1
-
-
33748559516
-
Ant colony optimization for disassembly sequencing with multiple objectives
-
McGovern, S.M., Gupta, S.M.: Ant colony optimization for disassembly sequencing with multiple objectives. Int. J. Adv. Manuf. Technol. 30, 481–496 (2006)
-
(2006)
Int. J. Adv. Manuf. Technol
, vol.30
, pp. 481-496
-
-
McGovern, S.M.1
Gupta, S.M.2
-
2
-
-
34548449384
-
Combinatorial optimization analysis of the unary NPcomplete disassembly line balancing problem
-
McGovern, S.M., Gupta, S.M.: Combinatorial optimization analysis of the unary NPcomplete disassembly line balancing problem. Int. J. Prod. Res. 45(18–19), 4485–4511 (2007)
-
(2007)
Int. J. Prod. Res
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
3
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
Agrawal, S., Tiwari, M.K.: A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. Int. J. Prod. Res. 46(6), 1405–1429 (2008)
-
(2008)
Int. J. Prod. Res
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
4
-
-
34548398404
-
Profit-oriented disassembly-line balancing
-
Altekin, F.T., Kandiller, L., Ozdemirel, N.E.: Profit-oriented disassembly-line balancing. Int. J. Prod. Res. 46 (10), 2675-2693
-
Int. J. Prod. Res
, vol.46
, Issue.10
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemirel, N.E.3
-
5
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koc, A., Sabuncuoglu, I., Erel, E.: Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Trans. Oper. Eng. 41, 866–881 (2009)
-
(2009)
IIE Trans. Oper. Eng
, vol.41
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
6
-
-
77953610368
-
A new multi-objective ant colony algorithm for solving the disassembly line balancing problems
-
Ding, L.P., Feng, Y.X., Tan, J.R., Gao, Y.C.: A new multi-objective ant colony algorithm for solving the disassembly line balancing problems. Int. J. Adv. Manuf. Technol. 48, 761–771
-
Int. J. Adv. Manuf. Technol
, vol.48
, pp. 761-771
-
-
Ding, L.P.1
Feng, Y.X.2
Tan, J.R.3
Gao, Y.C.4
-
7
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Karadag, A.A., Turkbey, O.: Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Comput. Indus. Eng. 65(3), 413–425 (2013)
-
(2013)
Comput. Indus. Eng
, vol.65
, Issue.3
, pp. 413-425
-
-
Karadag, A.A.1
Turkbey, O.2
-
8
-
-
84881185298
-
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
-
Kalayci, C.B., Gupta, S.M.: Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem. Expert Syst. Appl. 40(18), 7231–7241 (2013)
-
(2013)
Expert Syst. Appl
, vol.40
, Issue.18
, pp. 7231-7241
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
9
-
-
49649148317
-
On polynomials and crossing numbers of complete graphs
-
Saaty, T.L.: On polynomials and crossing numbers of complete graphs. J. Combin. Theor. 10, 183–184 (1971)
-
(1971)
J. Combin. Theor
, vol.10
, pp. 183-184
-
-
Saaty, T.L.1
-
10
-
-
84862817360
-
Using AHP to determine intangible priority factors for technology transfer adoption
-
Lee, S., Kim, W., Kim, Y.M., Oh, K.J.: Using AHP to determine intangible priority factors for technology transfer adoption. Expert Syst. Appl. 39, 6388–6395 (2012)
-
(2012)
Expert Syst. Appl
, vol.39
, pp. 6388-6395
-
-
Lee, S.1
Kim, W.2
Kim, Y.M.3
Oh, K.J.4
-
11
-
-
77957908640
-
In-depth analysis and simulation study of an innovative fuzzy approach for ranking alternatives in multiple attribute decision making problems based on TOPSIS
-
Chamodrakas, I., Leftheriotis, I., Martakos, D.: In-depth analysis and simulation study of an innovative fuzzy approach for ranking alternatives in multiple attribute decision making problems based on TOPSIS. Appl. Soft Comput. 11, 900–907 (2011)
-
(2011)
Appl. Soft Comput
, vol.11
, pp. 900-907
-
-
Chamodrakas, I.1
Leftheriotis, I.2
Martakos, D.3
-
13
-
-
36148947128
-
Using AHP and TOPSIS approaches in customer-driven product design process
-
Lin, M.C., Wang, C.C., Chen, M.S., Chang, C.A.: Using AHP and TOPSIS approaches in customer-driven product design process. Comput. Indus. 59, 17–31 (2008)
-
(2008)
Comput. Indus
, vol.59
, pp. 17-31
-
-
Lin, M.C.1
Wang, C.C.2
Chen, M.S.3
Chang, C.A.4
-
14
-
-
2142661748
-
2-Opt heuristic for the disassembly line balancing problem
-
Providence, RI
-
McGovern, S.M., Gupta, S.M.: 2-Opt heuristic for the disassembly line balancing problem. In: Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III, Providence, RI, pp. 71–84, 2003.
-
(2003)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III
, pp. 71-84
-
-
McGovern, S.M.1
Gupta, S.M.2
|