메뉴 건너뛰기




Volumn 3, Issue 3, 2006, Pages 324-330

A systematic approach to design and operation of disassembly lines

Author keywords

Disassembly line (DL) design; Disassembly Petri net; Line balancing

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; ECONOMICS; HIERARCHICAL SYSTEMS; INVENTORY CONTROL; MATHEMATICAL MODELS; PERSONAL COMPUTERS;

EID: 33746432209     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2005.860989     Document Type: Article
Times cited : (72)

References (16)
  • 2
    • 0036967254 scopus 로고    scopus 로고
    • Integration of disassembly leveling and bin assignment for demanufacturing automation
    • Dec.
    • M. M. Gao, M. C. Zhou, and R. Caudill, "Integration of disassembly leveling and bin assignment for demanufacturing automation," IEEE Trans. Robot. Automat., vol. 18, no. 6, pp. 867-874, Dec. 2002.
    • (2002) IEEE Trans. Robot. Automat. , vol.18 , Issue.6 , pp. 867-874
    • Gao, M.M.1    Zhou, M.C.2    Caudill, R.3
  • 3
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • A. Gungor and S. M. Gupta, "A solution approach to the disassembly line balancing problem in the presence of task failures," Int. J. Prod. Res., vol. 39, no. 7, pp. 1427-1467, 2001.
    • (2001) Int. J. Prod. Res. , vol.39 , Issue.7 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2
  • 4
    • 0344198082 scopus 로고    scopus 로고
    • Multi-criteria decision-making for optimization of product disassembly under multiple situations
    • A. Hula, K. Jalali, K. Hamza, S. J. Skerlos, and K. Saitou, "Multi-criteria decision-making for optimization of product disassembly under multiple situations,"Environ. Sci. Technol., vol. 37, no. 23, pp. 5303-5313, 2003.
    • (2003) Environ. Sci. Technol. , vol.37 , Issue.23 , pp. 5303-5313
    • Hula, A.1    Jalali, K.2    Hamza, K.3    Skerlos, S.J.4    Saitou, K.5
  • 5
    • 1442313014 scopus 로고    scopus 로고
    • Car disassembly and ergonomics in Sweden: Current situation and future perspectives in light of new environmental legislation
    • K. Kazmierczak, J. Winkel, and R. H. Westgaard, "Car disassembly and ergonomics in Sweden: Current situation and future perspectives in light of new environmental legislation," Int. J. Prod. Res., vol. 42, no. 7, pp. 1305-1324, 2004.
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.7 , pp. 1305-1324
    • Kazmierczak, K.1    Winkel, J.2    Westgaard, R.H.3
  • 6
    • 0036721661 scopus 로고    scopus 로고
    • Determining optimum disassembly sequences in electronic equipment
    • A. J. D. Lambert, "Determining optimum disassembly sequences in electronic equipment," Comput. Ind. Eng,vol. 43, no. 3, pp. 553-575, 2002.
    • (2002) Comput. Ind. Eng , vol.43 , Issue.3 , pp. 553-575
    • Lambert, A.J.D.1
  • 7
    • 0036430979 scopus 로고    scopus 로고
    • A novel representation scheme for disassembly sequence planning
    • J. R. Li, L. P. Khoo, and S. B. Tor, "A novel representation scheme for disassembly sequence planning," Int. J. Adv. Manufact. Technol., vol. 20, no. 8, pp. 621-630, 2002.
    • (2002) Int. J. Adv. Manufact. Technol. , vol.20 , Issue.8 , pp. 621-630
    • Li, J.R.1    Khoo, L.P.2    Tor, S.B.3
  • 8
    • 0042192046 scopus 로고    scopus 로고
    • Algorithmic selection of a disassembly sequence of a component by a wave propagation method
    • C. Mascle and B. A. Balasoiu, "Algorithmic selection of a disassembly sequence of a component by a wave propagation method," Robot. Comput. Integr. Manufact. vol. 19, pp. 439-448, 2003.
    • (2003) Robot. Comput. Integr. Manufact. , vol.19 , pp. 439-448
    • Mascle, C.1    Balasoiu, B.A.2
  • 9
    • 0034250590 scopus 로고    scopus 로고
    • Reconfigurable manufacturing systems: Key to future manufacturing
    • M. G. Mehrabi, A. G. Ulsoy, and Y. Koren, "Reconfigurable manufacturing systems: Key to future manufacturing," J. Intell. Manufact., vol. 11, no. 4, pp. 403-419, 2000.
    • (2000) J. Intell. Manufact. , vol.11 , Issue.4 , pp. 403-419
    • Mehrabi, M.G.1    Ulsoy, A.G.2    Koren, Y.3
  • 10
  • 11
    • 0035707986 scopus 로고    scopus 로고
    • An integrated approach to disassembly planning and demanufacturing operation
    • Dec.
    • Y. Tang, M. C. Zhou, and R. Caudill, "An integrated approach to disassembly planning and demanufacturing operation," IEEE Trans. Robot. Automat., vol. 17, no. 6, pp. 773-784, Dec. 2001.
    • (2001) IEEE Trans. Robot. Automat. , vol.17 , Issue.6 , pp. 773-784
    • Tang, Y.1    Zhou, M.C.2    Caudill, R.3
  • 12
    • 0041368822 scopus 로고    scopus 로고
    • Disassembly modeling, planning, and application
    • Y. Tang, M. C. Zhou, E. Zussman, and R. Caudill, "Disassembly modeling, planning, and application," J. Manufact. Syst., vol. 21, no. 3, pp. 200-217, 2002.
    • (2002) J. Manufact. Syst. , vol.21 , Issue.3 , pp. 200-217
    • Tang, Y.1    Zhou, M.C.2    Zussman, E.3    Caudill, R.4
  • 13
    • 0042386739 scopus 로고    scopus 로고
    • Virtual production lines design for back-end semiconductor manufacturing systems
    • Aug.
    • Y. Tang, M. C. Zhou, and R. Qiu, "Virtual production lines design for back-end semiconductor manufacturing systems," IEEE Trans. Semicond. Manufact., vol. 16, no. 3, pp. 543-550, Aug. 2003.
    • (2003) IEEE Trans. Semicond. Manufact. , vol.16 , Issue.3 , pp. 543-550
    • Tang, Y.1    Zhou, M.C.2    Qiu, R.3
  • 14
    • 15744383420 scopus 로고    scopus 로고
    • Fuzzy-Petri-Net based disassembly planning considering human factors
    • The Hague, The Netherlands, Oct. 10-13
    • Y. Tang and M. C. Zhou, "Fuzzy-Petri-Net based disassembly planning considering human factors," in Proc. IEEE Int. Conf. System Man Cybernetics, The Hague, The Netherlands, Oct. 10-13, 2004, pp. 4195-4200.
    • (2004) Proc. IEEE Int. Conf. System Man Cybernetics , pp. 4195-4200
    • Tang, Y.1    Zhou, M.C.2
  • 15
    • 85072416903 scopus 로고    scopus 로고
    • The BMW recycling and dismantling center - Advanced developments in vehicle recycling
    • K. Vornberger and M. Essenpreis, 'The BMW recycling and dismantling center - Advanced developments in vehicle recycling," SAE Tech. Paper Series 9 604 041996, 1996.
    • (1996) SAE Tech. Paper Series 9 604 041996
    • Vornberger, K.1    Essenpreis, M.2
  • 16
    • 0033721516 scopus 로고    scopus 로고
    • Design and implementation of an adaptive process planner for disassembly processes
    • Apr.
    • E. Zussman and M. C. Zhou, "Design and implementation of an adaptive process planner for disassembly processes," IEEE Trans. Robot, Automat., vol. 16, no. 2, pp. 171-179, Apr. 2000.
    • (2000) IEEE Trans. Robot, Automat. , vol.16 , Issue.2 , pp. 171-179
    • Zussman, E.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.