manufact.
, vol.11
, Issue.4
, pp. 403-419
-
-
Mehrabi, M.G.1
Ulsoy, A.G.2
Koren, Y.3
-
10
-
-
0034828875
-
A systematic approach to disassembly line design
-
Denver, CO, May 7-9
-
Y. Tang, M. C. Zhou, and R. Caudill, "A systematic approach to disassembly line design," in Proc. IEEE Int. Conf. Electron. Environ., Denver, CO, May 7-9, 2001, pp. 173-178.
-
(2001)
Proc. IEEE Int. Conf. Electron. Environ.
, pp. 173-178
-
-
Tang, Y.1
Zhou, M.C.2
Caudill, R.3
-
11
-
-
0035707986
-
An integrated approach to disassembly planning and demanufacturing operation
-
Dec.
-
Y. Tang, M. C. Zhou, and R. Caudill, "An integrated approach to disassembly planning and demanufacturing operation," IEEE Trans. Robot. Automat., vol. 17, no. 6, pp. 773-784, Dec. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, Issue.6
, pp. 773-784
-
-
Tang, Y.1
Zhou, M.C.2
Caudill, R.3
-
12
-
-
0041368822
-
Disassembly modeling, planning, and application
-
Y. Tang, M. C. Zhou, E. Zussman, and R. Caudill, "Disassembly modeling, planning, and application," J. Manufact. Syst., vol. 21, no. 3, pp. 200-217, 2002.
-
(2002)
J. Manufact. Syst.
, vol.21
, Issue.3
, pp. 200-217
-
-
Tang, Y.1
Zhou, M.C.2
Zussman, E.3
Caudill, R.4
-
13
-
-
0042386739
-
Virtual production lines design for back-end semiconductor manufacturing systems
-
Aug.
-
Y. Tang, M. C. Zhou, and R. Qiu, "Virtual production lines design for back-end semiconductor manufacturing systems," IEEE Trans. Semicond. Manufact., vol. 16, no. 3, pp. 543-550, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manufact.
, vol.16
, Issue.3
, pp. 543-550
-
-
Tang, Y.1
Zhou, M.C.2
Qiu, R.3
-
14
-
-
15744383420
-
Fuzzy-Petri-Net based disassembly planning considering human factors
-
The Hague, The Netherlands, Oct. 10-13
-
Y. Tang and M. C. Zhou, "Fuzzy-Petri-Net based disassembly planning considering human factors," in Proc. IEEE Int. Conf. System Man Cybernetics, The Hague, The Netherlands, Oct. 10-13, 2004, pp. 4195-4200.
-
(2004)
Proc. IEEE Int. Conf. System Man Cybernetics
, pp. 4195-4200
-
-
Tang, Y.1
Zhou, M.C.2
-
15
-
-
85072416903
-
The BMW recycling and dismantling center - Advanced developments in vehicle recycling
-
K. Vornberger and M. Essenpreis, 'The BMW recycling and dismantling center - Advanced developments in vehicle recycling," SAE Tech. Paper Series 9 604 041996, 1996.
-
(1996)
SAE Tech. Paper Series 9 604 041996
-
-
Vornberger, K.1
Essenpreis, M.2
-
16
-
-
0033721516
-
Design and implementation of an adaptive process planner for disassembly processes
-
Apr.
-
E. Zussman and M. C. Zhou, "Design and implementation of an adaptive process planner for disassembly processes," IEEE Trans. Robot, Automat., vol. 16, no. 2, pp. 171-179, Apr. 2000.
-
(2000)
IEEE Trans. Robot, Automat.
, vol.16
, Issue.2
, pp. 171-179
-
-
Zussman, E.1
Zhou, M.C.2
|